Loading...
HomeMy WebLinkAbout2890 AVENIDA CASTANA; ; CB010121; Permit- -G City of Carlsbad . 1635 Faraday Av Carlsbad, CA 92008 Building Inspection Request Line (760) 602-2725 02/21 I2001 Residential Permit Permit No:CBOI 0121 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 02/21 /2001 #Dwelling Units: Bedrooms: Project Title: Applicant: CENTEX HOMES 181 5 ASTON AV CARLSBAD CA 760 431-121 1 2890 AVENIDA CASTANA CBAD RESDNTL SubType: SFD 2552832500 Lot#: 678 $224,644.00 Construction Type: VN 1 Structure Type: SFD 4 Bathrooms: 3 VILLAGE N- PLAN 2,2438 SF, 624 SF GAR Reference #: CT88-03 ENCLAVE-LA COSTA VLY-PHS 11 Owner: CENTEX HOMES Status: ISSUED Applied: 01/02/2001 Entered By: RMA Plan Approved: Issued: 02/21/2001 Inspect Area: Orig PC#: PC99-04 Plan Check#: PCO1-01 1815ASTONAVE#101 CARLSBAD CA 92008 Total Fees: $1 1 ,I 84.86 Total Payments To Date: $0.00 Balance Due: $1 1,184.86 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee $931.56 $0.00 $605.51 $0.00 ($48.44) $22.46 $0.00 $0.00 $310.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'l Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) LFMZ Transportation Fee Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Master Drainage Fee: Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,374.25 $4.088.52 $0.00 $0.00 $0.00 $600.00 $0.00 $0.00 $0.00 $182.00 $60.00 $59.00 $0.00 $0.00 $0.00 $0.00 $1 1,184.86 FINAL APPROVAL Inspector: Date: 49-01 Clearance: NOTICE: Please take NOTICE that approval of your project includes the'lmposilon" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "feeslexactbns." You have 90 days hom the date this perml was issued to protest imposition of these feeslexactions. If you protest them. you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required informaGon with the City Manager for processing in acwrdance with Carlsbad Municipal Code Section 3.32.030. Failure to Gmely follow that procedure will bar any subsequent legal action to attack. review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified feeslexactins DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application pmssing or seNiCe fees in mnneGlion with this projecl NOR DOES IT APPLY to any feeslexac4ons of which you have previously been uiven a NOTICE similar to this, or as to which the statute of limitations has previously Othelwise expired Cily of Carltbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Plan Check#: Permit t: Project Name: Address: Contact Person: Sewer Dlst PC01-01 CB010121 ENCLAVE-LA COSTA VLY-PHS 11 VILLAGE N- PLAN 2,2438 SF, 624 SF GAR 2890 AVENIDA CASTANA Phone: LC WaterDist: 0 Lot: Fire Date: Perm# Type: Sub Type: 670 Y 07/31/2001 RESDNTL SFD ....................................... . ........ ...... ..... ... ...... .... ........ ........ ................ ......... . ....... ..... ..... ....................... Date Inspected: ?I*’ Approved: __ Disapproved: __ Inspected By: Inspected Date By: Inspected: Approved: __ Disapproved: __ Inspected Date By: Inspected: Approved: __ Disapproved: __ Comments: City of Carlsbad Bldg Inspection Request For: 08/27/2001 Permit# CB010121 Inspector Assignment: GG Title: ENCLAVE-LA COSTA VLY-PHS 11 Description: VILLAGE N- PLAN 2,2438 SF, 624 SF GAR Type: RESDNTL SubType: SFD Job Address: 2890 AVENIDA CASTANA Suite: Lot 678 Location: APPLICANT CENTEX HOMES Owner: Remarks: Phone: 7607536444 Inspector: Total Time: Requested By: DAVE CD Description Act Comments Entered By: ROBIN 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs InsDection History Date Description Act lnsp Comments 08/16/2001 89 Final Combo PA GG OTRM 08/07/2001 39 Final Electrical AP GG 07/19/2001 17 Interior Lath/Drywall AP GG 06/28/2001 82 DrywalVExt LatWGas Test AP GG 06/25/2001 16 Insulation AP GG 06/21/2001 16 Insulation NR GG 08/15/2001 84 Rough Combo AP GG 06/14/2001 84 Rough Combo NR GG 05/25/2001 83 Roof Sheathing/Ext Shear AP GG 04/13/2001 11 Ftg/Foundation/Piers AP GG 04/13/2001 12 SteeVBond Beam AP GG 04/02/2001 21 Underground/Under Floor AP GG 04/02/2001 22 Sewerrwater Service AP GG 03/30/2001 113Zoning (CE) CI ED RE-CHECK4/26