HomeMy WebLinkAbout2864 Trails Ln; ; CB153203; PermitResidential Permit
Print Date: 01/16/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2864 Trails Ln
BLDG-Residential
1560904100
$439,241.00
1
3.00
TRAILS END
Work Class:
Lot#:
Reference#:
Construction Type:
Bathrooms:
Orig. Plan Check#:
Plan Check#:
Single Family Attached
8
DEV04063
VB
4.50
PC130072
Description: TRAILS END-TYPE 1-UNIT 8-SF ATTACHED 2781 SF, 523 SF GAR, 445 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES-outside CFD
581473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outisde CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $31,814.64 Total Payments To Date: $31,814.64
. Ccityof
Carlsbad
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Balance Due:
Permit No: CB153203
Closed -Fina led
09/29/2015
12/19/2017
CRenf
1/16/2020 1:02:20PM
$0.00
$1,833.00
$783.10
$66.00
$166.00
$92.00
$182.00
$15,373.44
$18.00
$5,029.00
$934.00
$57.10
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153203)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address:
IVR Number: 709461
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
08/22/2019 08/22/2019 BLDG-21
Checklist Item
BLDG-Building Deficiency
BLDG-17 Interior Lath-Drywall
BLDG-18 Exterior Lath and
Drywall
BLDG-23 Gas-Test-Repairs
101648-2019
Underground/Underf
loor Plumbing
Checklist Item
BLDG-Building Deficiency
10/31/2019 10/31/2019 BLDG-33 Service 109352-2019
Change/Upgrade
01/16/2020 01/16/2020 BLDG-Final
Inspection
January 16, 2020
Checklist Item
BLDG-Building Deficiency
116587-2020
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
Passed Chris Renfro
COMMENTS
Backflow underground PVC to main line
connection. OK to backfill
Passed Chris Renfro
COMMENTS
Passed Chris Renfro
COMMENTS
TRUST THE PEV FAMILY
REVOCABLE TRUST
2864 Trails Ln
Carlsbad, CA
Reinspection Complete
Passed
Yes
Yes
Yes
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Yes
Yes
Yes
Yes
Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153203)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address: 2864 Trails Ln
Carlsbad, CA
IVR Number: 709461
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
05124/2019 05/2412019 BLDG-13 Shear 092843-2019 Partial Pass Andy Krogh Reinspectlon Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Prelim shear at party walls Yes
05/29/2019 0512912019 BLDG-17 Interior 093023-2019 Partlal Pass Paul Burnette Re Inspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06103/2019 08/03/2019 BLDG-17 Interior 093460-2019 Failed Chris Renfro Reinspection Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
06119/2019 06/1912019 BLDG-84 Rough 095043-2019 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
08/25/2019 06/25/2019 BLDG-16 lnsulatlon 095608-2019 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
06127/2019 06/27/2019 BLDG-27 Shower 095878-2019 Partial Pass Chris Renfro Reinspection Incomplete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07103/2019 07103/2019 BLDG-17 Interior 096471-2019 Partlal Pass Chris Renfro Relnspectlon Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/09/2019 07/0912019 BLDG-82 Drywall, 096886-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Test, Hot Mop
January 16, 2020 Page 3 of 4
PERMIT INSPECTION HISTORY REPORT (CB153203)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address:
IVR Number: 709461
Scheduled
Date
Actual
Start Date Inspection Type Inspection No.
Checklist Item
BLDG-Building Deficiency
01/31/2019 01/31/2019 BLDG-14 082726-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLOG-Building Deficiency
02/26/2019 02/26/2019 BLDG-14 084629-2019
Frame/Steel/Boltlngl
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
03/15/2019 03/15/2019 BLDG-14 086232-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
04/18/2019 04/18/2019 BLDG-13 Shear
Panels/HD (ok to
wrap)
08934 7-2019
Checklist Item
BLDG-Building Deficiency
04/19/2019 04/19/2019 BLDG-15 089586-2019
Roof/ReRoof (Patio)
Checklist Item
05/14/2019 05/14/2019 BLDG-14
BLDG-Building Deficiency
091805-2019
Frame/Steel/Boltlng/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
05/23/2019 05/23/2019 BLDG-16 lnsulatlon 092632-2019
Checklist Item
BLDG-Building Deficiency
January 16, 2020
Inspection Status Primary Inspector
COMMENTS
Footings Check
Partlal Pass
COMMENTS
Tim Frazee
Basement floor sheathing nailing OK
Partial Pass Tim Frazee
COMMENTS
Basement floor sheathing nailing OK
2nd floor sheet nailing on floor
Partial Pass Tim Frazee
COMMENTS
Basement floor sheathing nailing OK
2nd floor sheet nailing on floor
3rd floor sheathing OK upper floor 3/15/19
Passed Tim Frazee
COMMENTS
Passed Tim Frazee
COMMENTS
Roof nailing ok
Partlal Pass Paul Burnette
COMMENTS
Basement floor sheathing nailing OK
2nd floor sheet nailing on floor
3rd floor sheathing OK upper floor 3/15/19
Partlal Pass
COMMENTS
Paul Burnette
TRUST THE PEV FAMILY
REVOCABLE TRUST
2864 Trails Ln
Carlsbad, CA
Reinspectlon
Passed
Yes
Reinspection
Passed
Yes
Reinspection
Passed
Yes
Reinspection
Passed
Yes
Passed
Yes
Passed
Yes
Relnspectlon
Passed
Yes
Relnspection
Passed
No
Complete
Incomplete
Incomplete
Incomplete
Complete
Complete
Incomplete
Incomplete
Page 2 of 4
PERMIT INSPECTION HISTORY REPORT (CB153203)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address: 2864 Trails Ln
IVR Number: 709461
Carlsbad, CA
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary inspector Reinspection Complete Date Start Date
12/20/2017 BLDG-21 044270-2017 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist item COMMENTS Passed
BLDG-Building Deficiency No
01/2412018 01/2412018 BLDG-11 048754-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist item COMMENTS Passed
BLDG-Building Deficiency Yes
02/0112018 02/01/2018 BLDG-11 047544-2018 Partlal Pass Paul Burnette Reinspection Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist item COMMENTS Passed
BLDG-Building Deficiency No
02/1412018 05101/2019 BLDG-66 Grout 048769-2018 Cancelled Paul Burnette Reinspection Complete
Checklist item COMMENTS Passed
BLOG-Building Deficiency No
03/0912018 03/09/2018 BLDG-11 051139-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03127/2018 0312712018 BLDG-66 Grout 052859-2018 Partlal Pass Paul Burnette Relnspectlon Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
0411012018 04110/2018 BLDG-66 Grout 054429-2018 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/0512018 06/0512018 BLDG-11 059955-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/2312018 10/2312018 BLDG-11 073882-2018 Partlal Pass Tim Frazee Re inspection Incomplete
Foundatlon/Ftg/Pier
s (Rebar)
January 16, 2020 Page 1 of4
<._(~, Dl=CORD COPY CB1532"3 :~ CITY 0,~
CARLSBAD INSPECTION RECORD 2864 TRAILS LN Building Division
0 INSPECTION RECORD CARD WITH APPROVED
TRAILS END-TYPE 1-UNIT 8-SF A TT ACHED 2781 SF. 523
SF GAR. 445 SF DECK
PLANS MUST BE KEPT ON THE JOB
0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
61! FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Car(Jbadca.goy/Bulldlng AND CLICK ON
"Request Inspection"
DATE: \2--\
DEV04063
PC130072
1560904100
12/14/2017
CB153203
If "YES,. is checked below th.it Division's approval is re{1uired i:,rnH tornquesting a Final Bnilcling Inspection. If you h.1vc ,my qw!~Jtions
ple.:isc call the applic:11Jlc ~ivi~ions at the~ phonP numbers provided below. After all required approvals <He signed off fax to
760 G02 8560, email to hlltginspectiorn-.ti_,1carlslwtlca.1;ov or hrin1: in a COPY of this card to: 1G35 F;irad.1y Ave . Catlsh~uL
Required Prior to Requesting Building Final If Checked YES
Planning/Landscape 760-944-8463 Allow 48 hours
CM&J (Engineering Inspections) 760-438-3891 Call before 2 pm
Fire Prevention 760-602-4660 Allow 48 hours
Date Inspector
#12
#66 MASONRY PRE GROUT
&GROUT □ WALL DRAINS
#10 TILT PANELS
#11 POUR STRIPS
#11' COLUMN FOOTINGS
#14 SUBFRAME □ FLOOR □ CEILING
#15 ROOF SHEATHING
#13 EXT. SHEAR PANElS
#16 INSULATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWAU
#51 POOLEXCA/STEEL/BOND/FENCE
#55 PREPlASTER/RNAL #83 ROOFSHEATING, EXTSHEAR(13,15)
#19 FINAL #84 FRAME ROUGH COMBO (14,24,34,44)
COPL; II PLUMBING Date Ins r T-Bar (14,24,34,44)
#22 □ SEWER & BL/CO □ PL/CO FINAL OCCUPANCY (19,29,39,49)
#21 UNDERGROUND □WASTE □ WTR Date Ins r
#24 TOP OUT □ WASTE □ WTR
#27 TUB & SHOWER PAN
#23 A/S UNDERGROUND FLUSH
#25 WATER HEATER A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC
#29 FINAL A/S FINAL
CODI: f' STORM WATER F / A ROUGH-IN
#800 PRE.CONSTRUCTION MEEl'INO F/A FINAL
#603 FOUOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL
#809 NOTICE OFVIOLATION MEDICAL GAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL OAS FINAL
REV 10/2016 SEE BACK FOR SPECIAL NOTES
,, .,,.----·~ ,.. W.O. b h -' ,. -(__...
DATE /2. -L -7-I 7
NAME /2 · C.h--UPJ/1 '!
HOURS ______ _
..G._eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
--, i 1 -,--;; Ir
Client Name: __ l.1--=-~=--.,.tJ_.r""".1-"--A-'---"t/, ..... _,,-.....;..'l-=-/_,_1/...;cC_.,'--l_L---'c::::....-'--___ Project Name:--~' ~/-=·"t.=4.;;..-.._.1 .a../~,;_..;;;C.-=-'-..---J-' ..:.::-> ______ _ ,
.-,-i ,,.-, /,.. I I ., ,,-,, -, ,-/ J ,_ h I t ·1 {/ ~1 -, -.., Location/Tract: _!-!..lz:::.~::....•1..t..1.J.f...:::s~l=-=---•.:..1..:::)~__:::L:.:::.,.,~,<...:....: ..:....< • .J./..::..;·...a.:::,,;::::A.:.:4:.!., __ ..:::'-::::.... .... , __ --..:•--'=---------------,.
Unit/Phase/Lot(s): _/4_. ~-r...::1 _ _;;7-r/:._-?~_...:.1?-/.!.::10:....,.:,_, __.:.~..:..,i/:....i i;..;~ z::......,;,:._· _1 ..... r;::...'~·;....:i./ _____________ _
I
Referenced Geotechnical Report(s): --=,t,,-,:....' -,.!.;/4~, n...:.~...;:~-=--, _'"'"/..:::0::..~_--=,::==---)....!/:....·_--..:....J ...:7:__--="-...:f-,::;.~_-~b::..-· _-_/_f..:....~----------.r
Observation Summary
/,/ ;·
ll/t1 .
/. . ./
fl_, ll ? ,
-~;_,./
Jl. h ·1
f
i---
t 1,,./z;
Initials
Date
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of ~he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
;;-Ur r-1J:5 __ , /..:... -;--/,......,. c r:,.,/;~:,., o .,, ~A-... v & s ,<) L. L,,,f. .. .,-,, L n, .;--,, ?-~7 c: t? ,!,.,t.._, _ '/;-.,,/., A .-7 /:,
,t?,n;,.•/.,,",,, /·-,,,{,c-o-r<--1 -rl;-:;-r---;!f-,,e, ...,cf...,..~ i,._.,. c /.c../;; / i r ,-,«f ~1""/vC-/..,
I
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~'A-~xtended
period of time for such, and the contractor should schedule according!YjV k €£? /-;7c.)/ s I' _.,;,r
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final·Compaction Report provided at the completion
..q grading. . / / /?
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
/ ✓,,,,.-/
?i'~ ·--------
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
W.0. lc>k,3 5 -C
DATE~I -__.:..J._-_1 e,=--
NAME f\.-{ t V-E: ..SG?0.1\-
HOURS_~'2-;.._. 0,.;.._ __ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: --=D=--...,6'-'-N~N:::..:...A.____,.D~n..;:..1.:...\/.:...;E:=__._,, ~l,--=L;....::::C::___·Project Name: /v'l. A ; L... s [33.-Nb
Location/Tract: Tn_ A' L. 5 l;::::.ND c..,01--1-/Lf
Unit/Phase/Lot(s): _.;_L-....;;;;0-'r_.s"'---_\...,_/_-z.._-,--...a:3"--'-/ 1-_,_t-+._ ...... -c;"--'-/-'b=-__ __,.(_\ _-_io_' _).;..._ ______ _ , /
Referenced Geotechnical Report(s): ---lb:::..:...A~T~-E:::::...:..::0 _-.1...l ~0 _-..... 3::..:1.....;-___;.1_7.!...-;_.....;b~_--=b...._-___;./..::?.::;__, _______ _
I
Observation Summary
!1¼5 Initials
l / -z./ 19, Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
;.l.A. 5 Initials
I !-z./13 Date
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
t'v\. S Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. 1 I ?. I I a Date
tA~ :s Initials P E.Rf-.orn.w.E: b 5£1...G-c.r , ,.., f>n.-D RI N {,, ON ur-:.tiSR '5LIPI R L.ln l\ rf Tn.€ Nf..li 1::;:r. t•·'l< ... T\ c ,,·
1/ z.. I rn Date PrtO(\\,->{, I.Nt')lC.V"rlE=J T,-H,.., -r..-i...~·r-.1ct-11.~:s B'Ackht..t._ 1.S R.1=t..~-r.v,:'t C,0V'-'>p1,}<...T
f"t,-.,._f) Sv1r>0 <',LE" [on. -rt+i:: -~.,..,,Tcv-->Dt,D u..5€
Notes to Superintendent/Foreman
(1.)
2.
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. ;¾'--/<6 ep Mo I s r ;)(::;-
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 PalmerWay
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Geo-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
GEOCENTRIC
LA;\!) SL R \'FY l N t~ ,'\.ND MAP l' 1 :\ (;
January 3, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
Constr~ction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
INSPECTION REPORT PAGE _j_ OF _/_
I
CTE JOB NO. /,~ -/ 3' r S7
REPORT NO.
· INSPECTION MATERIAL IDENTIFICATION
CONC. MIX NO. & lb/in2
ARCHITECT
ENGINEER
OTHER
ff I l<_
INSPECTION DATE
PLAN FILE/OTHER
BLDG. PERMIT/OTHER
□ ' Pl'
□
□
□
□
□
□
□
CONCRETE
REINF. STEEL GROUT MIX NO. & lb/in2
MASONRY MORT AR TYPE & lb/in2
P.T. CONCRETE ..1./ ~ REINF. STEEL GR./SIZE fLb/5' d r 60 . . 7
FIELD WELDING STRUCTURAL STEEL
SHOP WELDING HIGH,:STRENGTH BOLT
BATCH PLANT MASONRY BLOCK
EXP.ANCHOR OTHER
OTHER
MATERIAL SAMPLING
0 CONCRETE O MORTAR O GROUT □ FIREPROOFING □ MASONRY BLOCK
0 REINFORCING STEEL O STRUCTURAL STEEL □ BOLTS O OTHER
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES. •NJ/.~.
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME
CERTIFICATION NO.
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806', I www.cte-inc.net
FOOTING TRENCH OBSERVATION SUMMARY
W.O. I ,.,f p <, S--C. -) c
DATE_~_t~_!f_l~iH_' __
NAME_-1,.-........,A~·~r.~-r ........... _·_
HOURS _____ / ____ _
Client Name: h~'Yll'IA P~. LL(_, Project Name: ---7741 ..... · ...... '__.· '+a .... , '-I """S_-<f'-; ... --:="-'-1 =i) ______ _
J
Unit/Phase/Lot(s):_...,,l..,.d2 .... ;-TS..:..1~_7.,_,~/'-'-R~_q+-+-/.....,1n'""".,---------------------, . [
l -\ {. i Referenced Geotechnical Report(s): ___ ,, .... )...,/...::.)::...\'-'-1 1.a..., ,_,_-, _c._~--'(=v.......,;;ab~P .... · lP=------------------
Observation Summary
eJ>-:rs:. Initials
l< \1 h ~ Date
l.~~ Initials
,v\\ h\'l. Date
l f~ Initials
--~, \_ ,9. Date
A representative of. GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable)_. The
setback· was in general accordance with the recommendations of the geotechnical report. --• -:_ ..;.,. •. ,..:-y c. <:,, x,, . ,"'\ (2., .c... 1hr.
-f
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soil~. presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey, soils may take an extended
period of time for s1:1ch, and the contractor should schedule accordingly.
3. In the event of a site change subsf:lquent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations arrd/or testing.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report. ·
Notes fo Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index t~~t r,ei_s~lt~ are contained i~. t'e As-Graded~ Geotechnical or Final Compac~ion Report provided at the completion
of gra~1,r:ig. ,· /,. . ! . ,.1 / ;ff)l)J-,p?, .. ,. /_
I l' i · I_( L-. t· / //f;,,-/.£:; .~-:;:-p~
__________ __... _ _,~a.........;...\. __ / Represent,atfveotG~oSoils, Inc.
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
GEOCENTRIC
L\ >.; D S C R V E Y I N G A >.; D \! AP P I " G
June 4, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on June 4, 2018 and found the
garage/second floor forms for buildings numbered 7 through 10 to substantially conform to the
line and grade as shown on the approved Precise Grading Plan. As such conforms to all
building setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
2150 N Centre City Pkwy Suite B, Escondido CA 92026
tel: 760.207.7824 fax: 760.745.7824
W\V\v.geocentricsurvey.com
GEOCENTRIC
LA;\ D S L' RV E \' I ;'\ C \ '.\' I) \1 :\ P PI .'-: C
April 5, 2019
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on April 4, 2019 and I hereby
certify that the framing on the roof, is as shown on the the following table.
LOT GARAGE
PAD
1 253.97
2 251.97
7 216.97
8 214.97
9 215.47
10 217.47
11 217.47
12 219.47
13 228.97
14 230.97
Sincerely,
Lorne DaPron
PLS 7824
2ND · RIDGE RIDGE LINE
FINISH LINE HEIGHT
FLOOR ABOVE PAD
254.64 276.02 22.05
252.64 274.03 22.06
217.64 239.14 22.17
215.64 237.13 22.16
216.14 237.59 22.12
218.14 239.63 22.16
218.14 239.66 22.19
220.14 241.64 22.17
229.64 251.08 22.11
231.64 253.09 22.12
2150 N Centre Cir-y Pk\.vy Suite H, 1:scondi<lo CA 92l)26
td 760.207.7824 fax: 760.745.7824
\VWW.gLY1ccnnicsun:cy.u1m