HomeMy WebLinkAbout2880 Trails Ln; ; CB153200; PermitResidential Permit
Print Date: 01/14/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2880 Trails Ln
BLDG-Residential
1560904100
$439,241.00
1
3.00
TRAILS END
Work Class:
Lot#:
Reference#:
Construction Type:
Bathrooms:
Orig. Plan Check#:
Plan Check#:
Single Family Attached
12
DEV04063
VB
4.50
PC130072
Description: TRAILS END-TYPEl-UNIT 12-SF ATTACHED 2781 SF, 523 SF GAR, 445 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLETRUST
5505 Cancha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFO
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLDG
TRAFFIC IMPACT Residential Condo Outisde CFO
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $32,046.64 Total Payments To Date: $32,046.64
{City of
Carlsbad
Status:
Applied:
Issued:
Permit
Fina led:
Inspector:
Final
Inspection:
Balance Due:
Permit No: CB153200
Closed -Finaled
09/29/2015
12/19/2017
CRenf
1/14/2020 11:19:56M
$0.00
$1,833.00
$783.10
$66.00
$166.00
$92.00
$182.00
$15,373.44
$18.00
$5,029.00
$934.00
$57.10
$232.00
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153200)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2880 Trails Ln
Carlsbad, CA
IVR Number: 709458
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
06/25/2019 06/24/2019 BLDG-27 Shower 095631-2019 Passed Chris Renfro Complete
Pan/Tubs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/08/2019 08/08/2019 BLDG-21 100145-2019 Passed Chris Renfro Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Backflow underground, ok to backfill Yes
09/10/2019 09/10/2019 BLDG-Electric Meter 103591-2019 Passed Chris Renfro Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/1412020 01/1412020 BLDG-Final 116289-2020 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
January 14, 2020 Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153200)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2880 Trails Ln
Carlsbad, CA
IVR Number: 709458
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
05/20/2019 05/20/2019 BLOG-17 Interior 092279-2019 Partial Pass Paul Burnette Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
05/23/2019 05/23/2019 BLOG-17 Interior 092636-2019 Partial Pass Paul Burnette Relnspectlon Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/07/2019 06/07/2019 BLDG-84 Rough 094141-2019 Passed Andy Krogh Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
06/14/2019 06/1412019 BLDG-13 Shear 094723-2019 Passed Chris Renfro Complete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-16 Insulation 094700-2019 Passed Chris Renfro Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/18/2019 06/1812019 BLDG•17 Interior 094885-2019 Partial Pass Chris Renfro Relnspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency First layer drywall at party walls Yes
06/24/2019 06/24/2019 BLDG-82 Drywall, 095375-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Test, Hot Mop
January 14, 2020 Page 3 of 4
PERMIT INSPECTION HISTORY REPORT (CB153200)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner:
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/0912020 Address:
IVR Number: 709458
Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
Checklist Item
BLDG-Building Deficiency
0112512019 01125/2019 BLDG-14 082184-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
02/25/2019 02/25/2019 BLDG-14 084434-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
03/1312019 0311312019 BLDG-14 085954-2019
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item
BLDG-Building Deficiency
04/10/2019 04/1012019 BLDG-13 Shear
Panels/HD (ok to
wrap)
088461-2019
Checklist Item
BLDG-Building Deficiency
04/15/2019 04/15/2019 BLDG-15 088998-2019
Roof/ReRoof (Patio)
Checklist Item
BLDG-Building Deficiency
05/02/2019 05/02/2019 BLDG-13 Shear
Panels/HD (ok to
wrap)
090626-2019
Checklist Item
BLOG-Building Deficiency
05/1012019 05/1012019 BLDG-16 lnsulatlon 091503-2019
Checklist Item
BLDG-Building Deficiency
05/1612019 05116/2019 BLDG-17 Interior
Lath/Drywall
January 14, 2020
092029-2019
COMMENTS
Footings Check
Partial Pass
COMMENTS
Tim Frazee
Floor sheathing on basement floor
Partial Pass Tim Frazee
COMMENTS
Floor sheathing on basement floor
2nd floor sheet nailing floor
Partial Pass Tim Frazee
COMMENTS
Floor sheathing on basement floor
2nd floor sheet nailing floor
3rd floor sheathing OK
Passed Tim Frazee
COMMENTS
Passed Tim Frazee
COMMENTS
Roof nailing OK 4/15/19
Partial Pass Tim Frazee
COMMENTS
Party wall hold downs, LTP 4s, Framing OK
to insulate 5/2/19
Partial Pass
COMMENTS
Tim Frazee
Insulation and draft stopping at Party walls
Partial Pass Paul Burnette
TRUST THE PEV FAMILY
REVOCABLE TRUST
2880 Trails Ln
Carlsbad, CA
Reinspection
Passed
Yes
Reinspection
Passed
Yes
Reinspection
Passed
Yes
Re Inspection
Passed
Yes
Passed
Yes
Passed
Yes
Reinspection
Passed
Yes
Reinspectlon
Passed
Yes
Relnspection
Complete
Incomplete
Incomplete
Incomplete
Complete
Complete
Incomplete
Incomplete
Incomplete
Page 2 of 4
PERMIT INSPECTION HISTORY REPORT (CB153200)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2880 Trails Ln
IVR Number: 709458
Carlsbad, CA
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
12/20/2017 BLDG-21 044274-2017 Passed Paul Burnette Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/04/2018 01/04/2018 BLDG-11 045044-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/23/2018 01/23/2018 BLDG-11 046593-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundatlon/Ftg/Pler
s (Robar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/05/2018 02/05/2018 BLDG-66 Grout 047841-2018 Passed Tim Frazee Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/22/2018 02/22/2018 BLDG-11 049417-2018 Partlal Pass Paul Burnette Reinspection Incomplete
Foundation/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/27/2018 03/27/2018 BLDG-66 Grout 052864-2018 Partial Pass Paul Burnette Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Buflding Deficiency No
04/10/2018 04/10/2018 BLDG-66 Grout 054431-2018 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06114/2018 06114/2018 BLDG-11 060802-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar}
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/23/2018 10/23/2018 BLDG-11 073888-2018 Partlal Pass Tim Frazee Re inspection Incomplete
Foundatlon/Ftg/Pler
s (Robar)
January 14, 2020 Page 1 of4
<_(~
~ CITY 01
CARt.SBAb CB153200
Building Division
RECORD CQF; C
INSPECTION RECORD 2880 TRAILS LN
TRAILS END-TYPE1-UN!T 12-SF ATTACHED 2781 SF. 523
0 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carlsbadca,goy/Bylldlng AND CLICK ON
"Request Inspection"
DATE:. \2-\'4-I 1
SF GAR. 445 SF DECK
DEV04063
PC130072
1560904100
12/14/2017
CB153200
If ·'YES" is checked helow that Division's approval i,; required prior to reql1e~ting a Final Bui Illini.~ Inspection. If ynu have any (Juestions
please call the applicable divisions at the 1>honc numbers provided below. After all requiu:d approvals are signed off-fa){ to
760-G02 8560. email to bldg:inspections("'carlsbadca.gov or bring in a COPY of this card to: 1G35 Faraday Ave . Carbhad.
Required Prior to Requesting Building final If Checked YES
Planning/Landscape 760-944-8463 Allow 48 hours
CM&l (Engineering Inspections) 760-438-3891 Call before 2 pm
Fire Prevention 760-602-4660 Allow 48 hours
Dato Inspector
#12 REINFORCED STEEL
#88 MASONRY PRE GROUT
SGROUT Cl WALL DRAINS
#10 TILT PANELS
#11 POURSTRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME O FLOOR O CEILING
#15 ROOF SHEATHING
#13 EXT, SHEAR PANELS
#16 INSULATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWALL
#51 POOL EXCA/STEEL/BOND/FENCE
#55 PREPLASTER/FINAL
□ SEWER & BL/CO □ PL/CO
#21 UNDERGROUND □WASTE O W1'R
#24 TOP OUT □ WASTE O Wl'R
#27 TUB & SHOWER PAN
#23 □ GAS TEST □ GAS PIPING
#25 WATER HEATER
#28 SOLAR WATER
#29 FINAL
Com 11 STORM WATER
#600 PRE-CONSTRUCTION MEETING
#603 FOLLOW UP INSPECTION
#605 NOTICE TO CLEAN
#807 WRITTEN WARNING
#609 NOTICE OFVIOLATION
#610 VERBAL WARNING
REV 10/2016
Ins or
UNDERGROUND (11,12,21,31)
#82 DRYWALL,EXTLATH, GAS TES 117,18,23)
#83 ROOF SHEATING, EXT SHEAR (13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
T-Bar (14,24,34,44)
ANAL OCCUPANCY (19,29,39,49)
A.JS UNDERGROUND VISUAL
A./S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
A.JS OVERHEAD VISUAL
A./S OVERHEAD HYDROSTATIC
A/S FINAL
F/AROUOH-IN
F/A FINAL
Date Ins r
FIXED EXTINGUISHING SYSTEM ROUGH-IN,,_----l-----f-------
FIXED EXTINO SYSTEM HYDROSTATIC TEST
FIXED EXTINGUISHING SYSTEM FINAL
MEDICAL GAS PRESSURE TEST
MEDICAL GAS FINAL
SEE BACK FOR SPECIAL NOTES
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
DAILY FIELD REPORT
Client: Pacifica Real Estate Services Inc Job 10-13959T Number:
Job Name: Trails End Residential Subdivision Development Day(s): Monday
Job Location: 3151, 3155 Donna Dr. Carlsbad Ca. Date(s): 4-9-19 2876, 2880, 2884, 2888 Trails End Carlsbad Ca.
Engineer: HTK Structural Engineers LLP
Permit number: CB153136, CB153197, CB153201, CB153200, CB153199, CB153198
Shear-wall Special Inspection
Performed the shear-wall special inspections on the shear-walls
that had fastener spacing at 4" or less per CBC section 1705 at
lot #1, #2, #11, #12, #13 and lot #14 per sheet S4. 0 Basement,
lower floor and main floor, sheet S4.1 upper floor and roof plan.
Verified correct materials, nailing spacing, hold-downs, foundation
connection and shear transfer between floors/roof. All corrections
were performed during the inspections, the installation is in
compliance with the approved plans.
Certification of Compliance: All work, unless otherwise noted, complies with the 81!
the California Code of Re ulations Title 24.
NAME: Bill Atwood
CERTIFICATION NO: 5012754
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
~L' .. --)
, ----; -i• ,,-~E' --'.•{ p; -•' . .. .
' / . ,. / s, .
.,-· J .•• ----... / 4-~;,. ·_./,.> / ~ ;, .,,.... // -~--.-w.o. ~t:·-: -:__
DATE /.L.--Z. 1-17
NAME /2. C/r..-1 S?-->J/1 ~,
HOURS ______ _
.G._eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
/'1 -1 L' ----Ir Client Name: e-_,,.,.;? 11 tJ A L/li /1/C , C C--Project Name: -7 t?d l , { C ..!"'..> _..;;_::;c._,:~a,..;;,.;._.,."---',~..:;...;;;;...:...._..:;._....;;;:;____ -, ........ -'-'-;..;..a.------------
---I C /--·. I / . ,,--. ,/ Location/Tract: --'/'-'-'n:;.::•c....,., .:...I -'-'i 5,.:::...._.,__,-"'----',7'-'C)::....,,.,.__;;L:.:..•...:;.l_<_,_/.:..··~b""':c:;:..A.:.;.i.-=----L=-_,_/ __ O---''--,:....J_---'-/_-Y_· ___________ _ ,,
I
Unit/Phase/Lot(s): _/4_ ... ...:;-r_· -"-J _...,7...,/'--"'-i ........ , _CJ.;.,., 1._,'i...;;;u...,.:..... _._/J""''l .... ~..:;.z_.,,.,'---_1_? .... l ~.,,1_1 _'/ _______________ _
J I
Referenced Geotechnical Report(s): _k_.,,,: __ ,;_li_~ __ ~, ____ /i __ U_.,...,_-__ ~: .... ·i __ /_-/_7 __ f.._:_, --~b_· _-/_b _________ _
,r'
Observation Summary
/,/ r
ll/,,1 .
~-
ll--li 1
I
--: ... ,/
Initials
Date
Initials
Date
Initials
A representative of GeoSoils, Inc. observed on site soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of ~he geotechnical report.
(l~ Date
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. ,
f-'
,viz 1
Initials
Date
J-U r ,.--;J_ 5 ' /-.:_ ,,-, -........ ,e r--=--'bJn o .,, ,;..,, ~ µ <.r .s ~i. LA -n Lt "-f-, Cri, c h r!---L..,.., • FJ',9~}., ,t1 ,, 1:.
/t~·h /.., ., . .,/,c.c,-r,:...1 -rt.,.,-r--t/-.-e-.... c ~ _,b_.,. ~I<-. II i , ,..,ibr1-.1c.l-.
/
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note tha\ clayey soils may tak~~xtended
period of time for such, and the contractor should schedule according~,.e::: €£? .,,-?'v..l s I" ....,,,W-
in the event of a site change subsequentto our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
_ot grading. . /1// /'?
/_ /
~«'.___ :··-----· ..
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
[ /Uf:SPA-'-{ \
W.0. (o 0 3 5 -C
DATE_l;....--'-1-._-_l_t', _____ _
NAME M I k£ St:r-..V\-
HOURS_~1-~, 0.;;;__ __ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: Dc,NNA On.. \\IE:. 1,--L C Project Name: ,-;'l.. 4 i L s ~Nb
Location/Tract: T fl 1/.\ 1 L s END C Al'<.. Ls L3 AP c, 01--1 -/'-f
Unit/Phase/Lot(s): __ l-_o __ , ......... s __ \_/ ___ 2_-=3 ..... /_1
L...,,..t ___ -r;;:;"-----/ __ e:,___,.. ______ ( ___ 1 _-_(,_) ________ _
/
Referenced Geotechnical Report(s): __,D=...;..A:...:·rc...:~:;;..:l ..... )_ ..... l....,O"---=3 ...:..1 _-.....;_I 7-'--,~· -=b----=~~---'-1....;;:;?.. _______ _
Observation Summary
IM5 Initials
1 /-z../ 19., Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report .
. ,v\ 5 Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
t /z/, B Date
t0i. s Initials
1 /?. I 18 Date
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
vV s Initials P1::.Rf--on.MEb 5~LGc,r ,,.., f>r'-£,R IN{,, ON UN{)ER'SL!A Q vn c1f'/ Tt'<€NC.li~~, l"\<...T1~..-
t I i. I /fiJ Date Pr'l.ol\l ...... (, .I:.,-H)\C.11\IE:..f Trf-tA,, T.-7...1:'r-JCHC:s 6'v.-.c.kf.:1lA ,s R.f:.l-:-r.v,,'-/ Cov--,eA<..T I
1-\-~0 S u1rA ~LE Fon.. ·rd-c: . .i:-........ ,<:=i,-,OE;D u.s.C
Notes to Superintendent/Foreman
G)
2.
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly.¾-/<6ep Mo I s r ;¥;--
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 PalmerWay
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Gfu-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
I I
January 3, 2018
GEO CE NTRI C
LAND SLRVEY!Nt: AND MAPPl~G
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 to substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks.
Sincerely,
Lome DaPron
PLS 7824 No. 7824
21-St) \: Cm rn: CI t.~· p·-<\\·y SuiL..: n, FsconJi.ck11...A 92026
Le!: 76t 1 .~\)7.7824 fax 760.7.:}5 7824
\V\V ,v .gcocen tr,iL ~u rvt·y.(n.n1
. ------
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
INSPECTION REPORT
7 8 7 6. 1 Q8o '288l/, .?.B88 ~ I .,_ \...._,, / ,, -'
PROJECT NAME TP".2.,t,!t <; 1;,,v r] f4&.S11_,fV-.,/"tJJ.. l INSPECTION
ADDRESS C t:;,'2_{ S {j(~ Q VIL~ t! r.-t;-12.12.. ij. □ CONCRETE
l2Qt:lltYr1, tl::Z. cAgt ~t-ZAn G<l REINF. STEEL
ARCHITECT 7' {J ~ '5,r (yt.l cl£ c.. £'.,{. □ MASONRY
ENGINEER _1-;,;c-,-,,,-□ P.T. CONCRETE
CONTRACTOR □ FIELD WELDING
OTHER □ SHOP WELDING
INSPECTION DATE /·'-/-/°' □ BATCH PLANT
PLAN FILE/OTHER □ EXP. ANCHOR
BLDG. PERMIT/OTHER r: 6/ ·i 3 I 18 -~ 8. I -;· j 2 6 1 □ OTHER
MATERIAL SAMPLING
PAGE OF
CTE JOB NO. IC'-I i 9 ,;·7 t
REPORT NO.
MATERIAL IDENTIFICATION
CONG. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORT AR TYPE & lb/in2
REINF. STEEL GR./SIZE A61,; (._tJ ,/.!"~
STRUCTURAL STEEL
HIGH-STRENGTH BOLT
MASONRY BLOCK
OTHER
0 CONCRETE 0 MORTAR 0 GROUT 0 FIREPROOFING □ MASONRY BLOCK
0 REINFORCING STEEL 0 STRUCTURAL STEEL 0 SOL TS O OTHER
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES.
r~-v-, ;-01 r---:::.. ,+ T UN 1 : d: I i .o T 5 / f · I 2' .A:,-..,,; T ff. ·5 c ,., t H :f" ,.;; 4-:; T , ,.,, ? u s ✓-?:,• 112. 06 T.•Jr/L. $
.t:roTt~tQ <L,/ (;' l/r1;:6[ -S<t, o f l 1"'1 011 rA1/ 1/J/~-e, I h vO... At141 Scv,,-,1 ,v 0t-4ll A1r,T 7 .
0~ -;--_.: ;;/./fr-.i/i./ -;;:_e,.,.;//; :t..Jr ,. i/1 ,~ 1,J.,,/ /, <:;0/
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications. ~-------------------------------------------
PRINTED NAME !A/// { 1 A ,-/, Cr:n/ ,;.-_,,. /
CERTIFICATION NO. 5 o·-1! y,;-~1 SIGNATURE _,4-=u-""--,,_,--+;-=-~"--"-·~-/-·;,._' :c.../".:=.~=-~""':,'-.#,-· __ _
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
INSPECTION REPORT ·
PROJECT NAME Trails end residential
ADDRESS Carlsbad village and Donna dr.
ARCHITECT _4~D~es~ig~n~---------
ENGINEER ~H~T~K~-----------
CONTRACTOR Pacifica ~==---------
OTHER
INSPECTION DATE
PLAN FILE/OTHER _6~-~13-=20~1~8 _______ _
BLDG. PERMIT/OTHER _b"'e""lo°'w~-------
INSPECTION
□ CONCRETE
[:8] REINF. STEEL
□ MASONRY
□ P.T.CONCRETE
□ FIELD WELDING
□ SHOP WELDING
□ BATCH PLANT
□ EXP. ANCHOR
□ OTHER
MATERIAL SAMPLING
PAGE -~1-Qf
GTE JOB NO. 10-13959T
REPORT NO.
MATERIAL IDENTIFICATION
CONG. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORTAR TYPE & lb/in2
REINF. STEEL GR./SIZE Grade# 60
STRUCTURAL STEEL
HIGH-STRENGTH BOLT
MASONRY BLOCK
OTHER
□
□
CONCRETE □
REINFORCING STEEL
MORTAR □ GROUT □ FIREPROOFING □
OTHER
MASONRY BLOCK
□ STRUCTURAL STEEL . □ BOLTS □
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING OR OTHER PROJECT ISSUES.
Weather partial clouds 70's/ Locations lots 11, 12, 13, 14 and exterior piers permits CB153198/CB 153199/ CB153200 and CB153201/
Observed placement of reinforcing footings and slab on grade these locations as per plans and specifications/Details shown page S4.0
Reinforcing tied in place and were needed placed on concrete chairs to maintain position and clearance/ Footings cleaned of excess
dirt and debris to maintain clearance from soil/ these locations ready for concrete placemenU < end >
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME ~M=lk~e~K=in=ge=ry~--------
CERTIFICATION NO. ICC 5258871/ SD 1001
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
;
~ GBOCENTIUC
LANlJ SURVF.YINC: AND MAPI'lNG
June 12, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on June 12, 2018 and found the
garage/second floor forms for buildings numbered 11 through 14 to substantially conform to the
line and grade as shown on the approved Precise Grading Plan. As such conforms to all
building setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
2150 .'-! Centre Ci Ly Pkwy Suite H, [sconJido CA 9:>026
tel 760.207.7824 fox: 760745.7824
\V\V\V _ g e-oce n tr.ics u rv ey. com
I
I
I
31110
231.61 --,------31111 231.61
LOT 14
2nd FF=231.64
BASEMENT
FT=211.24
PAD=21tl.1!H'3 ., 2~.64
LOT 1
2nrl FT=229.64
BASEMENT
FF=209.24-
PA00•208.57
GAl?AGE PAD=
230.97
CAI/ACE
PAD=
228.97
PLAN 1
31115 229.64 'r__,. ____ _J 31114 .__ ______ _J 229.62
X 31116 229.63 x31117 229.62
r
_______ _,:x31119
220.17 x31118 220.17
31120 220.16 -.------31121 LOT 12 220.15
2nd FF=220.14
BASEMENT
FF=19fh~:1-
PAD=1~rii1f
Pl.AN 1
LOT ~il3
2nd ff=;tt'8~14
GASCMENT
FF=197. 74
PAD" 197.07
GARAGE
PAD••
219.47
GARAGE
PAD=
217.47
31124
31125
218.17
PLAN 1
31127 218.16 'r_J ____ _J 31126
.__ ______ _] 218.17
X 31128 218.17 X 31129 218.16
GARAGE
fJ!d)=
217.47
LOT 14
2nd FF=231.64
BASEMENT
FF=21124
PAD=210.57
.J 1
LOT 1
2nd /T=229.64
BASEMEN/
FF=209.24
PAO,, 208. 57
PLAN 1
GAfiAGE
1< A!!ll7,7 2JtJ.'off'
~Wis
228.97
078
X 2 0.94
0076 X 31.01
X 00 8.94
0073 r-__,_ ____ xJ2B.93
LOT 12
2nd FF= 220.14
BASEMENT
FF=199. 74
l'AD=199.0I !'!AN 1
LOT 11
2nd FF =218.14
l3ASEMCNi
!'F=197.l4
PAD , 197.07
PLAN 1
G.Afi\U_l
X~3,
219.47
0067 X 19.52
X 3 069
9.50
070 X 17.51
x3072 ,..__,_ ___ ---317.49
GARAGE
f'AIJ=
21/47
,.
Geotechnical • Coastal • Geologic • Environmental ·
FOOTING TRENCH OBSERVATION SUMMARY
WO .~ I --,.,,.. __. ·i · -:
o ,. _____ !.._.Lf/7__,'' _,'"'.,....• 1;,_;• A;:...~.,._,_,_(,.:.__
DATE·-·.....,:;,;.,.._/--'..,..-/,_,1•,-->'_~ _s -_ &I /t1 r
NAME 't.:,.;!;, --~=-----HOUR S __ ~Z ___ _
i\ ' /,., Client Name: .· DAI//A /flt. /{Hi l u!,,, ---p N i .· . w,.,./) reject ame: ___ .. ...,if,~A'""'I~"--·'-; ....;;,e;,,'-',,'--v ----------
Location/Tract:_.;..;·· -::..:.~<1~1.a=-;..;,~r...,.~·.t~tl..:...· ....,_wl £::::;· _· .:;.l)'--i:-.!..1/.....,· I:...¥~----,-----------------------
I ' ,.
Unit/Phase/Lot(s): lo r..s /I Jr; /J/P6 /~r:.s / .. /4• t/ :-J A i,;/'J>lb: 'Ji04 /J.5
{ F I . /
I I
· Referenced Geotechnical Report(s): ..... , ..... 4 __ . ··, __ ::: __ . 7" .... 1.-____..1:·.._h.,,_"' JJ_...r.?, ... 1,..·r:,..:.., )____._L;.,;.~A .... 1"""~""tl)""-_l: .... o,._/ .... ::--,1 ._l .... 1......,..IJ""'.f"""rl: .... l) ......... /..._/"'""lo"'".,,.../2..:...l &...._ ______ _
/ f I ' I
Observation Summary
r -=2:-Initials
1,/1/J{Date
I
A repres.entative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
a;...,,.; Initials
I, It/; ~·Date ·
I I
A representative of.GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with rl:lcommendations of }he geotechnical report.
,'...:i:: Initials ~A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
ii 17' /J (bate 1, ~ setback was in general accordance with the recommendations of tbe geotechnical report. -{ ( * _/-~a-4Tn°' r1~C.~ ~~ i-1-:T"i II; ~:::._-1;5 ~ g>~ To povf;.... -~fVflr_lilNf}f1-t} 1,'7t•ftY/?l/!f:' ~ Initials .':+;o{/i.b h::.-,J;E,V//Jl,,,r, / ·/_./ot.:..--ro \Ji,'£..TtC-fU-•.J.oOfJ.~T~,{ 0 µ. /. 'ft:'A', i,_.,, p .. ~£6 r.??f;. t.brNf
~/1111 Date NZ-~Pe?r_-:--v ;mr-Le 1~t t;_v'~ r7]1!~ 11m~-.n__...,c., ,,,..,1/U/1 .· ·1t:.. ?~-r/ur-:i .QCC..
• 1 ti ,c. -, O f--V i)' /C,,-r-v,c.. l.,,-i1/ 1 -" I / l I'.:, 1 ,: , t '1'•
t ~ ., I
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. l 'IJ:lt.f /i:c;;/ST
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing. ,
4. This memo does not confirm the minimum footing dimension as required by the projectstructural engineer's
design, if different from the geotechnical report.
Notes fo Building Inspector
Soil compaction test results, as welta-s depth of fill,,re(ative compaction, bearing values, c.orrosivity, and soil expansion
index test results are contained in ,tife As-Grac,i.ed 6e6technical or Final Compaction Report provided at the completion
of. grading. / ,/ ·
.. · , c.:.~·: ·· )" , ,,-· / ,/_ , . . / _____ ,(_/ / , , '·· (_--..,___ ___ ..
5741 PalmerWay
Carlsbad, CA 92008
(760) 438-3155
/ /
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
Representative of Ge~Soils, Inc.
26590 Madison Ave.
. Murrieta, CA 92562
(951) 677-9651
~ GEOCENTRIC
l.A'.\D SL:RVEYING :\:\D ~APPi;\(;
April 5, 2019
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on April 4, 2019 and I hereby
certify that the framing on the roof, is as shown on the the following table.
LOT GARAGE
PAD
1 253.97
2 251.97
7 216.97
8 214.97
9 215.47
10 217.47
11 217.47
12 219.47
13 228.97
14 230.97
Sincerely,
Lorne DaPron
PLS 7824
2ND RIDGE RIDGE LINE
FINISH LINE HEIGHT
FLOOR ABOVE PAD
254.64 276.02 22.05
252.64 274.03 22.06
217.64 239.14 22.17
215.64 237.13 22.16
216.14 237.59 22.12
218.14 239.63 22.16
218.14 239.66 22.19
220.14 241.64 22.17
229.64 251.08 22.11
231.64 253.09 22.12
'21)() N C:ntrc C!ry Pkwy Suire H, rscnnJi<lo CA t)2{)26
td· 760.207.78'24 fax: 76l\745.7824
W\\'w.gcoccmricsur\'cy.com