HomeMy WebLinkAbout2882 CORTE MORERA; ; CB000849; Permit03/23/2000
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
03/23/2000
# Dwelling Units
Bedrooms
Project Title
City of Carlsbad
Residential Permit Permit No CB000849
Building Inspection Request Line (760) 602-2725
2882 CORTE MORERA CBAD
RESDNTL Sub Type SFD
2552801000 Lot# 494
$310,50300 Construction Type VN
6 Reference # CT88-03
1 Structure Type SFD
4 Bathrooms 4
ARBOR HEIGHT-LC VLY-VL F-PHS 2
PLAN 3, 3590 SF SFD, 701 SF GAR
Status ISSUED
Applied 02/26/2000
Entered By RMA
Plan Approved
Issued 03/23/2000
Inspect Area NF
OngPC# 99161
Plan Check# PCOO-22
Applicant
K HOVNANIAN
STE 100
5900 PASTEUR CT
CARLSBAD CA 92008
760944-9012
Owner
K HOVNANIAN AT LA COSTA VALLEY L L C
2495 CAMPUS DR
IRVINE CA 92612
Total Fees $13,43825 Total Payments To Date $000 Balance Due $13,43825
Building Permit
Add'l Building Permit Fee;
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$1,35958 .Meter Size
$0 00 :-Add'l Reel Water Con Fee
$883 73 •.. Meter Fee
$000 .- SDCWAFee
$0 00 CFD Payoff Fee
$31 05 UPFF
$000 PFF (CFD Fund)
$000 .License Tax
$31000 License Tax (CFD Fund)
$000 Traffic Impact Fee
$000 Traffic Impact (CFD Fund)
$0 00 LFMZ Transportation Fee
$0 00 Sidewalk Fee
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$000 MECHANICAL TOTAL
$0 00 Housing Impact Fee
Housing InLieu Fee
$0 00 Master Drainage Fee
$0 00 Sewer Fee
TOTAL PERMIT FEES
$000
$000
$000
$4,303 24
$5,651 15
$000
$000
$000
$580 00
$000
$000
$000
$19600
$6000
$6350
$000
$000
$000
$000
$13,43825
Inspector
FINAL APPROVAL
Date \Q -- o Clearance
NOTICE Please take NOTICE that approval of your project includes the Imposition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the! statute of limitations has previously otherwise expiredCITY OF uAHLSuALj
2075 Las PalmasDr, Carlsbad, CA 92009 (760)438-1161
City of Carlsbad
Final Building Inspection OCT 1 2 2000
Dept Building Engineering Planning CMWD St Lite Fire
Plan Check #
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected
Bv
Inspected
Bv
Inspected
Bv
Comments
PCOO-22
CB000849
ARBOR HEIGHT-LC VLY-VL F-PHS 2
PLAN 3, 3590 SF SFD 701 SF GAR
2882 CORTE MORERA
Phone
LC Water Dist 0
<OJj) Date / ,/, fi'ZS Inspected /»//*/"
Date
Inspected
Date
Inspected
• •
Date
Permit Type
Sub Type
Lot 494
Approved ?
Approved
Approved
10/11/2000
RESDNTL
SFD
Disapproved
Disapproved
Disapproved
City of Carlsbad Bldg Inspection Request
For 10/17/2000
Permit# CB000849
Title ARBOR HEIGHT-LC VLY-VL F-PHS 2
Description PLAN 3, 3590 SF SFD, 701 SF GAR
Inspector Assignment NF
Sub Type SFD
2882 CORTE MORERA
Lot 494
Type RESDNTL
Job Address
Suite
Location
APPLICANT KHOVNANIAN
Owner K HOVNANIAN AT ARBOR HEIGHTS L L C
Remarks
Phone 7609449012
Inspector
Total Time
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Act Comments
Requested By JEROME
Entered By CHRISTINE
\r^ ws
Associated PCRs
Inspection History
Date Description
9/29/2000 39 Final Electrical
8/10/2000 17 Interior Lath/Drywall
8/10/2000 18 Exterior Lath/Drywall
8/10/2000 23 Gas/Test/Repairs
8/9/2000 82 Drywall/Ext Lath/Gas Test
8/8/2000 17 I nterior Lath/Drywall
8/4/2000 16 Insulation
8/3/2000 16 Insulation
8/1/2000 84 Rough Combo
7/31/2000 14 Frame/Steel/Bolting/Weldmg
7/10/2000 83 Roof Sheathing/Ext Shear
5/16/2000 11 Ftg/Foundation/Piers
5/1/2000 21 Underground/Under Floor
5/1/2000 22 Sewer/Water Service
4/28/2000 21 Underground/Under Floor
Act Insp Comments
AP NF EMR
CA NF APPROVED ON 8/8
AP NF
AP NF
NR NF
AP NF
AP NF
AP NF
AP NF
NR NF
NR NF
AP NF
AP NF
AP NF
NR NF