Loading...
HomeMy WebLinkAbout2875 CAMINO SERBAL; ; CB010739; Permit03/07/2001 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/07/2001 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No:CB010739 Building Inspection Request Line (760) 602-2725 2875 CAMINO SERBAL CBAD RESDNTL Sub Type: SFD 2552813500 Lot#: 622 $304,462.00 Construction Type: VN Reference #: CT88-03 1 Structure Type: SFD 5 Bathrooms: 4.5 SHELBOURNE - LC VLLY PHASE 5 PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF Status: ISSUED Applied: 01/09/2001 Entered By: JM Plan Approved: Issued: 03/07/2001 Inspect Area: Orig PC#: PC99-149 Plan Check#: PC01-05 Applicant: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA 92014 858 259-8500 Owner: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA92014 858 259-8500 Total Fees: $13,081.79 Total Payments To Date:$0.00 Balance Due: $13,081.79 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee X) Inspector! $1,177.96 Meter Size $0.00 Add'l Reel. Water Con. Fee $765.67 Meter Fee $0.00 SDCWA Fee ($61.25) CFD Payoff Fee $30.45 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $310.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 LFMZ Transportation Fee $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee Housing InLieu Fee $0.00 Master Drainage Fee: $0.00 Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,374.25 $5,541.21 $0.00 $0.00 $0.00 $600.00 $0.00 $0.00 $0.00 $203.00 $60.00 $80.50 $0.00 $0.00 $0.00 $0.00 $13,081.79 FINAL APPROVAL Clearance: NOTICE: Please take NOTICE that approval of your project includes the 'Imposition* of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactjy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City •( Carlsbad Final Building Inspection OCT Dept: Building Engineering Planning CMWD StLite Fire Plan Check #: PC01-05 Date: 10/09/2001 Permit*: Project Name: Address: Contact Person: Sewer Dist: Inspected Bv: Inspected Bv: Inspected Bv: Comments: CB010739 SHELBOURNE - LC VLLY PHASE 5 PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF 2875 CAMINO SERBAL Phone: LC Water Dist: O /O ^y Date X//^T Inspected: /^/A/V Date Inspected: Date Inspected: Permit Type: Sub Type: Lot: 622 Approved: / Approved: Approved: RESDNTL SFD Disapproved: Disapproved: Disapproved: City of Carlsbad Bldg Inspection Request For 11/02/2001 Permit* CB010739 Title: SHELBOURNE - LC VLLY PHASE 5 Description: PLAN 3 - SFD 3359 SF, GAR 624SF, DK 51 SF Inspector Assignment: PD 2875 CAMINO SERBAL Lot 622 Type:RESDNTL Sub Type: SFD Job Address: Suite: Location: APPLICANT DAVIDSON BUILDERS Owner: Remarks: Phone: 6195724599 Inspecto^ Total Time:Requested By: JORDAN CD 19 29 39 49 Entered By: CHRISTINE Description Act Comments Final Structural fjJY "1Final Plumbing Final Electrical Final Mechanical Associated PCRs Inspection History Date Description Act Insp Comments 10/22/2001 39 Final Electrical AP PD EMR 08/24/2001 17 Interior Lath/Drywall AP NF 08/24/2001 23 Gas/Test/Repairs AP NF 08/16/2001 16 Insulation AP PD 08/16/2001 84 Rough Combo WC PD 08/14/2001 84 Rough Combo AP PD 07/06/2001 83 Roof Sheathing/Ext Shear AP PD 06/04/2001 89 Final Combo AP RB 05/16/2001 81 Underground Combo AP PD 05/02/2001 21 Underground/Under Floor AP PD 05/02/2001 22 Sewer/Water Service AP PD