HomeMy WebLinkAbout2863 CAMINO SERBAL; ; CB011001; Permit05/24/2001
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
05/24/2001
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No:CB011001
Building Inspection Request Line (760) 602-2725
2863 CAMINO SERBAL CBAD
RESDNTL Subtype: SFD
2552811600 Lot#: 545
$352,640.00 Construction Type: VN
Reference #: CT88-03
1 Structure Type: SFD
5 Bathrooms: 4.5
SHELBOURNE - LC VLLY PHASE 7
PLAN 4-SFD 3904 SF, GAR 649SF, DK 110SF
Status: ISSUED
Applied: 03/13/2001
Entered By: JM
Plan Approved:
Issued: 05/24/2001
Inspect Area:
Orig PC#: PC99-149
PlanCheck#: PC01-30
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA 92014
858 259-8500
Owner:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA 92014
858 259-8500
Total Fees: $14,208.69 Total Payments To Date:$0.00 Balance Due: $14,208.69
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Inspector:
$1,325.80 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$861.77 Meter Fee
$0.00 SDCWA Fee
($68.94) CFD Payoff Fee
$35.26 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$310.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$0.00 Housing InLieu Fee
Master Drainage Fee:
$0.00 Sewer Fee:
$0.00 Additional Fees:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,374.25
$6,418.05
$0.00
$0.00
$0.00
$600.00
$0.00
$0.00
$203.00
$60.00
$89.50
$0.00
$0.00
$0.00
$0.00
$0.00
$14,208.69
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICEythat approval of your project Includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions."/You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(3), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
CltyofCartsbad
Final Building Inspection 7 m
Dept: Building EnginMAng Planning CMWD
Plan Check ft PC01-30
Permit ft CB011001
Project Name: SHELBOURNE - LC VLLY PHASE 7
PLAN 4-SFD 3904 SF, GAR 649SF. DK 1 10SF
Address: 2863 CAMINO SERBAL
Contact Person: Phone:
Sewer Dtet: LC Water Dist: O
Inspected
Inspected
Bv:
Inspected
Bv:
^x£>Date .
Inspected: 2/y*i
Date
Inspected:
Date
Inspected:
StLlte Fire
Date:
Permit Type:
Sub Type:
Lot: 545
Approved: v
Approved:
Approved:
02/06/2002
RESDNTL
SFD
Disapproved:
Disapproved:
Disapproved:
Comments:
City of Carlsbad Bldg Inspection Request
For: 02/20/2002
Permit^ CB011001
Title: SHELBOURNE - LC VLLY PHASE 7
Description: PLAN 4-SFD 3904 SF, GAR 649SF, DK 110SF
Inspector Assignment: PD
2863 CAMINO SERBAL
Lot 545
Type: RESDNTL
Job Address:
Suite:
Location:
APPLICANT DAVIDSON BUILDERS
Owner:
• Remarks:
Total Time:
Sub Type: SFD
Phone: 7609424330
Inspector:
Requested By: GARY
CD
19
29
39
49
Entered By: CHRISTINE
Description Act Comments
Final Structural Af
Final Plumbing /
/Final Electrical /
Final Mechanical I
Associated PCRs
Inspection History
Date Description
02/08/2002 39 Final Electrical
11/09/2001 16 Insulation
11/06/2001 84 Rough Combo
10/10/2001 13 Shear Panels/HD's
10/10/2001 15 Roof/Reroof
08/21/2001 81 Underground Combo
08/07/2001 21 Underground/Under Floor
08/07/2001 22 Sewer/Water Service
Act Insp Comments
AP PD EMR
AP PS
PD
PD
PD
AP
AP
AP
AP
AP
AP
NF
PD
PD