HomeMy WebLinkAbout2883 CAMINO SERBAL; ; CB010722; Permit03/Q7/20Q1
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
03/07/2001
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No:CB010722
Building Inspection Request Line (760) 602-2725
2883 CAMINO SERBAL CBAD
RESDNTL Sub Type: SFD
2552813300 Lot#: 620
$290,570.00 Construction Type: VN
Reference #: CT88-03
1 Structure Type: SFD
5 Bathrooms: 3
SHELBOURNE - LC VLLY PHASE 5
PLAN 2 - SFD 3193 SF, GAR 638SF, DK 55 SF
Status: ISSUED
Applied: 01/09/2001
Entered By: JM
Plan Approved:
Issued: 03/07/2001
Inspect Area:
Orig PC#: PC99-149
PlanCheck#: PC01-05
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA92014
858 259-8500
Owner:
DAVIDSON BUILDERS
1302 CAMINO BEL MAR
DEL MAR CA 92014
858 259-8500
Total Fees: $12,719.66 Total Payments To Date:$0.00 Balance Due: $12,719.66
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$1,134.84 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$737.65 Meter Fee
$0.00 SDCWA Fee
($59.01) CFD Payoff Fee
$29.06 PFF
$0.00 PFF (CFD Fund)
$0.00 License Tax
$310.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 LFMZ Transportation Fee
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
Housing InLieu Fee
$0.00 Master Drainage Fee:
$0.00 Sewer Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,374.25
$5,288.37
$0.00
$0.00
$0.00
$600.00
$0.00
$0.00
$0.00
$168.00
$60.00
$76.50
$0.00
$0.00
$0.00
$0.00
$12,719.66
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.* You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
City of Carlsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
rr
Plan Check*:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Disfc
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PC01-05
CB010722
SHELBOURNE - LC VLLY PHASE 5
PLAN 2 - SFD 3193 SF, GAR 638SF, DK 55 SF
2883 CAMINO SERBAL
Phone:
LC Water Dist: O
/"•) ^-} Date
'/. /:?& Inspected: /o/JJ/o/
f f
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 620
Approved:
Approved:
Approved:
10/09/2001
RESDNTL
SFD
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 11/02/2001
Permit# CB010722
Title: SHELBOURNE - LC VLLY PHASE 5
Description: PLAN 2 - SFD 3193 SF, GAR 638SF, DK 55 SF
Type:RESDNTL Sub Type: SFD
Job Address: 2883 CAMINO SERBAL
Suite: Lot 620
Location:
APPLICANT DAVIDSON BUILDERS
Owner: LACOSTA VALLEY-CARLSBAD L P
Remarks:
Inspector Assignment: PD
Phone: 6195724599
Inspect
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: JORDAN
Entered By: CHRISTINE
Act Comments
Associated PCRs
Inspection History
Date
10/16/2001
08/20/2001
08/14/2001
08/13/2001
08/10/2001
07/09/2001
05/15/2001
05/02/2001
05/02/2001
Description
39 Final Electrical
82 Drywall/Ext Lath/Gas Test
16 Insulation
84 Rough Combo
84 Rough Combo
83 Roof Sheathing/Ext Shear
81 Underground Combo
21 Underground/Under Floor
22 Sewer/Water Service
Act
AP
AP
AP
AP
CO
AP
AP
AP
AP
Insp
NF
PY
PD
PD
PD
PD
PD
PD
PD
Comments
EMR