HomeMy WebLinkAbout2859 CAMINO SERBAL; ; CB010996; Permit05/24/2001
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
05/24/2001
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No:CB010996
Building Inspection Request Line (760) 602-2725
2859 CAMINO SERBAL CBAD
RESDNTL Sub Type: SFD
2552811700 Lot#: 546
$304,500.00 Construction Type: VN
Reference #: CT88-03
1 Structure Type: SFD
5 Bathrooms: 4.5
SHELBOURNE - LC VLLY PHASE 7
PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF
Status: ISSUED
Applied: 03/13/2001
Entered By: JM
Plan Approved:
Issued: 05/24/2001
Inspect Area:
Orig PC#: PC99-149
Plan Check#: PC01-30
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA 92014
858 259-8500
Owner:
DAVIDSON BUILDERS
13Q2CAMiNODELMAR
DEL MAR CA 92014
858259-8500
Total Fees: $13,082.48 Total Payments To Date:$0.00 Balance Due: $13,082.48
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$1,177.96 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$765.67 Meter Fee
$0.00 SDCWA Fee
($61.25) CFD Payoff Fee
$30.45 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$310.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$0.00 Housing InLieu Fee
Master Drainage Fee:
$0.00 Sewer Fee:
$0.00 Additional Fees:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,374.25
$5,541.90
$0.00
$0.00
$0.00
$600.00
$0.00
$0.00
$203.00
$60.00
$80.50
$0.00
$0.00
$0.00
$0.00
$0.00
$13,082.48
Inspectol
FINAL APPROVAL
Date:z Clearance:
NOTICE: Please take NOTIOE that approval of your project Includes the 'Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactjy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
City of Carlsbad
Final Building Inspection
Dept: Building Enginggjgg Planning CMWD StLite Fire
FEB ' 7
Plan Check #:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PC01-30
CB010996
SHELBOURNE - LC VLLY PHASE 7
PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF
2859 CAMINO SERBAL
Phone:
LC Water Dist O
xO rfS7 Date
X Fsiy Inspected: •&/?/**'
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 546
Approved: V
Approved:
Approved:
02/06/2002
RESDNTL
SFD
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 02/22/2002
Permit* CB010996
Title: SHELBOURNE - LC VLLY PHASE 7
Description: PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF
Inspector Assignment: PD
2859 CAMINO SERBAL
Lot 546
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
APPLICANT DAVIDSON BUILDERS
Owner: LACOSTA VALLEY-CARLSBAD L P
Remarks:
Phone: 7609424330
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: GARY
Entered By: CHRISTINE
Comments
Associated PCRs
Inspection History
Date Description Act Insp Comments
02/20/2002 89 Final Combo
02/12/2002 39 Final Electrical
11/21/2001 82 Drywall/Ext Lath/Gas Test
11/13/2001 16 Insulation
11 /08/2001 84 Rough Combo
10/12/2001 83 Roof Sheathing/Ext Shear
08/22/2001 81 Underground Combo
08/07/2001 21 Underground/Under Floor
08/07/2001 22 Sewer/Water Service
CO PY BROKEN WINDOW
PA PY EMR
AP PD
AP PS
AP PD
AP PD
AP NF
AP PD
AP PD