HomeMy WebLinkAbout2869 Trails Ln; ; CB153209; PermitResidential Permit
Print Date: 01/21/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
2869 Trails Ln
BLDG-Residential
1560904100
$387,913.00
Work Class:
Lot#:
Reference#:
Construction Type:
Single Family Attached
6
DEV04063
VB
# Dwelling Units: 1
3.00
Bathrooms: 3.50
Bedrooms: Orig. Plan Check#: PC130072
Plan Check#:
Project Title: TRAILS END
Description: TRAILS END-TYPE 2-UNIT 6-SF ATTACHED 2566 SF, 599 SF GAR, 131 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outisde CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $29,695.67 Total Payments To Date: $29,695.67
Status:
Applied:
Issued:
Permit
Finaled:
{city of
Carlsbad
Permit No: CB153209
Closed -Finaled
09/29/2015
12/19/2017
Inspector: CRenf
Final
Inspection: 1/21/2020 12:54:SOPI'-
Balance Due: $0.00
$1,648.40
$653.88
$66.00
$166.00
$92.00
$182.00
$13,576.96
$16.00
$5,029.00
$934.00
$50.43
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153209)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2869 Trails Ln
IVR Number: 709467 Carlsbad, CA
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/26/2019 07/26/2019 BLDG-82 Drywall, 098916-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Test, Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
09/23/2019 09/20/2019 BLDG-21 104819-2019 Partial Pass Chris Renfro Reinspection Incomplete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Backflow PVC to Main connection Yes
underground. OK to backfill
11/13/2019 11/13/2019 BLDG-33 Service 110539-2019 Passed Chris Renfro Complete
Change/Upgrade
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/21/2020 01/21/2020 BLDG-Final 116836-2020 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
January 21, 2020 Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153209)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2869 Trails Ln
Carlsbad, CA
IVR Number: 709467
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
06/27/2019 06/27/2019 BLDG-16 Insulation 095875-2019 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation pre-lim at party walls and attic Yes
areas
07/01/2019 07/01/2019 BLDG-13 Shear 096149-2019 Partial Pass Chris Renfro Reinspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Interior shear walls at bathrooms on second Yes
and third floors. Partial pass
07/03/2019 07/03/2019 BLDG-17 Interior 096473-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/11/2019 07/11/2019 BLDG-84 Rough 097179-2019 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
07/15/2019 07/15/2019 BLDG-17 Interior 097503-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 1st layer drywall at party walls Yes
07/17/2019 07/17/2019 BLDG-16 Insulation 097766-2019 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/19/2019 07/19/2019 BLDG-27 Shower 098089-2019 Passed Chris Renfro Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/22/2019 07/22/2019 BLDG-17 Interior 098229-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
January 21, 2020 Page 3 of4
PERMIT INSPECTION HISTORY REPORT (CB153209)
Permit Type: BLDG-Residential Application Date: 09129/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2869 Trails Ln
Carlsbad, CA
IVR Number: 709467
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
08/27/2018 08/27/2018 BLDG-11 068027-2018 Cancelled Paul Burnette Reinspection Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
10/23/2018 10/23/2018 BLDG-11 073878-2018 Partial Pass Tim Frazee Re inspection Incomplete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Footings Check Yes
03/21/2019 03/21/2019 BLDG-14 086577-2019 Partial Pass Tim Frazee Re inspection Incomplete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/08/2019 04/08/2019 BLDG-14 088199-2019 Passed Tim Frazee Complete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 2nd floor sheathing nailing OK Yes
05/16/2019 05/16/2019 BLDG-15 092036-2019 Partial Pass Paul Burnette Reinspection Incomplete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/03/2019 06/03/2019 BLDG-18 Exterior 093458-2019 Failed Chris Renfro Reinspection Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
06/05/2019 06/05/2019 BLDG-13 Shear 093744-2019 Partial Pass Chris Renfro Reinspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/24/2019 06/24/2019 BLDG-16 Insulation 095392-2019 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
January 21, 2020 Page 2 of4
PERMIT INSPECTION HISTORY REPORT (CB153209)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2869 Trails Ln
Carlsbad, CA
IVR Number: 709467
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
12121/2017 1212112017 BLDG-21 044157-2017 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01123/2018 01/2312018 BLDG-11 046588-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02101/2018 02101/2018 BLDG-11 047542-2018 Partial Pass Paul Burnette Re inspection Incomplete
Foundation/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02122/2018 0212212018 BLDG-11 049587-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
0310912018 0310912018 BLDG-11 051141-2018 Passed Paul Burnette Complete
Foundation!Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG•Building Deficiency Yes
05108/2018 05/08/2018 BLDG-21 057308-2018 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG•Building Deficiency Yes
05118/2018 05/18/2018 BLDG-11 058404-2018 Passed Paul Burnette Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG•Building Deficiency Yes
05/3012018 0513012018 BLDG-66 Grout 059426-2018 Partial Pass Paul Burnette Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG·BUilding Deficiency No
January 21, 2020 Page 1 of4
,<~;,,, o• RECORD COPY
CARLSBAD INSPECTION RECORD CB153209
2869 TRAILS LN Building Division
li1! INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
TRAILS END-TYPE 2-UNIT 6-SF ATTACHED 2566 SF 599
SF GAR. 131 SF DECK
li1! CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
li1! FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carlsbadca.gov/BuHdlng AND CLICK ON
"Request Inspection"
DATE: 12-q-I l
DEV04063
PC130072
1560904100
12/14/2017
CB153209
If .. YES" is checJil)rJ below that Division's approval is required prior to H"!questing a Final Building Inspection, If you have any qu,::stions
please call the applicable divbions at the phone numhcr'j provided hclow. After all r£;(1uircd ;qJJHOVi1ls are signed off-fa.x. to
760·G02-85b0. email to bldgi11spections<,,1car_lshach:a.gov 01· bring in a COPY of this card to: Hi35 Faraday Ave . Carlshafl.
Required Prior to Requesting Building Final If Checked YES
Planning/Landscape
CM&I {EngJneerlng Inspections)
Fire Prevention
#12 REINFORCED STEEL
#66 MASONRY PRE GROUT
□GROUT □ WALL DRAINS
#10 TILT PANELS
#11 POUR STRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME lllfFLOOR □ CEILING
#15 ROOF SHEATHING
#13 EXT. SHEAR PANELS
#16 INSULATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWALL
#51 POOL EXCA/STEEL/BOND/FENCE
#55 PREPLASTER/FINAL
#19 FINAL
CODE fl PLUMBING
#22 □ SEWER & BL/CO
#21 UNOEROROUNO □WASTE
#24 TOP OUT □ WASTE □ WTR
#27 TUB & SHOWER PAN
#23 □ GAS TESl □ GAS PIPING
#25 WATER HEATER
#28 SOLAR WATER
#29 FINAL
coor:: 11 STORM WATER
#800 PRE•CONSTRUCTION MEEllNO
#603 FOUOW UP INSPECTION
#605 NOTICETOCLEAN
#607 WRITTEN WARNING
#609 NOTICE OF VIOLATION
#610 VERBAL WARNING
REV 1012016
760-94+8463 Allow 48 hours
760-438-3891 Call before 2 pm
760-602-4660 Allow 48 hours
UNDERGROUND (11,12,21,31)
#82 DRYWALL,EXTLATH, GAS TES (17,18,23)
#83 ROOF SHEATING, EXT SHEAR (13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
T-Bar (14,24,34,44)
FINALOCCUPANCY(19,29,39,49)
A/ S OVERHEAD VISUAL
A/S OVERHEAD HYDROSTATIC
A/SFINAL
F/AROUGH-IN
F/AFINAL
FIXED EXTINGUISHING SYSTEM ROUGH-IN
FIXED EXTING SYSTEM HYDROSTATICTESl
FIXED EXTINGUISHING SYSTEM FINAL
MEDICAL OAS PRESSURETESl
MEDICAL OAS FINAL
Date Inspector
SEE BACK FOR SPECIAL NOTES
January 3, 2018
GEOCENTRIC
LA;\ !) S ! R \' l: Y ! N (c A N D :,1 A !' I' I N C
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No, 7824
21.50 :\ Ctnt.rc l. 1c~-f'i<\'·V S1.mc l\ LsconJ]d.,7 l. A. 9:_(i26
u.J ?fin 2()7.782-t fa:\ 760.7Lt5 7824
\-v ,v,v .gt:-nu.::n Lf'.l l'\U rvey.L·nm
.z:;::,.,;. )f __ ,l -' -,,. • -, ' -~--' / -::-<c:_ , . l -' > / -· .,. ~~H-.. :::/ )I,{: ;.f-' ..
,r/ -------w.o. be·., .! ~--.:.__.
I -r .,., "1 DATE L···", --1 .1
NAME /2. Cft..-1..SmA ✓,
HOURS ______ _
.G,_eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
~ L --I !'"-~ Client Name: __ V_,~=--=#.._1 .._r;"'"""7 A--'-..,.b.__-~..;.'i"""1-"-·v...;;;·c'--,,....__-'-_l_,.;;;;:::...-'---___ Project Name: -7 l't-d l I; C. ...:?.>
.....--I ,.,... ,,, ... I l, ,,..... .,
Locat·1on/Tract·. __ l-"-'~=--7 ..:......c.. .. =·___,,1=--'--.....,....:....:::c...,.:...__;;:' ::........:."_-_._'.a..'__.=1-..,:..:.-=--1 __ 1-::::_._,·r __ ,._..--.,--"J'-•. ,_) ___ !__Y ____________ _ , ,.,._,,,, I I ..S f. _ , .) • '-·· ,._ < , , ,r,_;.,, .f.,, • '-'
I'
Unit/Phase/lot(s): _/4, ___ 1-_._1 _7:....,a-/__..-;i7_.._. _7~/,_.1=o..,.:·--/....,./ /'""";....;z;......,.,'---✓-I; .... -~·;_'-/ ______________ _
/
Referenced Geotechnical Report(s): _..;.;.v_' ')..:..;'/:,'--. tt..:.F...::~;:.:...., _.,_/0=-·7_--=~: .... -,_./_·-'--/--'l-....,,.:...:....f-,;.;..~_-___,_('-, _-_/_&_~ _________ _ ,,-
Observation Summary
l,/ ;-Initials A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
IL./p Date .
J__,,,
/'!,, /1 1 ,
---~ __ ,,,<
nh-J
)
/---
ti.,/z-:
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
/
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~~~xtended
period of time for such, and the contractor should schedule according!#'"'£~? ,;'-;?.::.>/st" _p-
in the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
,.o.! grading. /.--/ /'
~«'.._ . ~~ ·------·-
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951 ) 677-9651
[ /UESDA-'-/ \
w.o. 0(6 3 5 -c.
DATE,_.:_l _-_;1-~---'-l~e,"'--_
NAME M t 1<:.e ..$.l::,;~l..-
HOURS __ 1-CC--,_o ___ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: D n N NA Project Name: /v1... A-; t._ s &:: t-.J. b
Location/Tract: Tn... A l LS l;::::.ND C..t Of.-1 -/Lf
Unit/Phase/Lot(s): _..:..l---_,:o:::....:...r ..;:::.S"------=-\ ...!../_--z..:;:;;__....;J..:..2 ...!../_1
Lt.!-; ...... _ ..... 5~/_,:b~ ___ (;,...._1_-_~:;..__').::...__ _______ _
J /
Referenced Geotechnical Report(s): -=b...:..rt~·'---'r E:~{):;..__--!,.l~◊---"3a::....:...I ---'/_1..,_____,....___b=-----=6"------'l-"'b:;._ _______ _
I
Observation Summary
v'-A5 Initials
i /-z../ 19, Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
,.JJ\ 5 Initials
1 Iii I B Date
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
t'vl.. S Initials
1 h./ ia Date
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
vV s Initials
1 I z. I rn Date
P1::.RF0(/"l.'.N'l(2/) 51:LG-c,r /t-.J F'l'l.£.,i~IN{,, ON UNDE:n.SL(P){-1 vnur'f Tn.;:-.-..i(lii::-:r. ·f...,<..T\c's"
f>r'\o(S1.-..(, .I:.Nt--,~(.11',rc.J Tr+<A-r ·r-.--z..e-·l'Jc.Hc:S 8¥-\c.kr-:,u ... IS R.&l-£'17>/IT"'i CoV'-',Dv'.\,LT
f't,,...,0 SvrrA(<',l\::" Fon. -rd·£ _r:-,,,..,-rt:i,-,OF::D u..5C
Notes to Superintendent/Foreman
G.J
2.
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. ~ i<iE ep Mo I s r ~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 Palmer Way
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of ~Soils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
-•i'O-'!ilJ/!1,(t,\iU•· G E O C E N T R l C
LAND SURVEYING AND MAPPING
May 17, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on May 9, 2018 and found the
first floor building forms for buildings numbers 3 through 6 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7B24
2150 ~Centre(" ity Pk1,vy Suitt: B, Escon<l.id(l (:A 9~026
tel 760.207.7821 fax 7607457824
V.-'Vi/W.gt:ocemr.icsurvty.1..:om
I
-~ I J
I I
I
31079
229.18
31071
~31-68 31072
----[<31.68
31073
231.{ig
31075 L----½~;----229.70 3107/i
229.71
31078
Z19.1s
/
•
/
/
• . .
.
.
,( ,eotechnical • Coastal • Geologic • Environmental
w.o. __ .=~.::;~;.;:-85;._" .;.._-.;:.c _,,. -;;.."'·-=-::.
DATE_-:.;-~~l~1~,J~1~i __
NAME. __ '..::::&:?;-;;..:;"":::;,__ __
HOURS :, ---=----
FOOTING TRENCH OBSERVATION SUMMARY
-... ~ . 'n I½ ;,-; Client Name: / r./lll(A "-· ,..::-1r~ &'--(...,. --. Project Name: ;~( h i-::, @ t:.
Location/fract: ---<-..:.~ ..... &""'a:a..S. ..... "'1-"1()"-........ -r ..... a.::,A.:.;4.t.=';/''-· __ (!,,_T_. -=0 __ 10 __ ' -.... I __ .¥,._ ____________________ _
. /,, ,-/; Unit/Phase/Lot(s): _ _.._:'_.~g ___ 1 ___ -
7
"3f_._'r ;,----:,~r/_v:t __ C
7
4';
7
ij>_fi.e_· ____________________ _
I ,.. ' ' I I I
Referenced Geotechnical Report(s): _v-_7 __ )1_._-n .... w .... -.... ' ___ 1_11...,/ ..... :-__ ':1i""/ __ 1_1_"-_✓_· _&-r'j_(tr, 1_
1 !_& ______________ _
I I
Observation Summary
t .:2 Initials
5'/it /J CJ Date " I
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil condition:
in the trench are generally free of loose soil and d~bris, non-yielding and uniform, and plumb; anc
are in general conformance with those indicated iri the geotechnical report.
1";;-Initials
.i-lt1 i,,l Date
'I
A representative of GeoSoils, Inc. observed and reviewed footing excavation qepth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of ~he geotechnical report.
( 1?~ Initial* A represente.tive of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
<'it! /17?' Date s~tback was ·in general.accordance with the .recommend~tions of the,geotechnical report.
' I tr-ixv!M T_ ,l"p__.e /,t4~'!-i tA t7c;;I-J ,,qt,c;l',rJtJ-41'}'..) ,:..v 11-h"fll_!_il ,-:, I ,f>,/5 _,i-¥-'t'f"P if-;[' ~ rtP!c:'( r.r..,1 Tl e:>µ / P'71J•n; _
,---, . . tb;1o "'U-.,~•✓r~ /17 ,fl,82-:F,.cr-c:,;r-wav~t..~ ,,-g,!'/~,, JI Tl'(' (7/(I' :" '<//?', B't::r.m-,'; 1t-y--#.~ ,r.a,,,tr,. ~-, ,.~ /-~ Initials (.-: ,r. -~ /N#~ . :~.; ::,-,t,(.,,,,,e.;r.!,o,,<1:N 'OV-'> . . U, · "5 /VP 1,/:IAI.J,f,:;Je. V/1,,.r,~1
_;:;-/,It/JR' Date d,,O. -p,17,m1-7?v l-/ IJ' f->&:·NAIJV ' W~ /-.5 '!(· "'7J e. AP~~h: ~./41V'..r. ,-r& .:-Ntt??:,-r,·
( 71'0./t;vw,'i!"..--#INAt-r;.:.· ,"'/W/,//Arf!',rj ..,·;C../r?IZ. To~-~; ~ .rl/J'...f.'-lN,V')r/17,lJ,., II
or·~J,.t1}c;/,1 Alli> A',/l'IIP&l'f.,.. 1?JC-7.11Jtf',">£,e>.;--'//.I :;-/il('ltA'fe-5 1~Ar' /;t1£~i~ /'t-v,mp !Pc;;
Notes to Superintendent/Foreman ·,;W,>Jc.~r f9:i~ lo/a. I} ··V/ 7 ;/ r-u.' l=-GC T'/fl!;. 1 i<r 1/ft,,.1 lB1' Ul5-i! J;l!Z,f, 1 i..
cftiJoTtJ,dl fl iCA-l,-,, 1ifl/''/PI fl7"; ·
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soil~. presoaking of soil below slabs may be recommended. Consult
the geotechnical 'report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. fftf4' /bt;,1~
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Note.s1o Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are co,!1tainecfin t~.e As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading. _ 7 · ,, · ,, ·· .-_,..1 __ ....... ;{
._.,,,✓ ~---__ ,.,. __,,/ ,. /vi' • \...
_,,;,..... ;I-._.,., "' / ,✓.,.,... ----
5741 PalmerWay
Carlsbad, CA 92008
· (760\ 43S.!'11 !,!,
-1~.
~ll';-M'9't-ro1 ,.....,j,.\ "'-"' __ .......... ..._
Representative of Ge6$oils, Inc.
26590 Madison Ave.
Murrieta. CA 9251>::>
' '?
7
(;-~L•-. '" ,,.c~~Jr~ction Testing & Engineerin!lr tnt.'"~ •• -,--.. , ---• . -"'~ '\~,f ;;, lospec•m I Testi"!) I Gootecho1a, I Eowoomeo" & Cooslruetioo Eogmeeo,, I aw Eogl"""'g I """""'
INSPECTION REPORT PAGE _j_ OF _j_
CTE JOB NO./O-!3Cf 5 '7
REPORT NO.
PROJECT NAME y;-,,,;Js [.,,.,../ /fo,-A..e;: . INSPECTION MATERIAL IDENTIFICATION
ADDRESS lJ,,;4 (IA-l.-, 1-C.,44-e!s ht1cf !},Jho bi-. . /
{f4-a/s b&cf
ARCHITECT 7 IJ.es,-5"" /4,,4/,, &c./1,y,.U
ENGINEER ,H v-;(f<
CONTRACTOR P110/;;,!J /Ml fst+/4 ~uru <:
OTHER [) )1/ L
INSPECTION DATE
PLAN FILE/OTHER
BLDG. PERMIT/OTHER
□
fg_'
□
□
□
□
□
□
□
CONCRETE CONG. MIX NO. & lb/in2
REINF. STEEL GROUT MIX NO. & lb/in2
MASONRY MORT AR TYPE & lb/in2
.,,..!';
P.T. CONCRETE REINF. STEEL GR./SIZE /J? 1 5 t:1 r & o
FIELD WELDING STRUCTURAL STEEL
SHOP WELDING HIGH-STRENGTH BOLT
BATCH PLANT MASONRY BLOCK
< EXP. ANCHOR OTHER
OTHER
MATERIAL SAMPLING
0 CONCRETE O MORTAR O GROUT 0 FIREPROOFING O MASONRY BLOCK
0 REINFORCING STEEL O STRUCTURAL STEEL 0 BOLTS O OTHER
,--1.~SPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
·•;f,,::£:-. • 'PLEASE NOTE A Y RE-lt-,ISPECT.ION, TESTING, 0~ OTHER PROJECT ISSUES. .
\---------------~------------------------&" 1-u, "', f-s/e .b , /,Be ;;,
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME Dtin nu /iz__,/,;_ I
CERTIFICATION NO. Jc--e-b85"2=tJ-C/ 56~ 7.,7_
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net