Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2881 Crest Dr; ; CBRA2018-0047; Permit
Permit Print Date: 09/19/2018 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: 2881 Crest Dr BLDG-Associated Permit Residentia Work Class: 1562204700 Lot#: $463,779.13 Reference#: 1 3.00 MILES BUENA VISTA Construction Type: Bathrooms: Orig. Plan Check#: Plan Check#: Single Family Detached 5 DEV14044 VB 3.50 PC2016-0052 Description: LANAI II: PHASE 1 // LOT 5 // PLAN lA // 2,854 SF LIV// 566 SF GARAGE// 470 SF PATIO Applicant: Owner: SHEA HOMES LIMITED PARTNERSHIP SARAH MORRELL SHEA HOMES LlMITED PARTNERSHIP B58-526-6555 BUILDING PERMIT FEE ($2000+} BUILDING PLAN CHECK FEE (BLDG) 858-526-6554 ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PlAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PARK IN-LIEU FEES SF DETACHED & DUPLEX: NW PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -outside CFO SB1473 GREEN BUILDING STATE STANDARDS FEE SDCWA SYSTEM CAPACITY CHARGE S/8" Displacement SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM TRAFFIC IMPACT Residential Single Fam. Outside CFO TRAFFIC IMPACT Residential Single Fam. Outside CFO WATER METER FEE 1" Displacement WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P) WATER TREATMENT CAPACITY CHARGE 5/8" Displacement Total Fees: $45,400.50 Total Payments To Date: $42,010.50 Status: Applied: Issued: Permit Finaled: Inspector: Final Inspection: Balance Due: (city of Carlsbad Permit No: CBRA2018-0047 Closed -Finaled 03/12/2018 03/26/201B TFraz 9/19/2018 12:06:00PM $3,390.00 $1,918.20 $1,342.74 $66.00 $170.00 $92.00 $7,649.00 $182.00 $16,232.27 $19.00 $5,099.00 $934.00 $60.29 $238.00 $56.00 $3,390.00 $3,290.00 $352.00 $4,169.0D $141.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov Permit Type· BLDG-Associated Permit Residential Application Date; 0311212018 Owner: SHEA HOMES LIMITED PARTNERSHIP Work Class: Single Family Detached Issue Date: 0312612018 Subdivision: Status: Closed -Finaled Expiration Date: 0211112019 Address: 2881 Crest Dr Carlsbad, CA 92008 IVR Number: 10042 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete ·~•"-··-·--·" .. * 06/2812018 06128/2018 BLOG-16 Insulation 062548-2018 Paased Tim Frazee Complete Checklist 1tem COMMENTS Passed BLDG-Building Deficiency No 07/0612018 0710612018 BLDG-17 Interior 063003-2018 Passed Tim Frazee Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 08/1312018 08/13/2018 BLDG-Electric Meter 066747-2018 Passed Paul Burnette Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency No 09/19/2018 09119!2018 BLDG-Final 070426-2018 Passed Tim Frazee Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes BLDG-Fire Final 069254-2018 Scheduled Dominic Fierl Incomplete Checklist Item COMMENTS Passed FIRE-Building Final No September 19, 2018 Page 2 of 2 Permit Type· BLDG-Associated Permit Residential Application Date: 03/12/2018 Owner: SHEA HOMES LIMITED PARTNERSHIP Work Cl.,:iss: Single Family Detached Issue Date: 03/26/2018 Subdivision: Status: Closed -Finaled Expiration Date: 02/11/2019 Address: 2881 Crest Dr Carlsbad, CA 92008 IVR Number: 10042 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete 03127/2018 03127/2018 BLOG-21 062867-2018 Passed Michael Collins Complete Underground/Underf loor Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Waste to POC only Yes 04/0612018 04/0612018 BLDG-11 064167-2018 Passed Chris Renfro Complete Foundatlon/Ftg/Pier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/07/2018 06/07/2018 BLDG-21 067168-2018 Passed Tim Frazee Complete Underground/Underf loor Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Water connection to meter Yes 06/11/2018 06/11/2018 BLDG-15 060601-2018 Passed Tim Frazee Complete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/12/2018 06/12/2018 BLDG-13 Shear 060716-2018 Passed Tim Frazee Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/2612018 06/26/2018 BLDG-35 Solar 062173-2018 Passed Tim Frazee Complete Panel Checklist Item COMMENTS Passed BLDG-Building Deficiency Rough electrical for the Rooftop solar Yes system BLDG-84 Rough 062174~2018 Passed Tim Frazee Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-14 Yes Frame~Steel-Bolting-Welding (Decks) BLDG-24 Rough-T opout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers September 19, 2018 Page1of2 Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 90631 · (562) 941-2990 • (714) 526-8441 • -Fax (562) 946-0026 REGISTERED INSPECTOR'S DAILY REPORT I. SWIT Job No . .-,J;,,, l 1 1 / ~ , j Date //j_ulf , TVPEQF • Reinforced Concrete • Welding LJ DIA/Epoxy INSPECTION • Post Tensioned Concrete • Fireproofing ,EJ Wood Framing REQUIRED • Reinforced Masonry • Asphalt . 0 Other Job Address?/ Jf -, / ·,, ( .I V. <. Tract·Ne: , 7.~ JOJ t .. '-' v•t7 Lot No.,, I-/ -I ✓ ""~ l., .. Job Narn1::, , ,d/...:1£ (/~ u J /J/,O l, rerrnit No. /hVl 2.J//,-0,) I 7 1,sued By ·-I ·I Vl/•(. (}/l.,. Type of Structure ( /' -Z ' Architect '"' /:J. Ll' .. ~ Material Description (type, grade, source) j r //)J Engineer ; • ,IJ •. ' , :,,~ ¥ . , " ... ,__ OJ. ,J :z Contractor .r '/Eli -) ,, l ~ '-.. I • ., Inspector's Name /~ 1 .:~ / -Subcontractor ,. ~ , l /., I' l ;, I I , 'TESTS"'PERFORMED SAMPLE AIR CONC IWATER TIME SET# TRUCK# TICKET# I LOCATION SLUMP TEMP TEMP ' ADDED CAST MIX# ,REM.ARKS ... ' ,I / , / / ; , ,I / / . -~ - INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF TEST SAMRLES TAKEN: STRUCT. CONNECTIONS (WELD MADE H.T. BOLTS TORQUED) CHECKED, ETC. ' .. ~. ,-. , ✓ J ,• ( I.. ,, .. .. { • ;, I,._. . ~·· ~ , , / I 1...,/ ( Y-U.t <:.. ·-.,,.,,..---.-?/t/,/I I//._ . •' -r i.,.. --.,L . (.. '-.,,, /) /:✓. ·, ,/ ,,{,J{_,,l,) .. ' ........... ,.J , /,' ,. ,,,~/( h/: ~•r -"""'" 'I' .._, / ,tv."-' . '-') . /;. ,: / ,. ' J/, V ( ~ • V/J (. /,./C / I 0 7, .. /, > ~E,,'-,-.1: , ,, -' 71/V,.,,1, ,, -I': ... -I /; /" .· ,:,,, L ~/l _t{. /J'' (.,._,_ 1.·,tl:"'-1 Ld / ~ ... • I:./ . ' --/ ~ ..... '-FI.,, / l.,, J L 14/•1 j , t ;_.,, f, .,,. ,J -r , ... <.. I I /I'"' I' \,' • - ·, ·,. CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE • PAGE / I OF I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE NOTED. I HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED PLANS, SPECIFICATION, TIMEIN TIMEOUT SAMPLES AND APPLICABLE S~CTION OF THE GOVERNING BUILDING LAWS. ,;I' r ,--· ..:::..-,(:'' / Approved By SIGNATURE OF;. REGISTE~ED INSPECTOR ,_✓ lJI',,,.-... lu ~ 11.,,---; ... ~..,. SPECIALTY NO. AGENCY Project Superintendent White -Office Copy • Canary -Accounting Copy• Pink -Inspector's Copy • Goldenrod -Jobsite Copy I Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 9063-1 {562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026 SWIT.Job No-G,, e ' Date /2 J REGISTERED INSPECTOR'S DAILY REPORT I 6 oo 8-E:,,,. '-{ A'-/•1~ TYPE OF 0 Reinforced Concrete LJ Welding 0 DIA/Epoxy INSPECTION er Post Tensioned Concrete • Fireproofing D Wood Framing REQUIRED Reinforced Masonry • Asphalt . D Other Job Address~ ~ ,, _ , _ J Tract No. 1:'1 No. <{ _ J Job Name ' -,, Pe~ _,,:;,,. -~, _ , lss~ .'¾:, A.1'-.. I A,· A1 /_ "::;:, I .• Type of Structure .z o.r -Architect / ~ .A Material Description (type, grade, source) Engineer S· •.. , .. r . -;ri,::; . -s. -YI" "c-A,, ---·<::_I A ... ,. ,, Contractor ..., 1 1 __ _ i~ Inspector's Name [Z_ 'fl 111 I , Subcontractor ., . -~ ,, ---r .( -. -TESTS PERFORMED . SAMPLE AIR CONC WATER TIME -SET# TRUCK# · TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS ~ INSPECTION SUMMARV--lOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT-AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, lYPE & !DENT. NO'S OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS /WELD MADE H.T. BOLTS TORQUED) CHECKED. ETC • . -A'z-re. -t,1,{,,. ~ ,I ~ ~ r .oT" fY" u -t?--7 - -,-,~-~ -.r-.. ----· , . '. ,,.., ,·g-4 n.. ...... -. --7" Of' 1 - -rs. --~ -11/.e..l.-_./. '\ S17rr -, I_ . ~G½,t,vv -1 ' • r,,-.,·. . --~ ~ ,0 J" -r _,,.,r ... #<-1 llfS" -4=e,,,,. .,._,_ I ------"~~ -r,.J.,p AO~/\€ ----Ill? -, ., ' ~'~-I A "'• .,· <--<..,.& _.,, r7 • . __ ., • ' : ,I -"'.-# <.../ Z-811 L 12.,:;;._"::> T 1-:>0 ~-c...,12.0 •. W\R co<(r tt-;-,:::; c..,~51 1 .. . c:,<:> <-(7 -< V µ " • VI It-(.,,, . c...,'B~, • ~ . * " " -o o<./ 8 . .. , 11-' ' #'-~ 2..~G.,3 • w ~ ? -o-c I "7 • . CERTIACATION OF COMPLIANCE CONTINUED ON NEXT PAGE 0 PAGE OF I HEREBY CERTIFY TH0A_0T,(il ~il'j ALL OF THE ABOVE ,. TIMEIN TIMEOUT SAMPLES FOUND THIS WOR 0 AND APPLICABLE AGENCY White-Office Copy • Canary-Accounting Copy • Pink -Ins ctor's Copy • Goldenrod -Jobslte Copy ITTF-049 )Southvlest Inspection &. Testing, Inc. . OGEOCON FOUNDATION OBSERVATION REPORT PROJECT NAME: Lg nq, 7l PROJECT NO. C:,~03 7-12 -02,, LOCATI ON: B (-l / Id I h9j Pr,ds 4 . ~. &. 7 , , > AGENCY PROJECT NO: APPROVAL/ PERMIT NOS: DATE l-f-4-L» p,.,,p .. / -~S-77 ( .-.. ~._ Or,"< C4'142ol9-001./6 FOUNDATION TYPE: p,...,,ic;-::;l..%Esl Cr,-">t Or,v~ D ADDITIONAL OBSERVATION REQUIRE C~l?A :it:)/~ -~ 7 0 CONVENTIONAL p.,..,4 l,-~<;{{;7 Cr.-s+ r,ve j& SUBSTANTIAL CONFORMANCE C' Bil.A 2.P1f( -oC-4~ li!l_ POST-TENSIONED p,,.e,17-ZS"/3 Cr~+ Or,vl"' D • PURPOSE OF OBSERVATION !isl Check soil conditions exposed are similar to those expected ~ Check footing excavations extend to minimum depth recommended in soil report -129 Check footings have been extended to an appropriate bearing strata 0 O ther ______________________________________ _ • APPLICABLE SOIL REPORT: TITLE: Jo tn IYl lona,, Jl { Fr-1n1"" ,,, f<cJ,-,.,t M, /,.c, R,pt d-r Tio S..rv1(P~ o'1,r1r>j s,1-t-qr~d,v,<:j <;., hd, .;, s 10h \ / 0 f-<:. 4 -JO re,,✓/ S bed,{_ ( A ----------------------------DATE: • SOIL REPORT RECOMMENDATIONS BASED ON: ,8. Expansion Condition G4:VeryLow(0-20) D Low(21-50) D Medium(Sl -90) D High (91-130} D Very High(>130} • Fill Geometry ___________________________________ _ • Other: ____________________________________ _ • MINIMUM FOUNDATION RECOMMENDATIONS: Footing Depth: D 12 Inches D 18 Inches D 24 Inches OTHER: Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B D Post-Tensioned OTHER: _______ _ Interior Slab Reinforcement: D 6x6-10/10 D 6x6-6/6 D No.3@24 Inches D No.3@18 Inches D Post-Tensioned • FOUNDATION CATEGORY: • NA ________________ _ ~ • II D Ill ___________________ _ • OBSERVATIONS: ,© Substantial conformance with Soi l Report. 0 Substantial conformance with Foundatio n Plans. ldenti ,_,_ ____________________ _ • Other --------------------------------------- • COMMENTS: 5Pt> Alok_ * ,/ : FOOTING EXCAVATIONS SHOULD BE CLEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THE SOIL MOISTURE CONTENT SHOULD BE MAINTAINED. FIELD COPIES TO GEOCON REPRESENTATIVE ., .... ' "t PLANNING ENCINE[RING SURVEYING IRVINF: SAN lJIEGO RIVERSIDE PALM DESERT LOS ANGELES DAVE HAMMAR ALISA VIALPANDO RAY MARTIN CHUCK CATER OOUG STROUP 97ll7 Waple~ Street SanLJiego,CA 92121 W58l 558-4500 PH {858)558·1414 FX www.llt1ns,1kerSO.com lnfo@Hw1sakerSO.com HUNSAKER &ASSOCIATES SAN DIEGO, INC. April 5, 2018 City of Carlsbad Engineering Department 1635 Faraday Avenue Carlsbad, CA 92008-7314 Re: Building Form Setback Certification Lanai II -Miles Buena Vista Carlsbad Tract CT 14-04 Drawing No. 496-6A Lots 4 through 7 Dear City Inspector: Please be advised the building foundation forms are in conformance with the precise grading plans as to horizontal and vertical location. The building setbacks were measured in relation to the property lines and were found to be in conformance with the approved precise grading plans for this property. Sincerely, Hunsaker & Associates San Diego, Inc. Gary C. Kraus P.L.S. 8770 Principal, Director of Survey JB:kv k:\0061120181u133.docx wo81-•11• '4P.i/201811:29AM