HomeMy WebLinkAbout2875 CAMINO SERBAL; ; CB010739; Permit03/07/2001
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
03/07/2001
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No:CB010739
Building Inspection Request Line (760) 602-2725
2875 CAMINO SERBAL CBAD
RESDNTL Sub Type: SFD
2552813500 Lot#: 622
$304,462.00 Construction Type: VN
Reference #: CT88-03
1 Structure Type: SFD
5 Bathrooms: 4.5
SHELBOURNE - LC VLLY PHASE 5
PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF
Status: ISSUED
Applied: 01/09/2001
Entered By: JM
Plan Approved:
Issued: 03/07/2001
Inspect Area:
Orig PC#: PC99-149
Plan Check#: PC01-05
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA 92014
858 259-8500
Owner:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA92014
858 259-8500
Total Fees: $13,081.79 Total Payments To Date:$0.00 Balance Due: $13,081.79
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
X)
Inspector!
$1,177.96 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$765.67 Meter Fee
$0.00 SDCWA Fee
($61.25) CFD Payoff Fee
$30.45 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$310.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 LFMZ Transportation Fee
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
Housing InLieu Fee
$0.00 Master Drainage Fee:
$0.00 Sewer Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,374.25
$5,541.21
$0.00
$0.00
$0.00
$600.00
$0.00
$0.00
$0.00
$203.00
$60.00
$80.50
$0.00
$0.00
$0.00
$0.00
$13,081.79
FINAL APPROVAL
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition* of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactjy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
City •( Carlsbad
Final Building Inspection OCT
Dept: Building Engineering Planning CMWD StLite Fire
Plan Check #: PC01-05 Date: 10/09/2001
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
CB010739
SHELBOURNE - LC VLLY PHASE 5
PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF
2875 CAMINO SERBAL
Phone:
LC Water Dist: O
/O ^y Date
X//^T Inspected: /^/A/V
Date
Inspected:
Date
Inspected:
Permit Type:
Sub Type:
Lot: 622
Approved: /
Approved:
Approved:
RESDNTL
SFD
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For 11/02/2001
Permit* CB010739
Title: SHELBOURNE - LC VLLY PHASE 5
Description: PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF
Inspector Assignment: PD
2875 CAMINO SERBAL
Lot 622
Type:RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
APPLICANT DAVIDSON BUILDERS
Owner:
Remarks:
Phone: 6195724599
Inspecto^
Total Time:Requested By: JORDAN
CD
19
29
39
49
Entered By: CHRISTINE
Description Act Comments
Final Structural fjJY
"1Final Plumbing
Final Electrical
Final Mechanical
Associated PCRs
Inspection History
Date Description Act Insp Comments
10/22/2001 39 Final Electrical AP PD EMR
08/24/2001 17 Interior Lath/Drywall AP NF
08/24/2001 23 Gas/Test/Repairs AP NF
08/16/2001 16 Insulation AP PD
08/16/2001 84 Rough Combo WC PD
08/14/2001 84 Rough Combo AP PD
07/06/2001 83 Roof Sheathing/Ext Shear AP PD
06/04/2001 89 Final Combo AP RB
05/16/2001 81 Underground Combo AP PD
05/02/2001 21 Underground/Under Floor AP PD
05/02/2001 22 Sewer/Water Service AP PD