HomeMy WebLinkAbout2888 Trails Ln; ; CB153198; PermitResidential Permit
Print Date: 01/13/2020
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2888 Trails Ln
BLDG-Residential
1560904100
$439,241.00
1
3.00
TRAILS END
Work Class:
Lot#:
Reference #:
Construction Type:
Bathrooms:
Orig. Plan Check#:
Plan Check#:
Single Family Attached
14
DEV04063
VB
4.50
PC130072
Description: TRAILS END-TYPEl-UNIT 14-SF ATTACHED 2781 SF, 523 SF GAR, 445 SF DECK
Applicant: Owner:
4 DESIGN ARCHITECTURE
KENNITH L CHRISS
TRUST THE PEV FAMILY REVOCABLE TRUST
5505 Can cha De Golf
Rancho Santa Fe, CA 92091-4041
760-433-1785
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -outside CFD
SB1473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outisde CFD
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $31,814.64 Total Payments To Date; $31,814.64
(city of
Carlsbad
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Balance Due:
Permit No: CB153198
Closed -Fina led
09/29/2015
12/19/2017
CRenf
1/13/2020 10:46:07 M
$0.00
$1,833.00
$783.10
$66.00
$166.00
$92.00
$182.00
$15,373.44
$18.00
$5,029.00
$934.00
$57.10
$2,632.00
$352.00
$4,169.00
$128.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications1 reservations, or other exactions hereafter
collectively referred to as "fees/exaction.11 You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. lf you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CB153198)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2888 Trails Ln
Carlsbad, CA
IVR Number: 709456
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Date Start Date
06/10/2019 06/10/2019 BLDG-16 lnsulatlon 094220-2019 Passed Andy Krogh Complete
06/12/2019 06/12/2019 BLDG-17 Interior 094450-2019 Partial Pass Chris Renfro Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 1st layer party walls Yes
06/19/2019 06/19/2019 BLDG-82 Drywall, 095041-2019 Passed Chris Renfro Complete
Exterior Lath, Gas
Test, Hot Mop
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-17 Interior Lath-Drywall Yes
BLDG-18 Exterior Lath and Yes
Drywall
BLDG-23 Gas-Test-Repairs Yes
08/08/2019 08/08/2019 BLDG-21 100147-2019 Passed Chris Renfro Complete
Underground/U nderf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Backflow underground, ok to backfill Yes
09/10/2019 09/10/2019 BLDG-Electric Meter 103589-2019 Passed Chris Renfro Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/13/2020 01/13/2020 BLDG-Final 116080-2020 Passed Chris Renfro Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final Yes
January 13, 2020 Page 4 of 4
PERMIT INSPECTION HISTORY REPORT (CB153198)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2888 Trails Ln
Carlsbad, CA
IVR Number: 709456
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
05/10/2019 05/10/2019 BLDG-16 lnsulatlon 091501-2019 Partial Pass Tim Frazee Reinspection Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Insulation and draft stopping at Party walls Yes
and wrap back at Party walls
05/14/2019 05/14/2019 BLDG-13 Shear 091733-2019 Partlal Pass Paul Burnette Reinspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Party wall hold downs, L TP 4s , Framing Yes
OK to insulate 5/2/19
05/16/2019 05/16/2019 BLDG-17 Interior 092031-2019 Partial Pass Paul Burnette Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLOG-Building Deficiency No
05/20/2019 05/20/2019 BLDG-17 Interior 092284-2019 Partial Pass Paul Burnette Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
05/23/2019 05/23/2019 BLDG-17 Interior 092638-2019 Partial Pass Paul Burnette Relnspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/03/2019 06/03/2019 BLDG-84 Rough 093540-2019 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
06/07/2019 06/07/2019 BLDG-13 Shear 094143-2019 Partial Pass Andy Krogh Reinspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Interior shear at party walls Yes
BLDG-Building Deficiency Party wall hold downs, L TP 4s , Framing Yes
OK to insulate 5/2/19
January 13, 2020 Page 3 of 4
PERMIT INSPECTION HISTORY REPORT (CB153198)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2888 Trails Ln
Carlsbad, CA
IVR Number: 709456
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Relnspection Complete
Date Start Date
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Footings Check Yes
01/25/2019 01/25/2019 BLDG-14 082188-2019 Partial Pass Tim Frazee Reinspection Incomplete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLOG-Building Deficiency Floor sheathing on basement floor Yes
02/12/2019 02/12/2019 BLDG-14 083696-2019 Partial Pass Paul Burnette Reinspection Incomplete
Frame/Steel/Baiting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Floor sheathing on basement floor Yes
02/19/2019 02/19/2019 BLDG-14 084042-2019 Passed Tim Frazee Complete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Floor sheathing on basement floor Yes
Nailing on Floor sheathing on 2nd Floor
03/13/2019 03/13/2019 BLDG-14 085956-2019 Partial Pass Tim Frazee Relnspection Incomplete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 3rd floor sheathing OK 3/13/19 Yes
04/10/2019 04/10/2019 BLDG-13 Shear 088463-2019 Passed Tim Frazee Complete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
04/11/2019 04/11/2019 BLDG-15 088582-2019 Passed Tim Frazee Complete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
05/02/2019 05/02/2019 BLDG·13 Shear 090630-2019 Partial Pass Tim Frazee Re inspection Incomplete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Party wall hold downs, L TP 4s , Framing Yes
OK to insulate 5/2/19
January 13, 2020 Page 2 of 4
PERMIT INSPECTION HISTORY REPORT (CB153198)
Permit Type: BLDG-Residential Application Date: 09/29/2015 Owner: TRUST THE PEV FAMILY
REVOCABLE TRUST
Work Class: Single Family Attached Issue Date: 12/19/2017 Subdivision:
Status: Closed -Finaled Expiration Date: 03/09/2020 Address: 2888 Trails Ln
Carlsbad, CA
IVR Number: 709456
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
12/20/2017 BLDG-21 044277-2017 Passed Paul Burnette Complete
Underground/U nderf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/0412018 01/04/2018 BLDG-11 045042-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01/23/2018 01/23/2018 BLDG-11 046595-2018 Partial Pass Paul Burnette Re inspection Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/0512018 02/0512018 BLDG-66 Grout 047842-2018 Passed Tim Frazee Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
02/22/2018 02/22/2018 BLDG-11 049419-2018 Partial Pass Paul Burnette Reinspection Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/27/2018 03/27/2018 BLDG-66 Grout 052866-2018 Partial Pass Paul Burnette Reinspec~ion Incomplete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
04110/2018 04/10/2018 BLDG-66 Grout 054424-2018 Passed Paul Burnette Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/14/2018 06/1412018 BLDG-11 060804-2018 Passed Paul Burnette Complete
Foundatlon/Ftg/Pler
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
10/23/2018 10/23/2018 BLDG-11 073886-2018 Partial Pass Tim Frazee Reinspectlon Incomplete
Foundatlon/Ftg/Pler
s (Rebar)
January 13, 2020 Page 1 of 4
<_&'f,
~ CITY OF.
R:_ _ .JRD COPY CB153198 CARLSBAD INSPECTION RECORD 2888 TRAILS LN Building Division
@ INSPECTION RECORD CARD WITH APPROVED
TRAILS END-TYPE1-UNIT 14-SF ATTACHED 2781 SF 523
SF GAR. 445 SF DECK
PLANS MUST BE KEPT ON THE JOB
@ CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
@ FOR BUILDING INSPECTION CALL: 760-602•2725
OR GO TO: www.Carbbaclca.qoy/Bulldlng AND CLICK ON
"Request Inspection"
DATE: \2-CJi-j
DEV04063
PC130072
1560904100
12/14/2017
CB153198
If "YES" is clwck,:d below th;1t Division·s approval is reriuired p1mr to requestmg a Fin:il Bui!{ling Inspection. lt you have any quc'.;tions
please call the ,ipplic:a!Jie divisions :it the phone numbers provided belovv. Afte1· ;:di tcquirul approvals are si~~IH:.t off ta;,; to
700 002-85GO. email to hldginspectio11~(:ncarls1Jadc;:1.gov or tiring in a COPY of this car<! to: Hd!) F<11<1d:1y Av,:. Carlsli;11l.
Required Prior to Requesting Bulldlng Final If Checked YES
Planning/Landscape 760-944-8463 Allow 48 hours
CM&/ {Engineering Inspections) 760-438-3891 Call before 2 pm
Fire Prevention 760-602-4660 Allow 48 hours
Date Inspector
#12 REINFORCED STEEL
#66 MASONRY PRE GROUT
ROUT □ WALL DRAINS
#10 TILT PANELS
#11 POUR STRIPS
#11 COLUMN FOOTINGS
#14 SUBFRAME □ FLOOR □ CEILING
#15 ROOF SHEATHING
#13 EXT, SHEAR PANELS
#18 INSULATION
#18 EXTERIOR LATH
#17 INTERIOR LATH & DRYWALL
#51 POOL EXCA/STF.EL/BOND/FENCE #82 DRYWAU,EXT LATH, OAS TES (17 ,18,23)
#55 PREPLASTER/FINAL #83 ROOF SHEATING, EXT SHEAR (13,15)
#19 FINAL #84 FRAME ROUGH COMBO (14,24,34,44)
CODI: If PLUMBING Ins r T-Bar 114,24,34,44)
#22 □ SEWER&BL/CO □ PL/CO FINAL OCCUPANCY (19,29,39,49)
#21 UNDERGROUND □WASTE □ WTR Date Ins r
#24 TOP OUT □ WASTE □ WTR A/S UNDERGROUND VISUAL
#27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO
#23 □ OAS TEST □ GAS PIPING A/S UNDERGROUND FLUSH
#25 WATER HEATER A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC
#29 FINAL A/S FINAL
COVEii STORMWATER F/A ROUGH-IN
#600 PRE-CONSTRUCTION MEETING F/AFINAL
#803 FOUOW UP INSPECTION FIXED EXIINGUISHING SYSTEM ROUGH-IN
#605 NOTICETO CLEAN AXED ElCIING SYSTEM HYDROSTATIC TEST
#807 WRITTEN WARNING FIXED ElCIINGUISHING SYSTEM FINAL
#809 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL OAS FINAL
REV 10/2016 SEE BACK FOR SPECIAL NOTES
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Sur,.,eying
DAILY FIELD REPORT
Client: Pacifica Real Estate Services Inc Job 10-13959T Number:
Job Name: Trails End Residential Subdivision Development Day(s): Monday
Job Location: 3151, 3155 Donna Dr. Carlsbad Ca. Date(s): 4-9-19 2876, 2880, 2884, 2888 Trails End Carlsbad Ca.
Engineer: HTK Structural Engineers LLP
Permit number: CB153136, CB153197, CB153201, CB153200, CB153199, CB153198
Shear-wall Special Inspection
Performed the shear-wall special inspections on the shear-walls
that had fastener spacing at 4" or less per CBC section 1705 at
lot #1, #2, #11, #12, #13 and lot #14 per sheet S4.0 Basement,
lower floor and main floor, sheet S4.1 upper floor and roof plan.
Verified correct materials, nailing spacing, hold-downs, foundation
connection and shear transfer between floors/roof. All corrections
were performed during the inspections, the installation is in
compliance with the approved plans_
Certification of Compliance: All work, unless otherwise noted, complies with the a11
the California Code of Re ulations Title 24.
NAME: Bill Atwood SIGNATURE:
CERTIFICATION NO: 5012754
1441 Montiel Road, Suite 115 I Escondido, CA92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
~ GEOCENTRIC
J. ,\ '.'\ ll S L' R \' F Y I N (; ·\ '.'\ I> ~1 .\ I' PI -..; C
April 5, 2019
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on April 4, 2019 and I hereby
certify that the framing on the roof, is as shown on the the following table.
LOT GARAGE
PAD
1 253.97
2 251.97
7 216.97
8 214.97
9 215.47
10 217.47
11 217.47
12 219.47
13 228.97
14 230.97
Sincerely,
Lorne DaPron
PLS 7824
2ND RIDGE RIDGE LINE
FINISH LINE HEIGHT
FLOOR ABOVE PAD
254.64 276.02 22.05
252.64 274.03 22.06
217.64 239.14 22.17
215.64 237.13 22.16
216.14 237.59 22.12
218.14 239.63 22.16
218.14 239.66 22.19
220.14 241.64 22.17
229.64 251.08 22.11
231.64 253.09 22.12
2150 N Ccnnc City Pkwy Suite H, Fscnndiclo CA 02{U6
td 76l!.207.7tf24 fax: 76l\745.7824
\V\\'W.gcLiccnrric::.u rvcy .com
.,..-~·!L, -•J ''). -,~ --~' ...t.--,r' V'.,, . .. .. . ~· f) ~.,. :,
~E ,./ . ~---~; '/\ r ' ,-: . .✓-.• -:, / ••
., ' ,,-:~ h-1/1·
. ' /' . '// / '· ~ s, .
w.o. 6( T ~--.C-
DATE / L-z. ·7-l?
NAME /:2. CJr.1 smA ~·
HOURS ______ _
..G,_eotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY [ , L , __,---1 r
Client Name: -""'-'-7-=~-7:...,---att_,t...;.1_A'----,0.,__1'.-'--'l ..... 1 ___ v __ c...,., __ l_ .. _,C... ____ Project Name: 7 /t.-4' .1 I { C .:.-?_::;.
-.-I £ ,'' I ,...... ,·'? / . ., Location/Tract: _::..l ..!..iZ-:::;;,:.....··..!..J .l.'~1~-==-..... •-=-'--=::>:....,.,...., ___:::L:.:...-..:..,(.:....:....,·..:..1-'-:~:.:::A.:..:J..:.( __ ..:::L:::::....,~7_-_v_·· --"'-,,_; _-__;;__Y ____________ _ ,
Unit/Phase/Lot(s): _/4_✓...:.-r_· =-J _.::..7+,/...1.t~--...:.CJr-1~10=-' .,,... _....;/J.-,,,:
1
/~;...:;z.;,_,,.l,,~-'-?~I .J;./J_'-.;...Y ______________ _
Referenced Geotechnical Report(s): ----'-0_' ~;:._tt...;.~..a.~..:'--, _::,_/c,,,=-'7---= ... ~:;.....,'..,./_-_/...,;7_' ---,;--b_.-_-_____ l,_-_/_(:_~----------,,.
Observation Summary
/,/ ,..
IL/i 1 .
/_,,·
'l--/< 1
--,: /'"
11.k 1
I
;-
:c.,/z?
'
Initials
Date
Initials
Date
Initials
Date
Initials
Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of !he geotechnical report.
A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report.
,r'I
i/,9,
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may tak~e~xtended
period of time for such, and the contractor should schedule accordingtyp--£ €£? /--?c>/ s / -~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth of fill , relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
_qgrading. ,,/ / /7
/✓ /
5741 Palmer Way
Carlsbad, CA 92008
(760) 438-3155
1446 E. Chestnut Ave.
Santa Ana, CA 92701
(714) 647-0277
~1C2_ ... _. ____
Representative of GeoSoils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951) 677-9651
w.o. 0 k, 3 5 -c..
DATE_l:_-_..::..1-_-_t'-~=· _
NAME ,\A t I-US Sc:::r--v\--
HOURS_-1-'--. o..c..-__ _
Geotechnical • Coastal • Geologic • Environmental
FOOTING TRENCH OBSERVATION SUMMARY
Client Name: D r"-:i N NA Project Name: _-..:../_r_1..;..;.V\~\ _L.;;;;..:::$'---=~--.:...N~b _____ _
Location/Tract: _-r-.,!_, ...:.0.~A~':....:L-::::....:..-5!...-~l=-~N-.:::..!:D~___::C~A:..:....f<..:::::...l~s~l3;!.!:A....!.· •~D:;___--=C.=-:t_.....::::6~'-1....:.....--...:..1_1.-f..l.-_______ _
Unit/Phase/Lot(s): _....;..l-_o;;:.....;...r ....;;s;..._._\-'/_-z.....;.;,_-,-___;:;;3'-"/'--
1
4--':...., . ..___.-S-~,_/--'b~ ___ (.:,___1_-_~_)-'----------, /
Referenced Geotechnical Report(s): ----.!D~A~-r...::t:::..!/.:!..)_....J/:..:,0:::...-...... 3-==-· ..!..I _-~_:,_/ 7..!,_......_--=b--__,,.~.___-__,_/ =b'---------
1
Observation Summary
IM5 Initials
i / ·:d 19, Date
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
)A 5 Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
: iii, 3 Date
t'v, S Initials A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
setback was in general accordance with the recommendations of the geotechnical report. 1 I -z I I B Date
11U. 5 Initials Pt=. RF o(l)_'.!V,E: b 5e: LS<. r , ,.., f>1u., ,~ 1 N (., ON UNDSn. -& LrA A un u rf TnG N(l-t~· ~. 11A<-T1 ~ ''
I/ z_. / IR Date PAoCSl~(, I.,-.;t,l <.V'rteJ Tt-H"<, 1"7..t='l'-lCHt"S B'>Ac.k1-,t..l.. IS R.r:cl..--rrv•r''/ Co,,,._..f "'"'''
/-_!N_f) Su<r-""<(',L(: Fon.. "Tt-1£ .:C:v--Jl<=v->Di:it> vs<::
Notes to Superintendent/Foreman
3.
4.
Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
Based on expansion potential of underlying soils, presoaking of soil below slabs maybe recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. %-/<6 e p Mo I s r ~
In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing.
This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes to Building Inspector
Soil compaction test results, as well as depth offill, relative compaction, bearing values, corrosivity, and soil expansion
index test results are contained in the As-Graded Geotechnical or Final Compaction Report provided at the completion
of grading.
5741 PalmerWay
Carlsbad, CA 92008
1446 E. Chestnut Ave.
Santa Ana, CA 92701
Representative of Gfu-SOils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
I<< ;,§;;
< <
<
GEOCENTRIC
L :\ ;\ D SI R \' L \' l N (; :\. S D MAP f' 1 \; {;
January 3, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on January 3, 2018 and found the
lower level building forms for buildings numbers 1 through 14 lo substantially conform to the line
and grade as shown on the approved Precise Grading Plan. As such conforms to all building
setbacks<
Sincerely,
Lome DaPron
PLS 7824 No< 7824
......._
Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil Engineering I Surveying
INSPECTION REPORT
78 ~6 -;:·.-..1 8~'> 2£8'1', ?_.;:;,,:_;£ _ l \ -l-~ -1 .,
PROJECT NAME TP,J,I{ > 1;.,v,] f2,.k,:..>/1)e,_,, . .✓.,.,..1µ, i INSPECTION
ADDRESS C /.\.,) ( , Ac\ n ti IL(. A ,-,..f• I) 12. d.
ARCHITECT
ENGINEER
CONTRACTOR
OTHER
INSPECTION DATE /·'-j-1 °:,
PLAN FILE/OTHER ___________ _
BLDG. PERMIT/OTHER G Pol ·i 3 I 'f 8 -C P,1 -:-3 2 · >I
□
CJ
□
□
□
□
□
□
□
CONCRETE
REINF. STEEL
MASONRY
P.T . CONCRETE
FIELD WELDING
SHOP WELDING
BATCH PLANT
EXP. ANCHOR
OTHER
MATERIAL SAMPLING
PAGE OF
REPORT NO.
MATERIAL IDENTIFICATION
CONC. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORT AR TYPE & lb/in2
REINF. STEEL GR./SIZE /-V-.1._,:· .-:~1; ,.,,,-,
STRUCTURAL STEEL
HIGH-STRENGTH BOLT
MASONRY BLOCK
0 CONCRETE O MORTAR O GROUT 0 FIREPROOFING O MASONRY BLOCK
0 REINFORCING STEEL O STRUCTURAL STEEL 0 BOLTS O OTHER
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES.
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications. ------------------------------------------------PRINTED NAME
CERTIFICATION NO.
fA(1.' { l d .. ~~ ~ ... r ,<\/.,.·. /
,/· ,,
/,,..,;..,, ,,-··. ,,,:"
SIGNATURE -~"?"'""~.<:..~--·=·-~"'--✓-"---,;,..·-~-✓_/-"/4"""0""--;7::;.,-'-•.,... __ _
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-inc.net
·.·~
Cl~c Construction Testing & Engineering, Inc.
Inspection I Testing I Geotechnical I Environmental & Construction Engineering I Civil EngineeJing I Surveying
INSPECTION REPORT
PROJECT NAME Trails end residential
ADDRESS Carlsbad village and Donna dr.
ARCHITECT _4c..::D.::;e:,sig..,n.,__ ________ _
ENGINEER __:_,HT-"Kc,._ __________ _
CONTRACTOR ---'--P"-ac~ifi~ca=----------
OTHER
INSPECTION DATE
PLAN FILE/OTHER _6::c_-_,_13-"-=20=-1c.=8c..._ ______ _
BLDG. PERMIT/OTHER --'b"'e"'lo"'w,.__ ______ _
INSPECTION
□ CONCRETE
IZl REINF. STEEL
□ MASONRY
□ P.T. CONCRETE
□ FIELD WELDING
□ SHOP WELDING
□ BATCH PLANT
□ EXP. ANCHOR
□ OTHER
MATERIAL SAMPLING
PAGE __ _ Qf 1
CTE JOB NO. 10-13959T
REPORT NO.
MATERIAL IDENTIFICATION
CONG. MIX NO. & lb/in2
GROUT MIX NO. & lb/in2
MORTAR TYPE & lb/in2
REINF. STEEL GR/SIZE Grade#60
STRUCTURAL STEEL
HIGH-STRENGTH BOLT
MASONRY BLOCK
OTHER
□
□
CONCRETE □
REINFORCING STEEL
MORTAR □ GROUT □ FIREPROOFING □
OTHER
MASONRY BLOCK
□ STRUCTURAL STEEL . □ SOL TS □
INSPECTIONS PERFORMED, MATERIAL IDENTIFICATION, PROGRESS, WORK REJECTED, REMARKS
PLEASE NOTE ANY RE-INSPECTION, TESTING, OR OTHER PROJECT ISSUES.
Weather partial clouds 70's/ Locations lots 11, 12, 13, 14 and exterior piers permits CB153198/CB 153199/ CB153200 and CB153201/
Observed placement of reinforcing footings and slab on grade these locations as per plans and specifications/Details shown page S4.0
Reinforcing tied in place and were needed placed on concrete chairs to maintain position and clearance/ Footings cleaned of excess
dirt and debris to maintain clearance from soil/ these locations ready for concrete placemenU < end >
Certification of Compliance: All work, unless otherwise noted, complies with applicable codes and the approved plans and specifications.
PRINTED NAME _cM:.,:le.::ke=-K,.,,iC'lng""e"'ry'------------
CERTIFICA TION NO. ICC 5258871/ SD 1001
1441 Montiel Road, Suite 115 I Escondido, CA 92026 I Ph (760) 746-4955 I Fax (760) 746-9806 I www.cte-lnc.net
~ GEOCENTRIC
LAND SURVEYING AND MAPPlNt;
June 12, 2018
To Whom It May Concern:
Subject: Trails End, Donna Drive, Carlsbad
Geocentric Land Surveying performed an as-built field survey on June 12, 2018 and found the
garage/second floor forms for buildings numbered 11 through 14 to substantially conform to the
line and grade as shown on the approved Precise Grading Plan. As such conforms to all
building setbacks.
Sincerely,
Lorne DaPron
PLS 7824 No. 7824
0.l'iO N Centre Ci Ly Pkwy Suite B, Escondido CA 92026
Lei 76020778].j fax 7607457824
V/W\V. gcocen tri c:iurvey. com
I I ;
I ' ! I I I I
'
31110
231.61
,..__1 _____ 31111
231.61
LOT 14
2nd FF=231.64
BASEMENT
FF~211.24
f'A/l=21tl:i.'i-i'3 ) 2 .64
LOT 13
2nd /T=229.64
BASEMENT
FF=209.24
PAD0 20B.57
GAl~AGC
PAD=
230.97
GAflACf
PAD=
228.97
PLAN 1
31115 229.64 'r_,. ____ _J 31114
'-------_J 229.62 x31116 229.63 X 31117 229.62
X 31119
220.17 x31118 220.17
31120
220.16
31121
220.15
LOT 12
2nd FF= 220.14
BASEMENT GARAGE
ff= 19§111:i PAD"
PAD= 1~.i!J7f 219.47
Pi.AN 1
LOT~3
2nd FF= 114 GARAGE
31125
BASEMENT
218.17
FF=/97.74
PAO=
PAD 0d97.07
217.41
PLAN 1
31127
218.16
31126
218.17
X 31128
218.17
X 31129
218.16
GARAGE
f'AIJ=
21741
j
LOT 14
2nd FF=231.64
BASEMENT
FF=211.24
l'AIJ=210.57
' LOT 13
2nd IF= 229. 64
BASEMENT
FF=209.24
PA/J 0208. 5 7
GARAGE
:1<A~1 2JIJ.t:/J!'
; : . 4 :: ['~i'''
X/ .!lll
228.97
X 3 078 2 0.94
0076
X 31.01
00 X 28.94
PLAN 1 0073
,--.J----___:_xj!28.93
LOT 12
2nd FF=220.14
BASEMENT
FF=199.74
l'AD=199.07
!'LAN 1
LOT 11
2nd ff=218.14
BASEMENT
ff=/97. 71
PAIJ,, 197.07
PLAN 1
fj~;E
~3
219.47
~fJ
217.47
0067
X 19.52
X 3 069 9.50
X 0070 17.51
X 3 072 ,_,_ ____ __117.49
GARAGE
!'AD=
217. 47
• .
' .
\,
•'
•
Geotechnical • Coastal • Geologic • Environr:nental ·
FOOTING TRENCH OBSERVATION SUMMARY
W. o . ______ 1 .... ~h___,--: .... ~;...-1;...· ~ .... • ~ .... ~\:_._·· .. .a.. __
DATE._-=& .... /1..._/""'/( ___ _
NAME. __ '~t~.e:"'----
HOURS __ ~Z ____ _
I'\ ' ---CI ie nt Name:---' ...... · o. ... >..,,.'Al.;.:.;.:f..:.;;'/A ........ /~e-=-<-1-"-w...:::;;....' __..i :..;;U.;__,,;_-, ______ Project Name: ____ . .,_,.ti...,· A...:ILA::..· .... : -"~:;.a .. N'-'--/J _________ _
I -/)/./ /'Ii Location/Tract:-""'"· ._.,.(""'1.a=· -~:....r ,._A,;.,;,A ..... l""'C:...:....'-'--'v'~· .... 'I' ____ .,...-_____________________ _
I I ,· ) Unit/Phase/Lot(s): l oT-"' II (; AIPO /~T:-s / ,/t/ I -/"
' : I
· Referenced Geotechnical Report(s): ,.-;;, ~ T /J/l'!?CT..? /.j rd!J !(;/~1 /11 Af,?I) 1;. !q //t., --":...:....~....;..;...:.).;... =~--.;::..,;...=::;;._.......,./,'-'--''-,'l '-'--'--+.:..:.aa""""---'-"-,-'-"'-1,,:..:..;;;.._-------
Observation Summary
(¾ Initials
I, I 1 /J f Date
I I
A representative of GeoSoils, Inc. observed onsite soil and footing trench conditions. Soil conditions
in the trench are generally free of loose soil and debris, non-yielding and uniform, and plumb; and
are in general conformance with those indicated in the geotechnical report.
&i~; Initials
,,; )1/2 ~·Date . ; I
A representative ofGeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing
excavations generally extend to proper depth and bearing strata, and are in general conformance
with recommendations of the geotechnical report.
. .
;'...:2; Initials *A representative of GeoSoils, Inc. reviewed footing setbacks from slope face (if applicable). The
~ tr hf.bate ; setback was in general accordance with th_e recommendations of tt;1e geotechnical report. -
I I ~ /-~a47}i<{) r1~c.s /-P?:-wr:-; //, ;:; J/;j ,tU. g;>t To rov~. (At¼OMlr/1/fi{}fj/"i 1 'Ttu~/¥/?/Nt-
L-iE-Initials '1 _c.µ(;l{.IU> f',:,:., {'P!fV/l)J:?'o f:i,;t?~ ro-J@Z.TlC-(l.-<--U-V/J~~T~-t"{ o (--I. !::-rt:-/t, i;,., p,1"1;,£,.:5 ?.t?~ t.br;tf
~lr/11 Date 1wqt-tvt?7_':-V/r"lff'le IC?f-'~l/t:;_/Jr ~ll!~ 71rm::.-F'(/IC-' ,r✓7/tf:/.A~tz:. ?~"T/13/~:.; ,i.r....e,
, 1 CJ,C -10 f-i'fo'Vie, r·(,,';,:_ L-Vt-" 1~11'7 1,.-,,,..,-.
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult
the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended
period of time for such, and the contractor should schedule accordingly. /fPt.ll /?7c;,/ST
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy
rain, etc.), we should be contacted to perform additional site observations and/or testing. ~
4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's
design, if different from the geotechnical report.
Notes fo Building Inspector
Soil compaction test results, as weltas depth of fill, ,re(~tive compaction, bearing values, c.orrosivity, and soil expansion
index test results are contained ~,t_tfe As-Grac;ted 9e6technical or Final Compaction Report provided at the completion
of grading. -. ...-c.-__;,; . ..... , • / ---
/ "' --✓-< .,,,/ __ ,_;7/ . (. (_:__-·----~---------'-----""=--':.-...;;.-_,,,-r'--..,...---
5741 PalmerWay
Carlsbad, CA 92008
(760) 438-3155
,;
1446 E. Chestnut Ave.
Santa.Ana, CA 92701
· {714) 647-0277
Representative of Ge~Soils, Inc.
26590 Madison Ave.
Murrieta, CA 92562
(951 ) 677-9651