Loading...
HomeMy WebLinkAbout2842 WHIPTAIL LOOP; ; CBC2019-0002; PermitJob Address: 2842 Whiptail Loop Permit Type: BLDG-Commercial Work Class: Parcel No: 2091202200 Lot Sf: Valuation: $86,400.00 Reference Sf: Occupancy Group: Construction Type: Sf Dwelling Units: Bathrooms: Bedrooms: Qrig. Plan Check Sf: Plan Check Sf: Project Title: Description: WHIPTAIL LOT 20:216 MODULES, 66 KW 'Status: Closed - Finaled Applied: 01/02/2019 Issued: 02/04/2019 Permit Finaled: Inspector: AKrog Final Inspection: 7/2/2019 12:44:19PM cogen Lcity of Carlsbad Commercial Permit Print Date: 07/02/2019 Permit No: CBC2919-0002 Owner: Contractor: BUILD TO SUIT LIMITED LP HOME ENERGY SYSTEMS INC 1000 Pioneer Way C/O Hamann 5980 Fairmount Ave, 105 Construction SAN DIEGO, CA 92010 CARLSBAD, CA 92020 619-692-2015 BUILDING PERMIT FEE ($2000+) $569.91 BUILDING PLAN CHECK FEE (BLDG) . $398.94 5B1473 GREEN BUILDING STATE STANDARDS FEE $4.00 STRONG MOTION-COMMERCIAL $24.19 Total Fees: $997.04 Total Payments To Date: $997.04 Balance Due: $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions.hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions.-If you protest them, you must follow the protest procedures set forth in Government code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad, CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov (City o f Carlsbad COMMERCIAL BUILDING PERMIT APPLICATION B-2 Plan Check ('tOJ -oa Est. Value Y? PC Deposit Date Job Address 2842 Whiptail Loop West Suite: APN: 2091202200 Tenant Name: Reynolds cl/Project #: Lot #: 20 Occupancy: B, F-i, & Si Construction Type: Ill-B Fire Sprinklers: yes/ no Air Conditioning: yes / no BRIEF DESCRIPTION OF WORK: Ballasted Solar PV Rooftop with 216 modules for 66kW. Work also includes: 1 Delta M60U Inverter,i 75 kVA Transformer, and 1 Visible Blade Disconnect El Addition/New: New SF and Use, ___New SF and Use, Deck SF, ________ Patio Cover SF (not including flatwork) 0 Tenant Improvement: SF, Existing Use Proposed Use SF, Existing Use Proposed Use 0 Pool/Spa: SF Additional Gas or Electrical Features? Solar: 66 KW, 216 Modules, Roof Mounted, Tilt: Yes / No, RMA: Yes I No, Panel Upgrade: Yes / No 0 Plumbing/Mechanical/Electrical Only: 0 Other: APPLICANT (PRIMARY) PROPERTY OWNER Name: Home Energy Systems I Attn: Elizabeth Shoemaker Name: Build to Suit Umited, LP Address: 5980 Fairmont Ave. #105 Address: 1000 Pioneer Way City: San Diego State: CA Zip: 92120 City: El Cajon State: CA Zip: 92020 Phone: (760) 550-1957 Phone: (619) 993-3249 Email: elizabeth@espermits.com Email: rich@hamannco.com DESIGN PROFESSIONAL Name: Home Energy Systems I Attn: Wenjie Chen Address: 5980 Fairmont Ave. # 105 City: San Diego State: CA Zip: 92120 Phone: (619) 692-2015 Email: wenjie@hessolar.com Architect State License: C46 & C-i 0 CONTRACTOR BUSINESS Name: Home Energy Systems / Attn: Wenjie Chen Address: 5980 Fairmont Ave. # 105 City: San Diego State: CA Zip: 92120 Phone: (619) 692-2015 Email: wenjie@hessolar.com State License: 800657 Bus. License: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Buildingccarlsbadca.gov B-2 Page 1 of 2 Rev. 06/18 (OPTION A): WORKERS'COMPENSATION DECLARATION: I hearby affirm under penalty of perjury one of the following declarations: Cli have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the work which this permit is issued. I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Insurance Company Name: American ZUdCh Insurance Company Policy No. WC-10-17-851-03 Expiration Date: 04101/2019 Cl Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to $100,000.00, In addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, Interest and attorney's fees. CONTRACTOR SIGNATURE: Bzabeth Shoemaker [JAGENT DATE: 01D2l2O19 ItI227t4fl.WW (OPTION B ): OWNER-BUILDER DECLARATION: I hereby affirm that lam exempt from Contractor's License Law for the following reason: O I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). O I am exempt under Section Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 Yes 0 No I (have/ have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address/phone / contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone/ contractors' license number): 5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address/phone/type of work): OWNER SIGNATURE: DAGENT DATE: CONSTRUCTION LENDING AGENCY, IF ANY: I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name: Lender's Address: ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Dyes 1111 No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes N No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 Yes • No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. APPLICANT CERTIFICATION: I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS ThE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF ThE GRANTING OF THIS PERMrnOSHA. An OSHA permit is required for excavations over 5'O' deep and demolition or construction of structures over 3 stories in height EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at anytime after the work is commenced fora period of 180 days (Section 106.4.4 Uniform Building Code). APPUCANT SIGNATURE: Elizabeth Shoemaker DATE: 0110212019 a,a,221I4o,w 1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: BuiIdingaCarIsbadCa.gOv B-2 Page 2 of 2 Rev. 06/18 Permit Type: BLDQ-Commercial Application Date: 01/0I2019 Owner: BUILD TO SUIT LIMITED LP Work Class: Cogen Issue Date: 92/04/2019 Subdivision: Status: Closed - Finaled Expiration Date: 12/30/2019 Address: 2842 Whiptall Loop Carlsbad, CA 92010-6708 IVR Number: 16278 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date 0610512019 06105/2019 BLDG-35 Solar 093764-2019 Partial Pass Andy Krogh Reinspection Incomplete Panel Checklist Item COMMENTS Passed BLDG-Building 9eficiency SPGE not released as of 6/5/19 due to No building not energized BLDG-Final 093763-2019 Failed Andy Krogh Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Structural Final Yes BLDG Electncal Final Requires meter set and test then SDGE No release 07/0212019 0710212019 BLDG-35 Solar 096335.2019 Passed Andy Krogh Complete Panel BLDG-Final 096336.2019 Passed Andy Krogh Complete Inspection Checklist Item COMMENTS Passed BLDG-Structural Final Yes BLDG-Electrical Final Yes July 02, 2019 Page lofl City of Carlsbad CBC2019-0002 1/31/2019 EsGil A SAFEbuIttCornpany DATE: 1/31/2019 JURlSDlCTlON:City of Carlsbad PLAN CHECK #.: CBC2019-0002 SET: II PROJECT ADDRESS: 2842 Whiptail Loop West PROJECT NAME: 66kW PV System Reynolds APPLICANT URIS. The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. LI The applicant's copy of the check list has been sent to: EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: () Email: Mail Telephone Fax Person LI REMARKS: By: Morteza Beheshti Enclosures: EsGil 1/22 EsGil A SAFEbui1tCompany DATE: 1/10/2019 JURISDICTION: City of Carlsbad PLAN CHECK #.: CBC2019-0002 SET: I PROJECT ADDRESS: 2842 Whiptail Loop West PROJECT NAME: 66kW PV System Reynolds U APPLICANT U JURIS. The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. El The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Elizabeth Shoemaker EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Elizabeth Shoemaker Telephone #: 760-550-1957 Date contacted: (by: ) Email: elizabeth@espermits.com Mail Telephone Fax In Person til REMARKS: By: David Yao Enclosures: EsGil 1/4/19 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 City of Carlsbad CBC2019-0002 1/10/2019 GENERAL PLAN CORRECTION LIST JURISDICTION: City of Carlsbad PLAN CHECK #.: CBC2019-0002 PROJECT ADDRESS: 2842 Whiptail Loop West DATE PLAN RECEIVED BY DATE REVIEW COMPLETED: ESGIL: 1/4/19 1/10/2019 REVIEWED BY: David Yao FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. The approval of the plans does not permit the violation of any state, county or city law. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? UYes UNo City of Carlsbad CBC2019-0002 1/10/2019 [DO NOT PAY - THIS IS NOT ANINVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK #.: CBC2019-0002 PREPARED BY: David Yao DATE: 1/10/2019 BUILDING ADDRESS: 2842 Whiptail Loop West BUILDING OCCUPANCY: BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) PV per city 86,400 Air Conditioning Fire Sprinklers TOTAL VALUE 86,400 Jurisdiction Code Icb IBY Ordinance I Bldg. Permit Fee by Ordinance Iv I V Plan Check Fee by Ordinance Type of Review: 121 Complete Review 0 Structural Only F-1 Repetitive Fee I"I Repeats 0 Other Hourly Hr: @ * EsGil Fee I $344.66 I Comments: Sheet of City of Carlsbad CBC2019-0002 1/10/2019 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring TWO corrected set of plans and calculations/reports to EsGil, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil is complete. Provide "project specific" calculations for uplift forces on the PV "BALLASTED" system, showing that all PV rack components and the roof structure and connections are adequately designed, according to the Report "SEAOC PV2", "WIND LOADS ON LOW PROFILE SOLAR PHOTOVOLTAIC SYSTEMS ON FLAT ROOFS". Provide "project specific" plans, details, and sections necessary to show all structural components and connections. The structural calculations, plans and details shall be sealed and signed by the P.E. Sheet SP2.0 shows the brick for the ballast system. The details are not legible. Please provide full size sheet to show the brick for the ballast system. The plan shall be signed and sealed by the engineer. Provide the plans to include the specific layout of each array, including the number of blocks required on each ballast. Provide a letter from the engineer of record stating that: "After inspecting the Site the Coefficient of Friction used in the lateral displacement calculations was found to be adequate for the Site roofing materials and conditions" 2. The plans shall indicate that special inspection will be provided (by the engineer of record) for the "BALLASTED SYSTEM". Section 1705.1.1. 3. Please refer to the following electrical items. 4. The jurisdiction has contracted with EsGil, located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact David Yao at Esgil. Thank you. City of Carlsbad CBC2019-0002 1/10/2019 ELECTRICAL AND ENERGY COMMENTS PLAN REVIEWER: Morteza Beheshti ELECTRICAL (2016 CALIFORNIA ELECTRICAL CODE) Please match single line with equipment layout as shown on plans. Rooftop Load center shown however, not included on single line. Please indicate feeder conduit sizing on single line. Please provide transformer primary overcurrent protection on single line. Please provide and demonstrate compliance with the building PV system Rapid Shut Down requirements. CEC 690.12 Please provide an AC disconnect at the roof within sight and adjacent to the inverter. CEC 690.14 Note: If you have any questions regarding this Electrical and Energy plan review list please contact Morteza Beheshti at mbeheshtkesgil.com or call (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. December 21, 2018 HES Solar 5980 Fairmount Ave, Suite 105 San Diego, CA 92120 TEL: (619) 692-2015 Ih1!ul Attn.: Wenjie Chen, Re: Job # 2018-13532: Reynolds The following calculations are to verify the adequacy of the existing structure located at 2848 Whiptail Loop West, Carlsbad, CA 92010 to support the installation of a Solar Photovoltaic Array. PZSE has reviewed the layout provided by HES Solar for a ballasted Solar Photovoltaic system. After review, PZSE certifies that the structure is adequate to support the proposed ballasted Solar Photovoltaic system. If you have any questions on the above, please feel free to call. Prepared By: PZSE, Inc. - Structural Engineers Roseville, CA 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 1 916.961 .3960 F 916.961.3965 W www.pzse.com Experience I Integrity I EmPoCj j8 tV2 Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK p A jobsite observation of the condition of the existing framing system was performed by an audit team from HES Solar. All attached structural calculations are based on these observations and the design criteria listed below. TABLE OF CONTENTS PAGE Project Loading Criteria 3 PV Seismic Data 4 Roof Load Calculation 6 Roof Framing Analysis 7 Lateral Analysis 9 DESIGN CRITERIA BUILDING CODE: CBC 2016 ASCE 7 VERSION: ASCE 7-10 RISK CATEGORY = II IMPORTANCE FACTOR = See individual Calculations WIND SPEED = 110 EXPOSURE CATAGORY = C SEISMIC DESIGN CATAGORY = D P Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK PV PROJECT DIMENSIONS & LOADING CRITERIA Building name: Reynolds Governing code: ASCE 7-10 Type of system: Ballasted PV Array Description Variable Value Unit Building Characteristics: Building Width (E/W) B = 175 ft Building Length (N/S) I = 218 ft Roof Pitch: 0.4 in 12 0 = 2.0 degrees Eave height he = 32 ft Eave overhang OH= 0 ft Parapet Height h = 4 ft Ridge height h = 35.056 ft Roof Dead Load 11.00 psf (See Attached Calculation) Roof Live Load 20.0 psf Note: Due to operational constraints of the PV system, Live Loads shall not be placed on the panels. Wind and Seismic Inputs: Risk Category II Table 1.5-1 Wind Loading Parameters: Exposure Category C Basic Wind Speed V = 110 mph Topographic Factor K t = 1.00 26.8 (Figure 26.8-1) Enclosure Classification = Enclosed Seismic Loading Parameters: Mapped Acceleration Parameter S5 = 1.035 g httrx//earthpuake.usgs.gov Mapped Acceleration Parameter S = 0.402 g Site Classification 0 11.4.2 Ballasted PV Array Configuration: Total number of PV panels 216 panels Total number of Attachments 0 attachments Panel Tilt 10 degrees PV Panel Width (x) 41.2 inches PV Panel length (y) 61.4 inches Roof Area Covered by PV Array 4178.2 Sq. Ft. PV Array Dead Load (Provided by Others) 7.00 psf Average (Provided by Others) 11.25 psf Maximum PZE Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK Reynolds - PV SYSTEM SEISMIC ANALYSIS per ASCE 7-10 Description Variable Value Unit - (ASCE 7-10) Risk Category II Table 1.5-1 Importance Factor l = 1.0 13.1.3 Component Amplification Factor ap = 1 Table 13.6-1 Component Response Factor R = 1.5 Table 13.6-1 Array Attachment Height above Ground z 35.1 ft 13.3.1 Mapped Acceleration Parameter S = 1.035 g 11.4.1 and USGS maps Mapped Acceleration Parameter S = 0.402 g 11.4.1 and USGS maps Site Classification D 11.4.2 Site Coefficient Fa = 1.086 11.4.3 (Table 11.4-1) Site Coefficient F = 1.598 11.4.3 (Table 11.4-2) Adjusted Max Spectral Response SMS = 1.124 g 11.4.3 Adjusted Max Spectral Response SM, = 0.642 g 11.4.3 Design Spectral Acceleration Parameter 5d = 0.749 g 11.4.4 Design Spectral Acceleration Parameter 5d1 = 0.428 g 11.4.4 Short Period Seismic Design Category, 0.2 sec D Long Period Seismic Design Category. 1.0 sec D Seismic Design category, Si > 0.75 N/A Seismic Demand On Nonstructural Components (PV Array) Fp = 0.4 ap(Sds)Wp(1 +2(z/h))/ (Rp/lp) 0.60 */ Equation 13.3-1 Fp max = 1.6 Sds(lp)Wp 1.20 Equation 13.3-2 Fp min = 0.3 Sds(Ip)Wp 0.22 Equation 13.3-3 Horizontal Seismic Load on Array: 0.60 Vertical seismic force, .2*SDS*Wp: 0.15 P Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK Reynolds - BALLAST SYSTEM SUPPLEMENTARY CALCULATIONS Description Variable Value Unit - (ASCE 7-10) Seismic Displacement Design For Ballasted PV Systems Calculated Seismic Displacement A,pv = 7.3 in (SEAOC PV-1) Condition Minimum Separation Between separate solar arrays of similar construction 0.31 ft Between a solar array and a fixed object on the roof or solar array of different 0.61 ft construction Between a solar array and a roof edge with a qualifying parapet 0.61 ft Between a solar array and a roof edge without a qualifying parapet 0.92 ft Notes: 1. A parapet is "qualifying" if the top of the parapet is not less than 6 inches above the center of mass of the solar array, and also not less than 24 inches above the adjacent roof surface. 2. The array is designed to move (displace) when subjected to earthquake forces. Therefore, the design displacement distance is calculated to provide room for the array to move without affecting other rooftop installations. After an earthquake, the array shall be returned to compliance with the separation distances listed above, and damaged anchors (if any) shall be repaired. PZH Project: Reynolds -- Job #: 2018-13532. Date: 12/21/2018 Engineer: GK, ROOF LOADING -- Reynolds Description - Variable Value Unit Existing Roof: Roof Pitch: 0.42 in 12 0 = 2.0 degrees Pitch Adjustment Factor 1.00 Rafter Span 8.0 feet Rafter Spacing 2.0 feet Roof Dead Loads: [Roofing: Welded Membrane (TPO, PVC, EPDM, etc.) 1.40 psf Decking: 1/2" Plywood or OSB 1.30 psf [Rafter or Top Chord: 2x4 @ 24 O.C. 0.57 psf Rafter Insulation: Fiberglass 3 "Thick 0.12 psf [Miscellaneous: -- N/A -- 0.00 psf j Ceiling Directly Applied: -- N/A -- Roof Pitch Adjustment: Rafter Subtotal, Dr = 0.00 0.00 3.4 psf psf psf [!m/Purlin: OWSJ @ 96 O.C. 2.75 psf ] Miscellaneous: Fire Sprinklers 3.00 psf [Miscellaneous: --N/A-- 0.00 psf Ceiling Joist or Bot. Chord: -- N/A -- @ 96 "O.C. 0.00 psf !Attic Floor: -- N/A -- 0.00 psf Ceiling Insulation: -- N/A -- 12 "Thick 0.00 psf [Ceiling: Suspended Ceiling (Metal Channels) 1.50 Dsf Ceiling Subtotal, Dr = 7.3 psf Roof Design Dead Load Round up? Yes Dr = 11.0 psf Roof Live Load Pitch reduction? No Lr = 20.0 psf Roof Snow Load Pf = 0.0 psf Fl (°) uirx.m D.sNflhl xcnmrr ____ It! EN ROOF LEGEND, i ' - I — - t-J I — — I i4i- —_-- f, '?f i iY - ryd 1FHT1 nL1.1. h AJ j/ ROOF JDLST SCHEDULE ____ 0~4 YO IL -.. a €!' '- __!tWF GIRDER Sri I >- —. 0 OU Z w SD_- W&CLIfrbOOOTURSCI WD CIW .aauaL cc : - axTat,oImn, It WTIL(.CSWIItJflIJIOII r7 ,___ ROOF FRAMING PLAN fr) — iwwo.a as,n osa it — —Nrj—,—&—j7 Project: Target-Littleton -- Job #: 2017-01891 Date: 12/21/2018 Engineer: GS OWSJ Overview Existing Roof Dead Load 11.00 psf Snow Load 0 psf Total Load 11.00 psf I Min Panel Worst Allowable Allowable 5% Additional OWSJG Point Load Worst Span Spacing PIf Allowabale PSF Increase PSF 40G5N14K 14 44 8.00 318 39.77 41.76 30.76 44G7N14K 13 36 10.00 361 36.11 37.92 26.92 36G5N14K 14 1 26 1 10.00 1 538 1 53.85 1 56.54 1 45.54 mm Worst Case PV Dead Load Mark Designation Allowable Joist Total Load DCR RJ-1 22-46LH 288 0.62 RJ-4 36LH 288 0.77 RJ-6 301-1-1 304 0.59 RJ-10 22-46LH 1 315 0.71 Joist DCR < I indicates that framing is ok. 26.92 psf 11.25 psf Project: Reynolds -- Job #: 2018-13532 [f/L_ Date: 12/21/2018 Engineer: GK Reynolds Gravity Check (IEBC 403): Due to operational constraints of the PV panels, live loads are not permitted to be placed on the PV panels. Therefore, in the area of the array, the change in loading is as follows: Area covered by the array: Area of PV panels: % of array area that is covered by panels: Specified Roof Live Load: Live Load Replacement Allowed? Roof live load reduction (CBC 1607.12.2.1) Uniform Roof Snow Load: Existing Roof Dead Load: Existing Roof Load (Total including Duration Factors) Live Load Replacement: 90.8% * (20 / 1) = Allowable 5% increase per IBC 3403.3 Allowable Load Increase or Replacement: Max Allowable Added Dead Load: 4178.2 sq. ft. 3794.5 sq. ft. 90.8% 20.0 psf Yes 1.00 1.00 20.0 psf 0.0 psf 11.00 psf 31.0 psf 18.2 psf 1.55 psf 19.71 psf 19.71 psf Lo = Ri = R2 = Lr = Load replacement check Max Allowable Added Dead Load: 19.71 psf Ballasted PV Array Dead Load: 7.00 psf 7 psf < 19.71 psf, Therefore OK Per IBC 3403.3 and by inspection, portions of the roof that are impacted by installation of the array will be subject to a net reduction in design loading. Therefore, the existing structure may remain unaltered. Project: Reynolds-- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK Reynolds Lateral Check (IEBC 402.4 & ASCE 7-10 1113.1): Weight of Existing Structure Length Width Roof Area % Solid Weight (osf) Weight IN 1L Existing Roof Dead Load 218 175 38150 100% 11.00 419650 Walls (Parallel to N/S) Length Height Area % Solid Weight (nsf) Weight IN Exterior: Concrete Tilt Up 436 20 8720 80% 145 1011520 Walls (Parallel to E/W) Length Height Area % Solid Weight (osf) Weight IN Exterior: Concrete Tilt Up 350 20 7000 80% 145 812000 Note: The wall height used for this analysis is equal to half of the top Weight of Existing Structure: 1 2243170 lb story height plus the parapet height. Weight of Proposed PV System Ballasted PV Array Estimated Dead Load: 7.00 psf For PZSE Inc. Internal Approx. Area of Ballasted PV System 4178 Sq. Ft. Use only Approx. Weight of PV System 29248 lb 10% Check - Diaphragm (N/S Direction) Weight of Roof Diaphragm 419650 lb Weight of E/W Walls 812000 lb 10% of Existing Weight 123165 lb Approx. Weight of PV System 29248 lb Percent Increase 2.37% 123165 lb > 29248 lb. Therefore OK 10% Check - Diaphragm (E/W Direction) Weight of Roof Diaphragm 419650 lb Weight of N/S Walls 1011520 lb 10% of Existing Weight 143117 lb Approx. Weight of PV System 29248 lb Percent Increase 2.04% 143117 lb > 29248 Ib, Therefore OK Per IEBC 402.4 & 403, ASCE 7-10 11b.4, and by inspection; the increase in the lateral demand/capacity ratio of the existing structure due to the installation of the PV system is less than 10%. Therefore, the existing structure may remain unaltered. * IRZ2 structural ENGINEERS December 21, 2018 HES Solar 5980 Fairmount Ave, Suite 105 San Diego, CA 92120 TEL: (619) 692-2015 Attn.: Wenjie Chen, Re: Job # 2018-13532: Reynolds The following calculations are to verify the adequacy of the existing structure located at 2848 Whiptail Loop West, Carlsbad, CA 92010 to support the installation of a Solar Photovoltaic Array. PZSE has reviewed the layout provided by HES Solar for a ballasted Solar Photovoltaic system. After review, PZSE certifies that the structure is adequate to support the proposed ballasted Solar Photovoltaic system. If you have any questions on the above, please feel free to call. Prepared By: PZSE, Inc. - Structural Engineers Roseville, CA 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 1 916.961.3960 F 916.961.3965 W www.pzse.com Experience I Integrity I Empowerment Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK A jobsite observation of the condition of the existing framing system was performed by an audit team from HES Solar. All attached structural calculations are based on these observations and the design criteria listed below. TABLE OF CONTENTS PAGE Project Loading Criteria 3 PV Seismic Data 4 Roof Load Calculation 6 Roof Framing Analysis 7 Lateral Analysis 9 DESIGN CRITERIA BUILDING CODE: ASCE 7 VERSION: RISK CATEGORY = IMPORTANCE FACTOR = WIND SPEED = EXPOSURE CATAGORY = SEISMIC DESIGN CATAGORY = CBC 2016 ASCE 7-10 II See individual Calculations 110 C D p Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK PV PROJECT DIMENSIONS & LOADING CRITERIA Building name: Reynolds Governing code: ASCE 7-10 Type of system: Ballasted PV Array Description Variable Value Unit Building Characteristics: Building Width (E/W) B = 175 ft Building Length (N/S) I = 218 ft Roof Pitch: 0.4 in 12 0 = 2.0 degrees Eave height h,= 32 ft Eave overhang OH= 0 ft Parapet Height h = 4 ft Ridge height h = 35.056 ft Roof Dead Load 11.00 psf (See Attached Calculation) Roof Live Load 20.0 psf Note: Due to operational constraints of the PV system, Live Loads shall not be placed on the panels. Wind and Seismic Inputs: Risk Category II Table 1.5-1 Wind Loading Parameters: Exposure Category C Basic Wind Speed V = 110 mph Topographic Factor Ka = 1.00 26.8 (Figure 26.8-1) Enclosure Classification = Enclosed Seismic Loading Parameters: Mapped Acceleration Parameter Ss = 1.035 g http://earthQuake.usgs.Qov Mapped Acceleration Parameter S1 = 0.402 g Site Classification D 11.4.2 Ballasted PV Array Configuration: Total number of PV panels 216 panels Total number of Attachments 0 attachments Panel Tilt . 10 degrees PV Panel Width (x) 41.2 inches PV Panel length (y) 61.4 inches Roof Area Covered by PV Array 4178.2 Sq. Ft. PV Array Dead Load (Provided by Others) 7.00 psf Average (Provided by Others) 11.25 psf Maximum PZI Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK Reynolds - PV SYSTEM SEISMIC ANALYSIS per ASCE 7-10 Description Variable Value Unit (ASCE 7-10) Risk Category II Table 1.5-1 Importance Factor l, = 1.0 13.1.3 Component Amplification Factor a = 1 Table 13.6-1 Component Response Factor R = 1.5 Table 13.6-1 Array Attachment Height above Ground z = 35.1 ft 13.3.1 Mapped Acceleration Parameter S = 1.035 g 11.4.1 and USGS maps Mapped Acceleration Parameter S 0.402 g 11.4.1 and USGS maps Site Classification D 11.4.2 Site Coefficient Fa = 1.086 11.4.3 (Table 11.4-1) Site Cbefficient F = 1.598 11.4.3 (Table 11.4-2) Adjusted Max Spectral Response Sms = 1.124 g 11.4.3 Adjusted Max Spectral Response Smi = 0.642 g 11.4.3 Design Spectral Acceleration Parameter 5ds = 0.749 g 11.4.4 Design Spectral Acceleration Parameter Sdl = 0.428 g 11.4.4 Short Period Seismic Design Category, 0.2 sec D Long Period Seismic Design Category, 1.0 sec D Seismic Design category, Si > 0.75 N/A Seismic Demand On Nonstructural Components (PV Array) Fp = 0.4 ap(Sds)Wp[i +2(z/h)]/ (Rp/lp) 0.60 Equation 13.3-1 Fp max = 1.6 Sds(lp)Wp 1.20 Equation 13.3-2 Fp min = 0.3 Sds(lp)Wp 0.22 Equation 13.3-3 Horizontal Seismic Load on Array: 0.60 Vertical seismic force, .2*SDS*Wp: 0.15 p Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK Reynolds - BALLAST SYSTEM SUPPLEMENTARY CALCULATIONS Description Variable Value Unit (ASCE 7-10) Seismic Displacement Design For Ballasted PV Systems Calculated Seismic Displacement A,,v = 7.3 in (SEAOC PV-1) Condition Minimum Separation Between separate solar arrays of similar construction 0.31 ft Between a solar array and a fixed object on the roof or solar array of different 0.61 ft construction Between a solar array and a roof edge with a qualifying parapet 0.61 ft Between a solar array and a roof edge without a qualifying parapet 0.92 ft Notes: 1. A parapet is "qualifying if the top of the parapet is not less than 6 inches above the center of mass of the solar array, and also not less than 24 inches above the adjacent roof surface. 2. The array is designed to move (displace) when subjected to earthquake forces. Therefore, the design displacement distance is calculated to provide room for the array to move without affecting other rooftop installations. After an earthquake, the array shall be returned to compliance with the separation distances listed above, and damaged anchors (if any) shall be repaired. - PZE Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK ROOF LOADING -- Reynolds Description - Variable Value Unit Existing Roof: Roof Pitch: 0.42 in 12 0 = 2.0 degrees Pitch Adjustment Factor 1.00 Rafter Span 8.0 feet Rafter Spacing 2.0 feet Roof Dead Loads: [Roofing: Welded Membrane (TPO, PVC, EPDM, etc.) 1.40 psf Decking: 1/2" Plywood or OSB 1.30 psf Rafter or Top Chord: 2x4 @ 24 "O.C. 0.57 psf Rafter Insulation: Fiberglass 3 "Thick 0.12 psf [Miscellaneous: --N/A-- 0.00 psf ] Ceiling Directly Applied: -- N/A -- Roof Pitch Adjustment: Rafter Subtotal, Dr = 0.00 0.00 3.4 psf psf psf [Beam/Purlin: OWSJ @ 96 "O.C. 2.75 psf Miscellaneous: Fire Sprinklers 3.00 psf Miscellaneous: --N/A-- 0.00 psf Ceiling Joist or Bot. Chord: -- N/A -- @ 96 O.C. 0.00 psf Floor: -- N/A -- 0.00 psf ] Ceiling Insulation: -- N/A -- 12 "Thick 0.00 psf [Ceiling: Suspended Ceiling (Metal Channels) 1.50 psf Roof Design Dead Load Roof Live Load Roof Snow Load Pitch Ceiling Subtotal, Dr = Round up? Yes Dr = reduction? No Lr = Pf = 7.3 11.0 20.0 0.0 psf psf psf psf (F (I (B KXThD.SMffl1 ___ ___ -4----.,. ,i-------•,.. ARCHnZCT - -- ---- : t_ Can 1______ , L IJ Ill [i it: jiji - —.-- I -"- -••---•-. ____- V -. _____ - k. afl -4 - IR00FJ5ISTSCHEDE11 L... _j' -. -• ---• —II M. -- II -..• - -'.--- _______ -'- r/ .- ttlt:titt !:: 7: Ep CL CLE M_ 0" MERMENSF®RM 9 I.gs €. ! .co >- S ol ThOOFGIRDERS.EDULE1 LLI CC E 4::- I • , ..- ROOF FRAMING PLAN 1\ .., Ca - Project: Target-Littleton -- Job #: 2017-01891 Date: 12/21/2018 Engineer: GS OWSJ Overview Existing Roof Dead Load 11.00 psf Snow Load 0 psf Total Load 11.00. psf Min Panel Worst Allowable Allowable 5% Additional OWSJG Load Worst Span Spacing PIf AllowabalePoint PSF Increase PSF 40G5N14K 14 44 8.00 318 39.77 41.76 30.76 44G7N14K 13 36 10.00 361 36.11 37.92 26.92 36G5N14K 14 1 26 1 10.00 1 538 1 53.85 1 56.54 45.54 mm Worst Case PV Dead Load Mark Designation Allowable Total Load Joist DCR RJ-1 22-46LH 288 0.62 RJ-4 36LH 288 0.77 RJ-6 301-1-1 304 0.59 RJ-10 22-46LH 315 0.71 Joist DCR < I indicates that framing is Ok. 26.92 psf 11.25 psf S Project: Reynolds -- Job #: 2018-13532 PZE Date: 12/21/2018 Engineer: GK Reynolds Gravity Check (IEBC 403): Due to operational constraints of the PV panels, live loads are not permitted to be placed on the PV panels. Therefore, in the area of the array, the change in loading is as follows: Area covered by the array: Area of PV panels: % of array area that is covered by panels: Specified Roof Live Load: Live Load Replacement Allowed? Roof live load reduction (CBC 1607.12.2.1) Uniform Roof Snow Load: Existing RoofDead Load: Existing Roof Load (Total including Duration Factors) Live Load Replacement: 90.8% * (20 / 1) = Allowable 5% increase per IBC 3403.3 Allowable Load Increase or Replacement: Max Allowable Added Dead Load: 4178.2 sq. ft. 3794.5 sq. ft. 90.8% 20.0 psf Yes 1.00 1.00 20.0 psf 0.0 psf 11.00 psf 31.0 psf 18.2 psf 1.55 psf 19.71 psf 19.71 psf Lo = R1= R2 = Ir = Load replacement check Max Allowable Added Dead Load: 19.71 psf Ballasted PV Array Dead Load: 7.00 psf 7 psf < 19.71 psf, Therefore OK Per IBC 3403.3 and by inspection, portions of the roof that are impacted by installation of the array will be subject to a net reduction in design loading. Therefore, the existing structure may remain unaltered. IlL Project: Reynolds -- Job #: 2018-13532 Date: 12/21/2018 Engineer: GK Reynolds Lateral Check (IEBC 402.4 & ASCE 7-10 1113.1): Weight of Existing Structure Length Width Roof Area % Solid Weight (Dsfl Weight INLL LLWJ Existing Roof Dead Load 218 175 38150 100% 11.00 419650 Walls (Parallel to N/S) Length Height Area % Solid Weight (nsf) Weight (lb) Exterior: Concrete Tilt Up 436 20 8720 80% 145 1011520 Walls (Parallel to E/W) Length Height Area % Solid Weight (osfl Weight IN Exterior: Concrete Tilt Up 350 20 7000 80% 145 812000 Note: The wall height used for this analysis is equal to half of the top Weight of Existing Structure: I 2243170 lb story height plus the parapet height. Weight of Proposed PV System Ballasted PV Array Estimated Dead Load: 7.00 psf For PZSE Inc. Internal Approx. Area of Ballasted PV System 4178 Sq. Ft. Use only Approx. Weight of PV System 29248 lb 10% Check - Diaphragm (N/S Direction) Weight of Roof Diaphragm 419650 lb Weight of E/W Walls 812000 lb 10% of Existing Weight 123165 lb Approx. Weight of PV System 29248 lb Percent Increase 2.37% 123165 lb > 29248 lb. Therefore OK 10% Check - Diaphragm (E/W Direction) Weight of Roof Diaphragm 419650 lb Weight of N/S Walls 1011520 lb 10% of Existing Weight 143117 lb Approx. Weight of PV System 29248 lb Percent Increase 2.04% 143117 lb > 29248 lb. Therefore OK Per IEBC 402.4 & 403, ASCE 7-10 11b.4, and by inspection; the increase in the lateral demand/capacity ratio of the existing structure due to the installation of the PV system is less than 10%. Therefore, the existing structure may remain unaltered. January 18, 2019 HES Solar 5980 Fairmount Ave. St. 105 San Diego, CA 92120 TEL: (619) 692-2015 Attn.: To Whom It May Concern, Re: Job 2018-13532: Reynolds Building located at 2842 Whiptail Loop West, Carlsbad CA 92010. Subject: Plan Check Response Item 1. The PV Ballast system was designed through CPP wind tunnel software wind lab. See attached sample calculations and letter from CPP approving the design methodology on pages 2-11. CPP has provided output pressure ID that correlate with wind tunnel testing that was completed for their system. Please see attached signed and sealed sheet SP2.0. Revised plan dimensions to 24 x 36 for clarity of drawing information. Seismic displacement calculated per minimum friction values in accordance with SEAOC ONE PV-1 2012 minimum friction value of 0.4. Friction testing results for Sunpower Helix system bm completed in compliance with SEAOC PV-1 2012 exceeds minimum requirements of SEAOC •_ PV-12012. 0 If you have any questions on the above, do not hesitate to call. Prepared by: PZSE, Inc. -Structural Engineers . oFESS Roseville, CA J7 TH No. S3878 xp. 3-31-19 ckocmao iq on- coo s 1478 Stone Point Drive, Suite 190, Roseville, CA 95661 1 916.961.3960 F 916.961:3965 W. www.pzse.com Experience I Integrity I Empowerment SUNPOWERS D-0093287_Reynolds_H DT_A Inputs & Calculations System Type: Dual-Tilt Module Type: 96 Cell Total Modules: 108 Helix Calculator Version: release-27 Site Characterization Building Height: 32.00 ft Building Width: 175.00 ft Building Length: 218.00 ft Parapet Height: 4.00 ft Wind Speed: 110.00 Exposure Category: C Exposure Category Transition Distance: 0 Ballast Block Weight: 14.00 lbs Max Allowable System Pressure: 12.00 psf Anchor Type: 0MG PowerGrip Plus Design Spectral Response: 0.70 Seismic Importance Factor: 1.00 LB: 31.64 ft KZ: 1.00 QZ: 26.22 psf System Summary Total System Weight: 22,898.00 lbs Max PSF: 11.25 psf Avg PSF: 5.49 psf Total Anchors: 0 Total Ballast: 920 Seismic Anchor Max. Spacing: 29 Page 2 of 46 Ballast Group Information Ballasting group: 1 1 Ballast Blocks: 1.00 I Panel Pressure: 2.76 I Anchors per panel: 0 Ballasting group: 2 I Ballast Blocks: 3.00 I Panel Pressure: 3.48 Anchors per panel: 0 Ballasting group: 3 I Ballast Blocks: 3.50 I Panel Pressure: 3.55 I Anchors per panel: 0 Ballasting group: 4 I Ballast Blocks: 4.00 I Panel Pressure: 3.73 I Anchors per panel: 0 Ballasting group: 5 I Ballast Blocks: 5.00 I Panel Pressure: 4.21 I Anchors per panel: 0 Ballasting group: 6 I Ballast Blocks: 5.50 I Panel Pressure: 4.37 I Anchors perpanel: 0 Ballasting group: 7 I Ballast Blocks: 6.00 I Panel Pressure: 4.57 I Anchors per panel: 0 Ballasting group: 8 I Ballast Blocks: 6.50 I Panel Pressure: 4.75 I Anchors per panel: 0 Ballasting group: 9 I Ballast Blocks: 7.00 I Panel Pressure: 4.93 I Anchors per panel: 0 Ballasting group: 10 I Ballast Blocks: 7.50 I Panel Pressure: 5.14 I Anchors per panel: 0 Ballasting group: 11 I Ballast Blocks: 9.00 I Panel Pressure: 5.70 I Anchors per panel: 0 Ballasting group: 12 I Ballast Blocks: 9.50 I Panel Pressure: 5.89 I Anchors per panel: 0 Ballasting group: 13 I Ballast Blocks: 11.00 I Panel Pressure: 6.48 I Anchors per panel: 0 Ballasting group: 14 I Ballast Blocks: 11.50 I Panel Pressure: 6.66 I Anchors per panel: 0 Ballasting group: 15 I Ballast Blocks: 12.00 I Panel Pressure: 6.84 I Anchors per panel: 0 Ballasting group: 16 Ballast Blocks: 13.00 I Panel Pressure: 7.20 I Anchors per panel: 0 Ballasting group: 17 I Ballast Blocks: 14.50 I Panel Pressure: 7.75 I Anchors per panel: 0 Ballasting group: 18 I Ballast Blocks: 15.00 I Panel Pressure: 7.93 I Anchors per panel: 0 Ballasting group: 19 I Ballast Blocks: 17.00 I Panel Pressure: 8.72 I Anchors per panel: 0 Ballasting group: 20 I Ballast Blocks: 20.00 I Panel Pressure: 9.80 I Anchors per panel: 0 Ballasting group: 21 I Ballast Blocks: 24.00 I Panel Pressure: 11.25 1 Anchors per panel: 0 Page 3 of 46 Array Layout Panel ID Danel ID Panel ID 6 / Seismic Wind Dual Tilt Page 4 of 46 Power Stations Standalone Inverters AC Run Length: 0 Attachment Point: Switch Gear Model: 60kW Delta - 524954 Strings per inverter: 0 Subarrays Subarray: 1 Seismic Anchors: 0 Seismic demand per anchor: n/a Weight: 2,741 .3Olbs Subarray: 2 Seismic Anchors: 0 Seismic demand per anchor: n/a Weight: 2,103.17 lbs Subarray: 3 Seismic Anchors: 0 Seismic demand per anchor: n/a Weight: 18,053.63 lbs Page 5of46 - Bill of Materials 512199 CLIP, WIRE FORMED, CABLE MANAGEMENT, INSIDE, 1624MM A 2 80 512200 CLIP, WIRE FORMED, CABLE MANAGEMENT, INSIDE, 352MM A 2 450 512510 LID, CABLE SUPPORT, HELIX ROOF 30 512511 CABLE SUPPORT, HELIX ROOF 30 513833 TRAY, LINK, HELIX ROOF 53 513844 TRAY, OPTIONAL BALLAST, HELIX ROOF 29 514056 BASE, CHASSIS, DUAL TILT, HELIX ROOF 125 514057 PLATFORM, CHASSIS, DUAL TILT, HELIX ROOF 125 514265 FOOT, RECYCLED RUBBER, HELIX ROOF 28 515063 SCREW, CAP, SH, M6 X 1 X 12, 18-8 55 (DIN 912) 500 515928 FRONT SKIRT, HELIX ROOF 130 517463 MONITORING SYSTEM, COMMERCIAL, PVS5x BASED, 240VAC, US 1 517871 TRAY, LEADING, HELIX ROOF, RIVETED VERSION 68 521794 DEFLECTOR, LH, HELIX ROOF V1.1 77 521795 DEFLECTOR, RH, HELIX ROOF V1.1 77 524954 INVERTER, DELTA, M60U_122 (MC4), 18INPUT, 60KW, 3PH 480V 1 AC,1000V DC 527073 KIT, INVERTER MOUNT, DELTA, HELIX ROOF 1 Contractor Ballast Blocks 920 Supplied TBD Modules 216 Page 6 of 46 Site-Specific Sample Wind Calculations PV PANEL & RACKING INFORMATION Panel Name = Panel Area, Apanei = Tent Area, = Ground Coverage Ratio (GCR) = Panel Weight, w, = 96 Cell 17.58 sf 35.14 sf 0.91 92.41 lb BUILDING GEOMETRY Building Height, H = Parapet Height, h, = Building Width on Longest Side, W = Characteristic Building Length, LB = 32.00 4.00 218.00 31.64 I a LB = 0.4V[HW], not to exceed H nor be less than 15 ft Code Section mph 26.5.1 26.7 1.5.1 WIND LOAD CRITERIA (PER ASCE 7-10/16 CHAPTERS 26 & 30) Basic Wind Speed*, V = 110.00 Exposure Category= C Risk Category* = II *Note: Verify that Basic Wind Speed (V) used is selected from the appropriate Figure 26.5-1 in ASCE 7-10 (A, B, or C) based on the Risk (Occupancy category) Velocity Pressure Coefficient, K. = 1.00 30.3.1 Topographic Factor, K1 = 1 26.8.2 Directionality Factor, Kd = 0.85 26.6 Velocity Pressure, q, = 0.00256KZKZKdV2 26.22 psf 30.3.2 BALLAST CALCULATION FOR A GIVEN HELIX DT TENT (PER SEAOC PV-2 2017 & WIND TUNNEL TEST DATA) Module ID = 3 Panel Category = sw Exposed Corner Ballast Block Weight = 14.00 lb Anchor Type = 0MG PowerG rip Plus Anchor Capacity = 418.00 lbs Max Allowable Dist. Weight on Roof = 12.00 psf Page 7 of 46 See Pressure ID at Ath, = = Panel I for Design 58.37 sf A = 1000A,b/LB2 Methodology I Uplift Force from Wind, F,ft F=qhXGCL XVE XVP XAteM = PV System Weight, w. = 98.54 lb Ballast Weight Required = 330.87 lb 0.61) - 0.6W,,, ~t 0 => Db,,,, ~ W, - D,,, Blocks Required w/o Anchors = 24 Distributed Weight w/o Anchors = 11.25 psf Anchors Required? No Anchors needed if (w + What,,,,) > W,110w Number of Anchors Required = 0 Blocks Required w/ Anchors = 24 Distributed Weight w/ Anchors = 11.25 psf <= 12 psf Wind Sliding Force Calculations Array 1 Lateral Wind Force: 1,196.67 Lateral Wind Resistance: 1,370.65 Number of ballast blocks added: 0 Number of anchors added: 0 Demand per Anchor: n/a Array 2 Lateral Wind Force: 1,015.42 Lateral Wind Resistance: 1,051.59 Number of ballast blocks added: 29.00 Number of anchors added: 0 Demand per Anchor: n/a Array 3 Lateral Wind Force: 3,681.43 Lateral Wind Resistance: 9,026.81 Number of ballast blocks added: 0 Number of anchors added: 0 Demand per Anchor: n/a Page 8 of 46 December 7th, 2018 PZSE Structural Engineers 1478 Stone Point Drive, Suite 190 Roseville, CA 95661 Dear Caleb, CPP performed wind tunnel testing of the SunPower Helix single tilt roof mount solar racking system. The testing process included iterations on the design in order to minimize the wind loads. The resulting deflectors provide wind loads which are significantly better than those in ASCE 7 or SEAOC PV2. The testing and wind load reporting was in accordance with SEAOC PV2-2017, which requires that parameters like parapets, array edge factors, load sharing, location on the roof, and building size be accounted for. For better precision, and to avoid errors, CPP incorporated these wind loading relationships into an on-line calculator (called WindLab) which automates the equations and rules that account for all of the aforementioned parameters. SunPower often use this calculator to optimize their layout, avoiding areas on the roof with the highest wind loads. This generally means keeping the array from the roof corners, particularly the east and west edge of the building near the north corners. Sincerely, David Banks, Principal CR1'. Incorporated info@cppwind.com 2400 Midpoint Drive, Unit 190 Tel: +1970 2213371 www.cppwind.com Fort Collins, Colorado 80524, USA Fax +1970 2213124 [cpp] CPP Project 7979 Testing to determine wind loads on the SunPower Helix Dual Tilt roof mount solar racking systems was performed in a CPP boundary layer wind tunnel. The results of this testing were incorporated into the layout and calculation tool (WindLab-API) for use by SunPower. The wind environment on a flat roof is distinctly different from the wind environment on the ground where loads are driven primarily by straight-line winds and the inherent turbulence in those winds. On a flat roof, conical vortices are formed at the building corner and these create intense roof level flow that creates significant uplift on inclined flat-plate PV modules. The vortices and ensuing loads on the modules behave in a predictable manner such that the wind tunnel results can be used to create an analytical model of the loading patterns. This is achieved with a series of equations that relate load to the distance from the building corner and from the axis of the vortex. Several parameters are tuned for variation of the loads relative to the vortex so that the analytical model reproduces the wind tunnel results. The CPP proprietary software that uses this analytical model and allows application of the model on any flat roof is called WindLab. WindLab is an online layout and calculation tool that incorporates the variation of loads across the roof as described above and allows them to be applied on any size roof or array. WindLab-API interfaces with a third-party layout tool but uses the same calculation procedures. Results are scaled based on roof size and the relative size of the module (or modules, if sharing loads effectively). The method is consistent with the SEAOC PV2-20 17 procedure. SEAOC PV2-20 17 cites the ASCE 7-16 methods, verbatim, but also provides some additional procedures and much more extensive discussion of the basis for these calculation procedures. We have implemented the PV2-20 17 methods in this analysis, including independent corners/walls, minimum design pressure based on far- interior (zone 1') load, and far-interior loads that don't scale with building size or parapet height. WindLab also accounts for the effect of parapet height (near roof corners and edges) and array edge effects. Both the parapet factor and the array edge factor are based on the results of wind tunnel testing. A comparison of the wind tunnel results to the WindLab models for the 100 SunPower Helix dual tilt system is shown in Figure E-1. In these figures, only the NE corner has been presented. Note that the NE corner is a mirror copy of what to expect on the other corners due to symmetry. In Figure E-1, color is used to represent severity of load, with red being the most severe. The individual values have not been included because they specifically relate to the size of the test building and the module size used in the test. It can be seen from the comparisons in Figure E-1 that in general WindLab envelopes the wind tunnel results closely. In some cases, irregularities in the wind tunnel data have been smoothed over in WindLab, tending toward conservative when not able to match exactly. One of those irregularities is displayed in Figure E-la as an edge effect/banding in the wind tunnel data in the fourth column (N-S fourth row) of the array, due to a significant N-S gap in the middle of the tested array. CPP Project 7979 Several deflector configurations were tested for the dual-tilt Helix system. Not all array positions were tested for the configuration with deflectors on all sides, therefore some edge effects are representative of the dual-tilt system without deflector, highlighted with black contour boxes in Figure E- 1 a. The WindLab product represents a system with deflectors on all sides (E-W and N-S), therefore, there are a few edges highlighted in Figure E- 1 a that do not necessarily match the corresponding edge effects in WindLab. The SEAOC PV2 wind load calculation method, which we have used in our reports since 2012, has been criticized as overly complex, and indeed some of the PV2 rules were simplified when the provisions were adopted into ASCE 7-16. The complexity lies in the number of "if-then" type rules required to accurately capture changes in wind loading related to the position of the array on the roof and relative other arrays. This is the kind of logic with can be accurately and reliably captured by a computer algorithm, and indeed WindLab was developed after we noticed that many of clients would write programs to automate the calculations in our reports. By automating the implementation of tedious step-by-step rules, we expect Windlab to reduce both errors and conservatism in wind load calculations, allowing your design team to better understand the wind loads patterns relevant to each project, and to focus on solutions. ### ¶4* ¶4* #444* #4*4* J 194* ## #41# 4*## #4* #4*4* #4*4* 4*#L4 — — — — — — — — — — — — — — — 4*4*4* 4*4*4* — CPP Project 7979 — A0 — — 006 row. — — — — — — — — — — — — — — — M. — — — — — — — J) — — W. — — — — — — — — — — - • 'P ## ¶# 1444 J## - — — - — - — — MW — — — — — — — — AA hw — — — *rn# ### ### ### #m* J .J ij• Figure E-la. Module GCL, wind tunnel testing, SunPower Helix Dual Tilt 100 system, NE cornering winds only — — __ __ — — — — — — 11 ### ### ## ### tat 1* ### ##t ##4 ### ### ## ### ### ### ### ### 44 #4*44 ### #4*4* #4*4* ### ### #4*4* 4*444* #4*4* #4*44 44 U #4*4* #4*4* #444* #44 — Pilo as — — — — — — — — — — — — — — — — —W9~ WW- [cppj _ am CPP Project 7979 # ### ### ### ### #mt ### ### ### ### #*# ### ff## ### ### ### ### ### ### ### ### ### # ### ### ### fl44 *W# #I*# ### #*# ### #ff# ### ### ### ff## ## ### ### ### #*I4* #u# #n ### rnt# mt# ### #u# w #u# ### ### # ### ### ## # #4 ### #ff# ### ## ff## ### ## # ## ### ### #t# ### Figure E-lb. Module GCL, WindLab, SunPower Helix Dual Tilt 100 system, NE cornering winds only D-00 9328 7_Reynolds "request": "corners": "angle": 90.14, "coordinate": 1094.85, -222.75, Panel ID "interior": false, "length_ccw": 1314.68, "length_cw": 368.8, ,—Velocity Pressure "order": 1, "orientation": "Se", "parapet".: 4.0, "q_value": 26.21610736308488 "angle": 90.0, "coordinate": 1097.96, 1091.92, 32.0 "interior": false, "length_ccw": 995.57, "length_cw": 1314.68, "order": 2, "orientation": "ne", "parapet": 4.0, "q_value": 26.21610736308488 "angle": 90.01, "coordinate": 102.39, 1094.29, 32.0 ' i d" : 3 , "interior": true, "length_ccw": 196. 92, "length_cw": 995.57, "order": 3, "orientation": null, "Parapet": 4.0, "q_value": 26.21610736308488 "angle": 90.01, "coordinate": 102.82, 1291.21, Page 10 of 46 .1 "tributary area for lifting": 58 .37, "tributary_area for sliding": 421. 91999999999996 "product id": 102, "qz": 26.21610736308488, "system—type": "Dual-Tilt" "response": "LB": 31.637776359151736, "meta": "api_version": "0. 12. 1", "debug": (), "git_shal": "7bab98e", "request_id": "1165449d-1a91-11e9-9eee-9d098644baeb", "request_schema_version": "0.7.0", "requested_at": "2019-01-17T19:49:57+00:00", "response—schema—version": "0.4.011 "panelPressures": "idle: "pressure for lifting": 10.57, "pressure for sliding": 3.6 Tent Area =35.l4sqft "pressure for lifting": 8.68, Uplift Force = "pressure for sliding": 2.96 8.68 psfx 35.14 sq ft= 305.0 lb Number of Ballast Blocks = 17 Weight of Ballast Block = 14lb/block "pressure_for lifting": 12.22, Racking + Panel Weight = 98.541b "pressure for sliding": 5. 3]. 17blocks x 14lb/block + 98.54 lb = 336.54 Ibs> 305 lbs Demand "pressure for lifting": 9.5, "pressure for sliding" : 3.82 I5I "pressure for lifting": 6.21, "pressure }, for sliding": 3.3 Tent Area = 35.14 sq ft "pressure for li Uplift Force = "pressure_for—sliding": Ea"-~ 5.43 1058 psfx 35.14 sq ft= 371.8 lb Number of Ballast Blocks = 20 Weight of Ballast Block = 141b/block "pressure_for lifting": 12.17, Racking + Panel Weight = 98.541b "pressure_for sliding": 5.37 20b1ock5 x 141b/block + 98.54 lb = 378.54 Ibs> 371.8 lbs Demad Page 37 of 46 "z": 32.0 "interior": false, "length_ccw": 1101.73, "length_cw": 196.92, "order": 4, "orientation": "ne", "parapet": 4.0, "q_value": 26.21610736308488 "angle": 89.98, "coordinate": -998.9, 1293.84, 32.0 "interior": false, "length_ccw": 2252.13, "length_cw": 1101.73, "order": 5, "orientation": "nw", "parapet": 4.0, "q_value": 26.21610736308488 "angle": 106.07, "coordinate": "x": -1003.65, -958.29, 32.0 "idle: 6", "interior": false, "length_ccw": 1307.79, "length_cw": 2252.13, "order": 6, "orientation": "swell "parapet": 4.0, "q_value": 26.21610736308488 "angle": 90.0, "coordinate": 252.25, -1323.01, 32.0 "interior": false, "length_ccw": 213. 38, "length_cw": 1307.79, "order": 7, "orientation": "Se", "parapet": 4.0, Page 11 of 46 "q_value": 26.21610736308488 "angle": 89.99, "coordinate": 311.76, -1118.1, 32.0 "8", "interior": true, "length_ccw": 90.23, "length_cw": 213.38, "order": 8, "orientation": null, "parapet": 4.0, "q_value": 26.21610736308488 "angle": 89.98, "coordinate": 398.41, -1143.29, 32.0 "id": 11991, "interior": false, "length_ccw": 468.86, "length_cw": 90.23, "order": 9, "orientation": "se", "parapet": 4.0, "q_value": 26.21610736308488 "angle": 89.99, "coordinate": 529.15, -693.02, 32.0 "id": "interior": true, "length_ccw": 57. 92, "length_cw": 468.86, "order": 10, "orientation": null, "parapet": 4.0, "q_value": 26.21610736308488 "angle": 90.0, "coordinate": 584.77, -709.18, 32.0 }, Page 12 of 46 "id": fillet, "interior": false, "length_ccw": 506.52, "length_cw": 57.92, "order": 11, "orientation": "se", "parapet": 4.0, "q_value": 26.21610736308488 "angle": 106.2, "coordinate": "x": 726.05, - "y": -222.76, 32.0 111211, "interior": true, "length ccw": 368.8, "length_cw": 506.52, "order": 12, "orientation": null, "parapet": 4.0, "q_value": 26.21610736308488 "module type": "96 Cell", "panels": "coordinate": -907.189962733451, -216.2775884228867 "facing": to wel 1, toile, "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 "coordinate": -907.2042976318608, -278.48291395581555 "facing": ,, wI I, "2", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 }, "coordinate": { -907.1781605604523, -340.7052583255123 Page 13 of 46 "facing": "WI' I, IIjI : "tributary_area_for lifting": 58.37, "tributary_area_for_sliding": 2883.12 }, "coordinate": -818.9136662768066, -216.26482329100367 }, "facing": "fl'1 "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 }, "coordinate": -818.9315636651615, -278.51601435253866 "facing": [I, "idlr: 11511, "tributary_area_for_lifting": 382. 19, "tributary—area—for—sliding": 2883.12 "coordinate": -818.9374451244711, -340.7043366069237 "facing": 'Is,, : 19611, "tributary_area_for_lifting": 115. 68, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6655994646998, 841.5710255420458 "facing": I, 'video: 1 1 79 , "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 Page 14 0f46 "coordinate": -730.6799490933861, 779.3094215240162 }, plid "facing": "v" " I , : 118 1 1, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6460375930849, 717.1170917505552 A }, "facing": ,,w,, I, "9", "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6664125094396, 654.8690990768044 }, "facing": ,, wil "tributary_area_for_lifting": 128 .16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6766381469995, 592.6520810978805 "facing": I, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 }, "coordinate": { -730.64938373496, 530.4597245491151 Page 15 of 46 "facing": l'w" "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -730.668451835711, 468.20281151281563 "facing": 'lw,1 'lid": jd": 1 1 3l "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.67332720061, 405.9947406717485 "facing": 'lw'1 I, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.656938782372, 343.75875900924075 "facing": "w,, 111511, 1, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -730.6622615976368, 281.5119454539658 "facing": II wil 1, id " : " 1 , Page 16 of 46 "tributary_area for lifting": 128. 16, "tributary area for sliding": 2883.12 }, "coordinate": -730.6735646102949, 219.29320264143485 "facing": "WI' I, 'rid": II7I, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6491899759337, 157.06661977559563 "facing": l,wl, 1, "18", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6593404752742, 94.85161793123012 "facing": vowel -- 'lid": 111999, "tributary area for lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.669802369637, 32.63418683985003 "facing": "w" 'rider: 112011, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883-12 "coordinate": Page 17 of 46 -730.643856236222, -29.587632634464384 }' "facing": ,,W" I' "tributary_area_for_lifting": 128. 16, "tributary_area_for sliding": 2883.12 }, "coordinate": -730.6552269140542, -91.80366938805861 }, "facing": "WI' llid1r 1 , : "22", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -730.6699893335491, -154.06433941633335 "facing": "W" 1 ' i d" : 11 23 -' "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6445741018877, -216.2855306160847 "facing": [], "24", "tributary_area_for_lifting": 382.19, "tributary_area_for_sliding": 2883.12 "coordinate": -730.6552670544796, -278.5043630472366 "facing": [I, : 19 2511, "tributary_area_for_lifting": 382. 19, "tributary_area_for_sliding": 2883.12 Page 18 0f46 "coordinate": -730.6666783871611, -340.7216798424673 "facing": U5I "26", "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 "coordinate": -642.3945635359198, -216.2484168816619 "facing": "n'' 1, "2791 , "tributary_area_for_lifting": 115. 68, "tributary_area_for_sliding": 2883.12 }, "coordinate": -642.3793162342463, -278.4919141307915 "facing": LI, 'lid": "28", "tributary_area_for_lifting": 382. 19, "tributary_area_for_sliding": 2883.12 V "coordinate": -642.3906805652696, -340.7101113751833 "facing": [1, ''Id": 112911, "tributary_area_for_lifting": 382. 19, tributary_area_for_sliding: 2883.12 "coordinate": -642.3982084799867, -402.90575730157235 "facing":it [ V e, ,, wil ''jd" : "3011, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -642.3757064846681, -465.1492813273215 }, "facing": 1, "tributary_area_for_lifting": 128.16, "tributary area for sliding": 2883.12 "coordinate": -642.3899988586949, -527.4116294295907 "facing": vi sit , , I, id": "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 }, "coordinate": -554.1284348408271, -216.25918123415053 "facing": flell 1, "jd" : 1 33II "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 }, "coordinate": -554.1030196091656, -278.48037243390206 }, "facing": "e" 1 'lid": 99 3419, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -554.1139609108103, -340.6992576950867 "facing": Page 20 of 46 I, "id": l35! "tributary_area_for_lifting": 58.37, "tributary area for sliding": 2883.12 "coordinate": -554.1036171404053, -465.181338125681 "facing": If nif "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 "coordinate": "x": -554.1143838650507, -527.3995889108611 "facing": lisle I, ''id" : 1937 "tributary_area_for_lifting": 115. 68, "tributary_area_for_sliding": 2883.12 "coordinate": { -416.65405848093917, 679.909414404369 }, "facing": I ,,wu 1, "tributary_area_for_lifting": 58 .37, "tributary_area_for_sliding": 492.23999999999995 "coordinate": -416.67190835689337, 617.6743021090845 "facing": fe wer I'- 1 id": '13911 , "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 492.23999999999995 Page 21 of 46 "coordinate": -416.6903464275087, 555.4505752037915 "facing": "W" "40", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 492.23999999999995 }, "coordinate": -416.6603762221681, 493.20921189588637 }, "facing": WI' I, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": -416.6727422033569, 430.9727922848319 "facing": fewer 1, 'lid": 11 4211, "tributary_area_for_lifting": 128 .16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": -416.6829470391938, 368.75535766491913 "facing": ,,W,, I, 114311, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 492.23999999999995 S }, "coordinate": { "x": -416.66403648212184, "y": 306.55130012065683 Page 22 of 46 "facing": Ir wir 114411, "tributary area for lifting": 128.16, "tributary area for sliding": 492.23999999999995 "coordinate": -416.6722598435652, 244 30994927302172 }, "facing": to "WI' 1, id" : 19 4511 "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": "x": -416.67963073872687, "y" 182 09807699942309 "facing": Irwil 1, "id": 1 4I1 , "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": { -416.66800853106156, 119.89286405284835 }, "facing": I,W" "id" : 114711 "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": -416.6648231695195, 57.657677423273896 }, "facing": I II ,,W', 1 : "48", Page 23 of 46 "tributary_area_for_lifting": 128 .16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": -416.6798950120264, -4.60486353046597 "facing": ,,w" 1, 'lid": "4911, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 492.23999999999995 "coordinate": -416.6749398428073, -66.80852982041327 "facing": ,, wu I, 'lid": 1150" "tributary_area_ for _lifting": 128.16, "tributary-area-for-sliding": 492.23999999999995 "coordinate": -416.66525954344456, -129.04211840513153 }, "facing": ,,w,, I, "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 492.23999999999995 }, "coordinate": -465.862881938847, -465.15080311618493 "facing": 11 ' id": 1'5211 , "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 "coordinate": Page 24 of 46 -465.8380872399699, -527.3880472139714 }, "facing": I "SI, 1, "id": n53I, "tributary area for lifting": 115. 68, "tributary area for sliding": 2883.12 "coordinate": -377.5874778793448, -465.15498874374686 I, "facing": "n" 'rid": 115411, "tributary_area_for_lifting": 115. 68, "tributary_area_for_sliding": 2883.12 "coordinate": -377.5999690697852, -527.3607746442158 }, "facing": I, I, : "5511, "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 "coordinate": -289.3114800574535, -465.14342027646234 "facing": "n" 1, 11 5611, "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 "coordinate": -289.3275821792372, -527.396147732989 "facing": ,,s,, I, : 11 5711, "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 Page 25 of 46 }, "coordinate": -201.06706473917046, 965.9954611323876 }, "facing": U wII 'lid": "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 "coordinate": -201.02589784447684, 903.7833681266721 "facing": I, i d" : "59", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -201.05238946175902, 841.556317950645 }, "facing": w,, I, "id" : 196011, "tributary_area_for_lifting": 128 .16, "tributary_area_for_sliding": 2883.12 "coordinate": -201.06375379278253, 779.3381207062538 "facing": w,, I, "tributary_area_for_lifting": 128 .16, "tributary_area_for_sliding": 2883.12 "coordinate": -201.0295427885436, 717.1260277067616 }, "facing": Page 26 of 46 "W" l')l 'lid": '62" "tributary area for lifting": 58.317, "tributary area for sliding": 2883.12 "coordinate": -201.03256023595037, -465.17867796033534 "facing": ,ln', J, "tributary_area_for_lifting": 115.68, "tributary_area_for_sliding": 2883.12 "coordinate": -201.0503125637173, -527.3936948650635 }, "facing": [I, Plidlr: "6411, "tributary_area_for_lifting": 382. 19, "tributary_area_for_sliding": 2883.12 }, "coordinate": -201.06517179551184, -589.6056625048266 "facing": 'lw,1 1, "id" : 9165", "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 "coordinate": -112.79106691727915, 966.0070295996721 "facing": ' e wl 1, : "66", "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 "coordinate": "x": -112.74989965277551, "y": 903.7916469393922 "facing": liell llidlf 1 , : "67 11, "tributary_area for lifting": 128. 16, "tributary area for sliding": 2883.12 "coordinate": -112.77609283667834, 841.5678596475349 1, "facing": e" "jd" : 116811, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.78842484843345, 779.349522359807 "facing": Ifell I' "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.39756581039177, 717.1686823151849 "facing": I, 'lid": 197011, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.77669036791795, 654.8668939557555 "facing": [ ,, w,, I, : 11 7111 , "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 Page 28 of 46 "coordinate": -112.7885845101479, 592.648839408638 "facing": IjII "72", "tributary_area for lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.76754446964134, 530.4318354256463 "facing": W il 1, "73", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.77340280247958, 468.20947877982326 "facing": W" I, "id": 197411, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.78388033322855, 405.9915801313145 "facing": it I, ''jd" : 117511, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -112.76363767322701, 343.77629176180557 Page 29 of 46 }, "facing": fewer Ire If, void": id": "tributary_area for lifting": 128. 16, "tributary area for sliding": 2883.12 }, "coordinate": -112.76994954661049, 281.55209964306755 "facing": [ "WI, flid" 1 , : 117711, "tributary_area_ for _lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.78742208312497, 219 28900993309514 "facing": 'l w,1 I, "jd" : "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding",: 2883.12 "coordinate": -112.77124431638552, 157.07510820415368 "facing": lower I, "79", "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.77012419010019, 94.85105851338812 }, "facing": [ "WI' Page 30 of 46 "80", "tributary area for lifting": 128.16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -112.78099501867857, 32.63298886715966 "facing": to "w,' 118111, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.77471586235953, -29.58244901293498 I, "facing": "WI' 1, "jd" : 118211, "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.76583732693983, -91.8062305391363 "facing": [ Ir wil 11 'lid": 1183", "tributary area for lifting": 128.16, "tributary_area_for_sliding": 2883.12 }, "coordinate": -112.77732601013595, -154.02388642965872 "facing": ,,W,, 11 : "84", "tributary_area_for_lifting": 128. 16, "tributary _area _for _sliding": 2883.12 Page 31 of 46 "coordinate": -112.77825402903386, -216.23948753011393 "facing": flidlr: 118511, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.76261759702882, -278.5084851902698 "facing": ,,w,, 1, "86", "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.77770457763509, -340.72477757480766 "facing": fewer I, "idly: 118711, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.78550899763125, -402.94009838327 }, "facing": fewer 1, "id": 11 8811, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -112.75644105585786, -465.16584428668074 }, "facing": [I, 'Fidel: 118911, "tributary_area_for_lifting": 382.19, "tributary_area_for_sliding": 2883.12 Page 32 of 46 "coordinate": -112.77384364526571, -527.3822121090714 "facing": "e" 'lid": "9011, "tributary_area_for_lifting": 128.16 "tributary_area_for_sliding": 2883.12 }, "coordinate": -112.78892390650799, -589.5974942407605 }, "facing": it I, "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 }, "coordinate": "x" -24.51594793465568, "y": -216.27412715790035 "facing": [ "e" 1, 'lid": 11 921r, "tributary_area_for_lifting": 58 .37, "tributary_area_for_sliding": 2883.12 "coordinate": -24.515311604237155, -278.493106881973 "facing": e" 'lid": "9311, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 2883.12 "coordinate": -24.50128606441275, -340.7132649801111 "facing": - "e" Page 33 of 46 I, : "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -24.512348566096517, -402.93148863244517 "facing": e" 1, "95", "tributary_area_for_lifting": 128.16, "tributary_area_for_sliding": 2883.12 "coordinate": -24.51616922281842, -465.1504714338208 "facing": I' ,, Ifell I, "96", "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 2883.12 }, "coordinate": 205.08208121229475, -16.48080986497127 }, "facing": lo wil "id": l97t "tributary_area_for_lifting": 58 .37, "tributary_area_for_sliding": 421.91999999999996 "coordinate": 205.0824726928315, -78.75223478991902 "facing": w,, 1 "id": 19 9811, "tributary_area_for_lifting": 128 .16, "tributary_area_for_sliding": 421. 91999999999996 "coordinate": Page 34 of 46 205.09305041596386, -140.96373106608593 }, "facing": ,'w,' 'Fidlp: 91999f, I, "tributary area for lifting": 128 .16, "tributary_area for sliding": 421. 91999999999996 "coordinate": 205.08202049508526, -203.18259242182495 "facing": I,w,1 I, "id": 11100", "tributary_area_for_lifting": 58 .37, "tributary_area_for_sliding": 421. 91999999999996 "coordinate": 293.3547653200488, -16.512583356020514 "facing": Toney 11 "id": 1,101", "tributary_area_for_lifting": 115. 68, "tributary_area_for_sliding": 421. 91999999999996 "coordinate": 293.34338228833815, -78.73051483533106 }, "facing": [1, "id": "102", "tributary_area_for_lifting": 382. 19, "tributary_area_for_sliding": 421. 91999999999996 "coordinate": 293.34586744124124, -140.9611207135877 "facing": (], "id": "103", "tributary_area_for_lifting": 382. 19, "tributary_area_for_sliding": 421.91999999999996 }, "coordinate": { Page 35 of 46 293.35801831697654, -203.1710239545405 }, "facing": 'Is,' 1, "id": "104", "tributary_area_for_lifting": 115. 68, "tributary_area for sliding": 421.91999999999996 "coordinate": 381.6307636284614, -16.500641883733113 "facing": I, "id": 1110511, "tributary_area_for_lifting": 58.37, "tributary_area_for_sliding": 421. 91999999999996 }, "coordinate": 381.6200434787818, -78.71830876167604 "facing": "e" I, "id": 11 106", "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 421.91999999999996 "coordinate": 381.6218655977436, -140.952474720491 "facing": Ifell I, "id": 11 10711, "tributary_area_for_lifting": 128. 16, "tributary_area_for_sliding": 421.91999999999996 "coordinate": 381.634016138868, -203.15945548725585 "facing": frely I, "id": 11108", Page 36 of 46 "pressure—for—lifting": 9.61, "pressure—for—sliding": 3.25 "9", "pressure—for—lifting": 9. 68, "pressure—for—sliding": 3.28 "pressure—for—lifting": 9. 57, "pressure_for_sliding": 3.26 "pressure_for_lifting": 9.35, "pressure—for—sliding": 3.2 id": 11 1211, "pressure_for_lifting": 9.05, "pressure_for_sliding": 3.12 }, "pressure_for_lifting": 8.7, "pressure_for_sliding": 3.01 U14 IT, "pressure—for—lifting": 8.32, 'pressure—for—sliding": 2.89 I , "pressure_for_lifting": 7.92, "pressure_for_sliding": 2.76 "pressure_for_lifting": 7.51, "pressure for sliding": 2.63 "pressure_for_lifting": 7. 1, "pressure_for_sliding": 2.5 "pressure_for_lifting": 6.86, "pressure_for_sliding": 2.42 "id": 111911, "pressure_for_lifting": 7.25, "pressure_for_sliding": 2.55 Page 38 of 46 }, void": id": 20" "pressure—for—lifting": 7.66, "pressure—for—sliding": 2.68 112111, "pressure—for—lifting": 8 .06, "pressure—for—sliding": 2.8 "pressure—for—lifting": 8.44, "pressure—for—sliding": 2.93 "id" : 1 1 3I, "pressure—for—lifting": 8.81, "pressure—for—sliding": 3.04 }, Ivid" : I4 !I "pressure—for—lifting": 5. 85, "pressure—for—sliding": 3.14 i ci" : 11251r, "pressure—for—lifting": 6. 02, "pressure—for—sliding": 3.21 "id" : "2611, "pressure_for_lifting": 9.92, "pressure_for_sliding": 5.32 }, id": 112711, "pressure_for_lifting": 8.44, "pressure_for_sliding": 4 .07 "pressure_for_lifting": 5. 17, "pressure_for_sliding": 2.76 "pressure_for_lifting": 5.04, "pressure_for_sliding": 2.68 id": "30", "pressure_for_lifting": 7.47, "pressure_for_sliding": 2 .53 Page 39 of 46 "pressure_for_lifting": 6.87, "pressure_for_sliding": 2.32 Void": 113211, "pressure_for_lifting": 7.89, "pressure_for_sliding": 4.76 'lid": "pressure_for_lifting": 8.59, "pressure_for_sliding": 4 .11 "jd" : 19 3411 , "pressure_for_lifting": 6. 24, "pressure_for_sliding": 2.14 jd" : 113511 , "pressure_for_lifting": 7.57, "pressure_for_sliding": 4 .6 "Id": 11 3619, "pressure_for_lifting": 4 .61, "pressure_for_sliding": 3.78 'lid": 11 3711, "pressure_for_lifting": 4 .16, "pressure_for_sliding": 4.1 "Id": "pressure_for_lifting": 6.06, "pressure_for_sliding": 9.04 "id" : 113911, "pressure_for_lifting": 4.78, "pressure_for_sliding": 3.83 }, "id" : 114011, "pressure_for_lifting": 4 .93, "pressure_for_sliding": 3.93 "pressure_for_lifting": 5. 06, "pressure_for_sliding": 4 .01 "jd" : 114211, "pressure_for_lifting": 5.17, "pressure—for—sliding": 4.08 19 4311, "pressure—for—lifting": 5.25, "pressure—for—sliding": 4.13 "idel: 114411, "pressure—for—lifting": 5.31, "pressure—for—sliding": 4.16 "pressure—for—lifting": 5. 34, "pressure—for—sliding": 4 .16 }, id" : 114611, "pressure—for—lifting": 5. 37, "pressure—for—sliding": 4 .16 114711, "pressure—for—lifting": 5. 39, "pressure—for—sliding": 4 .19 }, id : 114811 , "pressure_for_lifting": 5.38, "pressure_for_sliding": 4 .2 l49lI, "pressure_for_lifting": 5.32, "pressure_for_sliding": 4 .18 "50", "pressure_for_lifting": 5.24, "pressure_for_sliding": 4 .13 "pressure_for_lifting": 6.73, "pressure_for_sliding": 9.87 "52", "pressure_for_lifting": 4.51, "pressure_for_sliding": 3.8 }, "Id": 115311, "pressure_for_lifting": 4. 63, "pressure_for_sliding": 3.43 }, Page 41 of 46 "id" : "5411, "pressure-for-lifting": 4.41, "pressure-for-sliding": 3.76 195591, "pressure_for_lifting": 5.15, "pressure_for_sliding": 2.8 }, "pressure for lifting": 4.55, "pressure for sliding": 3.68 "id" : "pressure_for_lifting": 5.43, "pressure_for_sliding": 2.24 "id" : "58", "pressure_for_lifting": 7.36, "pressure_for_sliding": 2.64 "id": !l59, "pressure_for_lifting": 5. 04, "pressure_for_sliding": 1.79 }, "id" : "6011, "pressure_for_lifting": 4 .5, "pressure_for_sliding": 1.68 "jd" : 1161", "pressure_for_lifting": 3.86, "pressure_for_sliding": 1.55 "idle: "pressure_for_lifting": 4. 68, "pressure_for_sliding": 3.59 }, "id": 116311, "pressure_for_lifting": 4.79, "pressure_for_sliding": 3.56 Ilid": 116411, "pressure_for_lifting": .3.23, "pressure_for_sliding": 1.76 }, "Id" : ' Page 42 of 46 "pressure—for—lifting": 7.82, "pressure—for—sliding": 2.11 }, "pressure—for—lifting": 6.89, "pressure—for—sliding": 3 Frid": 11671F, "pressure—for—lifting": 4.86, "pressure—for—sliding": 1.58 }, "id" : 196811, "pressure—for—lifting": 4.46, "pressure—for—sliding": 1.44 grid": 916991, "pressure—for—lifting": 3.95, "pressure—for—sliding": 1.41 "id": "701w, "pressure_for_lifting": 3.44, "pressure_for_sliding": 1.42 "id" : 197111, "pressure_for_lifting": 3.44, "pressure_for_sliding": 1.4 "jd" : 117211, "pressure_for lifting": 3.33, "pressure_for_sliding": 1.36 "73", "pressure_for_lifting": 3.13, "pressure_for_sliding": 1.3 }, "Id": "pressure_for_lifting": 2. 94, "pressure_for_sliding": 1.24 }, id": 11 75", "pressure_for_lifting": 2.94, "pressure_for_sliding": 1.16 }, "id": 91 7699, "pressure_for_lifting": 2. 94, "pressure_for_sliding": 1.08 Page 43 of 46 uidl : I77 "pressure for lifting": 2. 94, "pressure_for sliding": 0.99 Frid": 91 7811, "pressure_for_lifting": 2. 94, "pressure_for_sliding": 0.9 "79", "pressure_for_lifting": 2. 94, "pressure_for_sliding": 0.81 "id" : 11 8011, "pressure_for_lifting": 2. 94, "pressure_for_sliding": 0.82 ''Id": 118111, "pressure for lifting": 2. 94, "pressure_for_sliding": 0.88 }, Ovid": 11 8219, "pressure_for_lifting": 2. 94, "pressure for sliding": 0.94 Ovid": 1183", "pressure_for_lifting": 2. 94, "pressure_for_sliding": 0.99 }, Void": 11 84", "pressure_for_lifting": 2. 94, "pressure for sliding": 1.07 "id" : 118511, "pressure_for_lifting": 2. 94, "pressure_for_sliding": 1.22 "id" : "8611, "pressure_for_lifting": 2.98, "pressure_for_sliding": 1.43 }, "id" : 11 8711 , "pressure_for_lifting": 3.42, "pressure—for—sliding": 1.52 Page 44 of 46 "pressure—for—lifting": 4 .06, "pressure—for—sliding": 1.66 "id": 1189", "pressure—for—lifting": 2.86, "pressure—for—sliding": 1 .53 }, grid": 119019, "pressure—for—lifting": 5.21, "pressure_for_sliding": 1.72 "91", "pressure_for_lifting": 7.49, "pressure_for_sliding": 2 .37 i d" : 119211, "pressure_for_lifting": 3.84, "pressure_for_sliding": 3.19 "93", "pressure_for_lifting": 3.02, "pressure for sliding": 1.43 94ff, "pressure_for_lifting": 3. 59, "pressure_for_sliding": 1.43 "id": "95", "pressure_for_lifting": 4.15, "pressure_for_sliding": 1.43 "pressure_for_lifting": 6.25, "pressure_for_sliding": 2.67 "pressure_for_lifting": 3. 84, "pressure_for_sliding": 5.8A }, "pressure_for_lifting": 2. 94, "pressure_for_sliding": 3.47 }, "99", "pressure_for_lifting": 2. 94, Page 45 of 46 "pressure_for_sliding": 3.82 "id": 1910011, "pressure_for_lifting": 3. 84, "pressure_for_sliding": 5.67 "id": "101", "pressure_for_lifting": 3.25, "pressure_for_sliding": 6.43 }, "Id": "102", "pressure_for_lifting": 1. 96, "pressure for sliding": 3.11 1, "id": "103", "pressure_for_lifting": 2. 04, "pressure_for_sliding": 3.11 "id": 1110411, "pressure_for_lifting": 3.67, "pressure_for_sliding": 6.28 "id": "105", "pressure_for_lifting": 4.71, "pressure_for_sliding": 7.03 "id": 1110611, "pressure_for lifting": 3. 66, "pressure_for_sliding": 3.11 }, void" : 1110711, "pressure_for_lifting": 3.98, "pressure_for_sliding": 3.21 }, "id": 111081', "pressure_for_lifting": 6. 08, "pressure_for_sliding": 6.68 I, "pressure_parsing_successful": true, "product": "created at": 112017-08-01T16:02:44.961-06:00", "id": 102, "name": 117979 - SunPower T10 E-W", "updated—at": "2018-03-04T07 :50:42.942-07:00" Page 46 of 46