Loading...
HomeMy WebLinkAbout2883 CAMINO SERBAL; ; CB010722; Permit03/Q7/20Q1 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/07/2001 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No:CB010722 Building Inspection Request Line (760) 602-2725 2883 CAMINO SERBAL CBAD RESDNTL Sub Type: SFD 2552813300 Lot#: 620 $290,570.00 Construction Type: VN Reference #: CT88-03 1 Structure Type: SFD 5 Bathrooms: 3 SHELBOURNE - LC VLLY PHASE 5 PLAN 2 - SFD 3193 SF, GAR 638SF, DK 55 SF Status: ISSUED Applied: 01/09/2001 Entered By: JM Plan Approved: Issued: 03/07/2001 Inspect Area: Orig PC#: PC99-149 PlanCheck#: PC01-05 Applicant: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA92014 858 259-8500 Owner: DAVIDSON BUILDERS 1302 CAMINO BEL MAR DEL MAR CA 92014 858 259-8500 Total Fees: $12,719.66 Total Payments To Date:$0.00 Balance Due: $12,719.66 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $1,134.84 Meter Size $0.00 Add'l Reel. Water Con. Fee $737.65 Meter Fee $0.00 SDCWA Fee ($59.01) CFD Payoff Fee $29.06 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $310.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 LFMZ Transportation Fee $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee Housing InLieu Fee $0.00 Master Drainage Fee: $0.00 Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,374.25 $5,288.37 $0.00 $0.00 $0.00 $600.00 $0.00 $0.00 $0.00 $168.00 $60.00 $76.50 $0.00 $0.00 $0.00 $0.00 $12,719.66 FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions.* You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any City of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire rr Plan Check*: Permit*: Project Name: Address: Contact Person: Sewer Disfc Inspected Bv: Inspected Bv: Inspected Bv: Comments: PC01-05 CB010722 SHELBOURNE - LC VLLY PHASE 5 PLAN 2 - SFD 3193 SF, GAR 638SF, DK 55 SF 2883 CAMINO SERBAL Phone: LC Water Dist: O /"•) ^-} Date '/. /:?& Inspected: /o/JJ/o/ f f Date Inspected: Date Inspected: Date: Permit Type: Sub Type: Lot: 620 Approved: Approved: Approved: 10/09/2001 RESDNTL SFD Disapproved: Disapproved: Disapproved: City of Carlsbad Bldg Inspection Request For: 11/02/2001 Permit# CB010722 Title: SHELBOURNE - LC VLLY PHASE 5 Description: PLAN 2 - SFD 3193 SF, GAR 638SF, DK 55 SF Type:RESDNTL Sub Type: SFD Job Address: 2883 CAMINO SERBAL Suite: Lot 620 Location: APPLICANT DAVIDSON BUILDERS Owner: LACOSTA VALLEY-CARLSBAD L P Remarks: Inspector Assignment: PD Phone: 6195724599 Inspect Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: JORDAN Entered By: CHRISTINE Act Comments Associated PCRs Inspection History Date 10/16/2001 08/20/2001 08/14/2001 08/13/2001 08/10/2001 07/09/2001 05/15/2001 05/02/2001 05/02/2001 Description 39 Final Electrical 82 Drywall/Ext Lath/Gas Test 16 Insulation 84 Rough Combo 84 Rough Combo 83 Roof Sheathing/Ext Shear 81 Underground Combo 21 Underground/Under Floor 22 Sewer/Water Service Act AP AP AP AP CO AP AP AP AP Insp NF PY PD PD PD PD PD PD PD Comments EMR