HomeMy WebLinkAbout2855 GAZELLE CT; ; CB142825; Permit01-28-2015
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No:
Building Inspection Request Line (760) 602-2725
CB142825
Job Address;
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2855 GAZELLE CT CBAD
Tl
2091201800
$116,964.00
Sub Type:
Lot #:
Construction Type:
Reference #
INDUST Status: APPROVED
0 Applied: 10/21/2014
2B Entered By: SKS
Plan Approved: 10/21/2014
Issued:
Inspect Area
Plan Check #:
ISIS-2,700 SF NEW LAB IN
EXISTING BLDG //ADD EQUIPMENT,
MECHANICAL ON 1ST FLOOR
ELECTRICAL, PLUMBING, &
Applicant:
MONTELLO TERRY
Owner:
CARLSBAD OAKS NORTH PARTNERS L P
4715 60TH ST
SAN DIEGO CA
619-229-0642
92115-3802
P O BOX 80036
SAN DIEGO CA 92138
Building Permit $686.07 Meter Size
Add1 Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00
Plan Check $480.25 Meter Fee $0.00
Add'! Building Permit Fee $0.00 SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $32.75 PFF (3105540) $0.00
Park Fee $0.00 PFF (4305540) $0.00
LFM Fee $0.00 License Tax (3104193) $0.00
Bridge Fee $0.00 License Tax (4304193) $0.00
BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00
BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00
Renewal Fee $0.00 PLUMBING TOTAL $63.00
Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $188.93
Other Building Fee $0.00 MECHANICAL TOTAL $51.52
Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Meter Size Sewer Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00
Reel. Water Con. Fee $0.00 Additional Fees $0.00
Green BIdg Stands (SB1473) Fee $4.00 HMP Fee ??
Fire Expedidted Plan Review $0.00 Green BIdg Standards Plan Chk ??
TOTAL PERMIT FEES $1,506.52
Total Fees: $1,506.52 Total Payments To Date: $1,506.52 Balance Due: $0.00
Inspector:
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad iVlunicipal Code Section 3.32,030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously othenAfise expired.
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERIMIT ISSUANCE: "j^^g^NNING '^g^SNglNEERING I^I^IIIDING j^flKl • HEALTH •HAZMAT/APCD
C City of
Carlsbad
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax:760-602-8558
email: building@carlsbadca.gov
www.carlsbadca.gov
Plan Check No. ^^^^f3 j ^ ^j>^S^
Est. Value /j jp, ^6 W
Plan Ck. Deposit ^)fO,
Date SWPPP
JOB ADDRESS 2855 Gazelle Court SUITE#/SPACE#/UNIT#
209 - 102 11
CT/PROJECT # # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME
ISIS
CDNSTR. TYPE
ll-B B
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s)
Install casework and lab equipment as well as required infrastructure for electrical, plumbing & mechanical for new lab
space within existing building shell space located at the first floor of wing b. No exterior site work under this application.
EXISTING USE
B
PROPOSED USE
B
GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE
YESQ* N0| I
AIR CONDITIONING
YES QNO I I
FIRE SPRINKLERS
YES[^]NO| I
APPLICANT NAME 3YnAY-.&peaan
ADDRESS (eOtv. SV -
PROPERTY OWNER NAME BMR
ADDRESS
17190 Bernardo Center Dr
CITY San Diego STATE CA ZIP CITY
San Diego
STATE
CA
ZIP
92128
PHONE PHONE
858-485-9840
FAX
EMAIL EMAIL
DESIGN PROFESSIONAL
ADDRESS ADDRESS
CITY
San Diego
STATE
CA
ZIP CITY , I SIATE ZIP
PHONE
EMAIL m (pernor M6 TTI PHONE FAX
EMAIL
STATE Lie. #
C22219
o _ CITY BUS. LIC.#
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)).
WORKERS- COMPENSATION
Workers' Compensation Declaration: / hereby affirm under penalty ofpeijury one of the following declarations:
11 have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the worl< for which this permit is issued.
^ I have and will maintain workers' com>ensatlon, as required bv Section 3700 of the Labor Code, for the performance of the worl< for which this permit is issued. My workers' compensation insurance carrier and policy
number are: Insurance Co Policy No. Expiration Date.
This section need not be completed if the permit is for one hundred dollars ($100) or less.
I I Certificate of Exemption: I certify that in thp perforir^fiJB of the work for which this.permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
Califomia. WARNING: Failure to secureyimkers' compensation coverage Is unia nul, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In
addition to the cost of compensation, daffiid&S|as droAjed for In Section 370&of (e Labor code, Interest and attorney's fees.
JS^ CONTRACTOR SIGNATURE \^pJ\/r^\C^^ \plf^^ DATE / ^
OWNER-BUILDER DECi.ARATION
/ hereby affirm (ha( / am exempt fram Contractor's License Law for the following reason:
I I I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I I I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code; The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law),
I I I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. Q Yes I INO
2.1 (have / have not) signed an application for a building permit for the proposed work.
3.1 have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number):
4.1 plan to provide portions of the wori<, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work):
I PROPERTY OWNER SIGNATURE •AGENT DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? Yes No
Is the applicant or future building occupant required to obtain a perniit from the air pollution control district or air quality management district? Yes No
Is the facility to be constnjcted within 1,000 feet of the outer boundary of a school site? Yes No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
C O N S T R U C X I O N L E N jD I H i N c -r^
I hereby affirm that there is a construction lending agency for the performance of the work this permit Is issued {Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
A1 P L I <e A NT CERTIFICATION)
I certify ttiat I have read the application and state that the above inforniation is conect and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building consbuction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentroned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0' deep and dennolitbn or constmctkjn of structures over 3 stories in height.
EXPIRATION: Every pemiit issued by the Buikiing Official under the provisions of this Code shall expire by limitatk)n and become null and void if the building or wori< authorized by such permit is not commenced vwthin
180 days from the date of such permit or if the buikiing or work authorized by such pennit is suspended or abandoned at any time after the wort( is commenced for a period of 180 days (Sedbn 106.4.4 Uniform BuikJing Code).
APPLICANT'S SIGNATURE DATE
STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection.
Fax (760) 602-8560, Email building(a)carlsbadca.aov or Mail the completed fomn to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, Califomia 92008.
C0#: (Office Use Only)
CONTACT NAME OCCUPANT NAME
ADDRESS BUILDING ADDRESS
CITY STATE ZIP CITY STATE ZIP
Carlsbad CA
PHONE FAX
EMAIL OCCUPANT'S BUS. LIC. No.
DEUVERY OPTIONS
PICK UP: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
MAIL/FAX TO OTHER:
ASSOCIATED CB#
NO CHANGE IN USE / NO CONSTRUCTION
CHANGE OF USE / NO CONSTRUCTION
ASSOCIATED CB#
NO CHANGE IN USE / NO CONSTRUCTION
CHANGE OF USE / NO CONSTRUCTION
APPLICANT'S SIGNATURE DATE
Inspection List
Permit*: CB142825 Type: Tl
Date Inspection Item
INDUST
Inspector Act
04/30/2015 89 Final Combo -Rl
04/30/2015 89 Final Combo PB AP
04/23/2015 85 T-Bar -Rl
04/23/2015 85 T-Bar PB AP
03/06/2015 14 Frame/Steel/Bolting/Weldin PB CA
03/03/2015 44 Rough/Ducts/Dampers PB PA
02/26/2015 44 Rough/Ducts/Dampers PB PA
02/18/2015 17 Interior Lath/Drywall PB AP
02/12/2015 14 Frame/Steel/Bolting/Weldin PB PA
02/05/2015 21 Underground/Under Floor PB AP
ISIS - 2,700 SF NEW LAB IN
EXISTING BLDG // ADD EQUIPMENT, ELE
Comments
AM PLEASE/ COF
Friday, May 01, 2015 Page 1 of 1
INSPECTION RECORD
0 INSPECTION Ili^ORb CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
EI CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
IZI FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Cariibadca.qov/Building AND CLICK ON
"Request Inspection"
DATE: /jABr^f/S
CB142825 2855 GAZELLE CT
ISIS - 2,700 SF NEW LAB IN
EXISTING BLDG // ADD EQUIPMENT, ELECTRICAL,
PLUMBING, & MECHANICAL ON 1ST FLOOR
Tl INDUST
Lot#: MONTELLO TERRY
RECORD COPY
IK "YES" IS CHECKED BELOW THAT DIVISION'S APPROVAL IS REQUIRED PRIOR TO REQUESTING A FINAL BUILDING INSPECTION.
IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER
ALL REQUIRED APPROVALS ARE SIGNED OFF— FAX TO 760-602-8560, EMAIL TO BLDGINSPECTIONSC''CARLSBADCA.GOV OR
BRING IN A COPY OF THIS CARD TO: 1635 FARADAY AVE.. CARLSBAD. CA 92008. BUILDING INSPECTORS CAN BE REACHED
AT 760-602-2700 BETWEEN 7:30 AM — 8:00 AM THE DAY OF YOUR INSPECTION.
HO YES Required Prior to Requesting Building Final If Checked YES Date Inspector Notes
Planning/Landscape 760-944-8463 Allow 48 hours
/ / CM&i (Engineering Inspections) 760-438-3891 Call before 2 pm
v/ Fire Prevention 760-602-4660 Allow 48 hours
Type of Inspection Type of Inspection
CODE # BUILDING Date Inspector CODE # ELECTRICAL Date Inspector
#11 FOUNDATION #31 • ELECTRIC UNDERGROUND • UFER
#12 REINFORCED STEEL #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT #33 • ELECTRIC SERVICE • TEMPORARY
• GROUT • WALL DRAINS #35 PHOTOVOLTAIC
#10 TILT PANELS #39 FINAL
#11 POUR STRIPS coDE# MECHANICAL
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING
#14 SUBFRAME • FLOOR • CEILING #44 DDUCTSt PLENUM • REF. PIPING
#15 ROOF SHEATHING #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS #49 FINAL
#16 INSUUTION coDE# COMBOINSPECTION
#18 EXTERIOR LATH 'TO #81 UNDERGROUND (11,12,21,31)
#17 INTERIOR UTH & DRYWALL #82 DRYWALLEXT UTH, GAS TES (17,18,23)
#51 POOLEXCA/STEEL/BOND/FENCE ff #83 ROOF SHEATING, EXT SHEAR (13,15)
#55 PREPUSTER/FINAL #84 FRAME ROUGH COMBO (14,24,34,44) jL n
#19 FINAL #85 T-Bar (14,24,34,44)
CODE # PLUMBING Date Inspector #89 FINAL OCCUPANCY (19,29,39,49) 1
#22 • SEWER &BL/CO • PL/CO FIRE Date Inspector
#21 UNDERGROUND^^ASTE • WTR
#24 TOP OUT /giWASTE fiSlllVTR A/S UNDERGROUND VISUAL
#27 TUB & SHOWER PAN ' —f A/S UNDERGROUND HYDRO
#23 • GAS TEST • GAS PIPING A/S UNDERGROUND FLUSH / ,
#25 WATER HEATER A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC 6|^ ' /I
#29 FINAL A/S FINAL —"
coDE# STORM WATEF? F/A ROUGH-IN —
#600 PRE-CONSTRUCTION MEETING F/A FINAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#807 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OF VIOUTION MEDICAL GAS PRESSURETEST
#610 VERBAL WARNING MEDICAL GAS FINAL
REV 10/2012 SEE BACK FOR SPECIAL NOTES
CARLSBAD 14-2825
11/20/14
EsGil Corporation
In (Partners/tip witli government for (BuiCtfing Safety
DATE: 11/20/14
JURISDICTION: CARLSBAD
PLAN CHECK NO.: 14-2825 SET: II
PROJECT ADDRESS: 2855 GAZELLE COURT
PROJECT NAME: ISIS PHARMACEUTICALS Wing *B' Core Research Lab Tl
• APPLICANT
• JURIS.
• PLAN REVIEWER
• FILE
XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff,
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
I I The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I 1 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
XI Esgil Corporation staff did not advise the applicant that the plan check has been completed.
I I Esgil Corporation
Date contacted:
Mall Telephone
• REMARKS:
Telephone #:
(by: ) e-mail Fax #:
Fax In Person
By: Chuck Mendenhall
EsGil Corporation
n GA • EJ • PC
Enclosures:
11/13/14
EsGii Corporation
In (PartnersAip witH government for (Buidfing Safety
DATE: 10/31/14 • APPLICANT
>arjuRis.
JURISDICTION: CARLSBAD ^• PLAN REVIEWER
• FILE
PLAN CHECK NO.: 14-2825 SET: I
PROJECT ADDRESS: 2855 GAZELLE COURT
PROJECT NAME: ISIS PHARMACEUTICALS Wing *B' Core Research Lab Tl
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
X The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
XI The applicant's copy of the check list has been sent to:
DAVID K.EITI I C/0 DGAAIA, 445 WEST ASH, SAN DIEGO, CA 92101
e-mail: p|kpith(?''^qa-sd,com-
I I Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Q^^>^ tbroSr^Sb^ Telephone #: 619-685-3990
Date contacted: (by^o ) e-mail whorosewki@dga-sd.com Fax #: 619-685-4077
^MailX Telephone^^^Fax In Person
• REMARKS: A ..I*^
By: Chuck Mendenhall Enclosures:
EsGil Corporation
• GA • EJ • PC 10/23/14
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
CARLSBAD 14-2825
10/31/14
PLAN REVIEW CORRECTION LIST
COMMERCIAL
PLAN CHECK NO.: 14-2825 JURISDICTION: CARLSBAD
OCCUPANCY: B//H3 USE: Core Research lab
TYPE OF CONSTRUCTION: ll-B ACTUAL AREA: 2700 sf Tl Only
ALLOWABLE FLOOR AREA: 23K/FLR. STORIES: no change
HEIGHT: no change
SPRINKLERS?: Y OCCUPANT LOAD: 25 lab Tl Only
REMARKS:
DATE PLANS RECEIVED BY DATE PLANS RECEIVED BY
JURISDICTION: 6/11/10 ESGIL CORPORATION: 10/23/14
DATE INITIAL PLAN REVIEW PLAN REVIEWER: Chuck Mendenhall
COMPLETED: 10/31/14
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2012 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e.. plan sheet number, specification section, etc.
Be sure to enclose the marked up list when vou submit the revised plans.
CARLSBAD 14-2825
10/31/14
GENERAL
The following note should be given with each correction list:
Please make all corrections, as requested in the correction list. Submit three new complete sets of plans for
commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets
can be submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department,
1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the
Carlsbad Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208,
San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City
of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning,
Engineering and Fire Departments until review by EsGil Corporation is complete.
• PLANS
1. Clearly identify on the floor plan on sheet A-101B the location of the fume hoods, and the
location of the reagent benches.
2. Detail on the plans the framing of the hard lid ceiling areas.
3. Include with the plans a written description of the type of work conducted within this tenant
improvement area. Include in the description the type of chemicals or other hazardous
materials to be used in the lab and the quantity of the hazardous materials used in the lab.
4. Please provide an updated hazardous material opinion and repotr for this new lab area or
provide a copy of the original report that shows that this lab combined with other areas and
materials within the control area do not exceed the limits in the code for the control area, as
per CBC, Section 414.1.3. CBC, Section 414.1.3.
• EXITS
5. Note on plans: "All egress doors shall be readily openable from the egress side without the use
of a key or special knowledge or effort." Section 1008.1.8. In lieu of the above, "Provide a
sign on or near the exit door, reading THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS
OCCUPIED." This signage is only allowed at the main exit.
. ELECTRICAL and ENERGY COMMENTS
6. Show on the plans the required motion sensor light controls as per the energy compliance
documents energy form LTI-02-E page 2 of 3 listing the controls within the core lab as
dimming/occupancy sensor.
7. Automatic davliqhting. On the electrical floor plans, include the daylit locations control design.
Note: Daylite dedicated multilevel control is required if lighting power exceeds .3 watts/square
foot. Include the details for the daylit control design. ES 130.1(d)
• MECHANICAL
8. Include on the mechanical plan sheet M301 the location of the fume hoods and the supply and
CARLSBAD 14-2825
10/31/14
exhaust ducts for the fume hoods.
9. Include with the mechanical plans air balance calculations for the fume hoods. Clearly outline
how you intend to provide the MUA for the fume hoods. CMC 505.3
10. Specify on the plans the type of duct material used for the exhaust fume hoods that exhaust
solvents or corrosive fumes. The duct material must a type of material approved for use for the
type of materials exhausted.
11. Show on the plans that the fume hood exhaust will be contained in a 2 Hr rated shaft where it
penetrates the rated floor system above the lab area. Further show the fume hood exhaust
termination on the roof a min of 10ft from any opening into the building. CMC 506
12. Show on the plans that the new lab area mechanical ventilation will provide min required OSA
as per CMC Table 403.7 Science lab rate of 1 CFM/ sq ft of floor area.
END OF REVIEW
(NOTE: This is a preliminary plan review. A complete code check will be made after the
iems listed above have been addressed)
To speed up the review process, note on this list (or a copy) where each correction item has
been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the
plan review for your project. If you have any questions regarding these plan review items,
please contact Chuck Mendenhall at Esgil Corporation. Thank you.
CARLSBAD 14-2825
10/31/14
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD PLAN CHECK NO.: 14-2825
PREPARED BY: Chuck Mendenhall DATE: 10/31/14
BUILDING ADDRESS: 2855 GAZELLE COURT
BUILDING
PORTION
AREA
( Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
LabTI 2700 City Est 116,964
Air Conditioning
Fire Sprinklers
TOTAL VALUE 116,964
Jurisdiction Code cb By Ordinance
BIdg. Permit Fee by Ordinanoe
Plan Check Fee by Ordinance
Type of Review: H Complete Review
ORepetitive Fee
^ Repeats
• Other
|—I Hourly
EsGil Fee
• Structural Only
Hr. @ *
$686.41
$446.17
$384.39
Comments: N/A In addition to the above fee, an additional fee of is due (hours .) for the
CalGreen review.
Sheet 1 of 1
macvalue.doc +
^ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
Community 8i Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 10/24/14 PROJECT NAME: ISIS
PLAN CHECK NO: 1 SET#: ADDRESS: 2855 GAZELLE CT
VALUATION: $116,964 R&D HO CHANGE IN USE
PROJECT ID: CB 14 2825
APN:
/ This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: KATHLEEN LAWRENCE 10/24/14
A Final Inspection by the Division is required Yes / No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: PERMITS@COX.NET
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
Chris Si5)(ton
Chris.Sexton@carlsbadca.gov
/ Kathleen Lawrence
^ 760-602-2741
Katiileen.Lawrence@carlsbadca.gov Gregory.Rvan@carlsbadca.gov
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cvnthia.Wonfi@carlsbadca.gov
Dominic.Fieri@carlsbadca.gov
Remarks:
NOADDTL ENGFEES"
PLANNING DIVISION Development Services
Planning Division BUILDING PLAN CHECK Development Services
Planning Division
CITY OF REVIEW CHECKLIST 1635 Faraday Avenue
CARLSBAD P-28 (760) 602-4610
www.carlsbadca.eov
DATE: 11-26-14 PROJECT NAME: PROJECT ID:
PLAN CHECK NO: CB 14-2825 SET#: 3 ADDRESS: 2855 Gazelle Ct APN: 209-120-18-00
^ This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required • Yes ^ No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
Q This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: permits@cox.net
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
X Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
1 1 Kathleen Lawrence
760-602-2741
Kathleen.La wrence@carlsbadca.fiov
Greg Ryan
760-602-4663
Gregorv.Rvan@carlsbadca.fiov
1 1 Gina Ruiz
760-602-4675
Gina.Rulz@carlsbadca.gov
I 1 Linda Ontiveros
760-602-2773
Llnda.Ontlveros@carlsbadca.gov
Q Cindy Wong
760-602-4662
Cvnthia.Wong@carlsbadca.gov
• • 1 1 Dominic Fieri
760-602-4664
Dominic.Flerl@carlsbadca.gov
Remarks:
Plan Check No. CB 14-2825 Address 2855 Gazelle Ct Date 11-26-14 Review # 3
Planner Chris Sexton Phone (760) 602-4624
APN: 209-120-18-00
Type of Project & Use: H Net Project Density: DU/AC
Zoning: P-M General Plan: PI Facilities Management Zone: 18
CFD (in/out) #_Date of participation: Remaining net dev acres:
(For non-residential development: Type of land use created by this permit: )
REVIEW #:
12 3 Legend: ^ Item Complete • Item Incomplete - Needs your action
lEl • • Environmental Review Required: YES • NO • TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
lEI • • Discretionary Action Required: YES • NO • TYPE
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: PIP 09-02 approved with 573 spaces
• • Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES Q NO Q
CA Coastal Commission Authority? YES • NO •
If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive,
Suite 103, San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
• • Habitat Management Plan
Data Entry Completed? YES • NO •
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of
Habitat Type impacted/taken, UPDATE!)
• • Inclusionary Housing Fee required: YES • NO •
(Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES • NO •
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct
Housing Y/N, Enter Fee, UPDATE!)
• • Housing Tracking Form (form P-20) completed: YES • NO • N/A •
p.28 Page 2 of 3 07/11
Site Plan:
K • • Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
City Council Policy 44 - Neighborhood Architectural Design Guidelines
• • 1. Applicability: YES • NO •
• • 2. Project complies: YES • NOQ
• •
• •
Zoning:
1. Setbacks: N/A - no additions to existing building all interior
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Required
Required
Required
Required
Required
2. Accessory structure setbacks: N/A
Front: Required
Interior Side: Required
Street Side: Required
Rear: Required
Structure separation: Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
• • 3. Lot Coverage: N/A Required Shown
• • 4. Height: Required Shown
• • lEI 5. Parking: Spaces Required 573 per PIP 09-02 Shown 572
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
• • K Additional Comments 1) Please show the parking breakdown. An example is attached to
ensure there is adequate parking. 2) Will there be any new roof mounted equipment? If so,
will be screened? An example is attached. 11-17-14 Applicant states no new roof mounted
equipment and all existing eguipment is screened.
11-17-14 1) The parking calculation shown on sheet A-000 is incorrect. Per the Carlsbad
Municipal Code, Section 21.44.010 the parking reguired for bio industrial R&D is 1 space per
300 sguare feet of gross floor area. The plans show 3.3 spaces per 1000 sguare feet of
gross floor area thereby making the total required parking spaces for the bio industrial R&D
569 spaces and 2 spaces for the warehouse use for a total 571 spaces. Please correct this
on sheet A-000.
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 11-26-14
p-28 Page 3 of 3 07/11
^ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
BUILDING DEPT
CoQQfii^^^& Economic
Development Department
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
DATE: 11/07/2014 PROJECT NAME: ISIS PHARMA PROJECT ID: CB142825
PLAN CHECK NO: 1 SET#: 1 ADDRESS: 2855 GAZELLE CT APN:
•
This plan check review is complete and has been APPROVED by the FIRE Division.
By: GR
A Final Inspection by the FIRE Division is required ves • No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: T. Moriteiio
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
76(>«02-2750
FIRE PREVENTION
760-602-4665
1 1 Chris Sexton
760-602-4624
Chrls.Sexton@carlsbadca.eov
1 1 Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
X Greg Ryan
760-602-4663
Gregory.Ryan@carlsbadca.gov
1 1 Gina Ruiz
760-602-4675
Glna.Rulz@carlsbadca.gov
1 1 Linda Ontiveros
760-602-2773
Linda.Ontlveros@carlsbadca.gov
1 1 Cindy Wong
760-602-4662
Cynthia.Wong@carlsbadca.gov
• • 1 1 Dominic Fieri
760-602-4664
Domlnic.Fleri@carlsbadca.gov
Carlsbad Fire Department BUILDING DEPT
COPY
Plan Review Requirements Category: Tl, INDUST
Date of Report: 11-07-2014 Reviewed by
Name:
Address:
MONTELLO TERRY
4715 BOTH ST
SAN DIEGO CA
92115-3802
Permit #: CB142825
Job Name:
Job Address:
ISIS-2,700SF NEW LAB IN
2855 GAZELLE CT CBAD
Please review carefully all comments attached.
Conditions:
CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED:
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
Entry: 11/07/2014 By: GR Action: AP
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
ISIS Pharmaceuticals, INC
2855 Gazelle Court
Carlsbad, CA 92010
Project Designer:
DGA
445 W. Ash Street
San Diego, CA 92101
(619) 685-3990
Report Prepared by:
Jemar Quibuyen
DEC Engineers, Inc.
7360 Carroll Road
San Diego, CA 92121
(858) 578-3270
RECEIVED
OCT 21 2014
CITY OF CARLvSBAD
BUILDING DIVISION
Job Number:
4373
Date:
10/16/2014
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and Is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - wwwjMrgysoft.com
EnergyPro 6.3 by Energy Soft User Number: 5151
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Form MCH-01-E Mechanical Systems 3
Form MCH-02-E HVAC System Requirements 6
Form MCH-03-E Mechanical Ventilation and Reheat 8
Form MCH-04-E Required Acceptance Tests 10
Form MCH-05-E Requirements for Packaged Single Zone Units 13
EnergyPro 6.3 by EnergySoft Job Number: 10:4373 User Number: 5151
STATE OF CALIFORNIA mBk. MECHANICAL SYSTEMS mBk.
CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION*'^'
CERTIFICATE OF COMPLIANCE NRCC-MCH-Ol-E
Mechanical Systems (Page 1 of 3)
proiectNsme: |sis pharmaceuticals, INC [>,tePr6„ared; 10/16/2014
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet Is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual
Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
YES NO Form/Worksheet # Title
H • NRCC-MCH-Ol-E (Part 1 of 3) Certificate of Compliance, Declaration. Required on plans for all submittals.
E • NRCC-MCH-Ol-E (Part 2 of 3) Certificate of Compliance, Required Acceptance Tests (MCH-02A to llA). Required on plans for all submittals.
• NRCC-MCH-Ol-E (Part 3 of 3) Certificate of Compliance, Required Acceptance Tests (MCH-12A to 18A). Required on plans where applicable.
• Si NRCC-MCH-02-E (Part 1 of 2) Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans.
• B NRCC-MCH-02-E (Part 2 of 2) Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water
systems. It is optional on plans.
• IZ NRCC-MCH-03-E Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooli'ng systems. It is
optional on plans.
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all
acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.
Installing Contractor:
The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
Enforcement Agency:
Plancheck - The NRCC-MCH-C
Inspector - Before occupancy
)l-Eform is not considered a completed form
permit is granted all newly installed process s
md is not to be accepted by the building department unless the correct boxes are checked,
/stems must be tested to ensure proper operations.
Test Description MCH-02A lyiCH-OBA MCH-04A MCH-OSA MCH-OSA MCH-07A MCH-OSA MCH-OSA MCH-lOA MCH-llA
Equipment
Requiring Testing
or Verification
#of
units
Outdoor
Air
Single Zone
Unitary
Air
Distribution
Ducts
Economizer
Controls
Demand
Control
Ventilation
(DCV)
Supply Fan
VAV
Valve Leakage
Test
Supply Water
Temp. Reset
Hydronic
System
Variable Flow
Control
Automatic
Demand Shed
Control
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • •
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
STATE OF CALIFORNIA
MECHANICAL SYSTEMS
CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION '"TW'
CERTIFICATE OF COMPLIANCE NRCC-MCH-Ol-E
Mechanical Systems (Page 2 of 3)
proj,ctN.me: |g|g phariTiaceutlcals, INC Date Prepared: 10/16/2014
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all
acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.
Installing Contractor:
The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
The following tests require a
Enforcement Agency:
Plancheck - The NRCC-MCH-C
Inspector - Before occupancy
U-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked,
permit is granted all newly installed process systems must be tested to ensure proper operations.
Test Description MCH-12A MCH-13A MCH-14A MCH-15A MCH-16A MCH-17A MCH-18A
Equipment
Requiring Testing
or Verification
#of
units
Fault Detection &
Diagnostics for DX
Units
Automatic Fault
Detection &
Diagnostics for Air &
Zone
Distributed Energy
Storage DX AC
Systems
Thermal Energy
Storage (TES)
Systems
Supply Air
Temperature Reset
Controls
Condenser Water
Reset Controls
ECMS
• • • • • • •
• • • • • • •
• • • • • • •
• • • • • • •
• • • • D • •
• • • • • • •
• • • • • • •
• • • • • • •
• • • • • • •
• • • • • • •
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
MECHANICAL SYSTEMS mm CEC-NRCC-MCH-01-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION*"!!*'*
CERTIFICATE OF COMPLIANCE NRCC-MCH-Ol-E
Mechanical Systems (Page 3 of 3)
Project Name: |g|g pharmaCBUtiCalS, INC Date prepared: 10/16/2014
DOCUIVIENTATION AUTHOR'S DECLARATION STATEIMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Docunnent^ion Author Nanrte: jg^^^ QuibUyen Documentation Author Signature; /T^/tyt/h^^J^
DEC Engineers, Inc. Signature Date: 10/16/2014 "
7360 Carroll Road CEA/ HERS Certification Identification (if applicable):
City/State/Zip: gg^ pjgg^^ (.^ g2i gl Phone: (858)578-3270
RESPONSIBLE PERSON'S DECLARATION STATEMENT
1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worlcsheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. 1 understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the
building owner at occupancy. „
Responsible Designer Nanne: p^^-g ^^^y^ p g Responsible Designer Signature: / \A )/
- DEC Engineers, Inc. Date Signed: ,0/16/2014
""""^ 7360 Carrol Road ^^"^'^ M30087
Citv/Stale/Zip: ^.^^^^^ gl '•'"""^ (858) 578-3270
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
SIAlt Uh UALIhUKNIA
HVAC SYSTEM REQUIREMENTS
CEC-NRCC-MCH-02-E (Revised 06/14) Ipt
CALIFORNIA ENERGY COMMISSION ' '
CERTIFICATE OF COMPLIANCE NRCC-iVICH-02-E
HVAC Dry System Requirements (Page 1 of 3)
ProiecNa™: jgig pharmaceuticals, INC Date Prepared: 10/16/2014
Equipment Tags and System Description^ Undefined Systen
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
T-24 Sections Reference to the Requirements in the Contract Documents^ MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
110.1 or 110.2(a)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
110.1 or 110.2(a)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
110.2(b), 110.2(c)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
110.2(d)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
110.2(f)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.1(b)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.1(c)4
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.1(c)5,120.2(e)3
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.2(e)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.2(f)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.2(g)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.2(h)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
120.2(i)
MANDATORY MEASURES
Heating Equipment Efficiency^
Cooling Equipment Efficiency'
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leal<age AHUs
Ventilation"
Demand Control Ventilation^
Occupant Sensor Ventilation Control
Shutoff and Reset Controls^
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation 120.4
PRESCRIPTIVE MEASURES
Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^"
140.4(a & b) Y Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^"
140.4(c)
Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^"
140.4(d)
Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^"
140.4(e)
Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^"
140.4(f)
Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^"
140.4(g)
Equipment is sized in conformance with
140.4 (a & b)
Supply Fan Pressure Control
Simultaneous Heat/Cool^
Economizer
Heat and Cool Air Supply Reset
Electric Resistance Heating^
Duct Leakage Sealing and Testing.^" 140.4(1)
Notes:
1. Provide equipment tags (e.g. AHU Ito 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units
with common requirements can be grouped together.
2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system.
3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency
requirements are applicable (e.g. full- and part-load) include all. Where appliance standards apply (110.1), identify where
equipment is required to be listed per Title 201601 et seq.
4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central
unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the
plans and specifications. Multiple zone central air systems must also provide a MCH-03-E form.
5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the
sequence of operation.
6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and
the sequence of operation
7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).
For all systems identify the specification for the thermostats and time clocks (if applicable).
8. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the
specification of the zone controls. Provide a MCH-03-E form.
9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies.
10. If duct leakage sealing and testing is required, a MCH-04-A form must be submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS
CEC-NRCC-MCH-02-E (Revised 06/13) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Wet System Requirements (Page 3 of 3)
Project Name: (gjg pharmacButicals, INC Date Prepared: 10/16/2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: . ..
Jemar Quibuyen
Documentation Author Signature: ^
company: Engineers, Inc. Signature Date: 10/16/2014 ^
''^"''"^ 7360 Carroll Road CEA/ HERS Certification Identification (if applicable):
City/State/Zip: San Diego, CA 92121 (858)578-3270
RESPONSIBLE PERSON'S DECURATION STATEMENT
1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. lam eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. 1 understand that a completed signed copy of this
Certificate of Compliance is required to be included with the documentation the builder provides to the^building owner at occupancy.
Responsible Designer Name: ^^^j^ p^^^^ Responsible Designer Signature: / )// Z' )/
DEC Engineers, Inc. — — L—-J6^—\S&^^
Date Signed: ^ 0/16/2014
7360 Carrol Road M30087
City/State/Zip: San Diego, CA 92121 (858) 578-3270
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
REQUIRED ACCEPTANCE TESTS
CEC-NRCC-MCH.04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION '-^
CERTIFICATE OF COMPLIANCE NRCC-IVICH-04-E
Required Acceptance Tests (Page 1 of 3)
proienN,a,e: |g|s pharmaceutlcals, INC Date Prepared; 10/16/2014
MECHANICAL COMPLIANCE FORMS & WORKSHEETS (indicate if worksheet Is Included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual Note: The Enforcement Agency may
require all forms to be incorporated onto the building plans. Forms NRCC-MCH-04-E and NRCC-MECH-05-E are alternative forms to NRCC-MCH-Ol-E, NRCC-MCH-02-E and NRCC-
MCH-03-E for projects using only single zone packaged HVAC systems.
YES NO Form Title
• NRCC-MCH-04-E (1 of 2) Certificate of Compliance. Required on plans when used.
• NRCC-MCH-04-E (2 of 2) Mechanical Acceptance Tests. Required on plans when used.
• NRCC-IVICH-05-E (1 of 2) HVAC Prescriptive Requirements. It is required on plans when used.
• NRCC-MCH-05-E (2 of 2) Mechanical SWH Equipment Summary is required for all submittals with service water heating, pools or spas. It is
required on plans where applicable.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
STATE OF CALIFORNIA
REQUIRED ACCEPTANCE TESTS
CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E
Required Acceptance Tests (Page 2 of 3)
ProienName: (gig PharmacButicals, INC Date Prepared: 10/16/2014
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the
applicable boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment
description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test.
Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated
for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance. Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements..
The NRCC-MCH-04-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment
requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be
conducted. The following checked-off forms are required for ALL newly installed and replaced equipment. In addition a Certificate of Acceptance forms shall be submitted to
the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of Section 10-103(b)
and Title 24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy.
Test Description MCH-02-A IVICH-03-A MCH-04-A IVICH-05-A IV1CH-06-A MCH-07-A IV1CH-11-A IV1CH-12-A MCH-14-A IVICH-18-A Test Performed By:
Equipment
Requiring
Testing or
Verification
#of
units
Outdoor
Air
Single Zone
Unitary
Air
Distribution
Ducts
Economizer
Controls
Demand
Control
Ventilation
(DCV)
Supply
Fan VAV
Automatic
Demand
Shed
Control
FDD for
Packaged
DX Units
Distribute
d Energy
Storage
DXAC
Systems
Energy
Managem
ent
Control
System
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
REQUIRED ACCEPTANCE TESTS
CEC-NRCC-MCH-04-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-04-E
Required Acceptance Tests (Page 3 of 3)
ProiecName, |g|s pharmaceuticals, INC Date Prepared: 10/16/2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Dcumentatior, Author Name: j^^^^ Qulbuysn Documentation Author Signature; AAJ^.^^
'"""""'^ DEC Engineers, Inc. Signature Date: .,Q^.|g/2oi 4 ^
7360 Carroll Road CEA/ HERS Certification tdentiHcation (if applicable);
ci,y/s,a.=/zip: San Diego, CA 92121 (858) 578-3270
RESPONSIBLE PERSON'S DECLARATION STATEMENT
1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. 1 understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the
building owner at occupancy. ,
Responsible Designer Nan„e: ^^^.^ ^^^^ Responsible Designer Signature; ^ (^U^^
DEC Engineers, Inc. DateSigned: 10/16/2014'^
7360 Carrol Road K<30087
a.y/sta,./zip: San DIego, CA 92121 """""'^ (858) 578-3270
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
STATE OF CALIFORNIA
REQUIREMENTS FOR PACKAGED SINGLE ZONE UNITS
CEC-NRCC-MCH-05-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-05-E
Requirements for Packaged Single-Zone Units (Page 2 of 2)
proiecName: (gig Rharmaceuticals, INC Date Prepared: 10/16/2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Docgmentation Autiior Name: ,
Jemar Quibuyen
Documentation Author Signature; /T^AA/X/^^^
Company: _ ,
DEC Engineers, Inc. Signature Date: 10/16/2014 ^
Address:
7360 Carroll Road
CEA/ HERS Certification Identification (if applicable);
ci.,/s.a.e/zip: San Diego, CA 92121 '•'"'"'^ (858)578-3270
RESPONSIBLE PERSON'S DECLARATION STATEMENT
1 certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. 1 understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the
building owner at occupancy. ^ .
Responsible Designer Name: ^.^^..^ Responsible Designer Signature; ^ (^^<iS^
^ DEC Engineers, Inc. Date Signed: 10/16/2014
"""'"^^ 7360 Carrol Road License:
M300B7
ci.v/s,a,e/zip: San DIego, CA 92121 ''^^'^'^ (858) 578-3270
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
PLUMBING, Development Services
CITY OF
ELECTRICAL, Building Division
CITY OF MECHANICAL 1635 Faraday Avenue
760-602-2719
CARLSBAD WORKSHEET
B-18
www.carlsbadca.gov
Building(a)carlsbadca.KOv
Project Address: Permit No.:
Information provided below refers to worl? being done on the above mentioned permit only.
This form must be completed and returned to the Building Division before the permit can be issued.
Building Dept. Fax: (760) 602-8558
Number of new or relocated fixtures, traps, or floor drains 4
New building sewer line? Ves No X
Number of new roof drains? X
Install/alter water line? N/A
Number of new water heaters? 0
Number of new, relocated or replaced gas outlets? 0
Number of new hose bibs? 0
Residential Permits:
New/expanded service: Number of new amps: —
Minor Remodel on/y: Ves No "/^
Commercial/Industrial:
625A
Tenant Improvement: Number of existing amps involved in this project:
Number of new amps involved in this project: ^^^^
New Construction: Amps per Panel:
Single Phase Number of new amperes ^
281A
Three Phase Number of new amperes
5A
Three Phase 480 Number of new amperes
Number of new fumaces, A/C, or heat pumps? 0
New or relocated duct worb? Ves X (new) No
Number of new fireplaces? 0
Number of new exhaust fans? 0
Relocate/install vent? No
Number of new exhaust hoods? 1
Number of new boilers or compressors? Number of HP 0
B-18 Page 1 of 1 Rev. 03/09
CB142825 2855 GAZELLE CT
ISIS - 2,700 SF NEW LAB IN
EXISTING BLDG // Ann FOI IIPMPMT PJ cr-ro,r-Ai
nj\^|t4 Odto^:!^-^^^^^^
A
Final Inspection required by:
• Plan • CM&I ^Oili^e
sw — QissuED acv.
Approved Datfe _By
BUILDING nl2ryj\LJ (:/}/)
PLANNING
ENGINEERING
FIRE Expedite? Y CA^
DIGITAL FILES Required? Y N
HazMat
APCD
Health
Forms/Fees Sent Rec'd Due? By
Encina Y N
Fire Y N
HazHealthAPCD Y N
PE&M y N
School Y N
Sewer Y N
Stormwater Y N
Specie^ jnspection Y N
CFD: (fe N
LandUse: f^pf Density: ImpArea: j FY: Annexi^^SlI Factor:
PFF: Y ^
Comments Date Date Date Date
Building l°bilh
Planning
Engineering
Fire
Neecl?
/L/PSH CtT /^o"^
• Done
O Done