Loading...
HomeMy WebLinkAbout2892 CAMINO SERBAL; ; CB000577; Permit07^21/2000 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/27/2000 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No:CB000577 Building Inspection Request Line (760) 602-2725 2892 CAMINO SERBAL CBAD RESDNTL 2552830300 $357,337.00 Sub Type: Lot#: Construction Type: Reference #: 1 Structure Type: 5 Bathrooms: SHELBOURNE-LA COSTA VILL E SFD 564 VN CT88-03 SFD 4.5 Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: PLAN 4-PHASE 1,4,166 SF+649 SF GAR+110 SF PATIOPIan Checktf: ISSUED 02/01/2000 RMA Plan Approved: 03/27/2000 PD PC99-149 PCOO-13 Applicant: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA 92014 858 259-8500 Owner: LACOSTA VALLEY-CARLSBAD L P CIO HEARTHSTONE ™ 16133 VENTURA BLVD#14dfr ENCINOGA 91436 0001 01 C-PRMT 02 516.19 Total Fees: $14,515.98 Total Payments To Date: $13,999.78 Balance Due: $516.19 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $1,524.08 Meter Size $0.00 Add'l Reel. Water Con. Fee $990.65 Meter Fee $0.00 SDCWA Fee ($79.25) CFD Payoff Fee $35.73 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $310.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 LFMZ Transportation Fee $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee Housing InLieu Fee $0.00 Master Drainage Fee: $0.00 Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,303.24 $6,503.53 $0.00 $0.00 $0.00 $580.00 $0.00 $0.00 $0.00 $203.00 $60.00 $85.00 $0.00 $0.00 $0.00 $0.00 $14,515.98 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. CltiilCiilsliid nnal Building InspecUon JJL 21 a» Dept: Building Engineering Planning CMWD StLtte Fire Plan Check*: PCOO-13 Date: 7/21/2000 Permit* CB000577 Permit Type: RESDNTL Project Name: SHELBOURNE-LA COSTA VILL E Sub Type: SFD PLAN 4-PHASE 1.3904 SF+649 SF GAR+110 SF PATIO Address: 2892 CAMINO SERBAL Lot: 564 Contact Person: JOE Phone: 6195725762 Sewer Dist: LC Water Dist: O Inspected ^ j/y^") Date s / By: y/s,7t Inspected: "/f2*y*0 Approved: Disapproved:. Inspected Date By: Inspected: Approved: Disapproved: _ Inspected Date By: Inspected: Approved: Disapproved:. Comments: City of Carlsbad Bldg Inspection Request For: 10/24/2000 Permittf CB000577 Title: SHELBOURNE-LA COSTA VILL E Description: PLAN 4-PHASE 1,4,166 SF+649 SF GAR+110 SF PATIO Inspector Assignment: PD 2892 CAMINO SERBAL Lot 564 Type:RESDNTL Sub Type: SFD Job Address: Suite: Location: APPLICANT DAVIDSON BUILDERS Owner: Remarks: PM PLEASE Phone: 7609424330 Inspector] Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: GARY Entered By: CHRISTINE Act- Comments Associated PCRs PCR00078 ISSUED PCR00093 ISSUED PCR98031 ISSUED PCR98052 ISSUED PCR98060 ISSUED PCR98147 ISSUED PCR98222 PENDING PCR99006 PENDING Inspection History Date 10/13/2000 10/13/2000 8/10/2000 7/27/2000 7/25/2000 7/25/2000 7/21/2000 6/29/2000 6/29/2000 Description 39 Final Electrical 39 Final Electrical 82 Drywall/Ext Lath/Gas Test 16 Insulation 84 Rough Combo 89 Final Combo 89 Final Combo 13 Shear Panels/HD's 18 Exterior Lath/Drywall Act Insp Comments AP RB EMR CO RB AP PD AP PD AP PD WC PD NR PD AP PD WC PD