HomeMy WebLinkAbout2868 Trails Ln; ; CB153204; PermitResidential Permit
Print Date: 01/15/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2868 Trails Ln
BLDG-Residential
1560904100
$439,241.00
1
3.00
TRAILS END
Work Class:
Lot#:
Reference #:
Construction Type:
Bathrooms:
Orig, Plan Check#:
Plan Check#:
Single Family Attached
9
DEV04063
VB
4.50
PC130072
Description: TRAILS END-TYPE 1-UNIT 9-SF ATTACHED 2781 SF, 523 SF GAR, 445 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
TRAFFIC IMPACT Residential Condo Outisde CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $32,046.64 Total Payments To Date: $32,046.64
{'city of
Carlsbad
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Balance Due:
Permit No: CB153204
Closed -Finaled
09/29/2015
12/19/2017
PBurn
1/15/2020 3:13:41PM
$0.00
$1,833.00
$783.10
$66,00
$166.00
$92.00
$182.00
$15,373.44
$18,00
$5,029.00
$934.00
$57.10
$232.00
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the 11lmposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as 11fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void1 or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes1 nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153204)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address:
IVR Number: 709462
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
January 15, 2020
Checklist Item
BLOG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electncal Final
COMMENTS
TRUST THE PEV FAMILY
REVOCABLE TRUST
2868 Trails Ln
Carlsbad, CA
Relnspection Complete
Passed
Yes
Yes
Yes
Yes
Yes
Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153204)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address: 2868 Trails Ln
IVR Number: 709462 Carlsbad, CA
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Relnspectlon Complete Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
06/19/2019 06/19/2019 BLDG-13 Shear 095051-2019 Partial Pass Chris Renfro Reinspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Interior shear walls Yes
06/21/2019 06/21/2019 BLDG-16 Insulation 095305-2019 Passed Michael Collins Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/01/2019 07/01/2019 BLDG-82 Drywall, 096151-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Tes~ Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 lntenor Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
08/14/2019 08/14/2019 BLDG-21 100749-2019 Passed Chris Renfro Complete
Underground/U nderf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Backflow underground PVC to main line Yes
connection. OK to backfill
10/31/2019 10/31/2019 BLDG-33 Service 109353-2019 Passed Chris Renfro Complete
Change/Upgrade
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/15/2020 01/15/2020 BLDG-Final 116375-2020 Passed Paul Burnette Complete
Inspection
January 15, 2020 Page 3 of 4
PERMIT INSPECTION HISTORY REPORT (C8153204)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Fina led Expiration Date: 04/28/2020 Address:
IVR Number: 709462
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
Checklist Item
BLDG-Building Deficiency
0311512019 03/1512019 BLDG-14 086233-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
04/17/2019 04/1712019 BLDG-15 089336-2019
Roof/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
04/1812019 04/18/2019 BLDG-13 Shear
Panels/HD (ok to
wrap)
089348-2019
Checklist Item
BLDG-Building Deficiency
05114/2019 05114/2019 BLDG-14 091807-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
05123/2019 0512312019 BLDG-16 lnsulatlon 092633-2019
Checklist Item
BLDG-Building Deficiency
05/24/2019 05/24/2019 BLOG-13 Shear
Panels/HD (ok to
wrap)
092840-2019
Checklist Item
BLDG-Building Deficiency
05129/2019 0512912019 BLDG-17 Interior
Lath/Drywall
093024-2019
Checklist Item
BLDG-Building Deficiency
06117/2019 0611712019 BLDG-84 Rough 094779-2019
Combo(14,24,34,44)
January 15, 2020
COMMENTS
Floor sheathing on basement floor
Partial Pass Tim Frazee
COMMENTS
Floor sheathing on basement floor
3rd floor sheathing OK upper floor 3/15/19
Passed Tim Frazee
COMMENTS
Roof sheeting nailing OK 4/17 /19
Passed Tim Frazee
COMMENTS
Partial Pass Paul Burnette
COMMENTS
Floor sheathing on basement floor
3rd floor sheathing OK upper floor 3/15/19
Partlal Pass
COMMENTS
Partial Pass
COMMENTS
Paul Burnette
Andy Krogh
Prelim shear at party walls
Partlal Pass Paul Burnette
COMMENTS
Passed Chris Renfro
TRUST THE PEV FAMILY
REVOCABLE TRUST
2868 Trails Ln
Carlsbad, CA
Reinspection
Passed
Yes
Relnspection
Passed
Yes
Passed
Yes
Passed
Yes
Reinspectlon
Passed
Yes
Reinspectlon
Passed
No
Relnspectlon
Passed
Yes
Relnspectlon
Passed
No
Complete
Incomplete
Complete
Complete
Incomplete
Incomplete
Incomplete
Incomplete
Complete
Page 2 of 4
PERMIT INSPECTION HISTORY REPORT (CB153204)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 04/28/2020 Address: 2868 Trails Ln
Carlsbad, CA
IVR Number: 709462
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Re Inspection Complete
Date Start Date
12/20/2017 BLDG-21 044271-2017 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/23/2018 01/23/2018 BLDG-11 048589-2018 Partial Pass PaUI Burnette Relnspectlon Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/14/2018 05/01/2019 BLDG-66 Grout 048771-2018 cancelled Paul Burnette Reinspectlon Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/09/2018 03/09/2018 BLDG-11 051138-2018 Passed Paul Burnette Complete
FoundatlonfFtg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03127/2018 03127/2018 BLDG-66 Grout 052860-2018 Partial Pass Paul Burnette Reinspectlon Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
04/10/2018 04/10/2018 BLDG-66 Grout 064428-2018 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/05/2018 06/05/2018 BLDG-11 059956-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pier
s (Robar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/23/2018 10/23/2018 BLDG-11 073884-2018 Partial Pass Tim Frazee Relnspectlon Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Footings Check Yes
01/25/2019 01/25/2019 BLDG-14 082185-2019 Partial Pass Tim Frazee Reinspectlon Incomplete
Frame/Steel/Boltlng/
Welding (Docks)
January 15, 2020 Paget 014
\(~' ~ CITY 0.~ RE"-'ORD COPY CB153204
CARLSBAD 2868 TRAILS LN
Building Division INSPECTION RECORD TRAILS END-TYPE 1-UNIT 9-SF ATTACHED 2781 SF. 523
SF GAR, 445 SF DECK
1i11 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST Bl! KEPT ON THE JOB
li1I CALL BEFORI! 3:00 pm FOR NEXT WORK DAY INSPECTION
li1I FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Qrlsbadca,goy/Bulldlng AND CLICK ON
"Request Inspection"
DATE: \2-
DEV04063
PC130072
1560904100
12/14/2017
CB153204
If ··YES" b chcckod below that Division·~ approv;1I is requiw\; ~;;ior to requcstint( a Fin.1l 811ildini; ln<;;1wction. It you have ,my que:;tions
please call the .:1pplicalJ!e r:ivision~ at the phone nurnbers prnvide(i !Jelov\i. After <di requited .1pprovab arc !,i,t.~nc!I oft fax to
7fi0 G02-85G0, email to hlllginspectionsCi,,c;H!$1Jadca.gov or bring in a COPY ot this eard to: 1U35 F:uad;iy AvP. Carlsbad
Required Prior to Requesting Building Final If Checked YES
Planning/Landscape
CM&I {Engineering Inspections)
Fire Prevention
#12 REINFORCED STEEL
#66 MASONRY PRE GROUT
lil.GROUT □ WALL DRAINS
#10 TILTPANElS
#11 POUR STRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME □ FLOOR □ CEILING
#15 ROOF SHEATHING
#13 EXT. SHEAR PANElS
#16 INSULATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWALL
#51 POOL EXCA/STEE BOND/FENCE
#55 PREPlASTEII/ANAL
#19 FINAL
□ SEWER & Bl/CO
#21 UNDERGROUND □WASTE □ WIR
#24 TOP OUT □ WASTE □ WIR
#27 TUB & SHOWER PAN
#23 □ GAS TEST □ OAS PIPING
#25 WAlER HEATER
#28 SOLAR WAlER
#29 FIN'AL
CODr.:I' STORM WATER
#600 PRE-CONSTRUCIION MEETING
#603 FOLLOW UP INSPECIION
#805 NOTICE TO CLl£AN
#807 WRITTEN WARNING
#609 NOTICE OF VIOLATION
#810 VERBAL WARNING
REV 10/2016
760-944-8463
760-438-3891
76~02-4660
Ins r
Allow 48 hours
Call before 2 pm
Allow 48 hours
#82 DRYWALL,EXT LATH, OAS TES (17,18,%3)
#83 ROOF SHEATING, EXT SHEAR I 13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
T-Bar 114,24,34,44)
ANAL OCCUPANCY (19,29,39,49)
A/S UNDERGROUND VISUAL
A/S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
A/S OVERHEAD VISUAL
A/S OVERHEAD HYDROSTATIC
A/SANAL
F/A ROUGH-IN
F/AANAL
FIXED EXTINGUISHING SYSTEM ROUGH-IN
AXED EXTING SYSTEM HYDROSTATIC TEST
AXED EXTINGUISHING SYSTEM ANAL
MEDICAL OAS PRESSURE TEST
MEDICAL GAS ANAL
Inspector
SEE BACK FOR SPECIAL NOTES
w.o. 6/ T ~--C.--
/ z..,, . ., DATE .L--, -1,;
NAME /:2.. CJL1.smA J,
HOURS ______ _
Aeotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
~ ...... L ---i ,,-
c1ient Name: _.;c.,✓_;·:..7=· ..... 11"-, .,:.atJ:..;A'-'. --"'&: .... J-'-~...;..'l-"-1 .... v...;;;c'--,,__ __ l_t_.--__ ,.. ____ Project Name: ---.--: .... 1 ..,;.1;._;;-t..a..4a.;...:.l....;t'--1 {;.__...;;c:;;;;....-_.~..;;;->;.__ ______ _
-J £ ,,-, I I , L,...... . .,-V 1.../ -I y Location/Tract: _l~n~•:....,..!....1..1..i ~s ---1.=-'-·..:..7.a:!J ~. _.:::L:::..-..:..f:.::......:...<..!..1.::.-··___.b..::.:.A.:...:J\,..::..1 __ .=_<j__--...:.'-~--------------,.
/4 7/-7 t:; I ,, I 1 !///, '-I Unit/Phase/Lot(s): --"~/....:J:.._....::..,;.....f.1,.lf__._. _:..,I 1:....!/.-=.0...,.a·--/~I ll:....,l~Z:......,..:...___L....-'. ______________ _
I
Referenced Geotechnical Report(s): _.::::.0 ...... 1.::.:..••_;_rt::...;.~=...-,_'-IU:::~---.:-... =-:-_; ::.../_-.;_/....:·7_, ----''--""?_., --"""(,;;_::, _-/_& _________ _ ,,.
Observation Summary
/,/ ,,.
n/n
/._,,·
fl,, Ii 1
'
--. ' '._.,/ .,
,i/-q
f
/-·
u.,,/z 7
Initials
Date
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~:,xtended
period of time for such, and the contractor should schedule according!yjV...e:: €€.? .,.,--;?c>J st'~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
~ grading. // //7 w-:, <----------
57 41 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
£/ ~ --··
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
[
-------.1 W.0. 0~35 -C
ruesoA-'-{ i DATE_I -_]..._-_I '2,~-
NAME f\,.{ t V-..E: ..Ser-.u\-
HOURS _ _.1-,_._o ___ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: -=D ........ l"::, .... N-=--N------A..____.._D ___ n._,_\J_E:=--.... -____ 1,.-_L _____ C.. ___ Project Name: /t'l, Ai Ls ~Nb
Location/Tract:_-..... , _f'l~A.._1-'L-'---""'5'--'L=-'-'N___...D'----,,--"C--'-A'---f<.,;a..L;;;...S~/3""-A~D ___ c.. ____ r __ o_l--\ ____ -_~i _Y~--------
Unit/Phase/Lot(s): __ /...._o __ r __ ,s'---_\ ___ / _-z___,-----'3 __ ' ___ /~-t ._,....-S-'----/--"(:,.._,_ ____ (._1 _-_l,_) _______ _
I /
Referenced Geotechnical Report(s}: __.D~A,.__·1'-',... e:~/) _ __._/ =o_-_._3""'1'-------'/_1.:........, __ b ____ ---=(>.__-___ l-"6 _________ _
I
Observation Summary
!AA.5 Initials
1 /-z .. / 12, Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report .
.iA 5 Initials
t Iii, g Date
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
£'v\ S Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. l /2/ lB Date
vU 5 Initials Pt:.RFon.w.r::-b 5£LG-cr ,,._, f>n.c,RIN § ON UNDEn.'5UAf3 v'TtUN Tn:.;;-AJC.li~:r. 1""'<..T1~'<
1 I 2-I I B Date ~r'l.oci1-(, I.,,n-,,~CY',IE"J T;-1-1 . ._, ·T.-?..cr-JCH<=S 8'll-'lc.k1-1LJ, .. 1.S R.1:.L,;--r,..,,r-1 C,0V'-"pv3-<-T
• A.-...D Svt r,,,. (>, LE' Fon.. Tt-1£ __i:--,.,...,Tt:ev->OED U..5 c
Notes to Superintendent/Foreman
Q
2.
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. %-/<6e p Mo 1 :; r--;)f:;;-
ln the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.}, we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 Palmer Way
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Gfu-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
January 3, 2018
GEOCENTRIC
l. A N D S L R \' E \' l N (~ A N D M A l' f' i ;>; G
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
215t.) :--..: Cenm: C 1t,· Phvy Sui Le: l\ FsconJitk1 ~ .. .A 92,l7.6
Le!: ;,nt) .~\)7.78?-t fiL\' 760.745 7824
www.sc11cenLr.iv-,urvey . ..:nm
Construction Testing & Engineering, Inc. . ....~.
Inspection I Testing I Geotechnical I Environmental & Construction ~ngineering I Civil Engineering I Surveying
INSPECTION REPORT PAGE __l_ OF _j__
I
PROJECT NAME 7i:&,/s ,£ ,v-1 //,Mu r . INSPECTION
ADDRESS b,,,,,_111 6,, 7: r,4;.eL5kJ I J / ~,R br. □ CONCRETE
{:&rls l,1tJ ~ REINF. STEEL
ARCHITECT r ti R.5.,; .,. □ MASONRY
ENGINEER ff Tl<,
.? ./]. '?j' CONTRACTOR f Ar" 1 W .19 rvut
OTHER i)ML
□ P.T. CONCRETE
,.,.. r , /' lcP,..fc .';)v£.!)tcR.J' D FIELD WELDING
SHOP WELDING □
0 BATCH PLANT
0 EXP. ANCHOR
CTE JOB NO. /,~-/3' rsf
REPORT NO.
MATERIAL IDENTIFICATION
CONC. MIX NO. & lb/in2
GROUT MIX NO. & lb/1n2
MORT AR TYPE & lb/in2
REINF. STEEL GR./SIZE_ #6)5a r 60 . . /
STRUCTURAL STEEL
I
HIGH-STRENGTH BOLT -----
MASONRY BLOCK
OTHER
INSPECTION DATE
PLAN FILE/OTHER
BLDG. PERMIT/OTHER 0 OTHER _______________ _
MATERIAL SAMPLING
□ CONCRETE O MORTAR □ GROUT □ FIREPROOFING □ MASONRY BLOCK
□ REINFORCING STEEL □ STRUCTURAL STEEL 0 BOLTS □ OTHER _____ _
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES. •$~J..( .~~
Certification of Compliance: All work, unless otherwise noted, complies with applicabl~ codes and the approved plans and specifications.
PRINTED NAME
CERTIFICATION NO.
1441 Montiel Road, Suite 115 I Escondido, CA92026 I Ph (760) 746-4955 I Fax (760) 746-9806°, I www.cte-inc.net
"
FOOTING TRENCH OBSERVATION SUMMARY
W.O. lcle <:. S--C -.S c
DATE __ l-:~J ..... ,/-i~k-' __
NAME._---",,_'--,~A~r.:;:rs.:q.....__.=-·-, HOURS ___ ~/ ___ _
Client Name: "tw r1 11A Of'Z.. Project Name: ___ T{2_-~..;;;,i~-..:..• .._I .... S_.r'"'..._;'=··'·-'-l =i) ______ _
s
Unit/Phase/Lot(s): _ .... L.._.,.,/'..._1-rs"--"----7+/ ..... R--,-_9++-/ ..... 1n......_ __________________ _
f • l
Referenced Geotechnical Report(s}°: __ __._l< .... )-;) .... 3'-\ .... 1.._l ' ..... \ , .... , _t_--__ l.._,1 __ l""'Li ....... 1 I .... ~...__ _______________ _
Observation Summary
LJ>-::S:S:. Initials
tt \\ h~ Date
I -:-,.-:rJ;" I .. I l-Y rnt1a s
tolt \\8 Date
i..3 ~ Initials
.•. \ \ h ,;:\ Date e
l f-;:zs:, Initials
~\1 \ \~ Date
A representative of-GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable)_. The
setback was in general accordance with the recommendations of the geotechnical report. ---t.~-°lr":--,...-\~
Notes to Superintendent/Foreman
1. Footing exc~vations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soil~. presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey· soils may take an extended
period of time for s1:1ch, and the contractor should schedule accordingly.
3. In the event of a site change subsf:lquent to our footing observation arid prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report. ·
Notes fo Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index t~~t r,es~lt~ are contained i",. t,~ ~s-Grad7df. Geotechnical or Final Compaction Report provided at the completion
of gradu:ig. -, . 1 , , /1 I I :/ .J .--7 ;7 ·· ,· / · , . ..--/// ~H--.//,,,-• ,,.~
. I l" i · !( i..,· V r /p,,,-~ .,Y;.Y / I :z:;:::-
5741 Palmer Way
Carlsbad, CA 92008
(760) 43S.3155
~ \ Represehtative ofG~oSoils, Inc,
\
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
~···
GEOCENTRIC
L\XD SCRVE\'1"1C AXD \!APP!XC
June 4, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying perfonned an as-built field survey on June 4, 2018 and found the
garage/second floor fonns for buildings numbered 7 through 10 to substantially confonn to the
line and grade as shown on the approved Precise Grading Plan. As such conforms to all
building setbacks.
Sincerely,
Lorne DaPron
PLS 7824
2150 N Centre City Pkwy Suite B, Escondido CA 92026
tel: 760.207.7824 fax 760.745.7824
\V\V\v.geocentricsurvey.com
~ GEOCENTRIC
I.,\'.'\ D S L' R \' E Y I ;,,.; c; \ :\ D \f .\PI' I .'\ C
April 5, 2019
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on April 4, 2019 and I hereby
certify that the framing on the roof, is as shown on the the following table.
LOT GARAGE
PAD
1 253.97
2 251.97
7 216.97
8 214.97
9 215.47
10 217.47
11 217.47
12 219.47
13 228.97
14 230.97
Sincerely,
Lorne DaPron
PLS 7824
2ND RIDGE RIDGE LINE
FINISH LINE HEIGHT
FLOOR ABOVE PAD
254.64 276.02 22.05
252.64 274.03 22.06
217.64 239.14 22.17
215.64 237.13 22.16
216.14 237.59 22.12
218.14 239.63 22.16
218.14 239.66 22.19
220.14 241.64 22.17
229.64 251.08 22.11
231.64 253.09 22.12
:2!50 ~ C1.:nm: Cirv Pkwv Suire B, Fscon<lido CA 921..126
td: 76G.2.07.7Ri4 fax: 76ll.745.7S24
\ vww.gL'Occnrricsu n:cy .com