HomeMy WebLinkAbout2860 Trails Ln; ; CB153202; PermitResidential Permit
Print Date: 01/16/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2860 Trails Ln
BLDG-Residential
1560904100
$439,241.00
1
3.00
TRAILS END
Work Class:
Lot#:
Reference #:
Construction Type:
Bathrooms:
Orig. Plan Check#:
Plan Check#:
Single Family Attached
7
DEV04063
VB
4.50
PC130072
Description: TRAILS END-TYPE 1-UNIT 7-SF ATTACHED 2781 SF, 523 SF GAR, 445 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFO
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
TRAFFIC IM PACT Residential Condo Outisde CFO
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $32,046.64 Total Payments To Date: $32,046.64
Ccityof
Carlsbad
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Balance Due:
Permit No: CB153202
Closed -Finaled
09/29/2015
12/19/2017
CRenf
1/16/2020 1:02:27PM
$0.00
$1,833.00
$783.10
$66.00
$166.00
$92.00
$182.00
$15,373.44
$18.00
$5,029.00
$934.00
$57.10
$232.00
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as 11fees/exactlon." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153202)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address: 2860 Trails Ln
IVR Number: 709460
Carlsbad, CA
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07109/2019 0710912019 BLDG-82 Drywall, 096885-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Tosi, Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Extenor Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
08/22/2019 08/22/2019 BLDG-21 101647-2019 Passed Chris Renfro Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Backflow underground PVC to main line Yes
connection. OK to backfill
10131/2019 10131/2019 BLDG-33 Service 109549-2019 Passed Chris Renfro Complete
Change/Upgrade
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/1612020 0111612020 BLDG-Final 116586-2020 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
January 16, 2020 Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153202)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address: 2860 Trails Ln
Carlsbad, CA
IVR Number: 709460
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Relnspection Complete
Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
05/2412019 05/2412019 BLDG-13 Shear 092842-2019 Partial Pass Andy Krogh Reinspectlon Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Prelim shear at party walls Yes
05/2912019 05/2912019 BLDG-17 Interior 093022-2019 Partial Pass Paul Burnette Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
0610312019 0610312019 BLDG-17 Interior 093459-2019 Failed Chris Renfro Relnspectlon Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Not ready No
06/19/2019 06/1912019 BLDG-84 Rough 095042-2019 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
05/25/2019 06/25/2019 BLDG-16 lnsulatlon 095607-2019 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
06/25/2019 06/26/2019 BLDG-27 Shower 095806-2019 Passed Chris Renfro Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
0612712019 06/2712019 BLDG-27 Shower 095877-2019 Partial Pass Chris Renfro Reinspection Incomplete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07103/2019 07/03/2019 BLDG-17 Interior 096469-2019 Partial Pass Chris Renfro Relnspectlon Incomplete
Lath/Drywall
January 16, 2020 Page 3 ol 4
PERMIT INSPECTION HISTORY REPORT (CB153202)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address:
IVR Number: 709460
Scheduled
Date
Actual Start Date Inspection Type Inspection No.
Checklist Item
01/31/2019 01/31/2019 BLDG-14
BLDG-Building Deficiency
082727-2019
Frame/Steel/Boltlng/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
02/26/2019 02/26/2019 BLDG-14 084628-2019
Frame/Steel/Boltlng/
Welding (Decks)
Checklist Item
BLOG-Building Deficiency
03/15/2019 03/15/2019 BLDG-14 086231-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Buildlng Deficiency
04/18/2019 04/18/2019 BLDG-13 Shear
Panels/HD (ok to
wrap)
089346-2019
Checklist Item
BLDG-Building Deficiency
04/19/2019 04/19/2019 BLDG-15 089585-2019
Roof/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
05/14/2019 05/14/2019 BLDG-14 091804-2019
Frame/Steel/Baiting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
05/23/2019 05/23/2019 BLDG-16 lnsulatlon 092631-2019
January 16, 2020
Inspection Status Primary Inspector
COMMENTS
Footings Check
Partial Pass
COMMENTS
Tim Frazee
Floor sheathing nailing on basement floor
OK
Partial Pass Tim Frazee
COMMENTS
Floor sheathing nailing on basement floor
OK
2nd floor sheet nailing on floor
Partial Pass Tim Frazee
COMMENTS
Floor sheathing nailing on basement floor
OK
2nd floor sheet nailing on floor
3rd floor sheathing OK upper floor 3/15/19
Passed
COMMENTS
Passed
COMMENTS
Roof nailing ok
Partial Pass
COMMENTS
Tim Frazee
Tim Frazee
Paul Burnette
Floor sheathing nailing on basement floor
OK
2nd floor sheet nailing on floor
3rd floor sheathing OK upper floor 3/15/19
Partial Pass Paul Burnette
TRUST THE PEV FAMILY
REVOCABLE TRUST
2860 Trails Ln
Carlsbad, CA
Re inspection Complete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Relnspectlon Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Reinspectlon Incomplete
Passed
Yes
Reinspectlon Incomplete
Page 2 of 4
PERMIT INSPECTION HISTORY REPORT (CB153202)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 1211912017 Subdivision:
Status: Closed -Finaled Expiration Date: 0412812020 Address: 2860 Trails Ln
Carlsbad, CA
IVR Number: 709460
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete Date Start Date
1212012017 BLDG-21 044269-2017 Passed Paul Burnette Complete
Underground/LI nderf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/24/2018 01/24/2018 BLDG-11 046753-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02101/2018 02101/2018 BLDG-11 047543-2018 Partial Pass Paul Burnette Re inspection Incomplete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02114/2018 05/01/2019 BLDG-66 Grout 048768-2018 Cancelled Paul Burnette Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/09/2018 03/09/2018 BLDG-11 051140-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03127/2018 03127/2018 BLDG-66 Grout 052857-2018 Partial Pass Paul Burnette Reinspectlon Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
04/10/2018 04/10/2018 BLDG-66 Grout 054427-2018 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06105/2018 06/0512018 BLDG-11 059954-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/23/2018 10/23/2018 BLDG-11 073880-2018 Partial Pass Tim Frazee Reinspection Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
January 16, 2020 Page 1 of4
«~" ~ CITY 04 CB~~CORD COPY
CARLSBAD 2860 TRAILS LN
Building Division INSPECTION RECORD TRAILS END-TYPE 1-UNIT 7-SF ATTACHED 2781 SF. 523
SF GAR. 445 SF DECK li1I INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
li1I CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
li1I FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carisbadca.gpv/BuHdlng AND CLICK ON
"Request lnspec;tlon·
DATE: 12 -19 -l 1
DEV04063
PC130072
1560904100
12/14/2017
CB153202
If ··YES" b check1:d below th;1t Division·s approval b rcquircrl 1;;;cr to requesting ;i Final Bui!llin;:{ lnspc,:tion. It you !lave ~u1y qu<;stions
please call the applir:.-1hk division~ at the phone numbers provided below. After •Ill required :1pproval5 are sit,;ncd ()ff fax to
760-ti02 85G0, email to hlclginspcctions(i_:1c.1rbhadca.gov or bring in a COPY of this card to: 10:15 Faraday Ave" Carbb;Hl.
Required Prior to Requesting Building Final If Checked YES
Planning/Landscape
CM&I {Engineering Inspections)
Fire Prevention
#12 REINFORCED STEEL
#68 MASONRY PRE GROUT
Ci!l'.GROUT □ WALL DRAINS
#10 TILT PANELS
#11 POUR STRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME □ FLOOR □CEILING
#15 ROOF SHEATHING
#13 EXT. SHEAR PANELS
#18 INSULATION
#18 EXIER10R LATH
#17 INlERIOR LATH & DRYWALL
#51 POOL EXCA/STEEL/BOND/FENCE
□ SEWER & BL/CO
#21 UNDERGROUND □WASTE □ WTR
#24 TOP OUT □ WASTE □ WIR
#27 TUB & SHOWER PAN
#23 □GASTEST □GAS PIPING
#25 WATER HEATER
#28 SOLAR WATER
#29 ANAL
' Coor: 11 STORM WATER
#800 PRE-CONSTRUCTION MEEnNO
#603 FOLLOW UP INSPECTION
#605 NOTICE TO CLEAN
#807 WRITTEN WARNING
#609 NOTICE OF VIOLATION
#810 VERBAL WARNING
REV 1012016
760-944-8463
760-438-3891
760-602-4660
Ins r
Allow 48 hours
Call before 2 pm
Allow 48 hours
#82 DRYWAU.,EXr LATH, GAS TES ( 17, 18,23)
#83 ROOFSHEATING, EXT SHEAR (13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
T-Bar (14,24,34,44)
ANAL OCCUPANCY (19,29,39,49)
A/S UNDERGROUND VISUAL
A/S UNDERGROUND HYDRO
A/5 UNDERGROUND Fl.USN
A/5 OVERHEAD VISUAL
A/S OVERHEAD HYDROSTATIC
A/SANAL
F/ A ROUGH-IN
F/A ANAL
AXED EXTINGUISHING SYSTEM ROUGH-IN
AXED EXTING SYSTEM HYDROSTATIC TEST
AXED EXTINGUISHING SYSTEM ANAL
MEDICAL OAS PRESSURE TEST
MEDICAL GAS ANAL
Date Inspector
Date Ins r
SEE BACK FOR SPECIAl NOTES
~;,.), ) • • I /•' ' •• 'J .-. ~-~ ' / JL . , ,.-,1__,,· •:•·'</ _.,.
. . , .. ·. . -j!l' . . . s, . . , ~E ..----;; -r,. ,~ .. -w.o. 6/, T :-·-C.-
DATE /.L.-L "1-i 7
NAME /.2.CJt,..1sm.11~,
HOURS ______ _
..Qeotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
l ~ /., ),, . L l' , -7----/Ir C ._,,, Client Name: -'J r; n A v ,, /,/1.., , -r..---Project Name: )'t..4 .1 ., L--'.> ---=a......... ........... ------=--'""""'"-';...._-'----------,,,:......a...;:c..::"--'-..;.._-="-__:.:;__ _____ _
Location/Tract: _-;-:...' .:.:.lZ::.:':....'' ~' J..../ _"'"< _£""-,':...a::.::..+.__:(::::~....:~l.....:...<·....l./.:..:...:.a::~..:.._--L==,,...~T __ O____,~ ..... /_-~/_Y_· _" ___________ _
~ /4 / I .1 ,, Unit/Phase/Lot(s): --"-=-r ....:J;...__7::..,,,:..-,.:"n-7__._, _7~/:..:/..;::..o..,.._ . __ l;.,.~l:....1~z;:......,:....__1 ..... 1 l::....•-=-j _'-1 ______________ _
Referenced Geotechnical Report(s): _..;..L-_7"""/.,_lt..;..~-;.,_-'-A...;;:u;_,,_--...:'-:;;..~...:./_-/ ____ 7_.,,.,._f-..._~~-' _~ ..... b_.· _-/_l_~----------r
Observation Summary
/,/
1 Initials A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
il/1,1 Date .
/../
'l--/1 1
'
---~/•"
u./7..·J I
;-
!v./z i
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of ~he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
rU r;--.J.5, 1-.:...·r-,-......... 0 I',~•/;;,,. 0 .-, ,.;_.1, -,)../ & .> /41 g 77 Lu, -r,c----hc t,t..1..~ • /k£,J., "'·"/~-
# ,l't· 1 /--,A', c.or<--/ --,/:.,yr-.J-,,e, ..,C ~ j;,,.. ,c. /<. h / / i r ,-,,f /4:.-t-1-.1~/.,
/
Notes to Superintendent/Foreman
· 1, )-Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. ···2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~e_2<tended
period of time for such, and the contractor should schedule according!y?"',e: ~? /-;?u/ s / .... ~
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
~ grading. /_,.1/ //7
~Q:_ ____ :--------·-
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
[
-~----.1 W.0. 0 k, 3 5 -C
rueSDA-'-/\ DATE.~I ---"-7-_-_I 'o-=-· _
NAME MI k...e .Se,-,..V't""
HOURS __ 1,.._._o __ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: -=D'--'-'"/':,-=-N-=--N----A._ __ D'---i"2.._,_\J_c=--.... -_____ 1---_'---=C.. _____ Project Name: in.. 4-i Ls ~Nb
Location/Tract: Jt],IA ' t..S END CArtlsL3AP Ct 6'-i -/Lf
Unit/Phase/Lot(s): __ !.-___ o-'-r-'.s=---_\ ,_/ _-z..._----'3::C....:...../ '-t......,____._"-"'.5'--'-·/-=b..__ _____ ( ____ 1 _-_G,---') _______ _
I _,/
Referenced Geotechnical Report(s): __,D"""-"-A~•:...:f:::::...:..,:;Q _ __,_/ """()_--=3::...:l:.....---'-/_1........,.~_b=-----~'----'-/..a:bc..-______ _
I
Observation Summary
0-15 Initials
I /-z./ 19, Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
iA 5 Initials
: Iii, B Date
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
£',AS Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. : /'2 / 18 Date
vU 5 Initials Pr:.RFon<MEb 5e::LS-c.r I"' f>n.c,;,;1 N {,, ON UNOEnSLIA ~ t.,T1 u H Tr'.2€.-..i(tit:":r, -r,'\<..T\ ~"
1/ i. I rn Date ~Aoci1-(, I.l",l t-, \{.II', !t=..S T ~ '"' 'Tir?...e r-JC/-11:= S B'>Ac. k r,; f(_.1,_ IS R.G-: L '<71111 •'i L. OV'-' p .,.,. .;.. T j
A~D SvtrAe.LE" Fon.. ·-rc-11:: _:z;::.,..,,isv-,OE:r> u.SC
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. :¥-k6 e p Mo 1 $ r -:J(:;;-
ln the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 PalmerWay
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Gfu-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
I
GEOCENTRIC
l.A~J) SLRVF.YINC· AND MA!'PIN<.;
January 3, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824
:2ljl) .'.: Ct:ntrt: i it,· Fkwv Sui LC: n, LsconJitlo , ... A 9:2ll26
,,!.,;;ti1·)7 ·-;.11 f.·· Y('"'•''i~"'J' cCi.:<,.•_.\,;.{.,_·, ,.,<.\ ,\1 ... r r .. /CL-f
\.V\·\-'V/ .~L't)Cttl Lr.i C'jU fVtf ,CO.TI1
Constryction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
INSPECTION REPORT
PROJECT NAME J;-4:_,/4 ,£ n ,,J l:j,1.,u..E: · INSPECTION
ADDRESS DM4,A i:).,, 7: ('5,.e/_s/44,J I), (451R 61-□ CONCRETE
t:t,ds ..61tJ ~ REINF. STEEL
ARCHITECT LI A -I-I\R..S.l!J .. □ MASONRY
ENGINEER I/ Z K, □ P.T. CONCRETE
CONTRACTOR YAci-/i/,A ~.,,/ i.c-/4.fc .r:(?&J__ilrRJ □ FIELD WELDING
OTHER i),rVJ t □ SHOP WELDING
(~ -C.,'-20 //( BATCH PLANT
EXP.ANCHOR
PAGE __l_ OF _/_
CTE JOB NO. ;c-/ 3' rsc;
REPORT NO.
MATERIAL IDENTIFICATION
CONC. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORT AR TYPE & lb/in2
REINF. STEEL GR/SIZE #6i5>s r 60 . . 7
STRUCTURAL STEEL
'
HIGH-STRENGTH BOLT
M~SONRY BLOCK
OTHER
INSPECTION DATE
PLAN FILE/OTHER
BLDG. PERMIT/OTHER
□
□
□ OTHER _______________ _
MATERIAL SAMPLING
□ CONCRETE □ MORTAR □ GROUT
□ REINFORCING STEEL □ STRUCTURAL STEEL
□ FIREPROOFING □ MASONRY BLOCK
□ SOL TS □ OTHER
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES. #/:!,~
(
1 .1 r< .4-Yvf
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME
CERTIFICATION NO.
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806', I www.cte-inc.net
w.o. 14c:s---C-J c.:
DATE __ ~__.l=:~J .... ,~/~Jk~~--
NAME._--'L,.,.=-~A~,·,~:m'""-":;t[:=--·_ f HOURS I
Geotechnical • Coastal • Geologic • Environmental ----------
FOOTING TRENCH OBSERVATION SUMMARY
.
Client Name: b h1riA D«. LLC.... Project Name: 77&1 . I S ..f:,-1 i)
Location/Tract: _ ___.b"""""'f.i"'"'~" .... O""";l ____ t ..... · s"""'<---,.....,,f-/ ..... t=,,,.r.__,,y1.._./r....,)-s'""'B""'A .... , ,""'0 _;r-1:......._.r;:.,::.i...•t ~, r=--"'"i _.....;C=--~i ....,...._n .... '-i_.' __ -.......... 1 t..f ______________ _
J
Unit/Phase/Lot(s): _...,.lc= . .._,-rs:.....;;..._7-+/...,_,;R'----e-_C,++-/ ..... 1r;'""--__________________ _
T • I
I
Referenced Geotechnical Report(s): __ __.\(..._) .... I =)-'\'""'\ __ ,'""'l _f_(v'-, l'-". C;::...v .... l .... i li:=; _______________ _
Observation Summary
LJ)-::rs:. Initials
l~ \\h ~ Date
L? -;u::-Initials
ta}th ~ Date
L ~ -:J$-Initials
:"th\".\ Date
i.. f;z:s;:, Initials
~\ 5 \_ ,?. Date
A representative of-GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of :he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable)_. The
setback was in general accordance with the recommendations of the geotechnical report.
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soil~, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey-soils may take an extended
period of time for S!JCh, and the contractor should schedule accordingly.
3. In the event of a site change subs~quent to our footing observation arid prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4. This menio does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes fo Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index t~~t_ ~es_ul~~ are contained i~._t71lE:fs-Gradedf. Geotechnical or Final Compaction Report provided at the completion
ofgrad1r:1g. ·· • , ,. /~; I · l /? . -7
, . / • .· I I I ' . ' /1/ /. --
' , •· {/ i .-· C/ > ·-;±;;;:-LJ~;~:?~
--------------,._,....._.,..\ __ / Represe'nt_at(ve otGeoSoils, Inc.
·,
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-02n
26590 Madison Ave.
Murrieta, CA 92562
(951) 6n-9651
GEOCENTRIC
L\ :\ ll S C R V E Y I N G A :S: D \!AP P I :S: G
June 4, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on June 4, 2018 and found the
garage/second floor forms for buildings numbered 7 through 10 to substantially conform to the
line and grade as shown on the approved Precise Grading Plan. As such conforms to all
building setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
2150 N Centre City Pkwy Suite B. Escondido CA 92026
tel: 760.207.7824 fax: 760.745 7824
www.geocentricsurvey.com
GEOCENTRIC
I..,\'.\ ll SL. R \' E YI:-..;{; .\\:I) '-1 .\ I' PI:.; C
April 5, 2019
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on April 4, 2019 and I hereby
certify that the framing on the roof, is as shown on the the following table.
LOT GARAGE
PAD
1 253.97
2 251.97
7 216.97
8 214.97
9 215.47
10 217.47
11 217.47
12 219.47
13 228.97
14 230.97
Sincerely,
Lorne DaPron
PLS 7824
2ND RIDGE RIDGE LINE
FINISH LINE HEIGHT
FLOOR ABOVE PAD
254.64 276.02 22.05
252.64 274.03 22.06
217.64 239.14 22.17
215.64 237.13 22.16
216.14 237.59 22.12
218.14 239.63 22.16
218.14 239.66 22.19
220.14 241.64 22.17
229.64 251.08 22.11
231.64 253.09 22.12
215'1 N Ccn1:r~ Citv Pl<\\'V Suire B, 1:scon<li<ln C.:\ 92026
t,:l: 760.i07.7tL{4 fax: 76(1.745.7824
\V\\'W.gCl)Ccntricsup;cy.corn