HomeMy WebLinkAbout2852 CAMINO SERBAL; ; CB010995; Permit05/24/2001
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
05/24/2001
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No:CB010995
Building Inspection Request Line (760) 602-2725
2852 CAMINO SERBAL CBAD
RESDNTL Sub Type: SFD
2552812500 Lot#: 554
$290,611.00 Construction Type: VN
Reference #: CT88-03
1 Structure Type: SFD
5 Bathrooms: 3
SHELBOURNE - LC VLLY PHASE 7
PLAN 2-3193 SF, 638 SF GAR, 55 SF DECK
Status: ISSUED
Applied: 03/13/2001
Entered By: JM
Plan Approved:
Issued: 05/24/2001
Inspect Area:
Orig PC#: PC99-149
PlanCheck#: PC01-30
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA92014
858 259-8500
Owner:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA92014
858 259-8500
Total Fees: $12,720.41 Total Payments To Date:$0.00 Balance Due: $12,720.41
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$1,134.84 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$737.65 Meter Fee
$0.00 SDCWA Fee
($59.01) CFD Payoff Fee
$29.06 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$310.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$0.00 Housing InLieu Fee
Master Drainage Fee:
$0.00 Sewer Fee:
$0.00 Additional Fees:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,374.25
$5,289.12
$0.00
$0.00
$0.00
$600.00
$0.00
$0.00
$168.00
$60.00
$76.50
$0.00
$0.00
$0.00
$0.00
$0.00
$12,720.41
Inspector)
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file toe protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacfly
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
GHy if Carlsbad
Final Building Inspection
Dept: Building Englanpring Planning CMWD StLite Fire
FEB" 7 /no/
Plan Check*:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dlsfc
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PC01-30
CB010995
SHELBOURNE - LC VLLY PHASE 7
PLAN 2 - 3193 SF, 638 SF GAR, 55 SF DECK
2852 CAMINO SERBAL
Phone:
LC Water Disk O
/Jif) Date y
X- Xx^ Inspected: 2/7/^^
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 554
" Approved: *
Approved:
Approved:
02/06/2002
RESDNTL
SFD
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 03/04/2002
Permit* CB010995
Title: SHELBOURNE - LC VLLY PHASE 7
Description: PLAN 2 - 3193 SF, 638 SF GAR, 55 SF DECK
Inspector Assignment: PD
2852 CAMINO SERBAL
Lot 554
Type:RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
APPLICANT DAVIDSON BUILDERS
Owner: LACOSTA VALLEY-CARLSBAD L P
Remarks:
Phone: 7609426558
Inspector:
Total Time:Requested By: JORDAN
CD
19
29
39
49
Entered By: CHRISTINE
Description Act Comments
Final Structural M
Final Plumbing /
/Final Electrical j
Final Mechanical / . ....
Associated PCRs
Inspection History
Date Description Act Insp Comments
02/20/2002 39 Final Electrical PA PY EMR
12/05/2001 82 Drywall/Ext Lath/Gas Test AP PD
11/27/2001 16 Insulation AP PD
11/20/2001 84 Rough Combo AP PD
11/19/2001 82 Drywall/Ext Lath/Gas Test AP PD
10/18/2001 13 Shear Panels/HD's AP NF
10/18/2001 15 Roof/Reroof AP NF
08/24/2001 81 Underground Combo AP NF
08/10/2001 21 Underground/Under Floor AP PD
08/10/2001 22 Sewer/Water Service AP PD