HomeMy WebLinkAbout2878 CORTE MORERA; ; CB001031; Permit03/23/2000
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
03/23/2000
# Dwelling Units
Bedrooms
Project Title
City of Carlsbad
Residential Permit Permit No CB001031
Building Inspection Request Line (760) 602-2725
2878 CORTE MORERA CBAD
RESDNTL Sub Type SFD
2552801100 Lot# 495
$339,586 00 Construction Type VN
6 Reference # CT88-03
1 Structure Type
4 Bathrooms
ARBOR HEIGHT-LC VLY-VL F-PHS 2
PLAN 4, 3950 SF SFD, 682 SF GAR
SFD
4
Status
Applied
Entered By
Issued
Inspect Area
Ong PC#
Plan Check#
ISSUED
02/26/2000
RMA
Plan Approved
03/23/2000
NF
99161
PCOO-22
Applicant
K HOVNANIAN
STE100
5900 PASTEUR CT
CARLSBAD CA 92008
760944-9012
Owner
K HOVNANIAN AT LA COSTA VALLEY L L C
2495 CAMPUS DR
IRVINE CA 92612
Total Fees $14,15195 Total Payments to Date $000 Balance Due $14,151 95
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$1,461 08 Meter Size
$0 00 ..'.. Add'l Reel Water Con Fee
$949 70 Meter Fee
$000 "S'DCWA Fee :
$000'. CFD Payoff Fee
$3396 '. PFF
$000 PFF (CFD Fund)
$0 00 .License Tax
$31000 License Tax (CFD Fund)
. $000 Traffic Impact Fee
$0 00 Traffic Impact (CFD Fund)
$000 LFMZ Transportation Fee
$0 00 Sidewalk Fee
$0 00 PLUMBING TOTAL
$$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$0 00 Housing Impact Fee
Housing InLieu Fee
$0 00 Master Drainage Fee
$0 00 Sewer Fee
TOTAL PERMIT FEES
$000
$000
$000
$4,303 24
$6,18047
$000
$000
$000
$580 00
$000
$000
$000
$21000
$6000
$6350
$000
$000
$000
$000
$14,151 95
InspectO;
FINAL APPROVAL
s^Date Clearance
NOTICE Please takeV&IOTISE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactwns DOES NOT APPLY to water and sewer connection fees and capactiy
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this., or as to which the statute of limitations has previously otherwise expiredCITY OF CARLSBAD
2075 Las PalmasDr, Carlsbad, CA 92009 (760)438-1161
City of Carlsbad
Final Building Inspection OCT I 22000
Dept Building Engineering Planning CMWD
Plan Check #
Permits
Project Name
Address
Contact Person
Sewer Dist
Inspected
By
Inspected
By
Inspected
By
Comments
PCOO-22
CB001031
ARBOR HEIGHT-LC VLY-VL F-PHS 2
PLAN 4, 3950 SF SFD, 682 SF GAR
2878 CORTE MORERA
Phone
LC Water Dist O
<O /jf^J ^a*e
'<•&*? Inspected Ay/3/*
Date
Inspected
Date
Inspected
• •
StLite Fire
Date
Permit Type
Sub Type
Lot 495
'* Approved v
Approved
Approved
•
••
10/11/2000
RESDNTL
SFD
Disapproved
Disapproved
Disapproved
•
City of Carlsbad Bldg Inspection Request
For 10/17/2000
Permit# CB001031
Title ARBOR HEIGHT-LC VLY-VL F-PHS 2
Description PLAN 4, 3950 SF SFD, 682 SF GAR
Inspector Assignment NF
2878 CORTE MORERA
Lot 495
Type RESDNTL Sub Type SFD
Job Address
Suite
Location
APPLICANT KHOVNANIAN
Owner K HOVNANIAN AT ARBOR HEIGHTS L L C
Remarks
Total Time
Phone 7609449012
Inspector
Requested By JEROME
Entered By CHRISTINE
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act Comments
Associated PCRs
Inspection History
Date
9/29/2000
8/11/2000
8/11/2000
8/11/2000
8/9/2000
8/4/2000
8/2/2000
8/1/2000
7/12/2000
7/11/2000
5/17/2000
5/1/2000
5/1/2000
Description
39 Final Electrical
17 Interior Lath/Drywall
18 Exterior Lath/Drywall
23 Gas/Test/Repairs
17 Interior Lath/Drywall
16 Insulation
84 Rough Combo
14 Frame/Steel/Boltmg/Welding
83 Roof Sheathing/Ext Shear
83 Roof Sheathing/Ext Shear
1 1 Ftg/Foundation/Piers
21 Underground/Under Floor
22 Sewer/Water Service
Act
AP
AP
AP
NR
PA
AP
AP
NR
AP
NR
AP
AP
AP
Insp
NF
TP
TP
TP
NF
NF
NF
NF
NF
NF
NF
NF
NF
Comments
EMR
GAR 1ST LAYER