Loading...
HomeMy WebLinkAbout2896 CAMINO SERBAL; ; CB000693; Permitft/27/2000 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/27/2000 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad Residential Permit Permit No:CB000693 Building Inspection Request Line (760) 602-2725 2896 CAMINO SERBAL CBAD RESDNTL Sub Type: 2552830400 Lot #: $290,160.00 Construction Type: Reference #: 1 Structure Type: 5 Bathrooms: SHELBOURNE-LA COSTA-VILL E SFD Status: ISSUED 565 Applied: 02/01/2000 VN Entered By: RMA CT88-03 Plan Approved: SFD Issued: 03/27/2000 4.5 Inspect Area: Orig PC#: PC99-149 PLAN 3.PHS 1, 3359 SF+624 SF GAR+51 SF PATIO Plan Check#: PCOO-13 Applicant: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA 92014 858 259-8500 Owner: ALLEY-CARLSBAD L P ,VP#1400 Total Fees: $12,902.92 Building Permit : Add'l Building Permit Fee" Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Balance Due: $12,902.92 M-f $1,289.58 , -.u-$0.00 $838.23 «m.W- $29.0f $OJOO )0 Meter Size Add'l Reel. Water C Weter Fee SDCWA CFD Pamftftee f*FF PFF (CFD Fun0 License Tax, Lio und) Ion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 BING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Master Drainage Fee: Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,303.24 $5,280.91 $0.00 $0.00 $0.00 $580.00 $0.00 $0.00 $0.00 $203.00 $60.00 $76.00 $0.00 $0.00 $0.00 $0.00 $12,902.92 Inspect FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this^ on as to which the statute of limitations has previously otheiwise expired.CITY Or CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 CltyifCirisbil Final Building InspecUon Dept: Building Engineering Planning CMWD ^Mrfte Fire jii 2 Plan Check*: Permit*: Project Name: Address: Contact Person: Sewer Dist Inspected ^— j Bv: /& Inspected Bv: Inspected Bv: Comments: / PCOO-13 CB000693 SHELBOURNE-LA COSTA-VILL E PLAN 3.PHS 1, 3359 SF+624 SF GAR+51 2896 CAMINO SERBAL NA Phone: 6195725762 LC Water Dist: O 1 TJ f tfto »• J /£*+ ^y' ^^^ '•*+- Date Inspected: "7/2* Date Inspected: Date Inspected: /„ /%j» <?/,, Date: Permit Type: Sub Type: SF PATIO Lot: 565 */ ff° Approved: Aooroved: Aooroved: ^ j-/>X/ t*«J^ c 7/25/2000 RESDNTL SFD Disapproved: ^ Disapproved: Disapproved: -****/»«*<» City of Carlsbad Bldg Inspection Request For: 10/26/2000 Permit# CB000693 Title: SHELBOURNE-LA COSTA-VILL E Description: PLAN 3,PHS 1, 3359 SF+624 SF GAR+51 SF PATIO Inspector Assignment: PD 2896 CAMINO SERBAL Lot 565 Type:RESDNTL Job Address: Suite: Location: APPLICANT DAVIDSON BUILDERS Owner: Remarks: Sub Type: SFD Phone: 7609424330 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: GARY Entered By: CHRISTINE Act Comments Associated PCRs Inspection History Date Description 10/13/2000 39 Final Electrical 8/14/2000 82 Drywall/Ext Lath/Gas Test 8/7/2000 16 Insulation 8/4/2000 16 Insulation 7/28/2000 16 Insulation 7/27/2000 16 Insulation 7/25/2000 84 Rough Combo 7/25/2000 89 Final Combo 7/3/2000 13 Shear Panels/HD's 6/28/2000 15Roof/Reroof 6/26/2000 15 Roof/Reroof 4/25/2000 81 Underground Combo 3/30/2000 21 Underground/Under Floor Act Insp Comments AP RB EMR AP PD AP PD PREVIOUSLY AP PD NR PD NR PD AP PD WC PD AP PD AP PD NR PD AP PD AP PD