Loading...
HomeMy WebLinkAbout2871 CORTE MORERA; ; CB000847; Permit03/23/2000 Job Address Permit Type Parcel No Valuation Occupancy Group 03/23/2000 # Dwelling Units Bedrooms Project Title City of Carlsbad Residential Permit Permit No CB000847 Building Inspection Request Line (760) 602-2725 2871 CORTE MORERA CBAD RESDNTL Sub Type SFD 2552801500 Lot# 499 $284,879 00 Construction Type VN 6 Reference # CT88-03 1 Structure Type SFD 5 Bathrooms 4 ARBOR HEIGHT-LC VLY-VIL F-PH 2 PLAN 2, SFD 3305 SF, GAR 603 SF - VILL F Status ISSUED Applied 02/26/2000 Entered By RMA Plan Approved Issued 03/23/2000 Inspect Area NF OngPC# 99161 Plan Check# PCOO-22 Applicant K HOVNANIAN STE 100 5900 PASTEUR CT CARLSBAD CA 92008 760944-9012 Owner K HOVNANIAN AT LA COSTA VALLEY L L C 2495 CAMPUS DR IRVINE CA 92612 Total Fees $12,81919 Total Payments To Date $000 Balance Due $12,819 19 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add'l Pot Water Con Fee Reel Water Con Fee Inspector $1,26858 ,MeterSize $0 00 Add'l Reel Water Con Fee $82458 ; Meter Fee $000 SDCWAFee ; $000 CFD Payoff Fee $28 49 PFF $0 00 PFF (CFD Fund) $000 License Tax $310.00 License Tax (CFD Fund) $0 00 Traffic Impact Fee $0 00 Traffic Impact (CFD Fund) $000 LFMZ Transportation Fee $0 00 Sidewalk Fee $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $0 00 Housing Impact Fee Housing InLieu Fee $0 00 Master Drainage Fee $0 00 Sewer Fee TOTAL PERMIT FEES $000 $000 $000 $4,303 24 $5,18480 $000 $000 $000 $580 00 $000 $000 $000 $19600 $6000 $6350 $000 $000 $000 $000 $12,819 19 FINAL APPROVAL Date \&-~ } es"~ &Clearance NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack review set aside void or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any tees/exactions of which you have previously been given a NOTICE simijar to this, or as to which the statute of limitations has previously otherwise expired CITY Ul- UAHLSBAU 2075 Las PalmasDr, Carlsbad, C A 92009 (760)438-1161 City of Carlsbad Final Building Inspection Dept Building Engineering Planning CMWD StLite Fire OCT ! 22000 Plan Check # Permit # Project Name Address Contact Person Sewer Dist Inspected Bv Inspected Bv Inspected By Comments PCOO-22 CB000847 ARBOR HEIGHT-LC VLY-VIL F-PH 2 PLAN 2, SFD 3305 SF, GAR 603 SF - VILL F 2871 CORTE MORERA Phone LC Water Dist O /") SD Date / /&"( msoected '»/"/" Date Inspected Date Inspected Date Permit Type Sub Type Lot 499 Approved Approved Approved 10/11/2000 RESDNTL SFD Disapproved Disapproved Disapproved • City of Carlsbad Bldg Inspection Request For 10/17/2000 Permit# CB000847 Title ARBOR HEIGHT-LC VLY-VIL F-PH 2 Description PLAN 2, SFD 3305 SF, GAR 603 SF - VILL F Inspector Assignment NF Type RESDNTL Sub Type SFD Job Address 2871 CORTE MORERA Suite Lot 499 Location APPLICANT KHOVNANIAN Owner K HOVNANIAN AT ARBOR HEIGHTS L L C Remarks Total Time Phone 7609449012 Inspector CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical *• • , ^equesWBy JEROME Entered By CHRISTINE Act Comments Associated PCRs Inspection History Description Act Insp CommentsDate 10/3/2000 39 Final Electrical 8/21/2000 82 Drywall/Ext Lath/Gas Test 8/18/2000 82 Drywall/Ext Lath/Gas Test 8/16/2000 17 Interior Lath/Drywall 8/10/2000 16 Insulation 8/7/2000 84 Rough Combo 8/4/2000 84 Rough Combo 7/14/2000 83 Roof Sheathing/Ext Shear 5/22/2000 11 Ftg/Foundation/Piers 5/4/2000 21 Underground/Under Floor 5/4/2000 21 Underground/Under Floor 5/4/2000 22 Sewer/Water Service AP NF AP NF CO NF PA NF GARAGE FIRST LAYER AP NF AP NF NR NF AP NF AP NF NR NF AP NF AP NF UNSCHEDULED BUILDING INSPECTION DATE /)~^t>-t? INSPECTOR PERMIT # 60- 4SY r PLAN CHECK # JOB ADDRESS _ DESCRIPTION _ CODE DESCRIPTION ACT COMMENTS J£