HomeMy WebLinkAbout2871 CORTE MORERA; ; CB000847; Permit03/23/2000
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
03/23/2000
# Dwelling Units
Bedrooms
Project Title
City of Carlsbad
Residential Permit Permit No CB000847
Building Inspection Request Line (760) 602-2725
2871 CORTE MORERA CBAD
RESDNTL Sub Type SFD
2552801500 Lot# 499
$284,879 00 Construction Type VN
6 Reference # CT88-03
1 Structure Type SFD
5 Bathrooms 4
ARBOR HEIGHT-LC VLY-VIL F-PH 2
PLAN 2, SFD 3305 SF, GAR 603 SF - VILL F
Status ISSUED
Applied 02/26/2000
Entered By RMA
Plan Approved
Issued 03/23/2000
Inspect Area NF
OngPC# 99161
Plan Check# PCOO-22
Applicant
K HOVNANIAN
STE 100
5900 PASTEUR CT
CARLSBAD CA 92008
760944-9012
Owner
K HOVNANIAN AT LA COSTA VALLEY L L C
2495 CAMPUS DR
IRVINE CA 92612
Total Fees $12,81919 Total Payments To Date $000 Balance Due $12,819 19
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
Inspector
$1,26858 ,MeterSize
$0 00 Add'l Reel Water Con Fee
$82458 ; Meter Fee
$000 SDCWAFee ;
$000 CFD Payoff Fee
$28 49 PFF
$0 00 PFF (CFD Fund)
$000 License Tax
$310.00 License Tax (CFD Fund)
$0 00 Traffic Impact Fee
$0 00 Traffic Impact (CFD Fund)
$000 LFMZ Transportation Fee
$0 00 Sidewalk Fee
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$0 00 Housing Impact Fee
Housing InLieu Fee
$0 00 Master Drainage Fee
$0 00 Sewer Fee
TOTAL PERMIT FEES
$000
$000
$000
$4,303 24
$5,18480
$000
$000
$000
$580 00
$000
$000
$000
$19600
$6000
$6350
$000
$000
$000
$000
$12,819 19
FINAL APPROVAL
Date \&-~ } es"~ &Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
tees/exactions of which you have previously been given a NOTICE simijar to this, or as to which the statute of limitations has previously otherwise expired
CITY Ul- UAHLSBAU
2075 Las PalmasDr, Carlsbad, C A 92009 (760)438-1161
City of Carlsbad
Final Building Inspection
Dept Building Engineering Planning CMWD StLite Fire
OCT ! 22000
Plan Check #
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected
Bv
Inspected
Bv
Inspected
By
Comments
PCOO-22
CB000847
ARBOR HEIGHT-LC VLY-VIL F-PH 2
PLAN 2, SFD 3305 SF, GAR 603 SF - VILL F
2871 CORTE MORERA
Phone
LC Water Dist O
/") SD Date /
/&"( msoected '»/"/"
Date
Inspected
Date
Inspected
Date
Permit Type
Sub Type
Lot 499
Approved
Approved
Approved
10/11/2000
RESDNTL
SFD
Disapproved
Disapproved
Disapproved
•
City of Carlsbad Bldg Inspection Request
For 10/17/2000
Permit# CB000847
Title ARBOR HEIGHT-LC VLY-VIL F-PH 2
Description PLAN 2, SFD 3305 SF, GAR 603 SF - VILL F
Inspector Assignment NF
Type RESDNTL Sub Type SFD
Job Address 2871 CORTE MORERA
Suite Lot 499
Location
APPLICANT KHOVNANIAN
Owner K HOVNANIAN AT ARBOR HEIGHTS L L C
Remarks
Total Time
Phone 7609449012
Inspector
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
*• •
, ^equesWBy JEROME
Entered By CHRISTINE
Act Comments
Associated PCRs
Inspection History
Description Act Insp CommentsDate
10/3/2000 39 Final Electrical
8/21/2000 82 Drywall/Ext Lath/Gas Test
8/18/2000 82 Drywall/Ext Lath/Gas Test
8/16/2000 17 Interior Lath/Drywall
8/10/2000 16 Insulation
8/7/2000 84 Rough Combo
8/4/2000 84 Rough Combo
7/14/2000 83 Roof Sheathing/Ext Shear
5/22/2000 11 Ftg/Foundation/Piers
5/4/2000 21 Underground/Under Floor
5/4/2000 21 Underground/Under Floor
5/4/2000 22 Sewer/Water Service
AP NF
AP NF
CO NF
PA NF GARAGE FIRST LAYER
AP NF
AP NF
NR NF
AP NF
AP NF
NR NF
AP NF
AP NF
UNSCHEDULED BUILDING INSPECTION
DATE /)~^t>-t? INSPECTOR
PERMIT # 60- 4SY r PLAN CHECK #
JOB ADDRESS _
DESCRIPTION _
CODE DESCRIPTION ACT COMMENTS
J£