HomeMy WebLinkAbout2896 CAMINO SERBAL; ; CB000693; Permitft/27/2000
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
03/27/2000
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
Residential Permit Permit No:CB000693
Building Inspection Request Line (760) 602-2725
2896 CAMINO SERBAL CBAD
RESDNTL Sub Type:
2552830400 Lot #:
$290,160.00 Construction Type:
Reference #:
1 Structure Type:
5 Bathrooms:
SHELBOURNE-LA COSTA-VILL E
SFD Status: ISSUED
565 Applied: 02/01/2000
VN Entered By: RMA
CT88-03 Plan Approved:
SFD Issued: 03/27/2000
4.5 Inspect Area:
Orig PC#: PC99-149
PLAN 3.PHS 1, 3359 SF+624 SF GAR+51 SF PATIO Plan Check#: PCOO-13
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA 92014
858 259-8500
Owner:
ALLEY-CARLSBAD L P
,VP#1400
Total Fees: $12,902.92
Building Permit :
Add'l Building Permit Fee"
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Balance Due: $12,902.92
M-f $1,289.58
, -.u-$0.00
$838.23
«m.W-
$29.0f
$OJOO
)0
Meter Size
Add'l Reel. Water C
Weter Fee
SDCWA
CFD Pamftftee
f*FF
PFF (CFD Fun0
License Tax,
Lio
und)
Ion Fee
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
BING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Master Drainage Fee:
Sewer Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,303.24
$5,280.91
$0.00
$0.00
$0.00
$580.00
$0.00
$0.00
$0.00
$203.00
$60.00
$76.00
$0.00
$0.00
$0.00
$0.00
$12,902.92
Inspect
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this^ on as to which the statute of limitations has previously otheiwise expired.CITY Or CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
CltyifCirisbil
Final Building InspecUon
Dept: Building Engineering Planning CMWD ^Mrfte Fire
jii 2
Plan Check*:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dist
Inspected ^— j
Bv: /&
Inspected
Bv:
Inspected
Bv:
Comments: /
PCOO-13
CB000693
SHELBOURNE-LA COSTA-VILL E
PLAN 3.PHS 1, 3359 SF+624 SF GAR+51
2896 CAMINO SERBAL
NA Phone: 6195725762
LC Water Dist: O
1 TJ f tfto »• J
/£*+ ^y'
^^^
'•*+- Date
Inspected: "7/2*
Date
Inspected:
Date
Inspected:
/„ /%j» <?/,,
Date:
Permit Type:
Sub Type:
SF PATIO
Lot: 565
*/ ff° Approved:
Aooroved:
Aooroved:
^ j-/>X/ t*«J^ c
7/25/2000
RESDNTL
SFD
Disapproved: ^
Disapproved:
Disapproved:
-****/»«*<»
City of Carlsbad Bldg Inspection Request
For: 10/26/2000
Permit# CB000693
Title: SHELBOURNE-LA COSTA-VILL E
Description: PLAN 3,PHS 1, 3359 SF+624 SF GAR+51 SF PATIO
Inspector Assignment: PD
2896 CAMINO SERBAL
Lot 565
Type:RESDNTL
Job Address:
Suite:
Location:
APPLICANT DAVIDSON BUILDERS
Owner:
Remarks:
Sub Type: SFD
Phone: 7609424330
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: GARY
Entered By: CHRISTINE
Act Comments
Associated PCRs
Inspection History
Date Description
10/13/2000 39 Final Electrical
8/14/2000 82 Drywall/Ext Lath/Gas Test
8/7/2000 16 Insulation
8/4/2000 16 Insulation
7/28/2000 16 Insulation
7/27/2000 16 Insulation
7/25/2000 84 Rough Combo
7/25/2000 89 Final Combo
7/3/2000 13 Shear Panels/HD's
6/28/2000 15Roof/Reroof
6/26/2000 15 Roof/Reroof
4/25/2000 81 Underground Combo
3/30/2000 21 Underground/Under Floor
Act Insp Comments
AP RB EMR
AP PD
AP PD PREVIOUSLY
AP PD
NR PD
NR PD
AP PD
WC PD
AP PD
AP PD
NR PD
AP PD
AP PD