HomeMy WebLinkAbout2873 Trails Ln; ; CB153208; PermitResidential Permit
Print Date: 01/21/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
2873 Trails Ln
BLDG-Residential
1560904100
$387,913.00
Work Class:
Lot#:
Reference #:
Construction Type:
Single Family Attached
5
DEV04063
VB
# Dwelling Units: 1
3.00
Bathrooms: 3.50
Bedrooms: Orig. Plan Check#: PC130072
Plan Check#:
Project Title: TRAILS END
Description: TRAILS END-TYPE 2-UNIT 5-SF ATTACHED 2566 SF, 599 SF GAR, 131 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
TRAFFIC IMPACT Residential Condo Outisde CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $29,927.67 Total Payments To Date: $29,927.67
Status:
Applied:
Issued:
Permit
Fina led:
(city of
Carlsbad
Permit No: CB153208
Closed -Finaled
09/29/2015
12/19/2017
Inspector: CRenf
Final
Inspection: 1/21/2020 12:55:02P~
Balance Due: $0.00
$1,648.40
$653.88
$66.00
$166.00
$92.00
$182.00
$13,576.96
$16.00
$5,029.00
$934.00
$50.43
$232.00
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153208)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2873 Trails Ln
Carlsbad, CA
IVR Number: 709466
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
0712612019 07/2612019 BLDG-82 Drywall, 098917-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Test, Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
0912312019 09/2312019 BLDG-21 104818-2019 Partial Pass Chris Renfro Reinspection Incomplete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Backflow PVC to Main connection Yes
underground. OK to backfill
1111312019 1111312019 BLDG-33 Service 110538-2019 Passed Chris Renfro Complete
Change/Upgrade
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/2112020 01/2112020 BLDG-Final 115835-2020 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
January 21, 2020 Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153208)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached lssue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2873 Trails Ln
Carlsbad, CA
IVR Number: 709466
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
06/27/2019 06/27/2019 BLDG-16 Insulation 09587 4-2019 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation pre-lim at party walls and attic Yes
areas
07/01/2019 07/01/2019 BLDG-13 Shear 096148-2019 Partial Pass Chris Renfro Reinspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Interior shear Walls at bathrooms on Yes
second and third floor. Partial pass
07/03/2019 07/03/2019 BLOG-17 Interior 096472-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/11/2019 07/11/2019 BLDG-84 Rough 097177-2019 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
07/15/2019 07/15/2019 BLDG-17 Interior 097502-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Installation complete at party walls. Yes
07/17/2019 07/17/2019 BLDG-16 Insulation 097765-2019 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
07/19/2019 07/19/2019 BLDG-16 Insulation 098081-2019 Partial Pass Chris Renfro Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-27 Shower 098088-2019 Passed Chris Renfro Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
January 21, 2020 Page 3 of4
PERMIT INSPECTION HISTORY REPORT (CB153208)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address:
IVR Number: 709466
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
08/2712018 08127/2018 BLDG-11
Foundation/Ftg/Pier
s (Rebar)
068026-2018
Checklist Item
BLDG-Building Deficiency
1012312018 10/2312018 BLDG-11
Foundation/Ftg/Pier
s (Rebar)
073883-2018
Checklist Item
BLDG-Building Deficiency
03/2112019 0312112019 BLDG-14 086576-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
04/08/2019 0410812019 BLDG-14 088198-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
05/16/2019 05/16/2019 BLDG-15
Roof/ReRoof (Patio)
092034-2019
Checklist Item
BLDG-Building Deficiency
0610312019 0610312019 BLDG-18 Exterior 093457-2019
Lath/Drywall
Checklist Item
BLDG-Building Deficiency
06105/2019 06/05/2019 BLDG-13 Shear
Panels/HD (ok to
wrap)
0937 43-2019
Checklist Item
BLDG-Building Deficiency
06/24/2019 06/2412019 BLDG-16 Insulation 095391-2019
Checklist Item
BLDG-Building Deficiency
January 21, 2020
Cancelled Paul Burnette
COMMENTS
Partial Pass Tim Frazee
COMMENTS
Footings Check
Partial Pass Tim Frazee
COMMENTS
Passed Tim Frazee
COMMENTS
2nd floor sheathing nailing OK
Passed
COMMENTS
Failed
COMMENTS
Not ready
Partial Pass
COMMENTS
Partial Pass
COMMENTS
Paul Burnette
Chris Renfro
Chris Renfro
Chris Renfro
TRUST THE PEV FAMILY
REVOCABLE TRUST
2873 Trails Ln
Carlsbad, CA
Reinspection Complete
Reinspection Complete
Passed
No
Re inspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
No
Reinspection Complete
Passed
No
Reinspection Incomplete
Passed
Yes
Reinspection Incomplete
Passed
Yes
Page 2 of4
PERMIT INSPECTION HISTORY REPORT (CB153208)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 05/11/2020 Address: 2873 Trails Ln
Carlsbad, CA
IVR Number: 709466
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
12/21/2017 12/21/2017 BLDG-21 044156-2017 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/23/2018 01/23/2018 BLDG-11 046587-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/01/2018 02/01/2018 BLDG-11 047541-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/22/2018 02/22/2018 BLDG-11 049586-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/09/2018 03/09/2018 BLDG-11 051142-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05/08/2018 05/08/2018 BLDG-21 057307-2018 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05/18/2018 05/18/2018 BLDG-11 058403-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05/30/2018 05/30/2018 BLDG-66 Grout 059425-2018 Partial Pass Paul Burnette Re inspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
January 21, 2020 Page 1 of4
,t~,,, o,
CARLSBAD
RECORD COPY
INSPECTION RECORD
CB153208
2873 TRAILS LN Building Division
611 INSPECTION RECORD CARD WITH APPROVED
TRAILS END-TYPE 2-UNIT 5-SF A TT ACHED 2566 SF. 599
SF GAR. 131 SF DECK
PLANS MUST BE KEPT ON THE JOB
611 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
611 FOR BUILDING INSPECTION CALL: 760-602•2725
OR GO TO: www.Carrsbadca.qoy/Sufldlnq AND CLICK ON
"Request Inspection"
DATE: 2_-
DEV04063
PC130072
1560904100
12/14/2017
CB153208
Jf ··YfS" is checked helow l!lal Divbion's approval is rctJuired _poor to requesting a Final Building Inspection. U you h;we oiny qu,•i~tions
please call tlw applicable divisions at the phone uumhcr:, prnvided below. Aftr,r .:111 .-equi:ecl cqiprovab are sitl,ned uft-fax to
7GO f:i02 85GO. email to IJ!di~inspections<'11carlshadca.gov ur llring in .l COPY of thb CdHl to: lG35 F,naday fw(, .. C;1n:-.ilad.
Required Prior to Requesting Building Final If Checked YES
Planning/Landscape
CM&J {Engineering Inspections)
#12
#66
#10
#11
#11
#14
#15
#13
#16
#18
#17
#61
#56
#21
#24
Fire Prevention
REINFORCED STEEL
MASONRY PRE GROUT
□GROUT D WALL DRAINS
TILT PANELS
POUR STRIPS
COWMN FOOTINGS
SUBFRAME il!'FLOOR D CEIUNG
ROOF SHEATHING
EXT. SHEAR PANELS
INSULATION
EXll:RIOR LATH
INTERIOR LATH & DRYWALL
POOL EXCA/STEEL/BOND/FENCE
PREPIASTER/ANAL
#27 TUB & SHOWER PAN
#23 0 GAS TEST O GAS PIPING
#25 WATER HEATER
#28 SOLAR WATER
#29 ANAL
Coor 1· STORM WATER
ll
760-944-8463
760-438-3891
760-602-4660
Ins r
Allow 48 hours
Call before 2 pm
Allow 48 hours
#83 ROOFSHEATING, EXTSHEAR(13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
T-Bar ( 14,24,34,44)
FINAL OCCUPANCY (19,29,39,49)
A/5 UNDERGROUND FLUSH
A/S OVERHEAD VISUAL
A/S OVERHEAD HYDROSTATIC
A/SANAL
F/A ROUGH-IN
#800 PRE-CONSTRUCTION MEmNG F / A ANAL
Inspector
Date Ins
#603 FOUOW UP IN.::.SP;.;Ec.cCTl=ON:;_ __ -+----+------+"'FIXEO=;.;EXTl=;.;.NG"'U"-IS'"H"-IN"-'G'-'SYSTEM=='-'R'-'0-'-UG.::.Hc._•;;;.IN'----+-----+------
#606 NOTICE TO CLEAN AXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM ANAL
#609 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL GAS ANAL
REV 10/2016 SEE BACK FOR SPECIAL NOTES
~f) __ ..... /· ,, .• ··.•• ~·~ -.' Li.ii_~.,f]. , , ~vAr' f'.l>l',/ ,,
~~~-" ···-
/ / ------.-w.o. b t · / > -~
DATE / L-L -1-1 7
NAME /2. CJ-r...1smA ','
HOURS ______ _
l3._eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
,"=:; 1-, L1 , ____ 1 r
Client Name: //~,; r.1 A 1,/)i /,JC 1 -Lr::..... Project Name: -:; }'t..4. .1 I; C. ~~> _..c.....,a:;.._:;"--'-"'-"-'---'"'---~.;;...;;;;_,_ ____ ___;;;;____ __,, ...... -'-'"-'-'-------------
---/ J C /"• ' } hi / 1:-:, l.,-. ./J 1...,,) -1' L / Location/Tract: ____,.:....<.:lZ;;;..:,;....."'-=-' .,_i """.s;~'·==-'-•,..:.....:.)-:"-. _L-=---..;./._<'__._f .:;_;'""'""'".-,l~A'-'-"'.:..· __ .:=:-:,:;.--'-__ v_-=------'-------------,,
I J /.. 7 qi i'j/ 1?/, Unit/Phase/Lot(s): _<.A?_v..:..-t-_._1 -:...,,......,..-?~_'"", /'""'/,..;;..o...,.:·--'..,.l,._.1"-'z_,=---_"'-I ..... J_~_/ _____________ _
<t " • /
Referenced Geotechnical Report(s): --'-°'-' .._,/,'-. n...;.~...:;~;.'-, _.,_lc=u_✓-i_·--=,!::..°J...:/_'_·-_/ .... 7_· ---,,:..-.-af-.,;.;..:_-..;..b;...-· _-_/_!_; _________ _ ,,..
Observation Summary
/,/ ,,.
IL/i 7
/_,,·
I[,.. /l J
'
~.,~;,''/
n/1."1
' ;~-
.'1.,,/z, i
Initials
Date
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed on site soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~~xtended
period of time for such, and the contractor should schedule according!#" k ~? ..,,-;7.::>/ s I' ..fl'"'
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final·Compaction Report provided at the completion
_q grading. // / /?
/✓ /
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
~<.2_ , ____ _
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
-···-------LiueSDA-'-/ \
W.0. 00,35 -C
DATE.--'-l _-....:7-'------1~£'.,a;...__
NAME t"v{ t V-6 .s~~
HOURS_-1-_.o ___ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name:-=D"----'-'o"-'-~~1...,.N..a:..:.P...,3 __ D""'--'n.._;.....1....;\/'""'~::;._ .... , ~j;--~L--'=C=--_Project Name: lv'l.v"~i L..S ~-NJ>
Location/Tract: Jr1. LA 1 t... 5 l~ ND CAn.LsB A-D c., ot---t-/Lf
Unit/Phase/Lot(s): _.,;_l--_:o:......r:.......:S;:::...._____;\_,_/_"2...::;._ __ ....:3~/.......!,-t_,,,.___ ___ .~_,_c ...;.1_
1 =b ____ ....;:(,___1 _-_~_)~-------, /
Referenced Geotechnical Report(s): _b!a:a:.!.A..!...·1:....:"·l,;C.==-c:...w/);____,,l,.l .:.::0_-__ 3.:...!,...1 -__:1_7.l,.._.___b=-_-.......!:a6~-__:l...::6::;__ ______ _
Observation Summary
v¼5 Initials
l / 7../ l~ Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
;)A 5 Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
: !iii B Date
t'v\ S Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. : / "2 / l 8 Date
vLA. 5 Initials Pf'=. RF or,,tME-b 5£: LS-c. r , ,.., F>rle, R I N f,,, ON U N!)E"n.-.:; LIAR t....rn u f'/ Tr-iG' NC. l+e :s-. -r "'\<-.T\ ~ •c
P't'l-0(\\.-.(, I.r,H)l C.V-.lf:=J Tt+t',;, 'T"'1._i:NC.HES 8'1Ac.k.1-1<-I... IS R.G-cl-=--rrv,,'i Co,.,....p v,-<...T
f't,.....I) S 1.JrrA~LE" Fon... ·r,+e: _;:-,.,.._,,sv--,OED u.SC
1/ z_. / 1e Date
Notes to Superintendent/Foreman
U.)
2.
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly.:¾-/<tEep Mo I s r ~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 Palmer Way
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Gfu-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
:""'
'
GEOCENTRIC
LA\"Lt SL RVEY!Ni;. ,-\ND MAPPl:\C
January 3, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
\.V\.\'\V ;.:'.L(KtnLr:cc.;urvey.t.:nrn
-,,,,,.~,;'"'''' G E O CE N T R l C
LAND. SURVEYJN'G AND 'MAP·PING
May 17, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on May 9, 2018 and found the
first floor building forms for buildings numbers 3 through 6 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lome DaPron
PLS 7824 No. 7824
2150 N Cemre City Pkwy Suite B, Escondido CA 92026
tel: 760.207.7824 fax: 760.745 7824
v.rv,:v;.:.g~ocentr.icsurvey.com
1087
227.19
31079
229.1a
31070
231.72
31078
229. 18
31071
231-68 31072 ___ ·•2a1.5e
1073 231.59
/
,
/
/
w.o. __ .:.:;t,,..:.it.,,,;;.;:5;..."5 ~--.;:,c_~ _:....,-=~
DATE ___ _..;.;.._lf'"~/~#~h~z_' __
NAME __ '..::.::£;.,:;;,;J· ,.,,,::;__ __
HOURS __ -~✓'-----
FOOTING TRENCH OBSERVATION SUMMARY
·-.., '=" . -~..,.,
Client Name: / 01/N;{ J. P-IJ/t~ tlc,, Project Name: __,1 ... ~,...---i'""' ..... 1!..o=-'h"'c""&:,;;.V->_· _________ _
L . rr I A r -I ,-,-· <!T /;/l_;·d-1 ocat1on ract: . /tV:% Sl'l'P. e::u;; u 1' ·
. I. ,--/~ Unit/Phase/Lot(s): ___ '£?=· '--'-;_.S-r--/..,_17'
7
' _·~+' /_!.P' __ (,-t-,0';-t-y>_!i,l!,_· __________________ _
1 ,, I ' I
Referenced Geotechnical Report(s): __ .,__;·_,_'A ___ -n'""'w-·--~1-~,...l~-i 6.,., ,~~1_1_--_--1 __ &7/i_ff-:'-:_11._&-______________ _
i / , r
Observation Summary
r .:;:.;, Initials
~i! h9 Date .. I
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil condition:
in the trench are generally free of loose soil and d~bris, non-yielding and uniform, and plumb; anc
are in general conformance with those indicated iri the geotechnical report.
/:;;, Initials
r< It, h,l Date
'1'
A representative of GeoSoils, Inc. observed and reviewed footing excavation qepth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
( -,;.,;:;?:; Initial* A represent~tive of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
_ I(' i,, !tR" Date s~tback was ·in general .accordance with the _recommend~tions of the geotechnical report.
' t Af¢'-..:Rv tr-6 7 r.1"-.e d-kt?t.?1 C4 J7o/j / ~aJ41 i" J ·~ ,;1,,"711_!__!f P; ,N$ ..J-/f'Y.:? ,!/;f;;.& rPf::'t r r..A 17 e?,-1 / nlhr: . .
,r,...., • 0 /41o . ,..,t:4-_,~•.1 Tlifp /P '~er ~,Tv?7VPrl!t.~ .~#//f1',, it/ Tl"(' t7/(/ :" ~ /'l<', /jj£;J"A(... ,\ li'y--#.~ ,re;,:;,r,1,:'i/c! ,:;;;:::-Initials (-: .1n.Pf. r~ /#/!I~ _. 7' R.' 11s-,M,-,,,e.--r:,, ,r-o,:)t</.~ u, · ,-; NP &HA.a,r,;;;e:~ W,r...1 ,j;f;,I
J::;-l;t/Jf( Date ~ ''f"'"t/?/YIP' t>#' I...:! I e-N4IP ' wr~ / ..5 ./:· £, lP~ ~~A ,-,-~ :: ,-y ---r.·
' 7 7 w -11Jvt--1--rl!' .. --.J111ur ~ hi'!. ,)/!PJ/-'~.P ~ ~¼/ .PIZ. ro ~ 1&,t:.-,,.,;Jv.~· m,1/.JT lt?#D 1 1 -
vr--~&,:Jm&/1 AUt> k;r/'!1,u;;;., 1JJC,7/j'4',0,ee,.r11J .;-/{,;rt,1e,.-1-~ 11Ptt7' l1-1r~,i:.i(;l{L. / ... ,,,,hp 1trq
Notes to Superintendent/Foreman T?,;.;::A f<A?,(n'a ~} .:t,/ 7 ~l't,A-rpe T'lli'f--11-r ~ll"f.:.l' Ur'-51! ;;~11
/..
(dW1};i.dl fl iCA l,-., 1 N-1/ll ¥J1 HI-'
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soil~. presoaking of soil below slabs may be recommended. Consult
the. geote~hnical ·report for presoaking recommendations. We not_e that clayey s~ils may take an extended
period of time for such, and the contractor should schedule accordmgly. /-,et/" /115'1~
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Note_s7\0 Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are coritaineffTh t~,e As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading. . 7 ·' ..,, · ,, .-· -/ -/
,; ___.,..,,. ,,, ..,,✓-;-
/ ,, ... ---,,. ./..,,-/ ✓v"------.4",,,. .J ·•~,_...,., ,; ,,J' / _ .....
5741 PalmerWay
Carlsbad, CA 92008
-/760\ 438-311'1'
-+446;E;..~'Ave.
~ ,af(ffl"92r01 , ..... ,,,, ~-~
.-. -~ I . , : . , .• -/ /,,·:-:I . I • ./;AY#.I': ~ ~
Representative of Ge6$oils, Inc.
26590 Madison Ave.
Murrieta. CA 925i-::>
CJ~ .. ,s _or:i,§!!iction Testing & Engineerin!',;·inl::.'"~" ,, ,,,_,,, ---~
_. -~b. laspectio, I Testiag I Geo<ec1,,;o;1 I '"'""'meat<& Cooslructioo E"!lmeeri"!l I Ciw '"''""""' I Sw-.,yl"!l
INSPECTION REPORT PAGE _)_ OF _j_
CTEJOBNO./O-/3'15 7
REPORT NO.
PROJECTNAME J;:,,,;,/s f,,,.,./ /fa,"-", . INSPECTION MATERIAL IDENTIFICATION
ADDREss Dtz4 aA-}:.;,,.., 1:C.,*els lz&l !},Jh~, ~--. /
CA:ce: Ls h&d
ARCHITECT i /).es,. ;r,1 Jp4 £, kc-~ru
ENGINEER ,H "I:f<
0 . /' ? (7 • ./. /-CONTRACTOR , /lc.1-r;i.1J r--wl µ't,,,.1<-;:uJ!uru ,<
OTHER O )1/ I_
INSPECTION DATE
PLAN FILE/OTHER
BLDG. PERMIT/OTHER
□
I:{
□
□
□
□
□
□
□
CONCRETE CONC. MIX NO. & lb/in2
REINF. STEEL GROUT MIX NO. & lb/in2
MASONRY MORT AR TYPE & lb/in2
/.
P.T. CONCRETE REINF. STEEL GR/SIZE /} t:, 1 5 4 r 6 6
7
FIELD WELDING STRUCTURAL STEEL
SHOP WELDING HIGH-STRENGTH BOLT
BATCH PLANT MASONRY BLOCK
' EXP.ANCHOR OTHER
OTHER
MATERIAL SAMPLING
□ CONCRETE □ MORTAR □ GROUT
□ REINFORCING STEEL □ STRUCTURAL STEEL
□ FIREPROOFING □ MASONRY BLOCK
□ BOLTS □ OTHER
"''-t!.SPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
¾-i:: ; PLEASE NOTE Y RE-lt-,ISPECT.ION , TESTING, Oij. OTHER PROJECT ISSUES. -·
r-, .,. ---------------~------------------------
·~-& 0 -/i ,_._ _,"< 1 f-> /,,, b '
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
SIGNATURE ~--1K~--
14'41 Montiel Road, Suite 115 I Escondido, CA92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net