Loading...
HomeMy WebLinkAbout2876 Trails Ln; ; CB153201; RecycleCarlstiad \ MEASURES CERTIFICATION CHECKLIST B-51 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov •• ,' ,s,;.,,c,·..,-• "~""-,l<'<",ctJ~..,.,--.,~ • .1."t···,.,,,"<¼,,,.,,,.,,,_,,,_~-,~/',,'.Ji<'•"•J•""",-<•••t·u '-"· ~-,,».~•• · -•· • ,,. ,.,,• , ., ,_.,. ,_,_,; .-,!\"SV,t·,:,,,"',~'" .. c-,a,·,~•,· •,,;v ,•J,0. -~,-:--_,,.,~.,•· • " • .-,. ,c •,,_,,,·,.a.,, This form, signed and completed, and all receipts for the recycled materials shall be, .._, : _;,,,-,, ... , ~-' ,4"'! :t·-' ,,--,;,::---,_<·:. • .. · •• . ,t::f~'(;i''"/:/submltted to the Buildln&lJrspector prior to Final lnspect/on~:tf~f1/Jie : <.; • ;:: 0: "---'·' .:',;: :~-' "", .. ""''"""'"'·" -~ ·,,,_.,,,,,,_._ •. ,, . •,.-,,-,-,,,,,-~ "' ,,, -_,._,.-c;.;,,..,;., ,,., y_.,._,_,.,._ , , .. ",''·"'· ,, .. -,.,•"••-, • .,._ .-., . .-,,~---•. ,.,,, •. "• , ,;··s,,,-_-.. ,, ,.,,_. -~-,----,••· •·: •~ti-·:. i l,,.,, ,;,> :. · -· , Site Development - . Mandatorv 4.106.2 A plan is developed and implemented to manage storm water drainage during construction. (X) 4.106.3 The site shall be planned and developed to keep surface water away from buildings. (X) Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Energy Efficiency ' ... .. 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by the California Energy Standards. ( X) Water Efficiency and Cqhservation Indoor.Water Use. ·_: ,' . 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: (X) 1. Water saving fixtures or flow restrictors shall be used. 7/01/2011 2. A 20 percent reduction in baseline water use shall be demonstrated. 4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not {X) exceed maximum flow rates. 7/01/2011 4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X) comply with specified performance requirements. 7/01/2011 Outdoor Watl3r Use ' . ~ . ' .'· ·, 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather- based. (X) ,_,,•'." ,· '' ., ,,', .,, -·.. ' ' . '' .' . .. Enhanced [)urabif\ty and·,Reduced Maintenance . 4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings in plates at exterior walls shall be protected against the passage of rodents by closing such openings (X) with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. Construc:tiori Wairt"iMin•gernent Plan , .. · . .· . .· 4.408.1 A minimum of 65 percent of the construction waste generated at the site is diverted to recycle or salvage. Recycled material receipts from approved recyclers must be attached to this form. (X) 4.408.2 Where a local jurisdiction does not have a construction and demoli!ion waste management ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the enforcinq aoencv. (X) Building i\rial11~qi~P.&J!f!d tjpera~ion ... · . . · .. ... ..· 4.410.1 An ooeration and maintenance manual shall be orovided to the buildinq occuoant or owner. rx i Erwironrilen~I qi!a:11tt· .. ,,, . ,. ' . . Firep!aCl!lil ;:,;, ..... } it. ·. .. · . . · ,· ' . . 4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any. installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. Woodstoves, mallet stoves and fireolaoes shall also comolv with annlicable local ordinances. (X) B-51 Page 1 of 2 Rev. 5/17 Pollutant Control 4.504.1 Duct openings and other related air distribution component openings shall be covered ( X) during construction. 4.504.2.1 Adhesive, sealants and caulks shall be compliant with voe and other toxic compound (X) limits. (X) \ 4.504.2.2 Paints, stains and other coatings shall be compliant with voe limits. . (X) 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for ROC and other toxic compounds. ,' ~ .. (X) 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials have been used. 4.504.3 Carpet and carpet systems shall be compliant with voe limits. !X) 4.504.4 50 percent of floor area receiving resilient flooring shall comply with voe-emission limits (X') defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (X) 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish svstems shall comply with low formaldehyde emission standards. Interior· Me>h,~ture Control . ' ' ' ' 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X) 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X) enclosure. Indoor A:ir Quality a:nd Exhaust ' ', 4.506.1 Exhaust fans which terminate outside the buildinq are provided in every bathroom. (X) Envin>nmental Cofufort ' ' ' , '' '',·' ' .' '' ' ' ' ' ' 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X) fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following methods: (X) 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent 3. Select heatinq and coolina eauioment accordina to ACCA 36-S /Manual S) or eauivalent. lnstiiHeraiji~liti\!f~J-qf§f C1ij11lifi~~fil>ns ·· . '· .,·' :; ,,•·•, ' ,,,;: '' ,' ' ,, •:· '·•·. '., ' ' •·.> ,· ...... . ''. 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X) systems. 702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (X) comoetence in the discioline thev are inspecting. I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. CB153136, CB153197, CB153206, CB153207, CB153208, CB153209, 2881, 2887, 287.3, 2869, 2860, 2864, 2868, 2872, 2876, 2880, 2684, 2688 TRAILS LANE CARLSBAD, CA 92008 CB153202, CB153203, CB153204, C8153205, CB153201, CB153200. Project Address: 3151, 3155 DONNA DRIVE CARLSBAD, CA 92008 Plan Check Number: CB153199, C8153198 Print Name: DAN HAYDEN Signed: \. d t). License Number: ''S"Ci\~ Date: /-?-llh tJ-o. B-51 Page 2 of2 Rev. 5/17 .. WASTE MANAGEMENT DUMPSITE/LANDFILL Palomar Landfill (PAL) 5960 El Camino Real Carlsbad CA 92008 , , DATE OF SERVICE SVC TICKET# 1/29/2018 935238 3/1/2018 944719 3/27/2018 953393 4/10/2018 958117 4/17/2018 960376 4/23/2018 961976 4/23/2018 961975 5/10/2018 967557 5/22/2018 972331 6/13/2018 978846 6/13/2018 978845 6/20/2018 981129 6/29/2018 973608 7/3/2018 985721 7/10/2018 987751 7/27/2018 994426 7/27/2018 994424 9/6/2018 7282 9/22/2018 13597 10/1/2018 16431 10/9/2018 18392 10/10/2018 19094 10/10/2018 19095 10/11/2018 20201 10/12/2018 20202 10/12/2018 20204 10/15/2018 20205 10/16/2018 20206 10/17/2018 21284 12/3/2018 36487 12/3/2018 36488 1/8/2019 47753 1/25/2019 53946 2/12/2019 58620 2/26/2019 62554 3/6/2019 65181 3/8/2019 65185 3/13/2019 67190 3/21/2019 69504 3/27/2019 71322 4/4/2019 74670 4/9/2019 75452 4/9/2019 75450 4/19/2019 79231 4/23/2019 79829 4/26/2019 81292 GENERAL CONTRACTOR: PACUFUCA REAK ESTATE SERVICES 3151 DONNA DR CARLSBAD CA 92008 Construction & Recycling Services 5701 S. Eastern Ave., STE 300, Commerce, CA 90040 714-480-2317 (Direct) 866-459-3985 (Fax) C&D SORT & TRANSFER FACILITY EDCO CDI Recycling & Buy Back Center 224 S Las Posas Rd Acct: 350-72372 Sales Rep: Victoria Brown-Delgado bdorman@pacificaent.com Prepared Date· 12/03/2019 San Marcos CA 92078 , Total Tons RECY BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY 40YD MIXED DEMO 9.03 7.49 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 13.05 10.83 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 17.75 14.73 83.00% EDCO SAN MARCOS (EDD) 40YD TRASH/ MSW 13.52 0.00 0.00% PALOMAR LANDFILL (PAL) 25YD TRASH/ MSW 2.54 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH/ MSW 5.80 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD TRASH/ MSW 2.83 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD TRASH/ MSW 6.80 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH/ MSW 2.71 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH/ MSW 4.52 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH/ MSW 3.01 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD TRASH/ MSW 5.52 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD TRASH/ MSW 3.04 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD TRASH/ MSW 9.19 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOO DYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOO DYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD TRASH/ MSW 5.39 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD TRASH/ MSW 10.36 0.00 0.00% PALOMAR LANDFILL (PAL) lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 40YD MIXED DEMO 5.60 4.65 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 4.03 3.34 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 5.22 4.33 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 4.10 3.40 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 4.07 3.38 83.00% EDCO SAN MARCOS (EDD) 40YD TRASH/ MSW 3.31 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 4.07 3.38 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 3.82 3.17 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 3.94 3.47 88.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.42 2.13 88.00% EDCO SAN MARCOS (EDD) 40YD TRASH/ MSW 2.28 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 3.21 2.82 88.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.38 2.09 88.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.82 2.48 88.00% EDCO SAN MARCOS (EDD) 40YD TRASH/ MSW 1.68 0.00 0.00% PALOMAR LANDFILL (PAL) 4/29/2019 81572 40YD MIXED DEMO 4.29 3.78 88.00% EDCO SAN MARCOS (EDD) 1~7/2019 84270 40YD TRASH/MSW 2.35 0.00 0.00% PALOMAR LANDFILL (PAL) 5/13/2019 86132 40YD MIXED DEMO 3.50 3.08 88.00% EDCO SAN MARCOS (EDD) 5/20/2019 88949 40YD MIXED DEMO 3.11 2.74 88.00% EDCO SAN MARCOS (EDD) 5/24/2019 90209 40YD TRASH/MSW 2.09 0.00 0.00% PALOMAR LANDFILL (PAL) 5/25/2019 90517 40YD MIXED DEMO 2.96 2.60 88.00% EDCO SAN MARCOS (EDD) 6/3/2019 92232 40YD MIXED DEMO 2.98 2.62 88.00% EDCO SAN MARCOS (EDD) 6/3/2019 92234 40YD TRASH/ MSW 1.93 0.00 0.00% PALOMAR LANDFILL (PAL) 6/10/2019 94769 40YD MIXED DEMO 5.09 4.48 88.00% EDCO SAN MARCOS (EDD) 6/13/2019 96232 40YD MIXED DEMO 0.90 0.00 0.00% PALOMAR LANDFILL (PAL) 6/17/2019 96889 40YD MIXED DEMO 5.18 4.56 88.00% EDCO SAN MARCOS (EDD) 6/24/2019 99027 40YD TRASH/ MSW 0.95 0.00 0.00% PALOMAR LANDFILL (PAL) 6/24/2019 99026 40YD MIXED DEMO 5.87 5.17 88.00% EDCO SAN MARCOS (EDD) 6/27/2019 100802 40YD MIXED DEMO 5.23 4.60 88.00% EDCO SAN MARCOS (EDD) 6/28/2019 101235 40YD TRASH/MSW 0.90 0.00 0.00% PALOMAR LANDFILL (PAL) 7/1/2019 101519 40YD MIXED DEMO 4.76 4.19 88.00% EDCO SAN MARCOS (EDD) 7/3/2019 102923 lOYD TRASH/ MSW 5.76 5.07 88.00% EDCO SAN MARCOS (EDD) 7/3/2019 102795 40YD TRASH/ MSW 1.56 0.00 0.00% PALOMAR LANDFILL (PAL) 7/8/2019 103334 lOYD TRASH/ MSW 6.87 0.00 0.00% PALOMAR LANDFILL (PAL) 7/8/2019 103329 40YD MIXED DEMO 4.66 4.10 88.00% EDCO SAN MARCOS (EDD) 7/8/2019 103331 lOYD MIXED DEMO 7.32 6.44 88.00% EDCO SAN MARCOS (EDD) 7/10/2019 104695 40YD MIXED DEMO 0.55 0.48 88.00% EDCO SAN MARCOS (EDD) 7/11/2019 104844 lOYD TRASH/ MSW 5.67 0.00 0.00% PALOMAR LANDFILL (PAL) 7/11/2019 104695 40YD TRASH/ MSW 1.57 0.00 0.00% PALOMAR LANDFILL (PAL) 7/12/2019 105339 40YD MIXED DEMO 2.73 2.40 88.00% EDCO SAN MARCOS (EDD) 7/16/2019 105192 lOYD TRASH/ MSW 5.34 0.00 0.00% PALOMAR LANDFILL (PAL) 7/22/2019 107916 40YD TRASH/ MSW 0.62 0.00 0.00% PALOMAR LANDFILL (PAL) 7/22/2019 105983 40YD TRASH/ MSW 1.16 0.00 0.00% PALOMAR LANDFILL (PAL) 7/25/2019 109455 lOYD TRASH/ MSW 5.33 0.00 0.00% PALOMAR LANDFILL (PAL) 7/25/2019 107469 lOYD TRASH/ MSW 3.84 0.00 0.00% PALOMAR LANDFILL (PAL) 7/29/2019 109974 40YD TRASH/MSW 1.20 0.00 0.00% PALOMAR LANDFILL (PAL) 7/29/2019 109454 40YD MIXED DEMO 3.04 2.68 88.00% EDCO SAN MARCOS (EDD) 7/31/2019 110729 40YD MIXED DEMO 4.42 3.89 88.00% EDCO SAN MARCOS (EDD) 8/2/2019 112068 lOYD TRASH/ MSW 2.19 0.00 0.00% PALOMAR LANDFILL (PAL) 8/6/2019 112560 40YD TRASH/ MSW 0.94 0.00 0.00% PALOMAR LANDFILL (PAL) 8/6/2019 112559 40YD TRASH/ MSW 2.47 0.00 0.00% PALOMAR LANDFILL (PAL) 8/7/2019 113778 40YD MIXED DEMO 2.96 2.60 88.00% EDCO SAN MARCOS (EDD) 8/9/2019 114306 lOYD TRASH/ MSW 6.76 0.00 0.00% PALOMAR LANDFILL (PAL) 8/12/2019 114601 lOYD TRASH/ MSW 5.39 0.00 0.00% PALOMAR LANDFILL (PAL) 8/15/2019 116183 40YD TRASH/ MSW 2.01 0.00 0.00% PALOMAR LANDFILL (PAL) 8/15/2019 116184 lOYD TRASH/ MSW 5.43 0.00 0.00% PALOMAR LANDFILL (PAL) 8/20/2019 117094 lOYD TRASH/ MSW 3.30 0.00 0.00% PALOMAR LANDFILL (PAL) 8/21/2019 118104 lOYD TRASH/ MSW 7.30 0.00 0.00% PALOMAR LANDFILL (PAL) 8/23/2019 119293 lOYD TRASH/ MSW 7.62 0.00 0.00% PALOMAR LANDFILL (PAL) 8/23/2019 119460 40YD TRASH/ MSW 3.94 0.00 0.00% PALOMAR LANDFILL (PAL) 8/26/2019 119579 lOYD TRASH/MSW 9.46 0.00 0.00% PALOMAR LANDFILL (PAL) 8/27/2019 119869 lOYD TRASH/ MSW 4.12 0.00 0.00% PALOMAR LANDFILL (PAL) 8/27/2019 4316 lOYD CL CONCRETE 10.00 10.00 100.00% MOODYS MATERIALS (MOO) 9/4/2019 121411 lOYD TRASH/ MSW 6.42 0.00 0.00% PALOMAR LANDFILL (PAL) 9/5/2019 122502 40YD MIXED DEMO 1.62 1.43 88.00% EDCO SAN MARCOS (EDD) 9/6/2019 123061 40YD TRASH/ MSW 3.36 0.00 0.00% PALOMAR LANDFILL (PAL) 9/11/2019 123786 lOYD TRASH/ MSW 5.37 0.00 0.00% PALOMAR LANDFILL (PAL) 9/25/2019 128006 40YD TRASH/ MSW 4.09 0.00 0.00% PALOMAR LANDFILL (PAL) 10/4/2019 131432 40YD TRASH/ MSW 2.36 0.00 0.00% PALOMAR LANDFILL (PAL) 10/4/2019 131433 40YD MIXED DEMO 1.21 1.06 88.00% EDCO SAN MARCOS (EDD) 10/7/2019 131434 lOYD TRASH/ MSW 7.31 0.00 0.00% PALOMAR LANDFILL (PAL) 10/18/2019 136251 lOYD TRASH/ MSW 4.36 0.00 0.00% PALOMAR LANDFILL (PAL) 10/18/2019 135048 40YD TRASH/ MSW 2.64 0.00 0.00% PALOMAR LANDFILL (PAL) 10/24/2019 137273 40YD MIXED DEMO 1.28 1.13 88.00% EDCO SAN MARCOS (EDD) 10/29/2019 138835 40YD TRASH/ MSW 1.30 0.00 0.00% PALOMAR LANDFILL (PAL) 11/1/2019 140440 lOYD TRASH/ MSW 6.98 0.00 0.00% PALOMAR LANDFILL (PAL) 11/4/2019 140726 40YD MIXED DEMO 1.01 0.89 88.00% EDCO SAN MARCOS (EDD) 11/5/2019 141106 40YD TRASH/ MSW 1.63 0.00 0.00% PALOMAR LANDFILL (PAL) 11/7/2019 109975 lOYD TRASH/ MSW 5.49 0.00 0.00% PALOMAR LANDFILL (PAL) 11/14/2019 143937 40YD TRASH/ MSW 1.19 0.00 0.00% PALOMAR LANDFILL (PAL) 11/26/2019 148149 40YD MIXED DEMO 1.53 1.35 88.00% EDCO SAN MARCOS (EDD) Total Tons 564,78 Total Tons Diverted 303,04 Total Tons Landfilled 261.74 Total Diversion 53.66% {city of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Deve_/gp_rt1e_n_t Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all Cllnstruction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Applicant Information CB153136, CB153197, CB153206, CB153207, C8153208, CB153209, CB153202, CB153203, CB153204, Permit No.ce1532os. ce153201. ce1s3200. ce153199, ce1s319a Project Title ...,T'-'RA-"---'l"'L'-''S'---'=E'-'N"'D'------------------- Project Address 3151 DONNA DRIVE CARLSBAD, CA 92008 APN 1560910100 Owner Contractor Architect Other Applicant Name ~H~A~Y~D=E~N~----~D=A~N~-------© © 00--Lost First Applicant Address 5505 CANCHA DE GOLF RANCHO SANTA FE CA 92091 Phone ( 858 I 755 -0216 E-mail Address DHAYDEN@PACIFICAENT.COM Applicant Mailing Address 5505 CANCHA DE GOLF RANCHO SANTA FE, CA 92091 (if different than project address} Project Type (check all that apply): Brief Description Residentlal Commercial ~ □ TWIN HOME SINGLE FAMILY FOR SALE Public Bulldlng □ Project Size 336,808 SQUARE FEET (square footage) Estimated Cost of Project $_~10=0=00=0=0=0 ___________ _ Please check the appropriate box: ~ I plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. DI plan on self-hauling to a certified recycling facility and will provide all receipts after construction. □This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Print Name DAN HAYDEN Signature_~~====:l!!e>,;~:!..,;;-,i::::=:=--'Date ,/0.(2.., Page 1 of 4 Rev. 11/12118 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits wil (cont'd) not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: SECTION A CB153136, CB153197, CB153206, CB153207, CB153208, CB153209, CB153202, CB153203, CB153204, Permit Noi;e15320s, ce153201, c a153200, ca153199, ca153198Project Title TRAIL'S END Project Address 3151 DONNA DRIVE CARLSBAD, CA 92008 APN 1560910100 Applicant Name HAYDEN DAN Phone ( 858 755 -0216 Last First SECTION B Complete the following table with estimated waste tonnage ·to be generat~d by ·your project. This is your plan for construction waste management. Chang~s can be made on the final recycle report. Goal: the diversion rat,~ shall be, 6~% by weights of debr:is. A B C Material Type Estimated Place a ( ✓) check Place a ( ✓) check next Place a (✓) check next Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if only using WASTE MANAGEM ENT roll-off bins. Mixed C&D Debris MASONRY BLOCK 188.23 X CONCRETE (BROKEN) 33.53 X UNPAINTED WOOD 27.50 X DRYWALL 28.00 X ROOF TILE 10.37 X LATH 17.94 X CARDBOARD 12.67 X WIRE 2.80 X METAL PIPE 2.80 X INSULATION 2.80 X TILE 2.80 X STUCCO 28.68 X MISC. RECYCLING 8.81 X TRASH 197.67 X TOTAL = 564.78 SECTION C To meet 65% Diversion Requirement (estimate) __ 5_6_4_.7_8 ____ x 0.65 = _____ 3_6_7_.1_1 ___ tons Toto/ Estimated Waste from above Minimum Required Diversion Contractor/Owner Signature ~ ------~ Date Page 2 of4 Rev. 11/12118 ' PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): SECTION A Acknowledgement I certify under penalty of perjury und er the laws of the State of California t hat the information provided in and with this form pertains t o construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of t he information, and that the information is true and correct t o the best of my knowledge and belief. Permit No._C-'--',___/_5"=---~..::e._L_O _______ Print Name DAN HAYDEN Address '1.. S 1 b Tr o..; \ S L ... 11.c. CARLSBAD, CA 92008-l_o-~-, -, -D-a-te--~--?__j-0_'2.v ___ __. SECTION B Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Exam le: Palomar Transfer Station, 5960 El 01/05/2018 Concrete (broken) 5 tons Camino Real -760 603-0153 1/29118-3127/18 MASONRY BRICK (BROKEN) 0 1.99 TONS 0TONS EDCO SAN MARCOS 224 S LAS POSAS RD 1/29/18-3127/18 CONCRETE(BROKEN) 0 0,37 TONS 0 TONS EDCO SAN MARCOS 224 S LAS POSAS RD 1 /29/18-3127 /18 MASONRY BRICK (BROKEN) 0 9.11 TONS 0 TONS MOODY'S MATERIALS 3210 OCEANSIDE BLVD 1/29118-3/27/18 CONCRETE (BROKEN) 0 1.61 TONS 0TONS MOODY'S MATERIALS 3210 OCEANSIDE BLVD @TOTAL SECTION C ~ 65% Diversion Rate Achieved --------~-----------= _____ % :5 65%0 Total of columns A+ B Total of columns A + 8 + C DIVERSION Contractor/Owner Signature ~a~ Date \J ~ / "Lv '2D Attach the following documentation to this Report: Return completed form and documentation to: • Original recycling weight tickets, landfill weight tickets • Original donation receipts with photos and/or itemized descriptions • Any other relevant information to support Recycling Report City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 11112/18 PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): SECTION A Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. C () IS' l 'LO l Print Name DAN HAYDEN Address L . .,._c. CARLSBAD, CA 92008 Lo { II Date SECTION B Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (Name, Address, Phone) Salvaged Landfill Examp,le: Palomar Transfer Station, 5960 El 01/05/2018 Concrete {broken) 5 tons Camino Real -760 603-0153 1/08/19-6/03/19 UNPAINTED WOOD 0 1.12 TONS 0TONS EDCO SAN MARCOS 224 S LAS POSAS RD 1/08/19-6/03/19 DRYWALL 0 0.67 TONS 0TONS EDCO SAN MARCOS 224 S LAS POSAS RD 1/08/19-6/03/19 ROOF TILE 0 0.45TONS 0TONS EDCO SAN MARCOS 224 S LAS POSAS RD 1/08/19-6/03/19 LATH 0 0.89 TONS 0TONS EDCO SAN MARCOS 224 S LAS POSAS RD 1/08/19-6/03/19 CARDBOARD 0 0.69TONS 0TONS EDCO SAN MARCOS 224 S LAS POSAS RD @TOTAL SECTION C Diversion Rate Achieved --------~-----------= _____ % ~ 65% S6S%0 Total of columns A+ B DIVERSION Total of columns A + B + C Contractor/Owner Signature __ ___.:~:..:===::::!!!i....~.i.:::::~-----Date \/'{ I u>'l.o Attach the following documentation to this Report: • Original recycling weight tickets, landfill weight tickets • Original donation receipts with photos and/or itemized descriptions • Any other relevant information to support Recycling Report Return completed form and documentation to: City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 11112118 PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): SECTION A Acknowledgement I certify under penalty of perjury under the laws of the State of Ca lifornia that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. C../3 / r )1...<1 l Print Name DAN HAYDEN Address 1... & 7 b Tr o..; Is L\:,o,,_< CARLSBAD CA 92008 ~t 11 Date SECTION B Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS @© Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility Reused or Recycled Disposed in (N ame, Address, Phone) Salvaged Landfill 8/27/19 STUCCO 0 0.71 TONS OTONS MOODY'S MATERIALS 3210-0CEANSIDE BLVD 6/03/19-9/05/19 sTucc·o 0 0.99TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RD 6/03/19-9/05119 UNPAINTED WOOD 0 0.49 TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RD 6/03/19-9/05119 DRYWALL 0 0.99 TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RD 6/03/19-9/05/19 ROOF TILE 0 0.17 TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RD 6103/19-9/05119 LATH 0 0.17 TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RD 6/03/19-9/05119 WIRE 0 0.17 TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RD 6/03/19-9/05119 METAL PIPE 0 0.17 TONS OTONS EDCO SAN MARCOS 224 S LAS POSAS RO 6/03/19-9/05/19 INSULATION 0 0.17TONS OTONS EOCO SAN MARCOS 224 S LAS POSAS RO 6/03/19-9/05119 TILE 0 0.17 TONS OTONS EOCO SAN MARCOS 224 S LAS POSAS RO 6/03/19-9/05/19 MISC. RECYCLING 0 0.26 TONS OTONS EOCO SAN MARCOS 224 S LAS POSAS RO @TOTAL SECTION C Diversion Rate Achieved = % -----------'---------------- ~ 65% S6S%0 Total of columns A+ B Total of columns A + B + C DIVERSION Contractor/Owner Signature, __ _:_=::~====:!!--Lt\1=,,,¥-~~----Date \ / '6 ( 2P 'tO Attach the following documentation to this Report: Return completed form and documentation to: • Original recycling weight tickets, landfill weight ticket s • Original donatio n receipts with photos and /or itemized d escriptions • Any other relevant informat ion to support Recycling Report City of Carlsbad Building Division (1st Floor) 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 11/12118 PART 2 Complete before final inspection, obtain WASTE MANAGEMENT sign~ture, and return With receipts prior to final bulldtng approval. DEBRIS RECYCLING REPORT (ACTUAL): c:;fCTION A Acknowledgement I certify Ul'l'der penalty of perjury under the laws ofthe State of California that the information provided in and with this form pertains to constrvction a_nd d.~molition debJis, generated only from the_ project ltstcd in PART 1, that I have reviewed the ac;curacy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. Address SECTION B ( 6 I (1 <. () \ Print Name DAN HAYDEN L 8 7 ' l r'c..;) ,-/... «;...,..,,~ CARLS BAO, CA 92008 c0+ II Date \ • Ose this'Final ~og below tQ track loadi of materials as they leave the job•site. . @@SAVE ~ECEIP-TS·@@ , . . - lndicateflN~L quantities In tonsJo,r each mat.er'ial _and save rec~ipts and docLJments from ·facilitles where material is taken. Addjtional Pro}~ct,~og pages are ayallable If.necessary. u~e City Conversion Table to convert volume to tons. A 8 C Date fVlaterlal Type Actual Amt Actual Amt Actual Amt Destlnatl.on Facility Reused or R.t!cycled Disposed in (Name, Address, Phone) Salvaged Landfill Exame,/r:: Palomar Transfer Station, 5950 El 01/05/2018 Concrfte (br¢{<en) Stons Camino-Real -780 503:.0153 9/001 UM 1120/19 UNPAIN I tu WOOi) 0 0.01 TONS 0TONS EDCO SAN MARCOS 224 .S LAS POSAS RD 9106/19-11/26119 CARDBOARD -0 O.OSTONS 0TONS EOCO SAN MARCOS 224 S LAS POSAS RO 9/06/19-11/2{;/19 ROOFTILE 0 0.25TONS QTONS eoco ~AN MARCOS 224 $ LAS POSf\S RD 1129/18-11/26/19 TAASH 0 0 18,7 TONS PI\LQMAA TRASNFER STATION 5960 EL CAMINO REAL 0 21.6 TONS· 18~7 TONS SECTION C Diversion Rate Achieved 21.6 TONS / 40.3 TO~S = 53.66 % DIVERSION ~65% 565%0 Tctaf of c:o/urnns A + 8 Total of columns A + B + C Contractor/Owner Signature ~-~ Attach the following documentation to this Report: • Original recycling we'ight tickets, landflll weight tickets • Original donation· receipts with photos and/or Itemized descriptions • Any other relev-,nt information to support Recycling Report Date \/ RI 1» i..0 Return completed form ~nd documentation to: City of Carlsbad Suildlng Division (1st Flobr) 1635 Faraday Avenve Carlsbad, CA 92b08 Page 3 of4