Loading...
HomeMy WebLinkAbout2871 CAMINO SERBAL; ; CB010743; Permit03/07/2,001 , Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/07/2001 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No:CB010743 Building Inspection Request Line (760) 602-2725 2871 CAMINO SERBAL CBAD RESDNTL Sub Type: SFD 2552813600 Lot#: 623 $352,640.00 Construction Type: VN Reference #: CT88-03 1 Structure Type: SFD 5 Bathrooms: 4.5 SHELBOURNE - LC VLLY PHASE 5 PLAN 4-SFD 3904 SF, GAR 649SF, DK 110SF Status: ISSUED Applied: 01/09/2001 Entered By: JM Plan Approved: Issued: 03/07/2001 Inspect Area: Orig PC#: PC99-149 PlanCheck#: PC01-05 Applicant: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA 92014 858 259-8500 Owner. DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA 92014 858 259-8500 Total Fees: $14,208.69 Total Payments To Date:$0.00 Balance Due: $14,208.69 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Inspect $1,325.80 Meter Size $0.00 Add'l Reel. Water Con. Fee $861.77 Meter Fee $0.00 SDCWA Fee ($68.94) CFD Payoff Fee $35.26 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $310.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 LFMZ Transportation Fee $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee Housing In Lieu Fee $0.00 Master Drainage Fee: $0.00 Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,374.25 $6,418.05 $0.00 $0.00 $0.00 $600.00 $0.00 $0.00 $0.00 $203.00 $60.00 $89.50 $0.00 $0.00 $0.00 $0.00 $14,208.69 FINAL APPROVAL Clearance: NOTICE: Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: PC01-05 Date: OCT I 10/09/2001 Permit*: CB010743 Permit Type: RESDNTL Project Name: SHELBOURNE - LC VLLY PHASE 5 Sub Type: SFD PLAN 4-SFD 3904 SF, GAR 649SF, DK 1 10SF Address: 2871 CAMINO SERBAL Lot: 623 Contact Person: Phone: Sewer Dist: LC Water Dist: O Inspected (^~)j^" Bv: /- '^ Inspected Bv: Inspected Bv: 7 Date . Inspected: /<>//*/*' Approved: * Disapproved:/ ' Date Inspected: Approved: Disapproved: Date Inspected: Approved: Disapproved: Comments: City of Carlsbad Bldg Inspection Request For 11/02/2001 Permittf CB010743 Title: SHELBOURNE - LC VLLY PHASE 5 Description: PLAN 4-SFD 3904 SF, GAR 649SF, DK 110SF Inspector Assignment: PO 2871 CAMINOSERBAL Lot 623 Type: RESDNTL Job Address: Suite: Location: APPLICANT DAVIDSON BUILDERS Owner: Remarks: Sub Type: SFD Phone: 6195724599 Inspectoi Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: JORDAN Entered By: CHRISTINE Act * Comments Associated PCRs Inspection History Date Description 10/22/2001 39 Final Electrical 08/16/2001 16 Insulation 08/16/2001 84 Rough Combo 08/14/2001 84 Rough Combo 07/06/2001 83 Roof Sheathing/Ext Shear 05/17/2001 11 Ftg/Foundation/Piers 05/02/2001 21 Underground/Under Floor 05/02/2001 22 Sewer/Water Service Act Insp Comments AP PD EMR AP PD WC PD AP PD AP PD AP PD AP PD AP PD