HomeMy WebLinkAbout2880 PIO PICO DR; ; 82-369; PermitS .' '5
I hereby Bill I am licensed under
0 visions of Cha r 9 (commencing with
Ij-E' UI section 7000) of Division 3 of the Business
41 l
and Professions Code nd FT7ense Is in
full for
ZI Lic No
Or
I hereby affirm that I am exempt from the Contrac-tors License law for the following reason (Sec. 7031.5
Business and Professions Cede: Any city or county which re-
- quires a permit to construct, alter. Improve, demolish. or
repair any structure, prior,
to its issuance also requires the ap-
plicant tar such permit to tile a
signed
statement that ho is rcensed pursuant to the previsions at the Contractor's
License Law (Chapter 9 commencing with Suction 7000 of Division 30t the Business and Professions Code) or that is ex-
empt therefrom and the basis for the alleged exemption. Any
violation of Section 7031.5 by an applicant for a permit sub-
(ccl s the applicant to a civil penalty of 005msre than finehun-
dred dollars ($500).
I, as owner of the prnperty, or my employees with wages
as their sale compensation, will do the work, and the struc-ture is out Intended or offered for sole (Sec. 7044, Business
and Professions Code: The Contractor's License Law dues .nnt apply In an owner, of, property whobuilds or improves
thereon and who dons such work himself or through his own employees, provided that such improvements are not intend-
ed or offered for sale.- If, however, the building on improve-ment is sold within one year of completion, the owner-builder
will have the burden Of proving that he did not build or im-
prove for the purpose of sale).
f, as owner of the pre(erfy, urn exclusively contracting with licensed contractors to construct the project (Sec. 7044,
Business and Professions Cede: The Contractor's License law does out apply to an owner of property who builds or im-
proves thereon, and who contracts for each projects with a
contractor(s) license pursuant to the Contractor's License Law).
C, o As a homeowner lam improving my home, and the follow-
ing conditions exist:
it. The work is being performed prior to sale.
I have lived in my home for twelve months
- prior In completion of this work. - I have not claimed this exemption during the
- last three years. -
0 lam exempt under Sec. ' , B& P.C.
for this reason -.
U) Z 0
I- 4
4 -J C., Ui 0
Z 0
4 U) Z Ui a.
0 C-,
U,
Ui
cc 39
I hereby affirm that I havea certificate of consent
self-insure, or a certificate of Workers
mpensation InsuranCe. 000 certified copy thereof
(Sec. 3800. Labor Code).
POLICY NO
Cl copy
____,..r' -
COMPANY
Ce
the
rti ereb fied
CERTIFICATE OF EXEMPTION FROM WORKERS COMPENSATION INSURANCE
(This section need not be completed if the permit
- is for one hundred dollars (S100) or less)
C) t certify that in the performance of the work for which this permit is issued. I shalt not employ any
person in any manner so as to become subject to the Workers' Compensation Laws of California
NOTICE TO APPLICANT: If, after makin3 this Cciii
ficate of Exemption, you should become subject to
the Workers' Compensation provisions of the Labor Code, you must forthwith comply with such
provisions or this permit shall be deemed revoked
I hereby affirm that there is a construction
lending agency for the performance of the work to,
which this permit is issued (Sec 3097. Civil Code)
Lenders Name -
Lenders Address
iir RAI I pniii PN nii v z PDFqr. inn APPLICANT TO FILL IN INFORMATION WITHIN SHADED AREA AND DECLARATIONS.
CARLSBAD BUILDING DEPARTMENT
' APPLICATION & PERMIT 1200 Carlsbad, California 92008.1989 (714) 438-5525
AV ST DATE F AP LICATION BUSINESS L/C ! N JOB ADDRESS
D.
' i,/)
CONTRACTORS PHONE OWN,eJ.45 OWNER'S PHON TRACTOR
,
V LUATI , PERMIT NUMBER
ZäNE
-6p2bL R
/y4,Cb
LICENSE NO.
-l'77
PLAN I.D. # BLDG USE CODE
LbT BLOCK SUBOIVIS/ON J 7OR7,L47 4 DE R LICENSE # c- --'
STANDARD PLAN #
- -
BUILDING SO. FOOTAGE
DESCRIPTION OF WORK
ONEFfS ESS DESIGNER'S PHONE
'1 97$
-
Not Valid Unless Machine Certified —
F/P FL~X
YO
NO I OCCGP I EDU
______
CENSUS TRACT GP LAND USE PARKING SPACE I RES UNITS I GRADING PERMIT ISSUED
YO N J I REDEVELOPMENT AREA
Y CI N -
I TYPE
Nf
0CC LOAD FIRE SPR
vO N
QTY. PLUMBING PERMIT - ISSUE 7,Jo-] QTY. MECHANICAL PERMIT ISSUE SUMMARY/ACCOUNT NUMBER
EACH FIXTURE TRAP 7'. '"/ INSTALL FURN. DUCTS UP TO 100,000 BTU — BUILDING PERMIT 01-00-00-8220
EACH BUILDING SEWER - (.42 OVER 100,000 BTU. • SIGN PERMIT 01-00-00-8221
EACH WATER HEATER AND/OR VENT BOILER/COMPRESSOR UP TO 3 HP PLAN CHECK 01-00-00-8806 2'Z 4.o
_/_
EACH GAS SYSTEM I TO 4 OUTLETS ESSOR 3-15 HP BOILER/COMPRESSOR -- TOTAL PLUMBING 01-00-00-8222
-
EACH GAS SYSTEM 5 OR MORE , METAL FIREPLACE . -" ELECTRICAL 01-00-00-8223
EACH INSTAL., ALTER, REPAIR WATER PIPE . VENT FAN SINGLE DUCT • MECHANICAL 01-00-00-8224
EACH VACUUM BREAKER ' , - MECH EXHAUST - HOOD/DUCTS . - MOBILEHOME 01-00-00-8225
WATER SOONER . RELOCATION OF EA FURNACE/HEATER . MOBILEHOME PARK INSP
EACH ROOF DRAIN (INSIDE) ' - - SOLAR 01-00-00-8220
-- - - • TOTAL MECHANICAL
'
I I ,q- ._
STRONG MOTiON - - 80-92-33-0519
TOTAL PLUMBING - I 'I EIS, FIRE SPRINKLERS 01-00-00-8227
QTY. ELECTRICAL PERMIT - ISSUE - OTY
-
SOLAR -ISSUE '
PUBLIC FACILITIES FEE 32-00-00-8923
BRIDGE FEE
NEW.CONST EA AMP/SWT/BKR 7eo 4.- p — COLLECTORS - SCHOOL FEE - DISTRICT
'1 PH • 3 PH ' . STORAGE TANKS - Carlsbad 80-92-21-0519
- EXIST BLDG EA AMPISWT/BKR • - . ROCK STORAGE - Encinitas 80-92-22-0519
1 PH 3 PH - , PUMP - San Oieguilo 80-92-23-0519
REMODEL/ALTER PER CIRCUIT . . PLAN CHECK FEE - - San Marcos 80-92-24-0519
TEMP POLE' 200 AMPS • - . - _____________
OVER 200AMPS
TEMP OCCUPANCY (30 DAYS) . ________ _______________________ - '• , - - '
--
TOTAL ELECTRICAL TOTAL SOLAR - ' - -TOTAL FEES PAYABLE -°" -i--3 —
Expiration. Every permit issued bytheBuilding Official underthe provisions ofthis * AN OSHA PERMIT IS REQUIRED FOR EXCAVATIONS OVER
ode Shall expire by imitation and become null and void. If the building or work -5' 0" DEEP AND DEMOLITION OR CONSTRUCTiON OF CERTIFY UNDER PENALTY OF PERJURY THAT ALL INFORMATION HEREON INCLUDING THE uthorized by Such permil is not Commenced viihun 180 days from the date of such STRUCTURES OVER 3 STORIES IN HEIGHT
I HAVE CAREFULLY EXAMINED THE COMPLETED "APPLICATION AND PERMIT" AND DO HEREBYL-
banclone0le,
DECLARATIONS ARE TRUE AND CORRECT AND I FURTHER CERTIFY AND AGREE IF A PERMIT ISermit, or itt9*uiIdun or Work aulhorizg'hby such permit is suspended or
k is encod for a period ol 180 dISSUED: TO COMPLY WITH ALL CITY, COUNTY AND STATE LAWS GOVERNING BUILDING CON-any lime for th wo
STRUCTION, WHETHER SPECIFIED HEREIN OR NOT. I ALSO AGREE TO SAVE INDEMNIFY AND ApPLICT' G CONTRACTOç APPpIEDB DAJ JI
EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE
KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND
E
1`~7 U
BY PHONE 0 GRANTING OF THIS PERMIT.
FIELD INSPECTION RECORD
REQUIRED SPECIAL INSPECTIONS INSPECTOR'S NOTES
- REQ. IF INSPECTOR'S INSPECTION CHECKED APPROVAL DATE iez 794- sv~o -
SOILS COMPLIANCE ce71f tc.!er c-ow4owt 5elp0dAr4r])_ PRIOR TO
FOUNDATION INSP
STRUCTURAL CONCRETE
OVER 2000 PSI
PRESTRESSED
CONCRETE
POST TENSIONED
CONCRETE
FIELD 'ELDING
HIGH STRENGTH
BOLTS
SPECIAL MASONRY .
PILES' CA I SSONS
'
- ) S
II'JSPFCTIflN TVPF DATE INSPECTOR
BUILDING
JNDATION Th (1
REINFORCED STEEL
MASONRY
GUNITE OR GROUT
FLOOR & CEILING SUB FRAME
SHEATHING
FRAME
EXTERIOR LATH INSULATION
INTERIOR LATH & DRYWALL
PLUMBING
SEWER AND BL/CO
PLUMBING UNDERGROUND
PLUMBING TOP OUT
TUB AND SHOWER PAN
GAS TEST
ELECTRICAL
TEMPORARY POWER
ELECTRIC UNDERGROUND
ROUGH ELECTRIC
ELECTRIC SERVICE
BONDING
G. F. I. - SMOKE DETECTOR
MECHANICAL
DUCT & PLEM., REF. PIPING
HEAT - AIR COND. - SOLAR SYSTEMS
VENTILATING SYSTEMS
CALL FOR FINAL INSPECTION WHEN ALL APPROPRIATE
ITEMS ABOVE HAVE BEEN APPROVED.
JOB SITE FINAL
PLUMBING
ELECTRICAL .
MECHANICAL.
GAS - . --
BUILDING
SPECIAL CONDITIONS
CERTOF OCCUP,' ISSUED
City of (ar(bab
REQUEST FOR INSPECTION RECORD f.
INSPECTOR PERMIT NO.
OWNER
ADDRESS
REQUESTED BY
AJ
(BUILD I N..J
D FOUNDATION
D REINFORCING STEEL
O MASONRY
GROUT - GUNITE
O FLOOR AND CEILING SUB FRAME
O SHEATHING 0 ROOF 0 SHEAR
0 FRAME
0 EXTERIOR LATH
O INSULATION
0 INTERIOR LATH OR DRYWALL
(1/Fl N AL
TIME:
DATE:
PHONE NO.
PERSON TAKING REPORT
I ELECTRICAL I
D TEMPORARY SERVICE
UFFER GROUND
O ELECTRIC UNDERGROUND
O ROUGH ELECTRIC
POOL BONDING
D ELECTRIC SERVICE
FINAL
PLUMBING MISCELLANEOUS
O UNDERGROUND PLUMBING O CONDITIONED AIR SYSTEMS
O SEWER AND PL/CO O SOLAR HEAT
O TOP OUT PLUMBING D PATIO
O TUB OR SHOWER PAN o POOL 0 SPA
O GAS TEST O SIGN
O WATER HEATER 0 GRADING
O SOLAR WATER O DRIVEWAY
FINAL O FINAL
SPECIAL INSTRUCTIONS
Ready For Inspection: 0 Mond' 0 Tuesday 0 Wednesday 0 Thursday Friday
0 A. M. 0 P.M. \
ST.
INSTALLATION DATE
NO. UNITS COST PER UNIT TOTAL_
__t _...-, -
TOTAL CHARGES (LATERAL ETC.)
LATERAL NO
APPLICATION FOR PERMIT TO CONNECT TO CITY SEWER SYSTEM.
CITY OF CARLSBAD
ENGINEERING DEPARTMENT SE
!DDATE
438.5541
FOR APPLICANT TO FILL IN UED BY
BUILDING I - f7)I _______________________
ISSUED-
ADDRESS VALIDATION
OWNER
MAILING
-
ADDRESSADDRESS
-.-.. . .-. - ' •/ —. 4''•
CONTRACTOR
(..
CONTRACTORS -
ADDRESS
NEW BUILDING EXISTING BUILDING
LEGAL
/
DESCRIPTION
4. — 01,
1111.1 .t.f C
LATERAL CHARGE COMPUTATION
STANDARD 4" (Max. H. 30, V. 101
OVER 30H.-@_______ FT.
OVER 1O'V. _____ _____ FT. P4.
STANDARD 6" (Max. H. 30, V. 101
OVER 30' H. ______ _______ FT.
OVER 10'V.-@- FT.
TOTAL CONSTRUCTION COST
SERVICE CHARGE (REPAVING ETC.) If.
TOTAL LATERAL CHARGE
REMARKS:' Q_
I
LINE COST DATA
ASSESSMENT DIST. NO.
FRONTAGE ________COST PER FT
OTHER
TOTAL______
LATERAL LOCATION
I: / CONNECTION FEE ,
UNITS COST PER UNIT-TOTAL-
PUMP STATION FEES
WHITE: Engineering- GREEN: Finance YELLOW: Sanitation PINK: Building GOLDENROD: Permitter
ESGIL CORPORATION
9820 CHESAPEAKE DR., SUITE 122
SAN DIEGO, CA 92123
(714) 60-1468
IPA
O9Ld1QL3 CVQ1d
Lf -LL c---
) Gçr
LLLL44
4i
I
itp of Qar!bab
Jl.R!SDICTIONz________________
P
L ____
PROJECT ADDRESS:gc /2/0
TO: iYt9 -ryD SHp
t) CPr(-r1D
C y2)Lc 1f)) . o (3 B
PLAN CORRECTION SHEET
Plan Chock No.
' its, plans r.,cci',ed by jurisdicti
ete tolans received by plan checker t<~ I7 Z
t.€.i2 Oa:c initial plan check completed q' byj
FfEWC'R0s PLEASE READ
'3ao check is limited to technical requirements
contained in the Uniform Building Code, Uniform Plumbing Cod., Uniform Mechanical Code, National
Electrical Code and state laws regulating energy'
conservation, noise attenuation and access for
the h.-dicapped. The plan check is based on
regulations enforced by the Building Inspection
partment. You may have other corrections
based on laws and ordinances enforced by the ( Planning Department, Engineering Department
or other departments. V I C-r u. flr- 1 4 c -3B 55t '—The items circled below need clarification,
wodifscation or change. All circled items have
tc be satisfied before the plans will be in
conformance with the cited codes and regulation.fs. Per Sec. 303 (c), 1979 Uniform Building Code,
the approval of the plans does not permit the
violation of any stat., county or city law.
A. PLANS
(?
Please make all corrections on the original
tracings and submit two new sets of prints,
and any original plan sets that may have
been eturned to you by the jurisdiction.
tG: pg
( 9B.oC174
5~1*q (' To facilitate rechecking, please identify,
next to each circled item, the sheet of
the plans upon which each correction on
this sheet has been made and return this
check sheet with the revised plans.
APPLICANT COPY
D9Ty copy
PLAN CHECKER COPY
® U '5 0 cc L')6• iCij I)i
'-f ?-& \Wt2.
W u s Th Lc Fi?o-44
ç Lt 40 Lo 10, 2o vt'\
so '4('i€ tc&A,( QtI
5tIO t io -4-
Lt'-%, 'CV i=Y'4
Ij-i..so CC,.g ()1 c-o-çu&a
U 4 s.- ri-s Ll ra -I e
____ 'P'-y'.t L- tvrz w -r • (40 u-
AJOO
-U2. v o.-rt-z-i-'1 Opcuv
r13 o'oak'S cjô
c i, t Co
e. l'7o+ 9e Q U\ is -\- ' 'S4ci. lLc)
orzZo4e k
C v L)CS o8(q3
c R-4i
c lv e c 'w i
A4 c9?0ce.T 1 _o
___ '•'i
() L-u.eNa t46'1C - 7ooy- 1 i
& C Lt1 -Qyzoyyi. s7e0-c W C
c'i) &)1itt2. .-'C r0 be. tV-i-o q" I'i,-tln
9k -to -tz je 041, Ur -
() )O - - - (ucir ()1O1iG4-..
d Zo ci—S-
____ c\ ,-- -c i-
(-(- € c-
____ \ lz5L
5hcc(1 Racie Cci.Ac. s&eet Csi,2 -)
4) ciVt47 2 1 O-t4..S
,1Ali ccu. ovi- dJ1 SIe.&e -iia(IVicIJ
_____
L4J\l.,L. NOT c4.L LJ +1'ioS.
I Wi (flcOd u1y'Y_
L
(i)
4r1 q!1fj C (2.
Date a /0 , /~kd , 192- Jurisdiction?/6/7
Prepys C3 Bldg. Dept.
VALUATION AND PLAN CHECK FEE E3 Esgil
PLAN CHECK NO.
BUILDING ADDRESS - 2 -o fci "j co
APPLICANT/CONTACT k—:~I> V\OLL PHONE NO. __T
BUILDING OCCUPANCY - DESIGNER PHONE _12-'%
TYPE OF CONSTRUCTION _j-.'3 CONTRACTOR PHONE_________
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE
3?2 -
Res. Baths (over 3) - @2,200
Res.Firep1aces(°' @1,760
Air Conditioning
-
Commercial @ 2.80
Residential
- 2.40
Res. or Comm.
Fire Sprinklers
S
@ 1.50
S
5
-
Total Value
AdjuJiUfor State
Flyated Handicapped
1171/ cO ccessRegul
711
\
S
Building..Perrnit Fee.$. X 1.065
Plan Check Fee $ 27 5 60 x 1.065 / S
COMMENTS: / 1
8/4/82
EEl.
I E C E I V E D
liU1tDikD EPARTNENI DATE :
RI-0 OCT-i918Z
fBUILUING ADDRESS: ,C
A. P . N :CITY OF CAR LOAD
- !Ur1ln npnrtment
.11EEARIIiENI 701
ZONE: J SCFiOOL FEES: SAN DIEGUITO SAN MARCOS
ENCINITAS — CARLSBAD
UNITS REQ'D:
% COVERAGE ALLOWED:
PARKNG SPACES REQ 'U:
BUILDING HEIGHT REQ'D:
PROVIDED: j .
PROVIDED:
PROVIDED:
PROVIDED:
FRONT SETBACK
ALLOWED:
PROVIDED:
INTRUSIONS:
RE-DEVELOPMENT APPROVAL REQ ' U:
SIDE SETBACK REAR SETBACK
j
LANDSCAPE & IRRIGATION PLAN COMMENTS-.'
\c
ENVIRONMENTAL PROTECTION REQ:
ADDITIONAL COvIENTS:
OK T JSSUE:j-
•
DATE: OK TO FINAL: DATE:
R.O.W: IMPROVEMENTS:
PUBLIC FACILITIES FEE.:: SEWER CONNECTION:
DRIVEWAY LOCATION(S) :
GRADING PERMIT:
EASEMENTS: DRAINAGE:
LEGAL DESCRIPTION:
ADDITIONAL COMMENTS:
0 -
*CHECK IF EN'INEERING INSPECTION REQ'D. ON FINAL: \'T"
,
-1TO ISSUE, DATE: [ PWI: OK TO FINAL J_ f
k * * *W&AJ.
- * IF THIS ITEM IS NOT CHECKED, BUILDING DEPARTMENT WILL MAKE
FINAL INSPECTION.
19
CARLSBAD FIRE DEPARTMENT
PAGE1 OF 1275 ELM AVENUE, CARLSBAD, CA. 92008
(714) L38-552l
PLAN CHECK REPORT
DISAPPROVED
PLAN CHECK
OTHER REF II
PROJECT 'Y ADDRESS
ARCHITECT __________________________ ADDRESS _______________ PHONE
OWNER _____________________________ ADDRESS _______________ PHONE
21
OCCUPANCY _J2_ CONST. ________TOTAL SQ. FT. /a'O STORIES _____
0 SPR1NKLERED 0 TENANT IMP.
APPROVAL OF PLANS IS PREDICATED ON CONFORMING TO THE
FOLLOWING CONDITIONS AND/OR MAKING THE FOLLOWING
CORRECTIONS:
Provide one copy of the floor plan(s), site plan, and sheets
Storage, dispensing or use of any flammable or combustible liquids, flammable
liquids, flammable gases and hazardous chemicals shall comply with Uniform
Fire Code and
Building(s) not approved for high piled combustible stock. Storage in closely
packed piles shall not exceed 15 feet in height, 12 feet on pallets or in racks
and 6 feet for tires, plastics and some flammable liquids. If high stock piling
is to be done, comply with Uniform Fire. Code, Article 81.
14 Medical gas system(s) shall comply with N.F.P.A. Standard 56F.
,k7 5. Fire extinguishers shall be provided based upon the following criteria:
,)( a) 1-2A rated ABC extinguisher for each 300 sq.ft. or portion thereof
maximum travel distance to an extinguisher of 75 feet
',
c) other: vt i ,4st d//e €7 -
____ 6. Fire sprinkler system(s) per N.F.P.A. Standard shall be
provided to protect
Dry chemical extinguishing system(s) shall be installed per N.F.P.A. Standard
96 to protect cooking equipment and exhaust system.
Plans of
system(s) shall be approved by the Fire Department prior to installation of
system(s).
Show on site plan locations of all nearby proposed or existing hydrants within
200 feet.
Hydrant(s) shall be provided and located
Show location(s) on site plan. Fire Flow: gpm for hours from
hydrants.
Access for fire apparatus is not adequate. Provide
12.shall be of hour construction
with openings protected with hour assemblies.
Comply with regulations on attached sheet(s).'
•
aminer ' Vate
Report nailed to architect ' ' Met with Attach to Plans
CARLSBAD FIRE DEPARTMENT
PAGE 2 OF - PLAN CHECK REPORT
PROJECT PLAN CHECK 6DZ3
14.
9.
20.
24.
5.
iitVW~L-2 6.
Drapes and other decorative materials shall be flame retardant. Certification
thereof shall be provided. Exits, exit lights, fire alarm stations, hose
cabinets and extinguisher locations shall not be concealed by decorative
material.
Interior finish shall conform with Title California Administrative Code
regulations.
Fireplaces and other appliances employing open flames shall have metallic guards.
Loose chairs exceeding 299 shall be bonded together in groups of 3 or more.
Storage and janitor closets shall be of one-hour construction with all openings
protected with 3/4 hour self closing and latching assemblies.
An approved fire alarm or two-way communication system shall be provided per
Title 24, California Administrative Code.
An occupant capacity sign, with minimum one inch letters and numbers, shall be
posted near main exit ( __square feet per person).
Exit doors shall be openable from the inside without the use of a key or any
special knowledge or effort.
A "THIS DOOR MUST REMAIN UNLOCKED WHENEVER THE PUBLIC IS PRESENT" sign, with
minimum one inch letters, shall be provided adjacent to main exit door_______
"EXIT" signs shall be in block letters minimum 6 inches high. Luminance on
face of sign shall be 50 lux.
"EXIT" signs shall be electrically illuminated and energized from separate
circuits. Show on electrical plan(s).
One of the above circuits shall be part of the emergency lighting system.
An "EXIT" sign shall be posted over exit door
and directional signs located
Show locations on floor plan(s).
Approved panic hardware shall be provided on exit doors
Show on door schedule.
Corridor shall be of one-hour construction with door open-
ings protected with 20 minute self closing and latching assemblies.
An additional exit door shall be provided in
per Uniform Building Code, Chapter 33.
/
Plan Examiner Date
ri
CHRIS CHRISTAKOS ENGINEERING
STRUCTURAL DESIGN
250-5 South Orange Street, Escondido, Calif. 92025 (714) 489-1139
S FOR: Two Story Office Building
T
R
U LOCATION: 2890 Plo Pico Dr., darisbad, CA.
TA
UL
R c OWNER: Jerry Bryan Photography
AU:
LL
A JOB # 0c03-82
cn
-
ESSI
NO. C29054
CIVI
MEMBER OF: STRUCTURAL ENGINEERS ASSOCIA TION OF CALIFORNIA AND AMERICAN SOCIETY OF CIVIL ENGINEERS
,c. O-iz
vq
<= 0 =>
7;; M
' -2'Z I/O-ta 13-
f2o ,/o,s 71 ' '/6 0 ,
36
9
ZX,o /6 ! r.
+1
Th 6/0 7o .90
P2
970 0" T' ):2,7
.
.
A _14 é,/L >46
at,
I .
.6x/i h(.
r;
~ -T
it,
I ~04
4(4
000
tippe;'- 1e.00/L
ls/Z
LA Meg /t.U41fl/5
1SM/C O4/C /- — 1O/,1O /5 p5f
Lpoi—
tue: io1c1 (èf,) 90
/ V,uw'vo '
2. /iocs
/e /OQ 4
/
îr"ffoP 1L1/ -c.c) '7L? &oV-
,4T oo1L /4pi(i)
goor
J2ooe
_
i 2
e $1
17,11 z/,6 pVii100
c 6"oc.
,9?ø #QLAdP,fl/-S, i'/o, P/'&,
"
,LI,1/,• cL//ocL
d(//A' OT (st) /jc/ /o,4 /4f
ñr,a7w cioFJ 7-0r'-eL4 -
'P_Ic_ F ñ-'- 711L .j4L.Lf
rH PoR-S 4
74/Z w4/-4-5 (-~e5 w41, 9C~465 DULG
LJpPtp- cA,z •--s
12 AT
V gz)
V '137.';;// .!cL''
No 7-6 m ,,ULôo/
1A
4rF
JeR /Z
47-
/cM- 907Y
dw
-
//o c OI.
Alo 75:
-
0•• LL)A £ i '4414 0,0/j fiz,ii
U4L 47. /A)E'() 0
000
(1 7
xxx
flo
)
/T: w4 70 B6 ,ia001 %Pep
0
•0
_
60N 47 c/,(15 0
V 175 • Ji4
t-
IVA
-i,
M- 4 -r — O/?I1- /J
,4L,— 'TT 4W6-
V7,
• P
0
•
0
'
-
?/ (s -. •
A/0 47_//
//6d e/'.c . pr&
/
2-
000
0,44- ,TT ftuE
13716-mA (is>) z
6t'O//P' (/16 !ko 11~071H 45~16qt a/f4L ?1?,UFt-f
p-1L p,C..
i.tz /..IO1POUJI'J
or &i p1q1iJE.
c;J$. r1149 79,te 72 7'L5
cJOI.t7J D/Z11Cr rriwr
(èo7i c#PFi)
.UflL
V6 2,205 ,'- i7sti0).r 20
rnou I
Sio5 3?t'('
2. ,D TJ.' /3f7o)
U--'4 I L
ve
4
-4
,otTJ.
All
, '?/oI' ,~ // ~
Hpa..o7- 'YDf/? AL
4,-e: LJc• 9 o7fl c'a6) 7
- JoiJri 1246-c7,z<.'7
(A E A rijE tL,+tL
/ B r
HL2Z /-/i?Ou/J 9oTh /ç d &4L&
F/Mr Tb
, Jouj D,* TRA)T
-- —
197- ZIA,16
•
- or) .' 2'
V4 /A1E
y;
°rfl f-oQ/2J
-
u_ 47-
\4 /5 o
z:OD W
(,46. A.
L)/ (l)/"( ,9oL7-
PE?' qllr7grL
f-tpz ,'oTf 'kr op
4jtiE-
I
ae ZL //Vç /0( L? o¼rc,pc1
All
I fr1Z S07// tM'i - . 'Hb
V e -
Bt'6-
T
g\ A)/(/) 516 'o Pe~L ?h~j
Hp 80 r' ,j/pr 4. cwft/L
Ø4AJL •
II . -JJ
L'PI2y Ri y4vlJ bco3-el7io-tz. (7
-
-
7'E1C7V/24- 7-rn'-c
I
Jof$77f) lXL- IN IA! IXI 's &CY - 9- 4 COP ,'4 P7.
/ ''-2 C6
Ii e. PM7
mx' JL
S
S
/&uOOJ%.: tL LI1/wii
-FO/t fly CA
ROOF 4 L L
O" /V°r c,w6
I S
10
S
•
6"O.C.(. S
•
t•u •DO
uJi°tLL- S S S
F E FT 7
&OT ro (,uA1,L
S
•
fg
•
.1_S
55
Tht~JAJLI f
rj,
I
2,x,° thAJ
—___•.;I-' O7H/ZCAQ,T5 <1vi 9.r
w HA IJ 12_Iez .Jo,i .
C. J1214/ RPj'4-Q LZ 00,
F6J,J9,4r/,,t1 to 6 $/cA1
&1E /Oao/'/ cc?/. $(itI,%JCt PESc1, ci.)/O 9o'-~ ,POJZT
fon,crS çpoI7T//L'(
oor/&
8n,5 07;Y w45
IY07-6
,071,J(, ,il
2)L OL) h)077 ,j OAJ f?Jç CL
.- .
C
CCE
H RIS ZI-IR I STAKOS ENGINEERING
STRUCTURAL DESIGN
250-5 South Orange Street, Escondido. Calif. 92025 (714) 489-1139
SHEAR .• WALL SCHEDULE
Ix D.F. diagonal sheathing ---_________________________
(as per UBC Sec. 2514 (b))
Z --1/2" drywall with 5d cooler nails @ 7" o.c. edge &
field (Table 47..1 UBC)
5/80 drywall with 6d cooler nails @ 7" o.c. edge & field (Table 47-1 USC) -
drywall with 5d cooler nails @ 4" O.C. edge & field (Table 47'-X UBC)
,4\--5/8" drywall with 6d cooler nails @ 4" o.c. edge &
field 'Mable 47"X UBC) - —.- - -------- -_____
blocked drywall with 5d cooler nails @ 4" o.c.
ADI_ edge & field (Table 47-I UBC)
A7--5/8" blocked drywall with 6d cooler nails @ 4" o.c.
edge & field (Table 47-I. UI3C)
_ stucco over paper backed lath w/16 gauge staples
at 6" o.c. at top & bottom plates, cdca of shear wall
and on field (XCBO Report No. 1823, Feb. 1977)
&_7/80 or (IC3O Report No.1318, Feb. 1973) stucco over paper backed lath w/16 gauge staples
at 3" ó.c. at top & bottom plates, edge of shear wall
and 6" o.c. on field (ICBO Report No. 1823, Feb. 1977)
or (ICSO Report No. 1318, FeL. 1973)
A-3/0" Structural II Plywood with 8d nails @ 6" o.c.
at edges & 12" o.c. field (Table 25X UBC,
Structural II Plywood with Ud nails 0 4" o.c.
at edges & 12" o.c. field (Table 25K UBC)
A-3/8" Structural II Plywood with Sd nails Q o.c. at edges. & 121 o.c. field (Table 251C UBC)
A7
3/80 Structural XI Plywood with Od ni1s 0 2" o.c.
at edges & 12" o.c. field (Table 25K UBC)
Structural Plywood with d nails 0 " 0.0e at ,edges & 12" 0.0. field
Structural . Plywood with d nails 0 " o.c.
at edges & 12.' o.c. field
300#/i
1.00!,.
100#/1
125#/l
125#/1
1504/1
175#/1
1804/1
3251/1
260#/l
3804/1
5704/1
6404/1
CONNECTION
22-Built-up girder and
23.2" planks
24. Particleboard: 5
Wall Sheathing (to fransit /s" Ye"
%Vt3/U
25.Plywood:5
Subfloor, roof and wall she
and less
%"-l"
1%"-1 /4"
Combination Subfloor-sjnde
s/s" and. less
Z6. PaneI Siding ((o framing) -
or less
27 Fiberboard Sheathing ;7
½"
'Common or box nails may be used except
'Common or deformed shank.
'Common.
'Deformed shank.
'Nails spaced at 6 inches on center at edg
(II) inches at intermediate supports for i where spans are 48 inches or more. Fo
shear walls refer to Section 2514(c). Nail box or casing.
'CorrOsion.rcsjsla,tt siding and easing nail
'Fasteners spaced 3 inches on center at ex
termediate supports.
'Galvanized roofing -ntils with '1,,-inch.d
inch sheathirg and I ',4 inch for "/,,-inch
'Galvanized staple with %.-inch crown and
I '1,-inch length for "/,,-inch sheathing.
-
- 25.0,25-P UNIFORM BUILDING CODE 1979 EDITION
TABLE NO. 25.0—ALLOWABLE SHEARS FOR WIND OR SEISMIC
LOADING ON VERTICAL DIAPHRAGMS OF FIBERBOARD SHEATHING
BOARD CONSTRUCTION FOR TYPE V CONSTRUCTION ONLY,
SHEAR VALUE 3-INCH
NAIL SPACING AROUND
SIZE AND PERIMETER AND 6,-INCH APPLICATION NAIL SIZE AT INTERMEDIATE POINTS
x 4' x 8' No. 11 ga. gal. roofing 125: nail 1½" long, ?e" head
x 4' x 8' No. 11 ga. gal. roofing 1 175 nail 1" long, i" head
'Fiberboard sheathing diaphragms shall not be used to brace concrete or
masonry walls.
'The shear value may be 175 for '/s.inch x 4 foot a 8 foot fiberboard nailbase
sheathing. .. . ..•...... ..
TABLE NO. 25.P—NAILING SCHEDULE
CONNECTION •. . . NAILING'
joist to sill or girder, toenail 3-8d
Bridging to joist, toenail each end 2-81
1" x 6" subfloor or less to each joist, face nail 2-8d
'Wider than 1" x 6" subfloor to each joist, face nail 3-81
2" subfloor to joist or girder, blind and face nail 2-16d
Sole plate to joist or blocking, face nail 16d at 16" o.c.
Top plate to stud, end nail 2-16d
Stud to sole plate 4-8d, toenail or
2-16d, end nail
Doubled studs, face nail 16d at 24" o.c.
Doubled top plates, face nail 16d at 16" o.c.
It. Top plates, laps and intersections, face nail 2-16d
Continuous header, two pieces . lGd at 16" o.c.
along each edge
Ceiling joists to plate, toenail 3-8d
Continuous header to stud, toenail . 4-8d
Ceiling joists, laps over partitions, face nail 3-16d
Ceiling joists to parallel rafters, face nail . 3-16d
Rafter to plate, toenail 3-8d
1" brace to each stud and plate, face nail 2-8d
1" x 8" sheathing or less to each bearing, face nail 2-8d
Wider than 1" x 8" sheathing to each bearing, face nail 3-8d
Built-up corner studs I 6 at 24 a o.c.
278
. . - ...................' .
251'
UNIFORM BUILDING CODE
1979 EDITION
HAILING'
i-T
o.c. at top Od at staggered and bottom an
,2 0aat ends and at
each splice
at each scaring
2"
- .Par ticl Sheathing(to framing) 8d3 Wall
5wood: 5 th an d wall sheathing (to (ramng) 6 d2 ly
/z"
Subo0r, roof 8d oT'-4 and less 8d2
10d3 or 8d4
(to framing):
6d4 SUbRoos.underlm Combination . 8d4
~" and less i()a3 or 8d4
(to framing) . 6d6
26.P, Siding
-
- ½" or less .
No. I 1 911 oardSI1ea;;;:7
-: No. l6ga
herwise stated.
,Common or box nails may be used except where ot
,common or deformed shank.
,Common. shank.
ts
'ai1s spaced at 6 inches on center at edges, 12
incheS at intermediate suPPOT
.Def,Deformed
(10 inches at intermedte supP0S for floors), except 6 inch at all supports
where spans are 48 inch, or more. For nailing of plywood di
aphragms and
shear walls refer to
Section 2514 (c) sailS for wall s
heathingmay be common,
box or casing.
corrosi0eui5ta siding and
easing nails.
aStenerS spaced 3 inches on center
at exterior edges and 6 inClsS on center at
in
.COT
r
oofing nails with ,,,inch.diamet head and l'/-fl
length for -
termedte 50pp0rt5
inch she
athing and 1'!. inch for i,1,tnch sheathing
gr,a1vani1ed staple with ',,,inch
crown and Ihi15Ch length for hinch sheathing and
1,4_mci' length for ,/,,-inch sheathing 279
AIRS FOR WIND OR SEISMIC
OF FIBERBOARD SHEATHING
E V CONSTRUCTION ONLY
FATINIERNIEDIATE
VALUE 3-INCH
NAILPACING AROUND ETER AND 6-INCH POINTS
head 1252
Tooling 175 head
not be used to brace concrete or
x 4 loot x 8 loot fiberboard nailbase
AILING SCHEDULE
NAILINGI
3-Sd
3 2-8d
tuist, face nail 2-8(1
ach joist, face nail 3-8d
id and face nail 2-16d
tee nail 161 at 16" o.c.
2-16d
-
4-8d, toenail or
2-16d, end nail
16d at 24" o.c.
16d at 16' o.c.
us, face nail 2-161
16d at 16" o.c.
along each edge
3-81
nail 4-8d
uis, face nail 3-16d
face nail 3-16d
3-8(1
:e, face nail 2-8d
:h bearing, face nail 2-8d
to each bearing, face nail 3-8d
16d at 24" o.c.
CONNECTION
flBuilt-UP gir CT 'In _alns
JOHN VERNON & ASSOCIATES
1859S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 7438808
GRADING REPORT
"4.
Agency______________________ F~
Project Location_
Name of Permittee_
Grading Permit No.
.-A.* COMPATIBILITY WITH GRADING PLAN AND PERMIT
Was the compacted fill placed only in the approximate lo- Yes No
cations designated on the grading plan a.z areas to be
filled? 4- A,4*dC ,4-j ,eg:ID
Did the quantity of fill material placed approximately - Yes No
conform to the grading plan?
Did the toe of fill or the top of cut appear to meet the Yes'- No
prescribed property line setback (1.5' for fill; 3.0'
for cuts)?
Were the finished fill slopes equal to or less than 2 hor- Yes_' No
izorital to 1 vertical?
If the fill material was obtained by cuts on the site, Yes No
were the cuts made in the proper location and to the proper
slope approximately as shown on the approved grading plan?
Were brow ditches constructed approximately as shown or— Yes_ No
the grading plan?
B. LOCATION AND AMOUNT OF COMPACTION TESTS
Have you attached a sketch and data showing the location Yes V No_
and relative elevation for all compaction tests?
Was a compaction test made so that there is at least one Yes V' No_
test in each 2' thick lens of compacted material.
As indicated by inspections, observations and compaction Yes" No
test results, was the fill, excluding the top 1.0', compacted
to at least 90% of maximum dry density?
C. QUALITY OF FILL COMPACTION OPERATION
Was the area to receive fill properly prepared .in terms of Yes-L/ No
brush removal, benching, wetting, removal of noncompacted
fill or debris and related items?
Was all detrimentally expansive soil placed in the fill at Yes No_
3' or more below finish grade?
Duplicate of DPL #73
Rev. 3-7-79 (1)
/ Have you attached a copy of your curve showing the rela- Yes V No
tionship between optimum moisture content and maximum
density?
/
Was all material used as fill (earth, rocks, gravel) Yes V No
smaller than 12" in size?
Are all areas of the 1111 suitable for support of Yes_" No
structures?
Were all existing fills on the site recompacted in accord- Yes V No
ance with the provisions of the grading ordinance?
D. STATISTICAL DATA
Dates the grading work was performed*JJ— de7?i
Dates,your representative was on site and number of hours on site for
each date, and name of representative/
- dEi~A .
E. AS-BUILT DATA
If the fill placement was not in accordance with the , (1s_ No
approved grading plan, did you notify the permittee to
obtain approval for deviation from the plan before pro-
ceeding with additional fill placement?
If the approved grading plan does not reflect the actua ,,i_ No
location, depth and type of fill, have you submitted fo
review and approval an as-built plan?
REMARKS:
CERTIFICATION
I hereby certify, under penalty of perjury, that the information
provided in this certification is true to the best of my knowledee
and belief.
Signature Date______
R.C.E. 21719
PROPERTY DEVELOPMENT ENGINEERS
JOHN VERNON & ASSOCIATES
1859 S. E&ODdidO Blvd.
Econdido, CA 92025
743-8808
Duplicate of DPL #73
Rev. 3-7-79 (2)
/1O L
LE
OPT. MOISTURE
RELATIVE COMPACTION
(1 TEST REPORT
TEST* /
FG -
OG-
JOHN VERNON & ASSOC
vm.oin DATE:
TESTED BY
LOCATION: te
01 5WTito
SAND VOLUME DATA: C
INITiAL WEIGHT OF SAND
K3HT OF RESIDUE
WEIGHT OF SAND USED
SAND DENSITY
VOL. OF HOLE & CONE
VOL. OF CONE
VOL. OF HOLE
EXCAVATED SAMPLE: IN PLACE
GR /0.73 LB
42; X GR
4f5; GR 07 GR
ILI
i LB/CF
/9 LB/cr
WET WEIGHT
DRY WEIGHT
WEIGHT OF WATER
% MOISTURE
IN PLACE WET DENSITY
IN PLACE DRY DENSITY
IMPACT TEST DATA:
OPTIMUM WET DENSITY
OPTIMUM MOISTURE %
OPTIMUM DRY DENSITY
RELATIVE COMPACTION: % MOISTURE
LB/CF
0 I 1 I q9j
L
LB
iD. I 48 LB
bz7 LB/CF
0. O4-/ c
c.e'8( CF
TEST*Z
RELATIVE COMPACTION FG OG =
TEST REPORT
JOHN VERNON & ASSOC.
iy ovmomm1,T muaws DAM
TESTED BY
LOCATION: /L ,
A'. /
SAND VOLUME DATA:
INAL WEIGHT OF SAND
WEIGHT OF RESIDUE
WEIGHT OF SAND USED
SAND DENSITY
VOL. OF HOLE & CONE
VOL. OF CONE
VOL. OF HOLE
IN PLACE OPT, MOISTURE
OcD GR //.b3 LB OR
QR GR
GR 37 GR
/ __________
i.34? LB/CF
/jp. 4L LB/CF
EXCAVATED SAMPLE:
WET WEIGHT
DRY WEIGHT
WEIGHT OF WATER
% MOISTURE
IN PLACE WET DENSITY
IN PLACE DRY DENSITY
IMPACT TEST DATA:
OPTIMUM WET DENSITY
OPTIMUM MOISTURE %
OPTIMUM DRY DENSITY
RELATIVE COMPACTION:
LB/
I
SMOT(E 4?/ %]
TEST#
FG —
OG -i -/ RELATIVE COMPACTION
/\
OWNER: Y) TEST REPORT
CONTRACTOR: /%7J 77c7 AP
JOHN VERNON la ASSOC.
PROPERTY DEVELOPMENT BISINEEN$ DATE
I59 S. £SCONDOO SLVD.,EScONOIOO, CA 92025 TESTED 7438808
LOCATION:
FT-B, /3 - J
SAND VOLUME DATA:
INITIAL WEIGHT OF SAND
WEIGHT OF RESIDUE
WEIGHT OF SAND USED
SAND DENSITY
VOL. OF HOLE & CONE
VOL. OF CONE
VOL. OF HOLE
EXCAVATED SAMPLE: IN PLACE
LB
LB
ie.ti LB
e9.3 /CF
".' cr
CF
£2 9 3 CF
OPT. MOISTURE
WET WEIGHT
DRY WEIGHT _47 GR
WEIGHT OF WATER _L!!
% MOISTURE ____
IN PLACE WET DENSITY
IN PLACE DRY DENSITY
41 LB
LB/CF
-
LB/CF
jr" GR
44::; GR
6-4 GR
/2.
IMPACT TEST DATA:
OPTIMUM WET DENSITY
OPTIMUM MOISTURE %
OPTIMUM DRY DENSITY
RELATIVE COMPACTION:
--
- ,, L
%MOtSTURE
-.-
II -. -
I j L
I i/I
--- -J
-
..-
1
JOHN VERNON & ASSOCIATES
1859 S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 743-8808
November 1, 1982
Mr. Ed Mullen
P. 0. Box 1480
Carlsbad, Ca. 92008
Subject: Preliminary Soils Investigation
Site: Southeast corner of Stratford Lane and Pio Pico Drive,
Carlsbad, Ca.
Mr. Mullen:
At your request our office has completed an addendum to the Preliminary
Soils Investigation we prepared for Mr. Jerry Bryan, dtd. March 16, 1979.
That report provided design criteria for the parking lot and two story
building situated on the Southerly portion of the site. It is under-
stood that the proposed new two story building will be situated at the
Northerly end.
On October 29, 1982 a representative of our firm observed the excavation
of two test pits in the new building area and tested the existing soil.
These tests compared favorably with the testing done during the original
soils investigation.
The soil horizons were virtually as noted in our former report, being a
dark red brown silty sand to the bottom of the trenches at 5'+. Because
of the above we recommend that the conditions and criteria set forth in
our original report be followed for the new construction, except that the
10' perimeter recompaction may be reduced to 5'.
We have attached a copy of the original report and a copy of the Standard
, Specifications for the Placement of Compaction Filled Ground for your
informatio
:'- DAV IS
R.C.E. 21719
V. PROPERTY DEVELOPMENT ENGINEERS, INC.
NG;NEERsNG S SOILS TESTING S SURVEYING
JOHN VERNON & ASSOCIATES
1859 S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 743-8808
March 16, 1979
£r. Jerry Bryan
P.O. Box 748
Carlsbad, Ca. 92008
Subject: Preliminary Soils Report
Site: Northeast Corner Laguna St. and Pio Pico, Carlsbad, Ca.
To whom it may concern:
Our firm has completed an investigation of the natural soil at
the above site. The native soil is a red brown silty sand
(SW per the Unified Soil Classification) and is not detrimentally
expansive.
On February 15, 1979 we explored the subsurface soils to a depth
of 8'. Two test holes were drilled showing only slight differences
in the soil texture from the ground surface to the full depth.
A sample of soil was taken at the 4' level for determination of
allowable bearing pressure. At the time of sampling the soil was
in a moist, loose condition.
The soil sample was tested for maximum density, optimum moisture
and direct shear. The results of these tests are as follows:
Maximum Dry Density 130.6#/ft3
Optimum Moisture 8%
Direct Shear
Angle of Internal Friction 320
Apparent Cohesion 100#/sf
JOHN VERNON & ASSOCIATES
1859 S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 7438808
Due to the soil density the foundation areas will require excavation
and recompaction. The limits of the recompaction should be to at
least 4' below finished grade and 10' clear of all buildings. Parking
lot areas should be compacted to not less than 2' below subgrade.
Grading and compaction should be accomplished in accordance with the
attached specifications.
A1loable bearing pressure for single story 12" wide x 12" deep foot-
ings is 3000#/sf. Two story construction may use 3750#/sf if footing
dimensions are at least 15' wide and 18" below lowest adjacent finish
grade. Round and square pier footings may use bearing pressures as
follows:
p = 1690 = 1136d + 364A (Round)..
p = 1690 = 1136d + 486A (Square)
Where
p = Allowable pressure in lbs/sf
d = Depth of footing below finish grade in feet
A = Area of footing surface in squ are feet
The above bearing pressures have a safety factor of 3.
d- &'). ~
C. W. DAVIS
;.C.E. 21719
JOHN VERNON & ASSOCIATES
• 1859 S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 743-8808
STANDARD SPECIFICATIONS FOR PLACEMENT
OF COMPACTED FILLED GROUND
Objective:
Obtain filled ground which is uniform and has adequate internal
strength to support any'.structures proposed. The method by which
this is obtained is described herein.
Preliminary Proceédures:.
Permits -Owner shall ascertain the grading permit require-
ments of the agency whose jurisdiction Covers the land on which the
grading is to' be, performed and 'shall be responsible for' complying
with them.
Water -. An adequate water supply shall be provided so that
compaction of filled ground will not be delayed.
Soils Engineer --A soils engineer shall be retained to pro-
vide direction in grading, testing for compaction and certification
that the grading complies with grading ordinances and with approved
grading plans.
Grading:
I. Clearing and Grubbing - All natural surface which is to be
covered by filled ground, excavated or needed for brow ditches,
swales or 'other grading appurtenances shall' be cleared and grubbed.
Trees, shrubs and grass, as 'well 'as organic overburden shall be
removed from the area to be graded. Cleared material may be disposed
of as approved. 'by the local controlling agency. No embankment shall
consist Of treea,.shrubs or other organic material.
Natural Ground :PreParati0n - Natural ground shall be excavated
from beneath embankment areas to solid' material, 'the exact depth as
determined by the soils engineer. This material shall be brought
to proper moisture content and recompacted to not less than 90%
maximum density as determined by A.S.T.M D-15.57-70.
PROPERTY DEVELOPMENT ENGINEERS
ENGINEERING • SOILS TESTING 0 SURVEYING
JOHN VERNON & ASSOCIATES
1859 S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 743-8808
Any existing fill which has not been certified must be removed and
recompacted.
If the slope of the' existing ground exceeds 1' vertical in' 6'
horizontal, a bench cut level, 10'. wide shall be excavated at the
toe of the fill. This will allow the embankment'to be placed on
a horizontal base for more uniform compaction.
3. Embankment Placement - Fill material should consist of native
or imported material which has been brought .to the optimum moisture
'content. Material to be used for embankments may have rocks with
diameters' greater than' 12" providing they are evenly distributed in
the soil mixture and are at least 3' below finish grade. Fill slopes
shall not consist of, nor be founded on,' large rocks. Although,
'rocks may be placed. along the outside of the toe of the fill slopes.
Rock placement' in embankments shall be under direct supervision of
'the soils engineer.
Embankment material shall be placed in layers varying from 6" to
12" deep, depending on soil type, and compacted by suitable compact-
lye effort to a density of not less than 90 of the maximum density
as determined by A.S.T.M. D-1557-70. Moisture content and depth
of layers'shall be determined by the soil engineer at the time of
grading,' and shall 'be updated whenever embankment soil types change.
As the' embankment increases in elevation new benches shall be cut
into original ground. Benches shall beat least 6' horizontally
into natural ground, be level and shall occur, at, intervals to be
determined by the soils engineer at the time of grading.
Compaction may be obtained by the use of any combination of equip-
ment'which will result in an embankment that'is properly compacted,
uniform in moisture and properly finished to the lines and grades
shown on the'plans or to those set forth in the applicable grading
ordinance.
Li... Additional Grading - Cut slopes shall be cut to the lines
and grades as shown i on the plans or set forth:in the applicable
grading ordinance.
(2)
.• JOHN VERNON & ASSOCIATES
1859 S. ESCONDIDO BLVD.
ESCONDIDO, CA 92025
TEL. (714) 743•8808
Cut slopes shalibe protected from erosion by brOw'ditches. Brow
ditches shall be either earthen or lined with erosion resistant
material as shown on the plans or as recommended by the engineer.
Embankrnentsshall'be protected from erosion by placing,an earthen
berm alone the top of slope.for the entire perimeter, of the fill.
Where drainage is brought down the slope, the drainage way shall
be lined with erosion resistant material to 'prevent loss of 'embank-
ment slopes.'
Where eaves are located less'than 5' horizontally from top of fill slopes, eaves troughs shall be provided to prevent weakening of
slope due to water intrusion.
All areas of the building pad' must be well drained.. Drainage swales.
shall have a mimimu'm slope of 1' vertical in 100' horizontal unpaved
or 1' vertical in 200' horizontal paved with concrete.
' Drainage shall be provided to ensure foundations'wi'll.not be subjected to
pondéd water.
If
eoo It3
LI
- -