HomeMy WebLinkAbout2902 CARRILLO WAY; ; CB992918; Permit09/30/1999
City of Carlsbad
Residential Permit Permit No:CB992918
Building Inspection Request Line (760) 438-3101
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
08/05/1999
# Dwelling Units:
Bedrooms:
Project Title:
2902 CARRILLO WY CBAD
RESDNTL Sub Type: SFD
2226502000 Lot#: 160
$310,280.00 Construction Type: VN
6 Reference #: CT93-04
1 Structure Type: SFD
5 Bathrooms: 5.5
BRASADO-RANCHO CARRILLO
PHASE2-PLN 2, 3589 SF, GAR638 SF-VILL Q2
Status: ISSUED
Applied: 06/30/1999
Entered By: JM
Plan Approved:
Issued: 09/28/1999
Inspect Area: NF
Orig PC#: PC990060
PlanCheck#: 990111
Applicant:
HORTON, D.R.
101
1010 SO COAST HWY
ENCINITAS CA 92024
760-634-6700
Total Fees: $18,226.18 *"**' *^ef8$"Payments To Dale:
T ' I V - '**-**-{- '
e Due: $18,226.18
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
und)
ton Fee
$0.00
$0.00
$0.00
$0.00
$2,400.00
D5/8
$0.00
OMBING TOTALELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Master Drainage Fee:
Sewer Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$4,454.44
$5,647.10
$0.00
$0.00
$0.00
$550.00
$0.00
$100.00
$0.00
$231.00
$60.00
$100.00
$0.00
$0.00
$0.00
$2,480.00
$18,226.18
Inspector:
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely folbw that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with tills project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similartp tNs,orMtowhich the statute of limitations has previously otherwise expired.CITY OF CAHL&BAU
2075 Las Patmas Dr., Carlsbad, CA 92009 (760) 438-1161
Ctty tf Carlsbad
Final Building Inspection
Dept: Building «Htftneer
Plan Check #:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inserted
Bv\ XJLA;
Inspected
By:
Inspected
Bv:
990111
Ing Planning CMWD St
CB992918
BRASADO-RANCHO CARRILLO
PHASE2-PLN 2, 3589 SF, GAR638 SF-VILL Q2
2902 CARRILLO WY
CA
^S,OA£
Phone:
Water Dist: CA
Date /. /
^\ 1 1 J / '' I -V O/ JK_j Inspected: LffZr/t9e3
Date
Inspected:
Date
Inspected:
Lite Fire
Date: 4/19/2000
PermltType: RESDNTL
Sub Type: SFD
Lot: 160
Approved: *S Disapproved:
Approved: Disapproved:
Approved: Disapproved:
Comments: \ JLD/VA 5vv o o i"
n\A>o
City of Carlsbad Bldg Inspection Request
For: 6/7/2000
Permit# CB992918
Title: BRASADO-RANCHO CARRILLO
Description: PHASE2-PLN 2, 3589 SF, GAR638 SF-VILL Q2
Inspector Assignment: NF
Type: RESDNTL Sub Type: SFD
Job Address: 2902 CARRILLO WY
Suite: Lot 160
Location:
APPLICANT MORTON, D.R.
Owner:
Remarks:
Phone: 7606038735
Inspector:AlE
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: JERRY SIMS
Entered By: ROBIN
Act Comments
Associated PCRs
Inspection History
Date Description
4/20/2000 39 Final Electrical
4/17/2000 39 Final Electrical
4/3/2000 23 Gas/Test/Repairs
1 /28/2000 18 Exterior Lath/Drywall
1127/2000 18 Exterior Lath/Drywall
1/20/2000 17 Interior Lath/Drywall
1/13/2000 16 Insulation
1/12/2000 16 Insulation
1/6/2000 84 Rough Combo
12/16/1999 83 Roof Sheathing/Ext Shear
10/18/1999 11 Ftg/Foundation/Piers
10/7/1999 21 Underground/Under Floor
Act Insp Comments
AP NF
NR DM
NF
NF APPROVED ON 1/27
NF
NF
APPDON1-12
AP
CA
AP
AP
CA
AP
AP
AP
AP
AP
NF
NF
NF
NF
NF
NF