Loading...
HomeMy WebLinkAbout2902 CARRILLO WAY; ; CB992918; Permit09/30/1999 City of Carlsbad Residential Permit Permit No:CB992918 Building Inspection Request Line (760) 438-3101 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 08/05/1999 # Dwelling Units: Bedrooms: Project Title: 2902 CARRILLO WY CBAD RESDNTL Sub Type: SFD 2226502000 Lot#: 160 $310,280.00 Construction Type: VN 6 Reference #: CT93-04 1 Structure Type: SFD 5 Bathrooms: 5.5 BRASADO-RANCHO CARRILLO PHASE2-PLN 2, 3589 SF, GAR638 SF-VILL Q2 Status: ISSUED Applied: 06/30/1999 Entered By: JM Plan Approved: Issued: 09/28/1999 Inspect Area: NF Orig PC#: PC990060 PlanCheck#: 990111 Applicant: HORTON, D.R. 101 1010 SO COAST HWY ENCINITAS CA 92024 760-634-6700 Total Fees: $18,226.18 *"**' *^ef8$"Payments To Dale: T ' I V - '**-**-{- ' e Due: $18,226.18 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee und) ton Fee $0.00 $0.00 $0.00 $0.00 $2,400.00 D5/8 $0.00 OMBING TOTALELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Master Drainage Fee: Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $4,454.44 $5,647.10 $0.00 $0.00 $0.00 $550.00 $0.00 $100.00 $0.00 $231.00 $60.00 $100.00 $0.00 $0.00 $0.00 $2,480.00 $18,226.18 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely folbw that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with tills project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similartp tNs,orMtowhich the statute of limitations has previously otherwise expired.CITY OF CAHL&BAU 2075 Las Patmas Dr., Carlsbad, CA 92009 (760) 438-1161 Ctty tf Carlsbad Final Building Inspection Dept: Building «Htftneer Plan Check #: Permit #: Project Name: Address: Contact Person: Sewer Dist: Inserted Bv\ XJLA; Inspected By: Inspected Bv: 990111 Ing Planning CMWD St CB992918 BRASADO-RANCHO CARRILLO PHASE2-PLN 2, 3589 SF, GAR638 SF-VILL Q2 2902 CARRILLO WY CA ^S,OA£ Phone: Water Dist: CA Date /. / ^\ 1 1 J / '' I -V O/ JK_j Inspected: LffZr/t9e3 Date Inspected: Date Inspected: Lite Fire Date: 4/19/2000 PermltType: RESDNTL Sub Type: SFD Lot: 160 Approved: *S Disapproved: Approved: Disapproved: Approved: Disapproved: Comments: \ JLD/VA 5vv o o i" n\A>o City of Carlsbad Bldg Inspection Request For: 6/7/2000 Permit# CB992918 Title: BRASADO-RANCHO CARRILLO Description: PHASE2-PLN 2, 3589 SF, GAR638 SF-VILL Q2 Inspector Assignment: NF Type: RESDNTL Sub Type: SFD Job Address: 2902 CARRILLO WY Suite: Lot 160 Location: APPLICANT MORTON, D.R. Owner: Remarks: Phone: 7606038735 Inspector:AlE Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: JERRY SIMS Entered By: ROBIN Act Comments Associated PCRs Inspection History Date Description 4/20/2000 39 Final Electrical 4/17/2000 39 Final Electrical 4/3/2000 23 Gas/Test/Repairs 1 /28/2000 18 Exterior Lath/Drywall 1127/2000 18 Exterior Lath/Drywall 1/20/2000 17 Interior Lath/Drywall 1/13/2000 16 Insulation 1/12/2000 16 Insulation 1/6/2000 84 Rough Combo 12/16/1999 83 Roof Sheathing/Ext Shear 10/18/1999 11 Ftg/Foundation/Piers 10/7/1999 21 Underground/Under Floor Act Insp Comments AP NF NR DM NF NF APPROVED ON 1/27 NF NF APPDON1-12 AP CA AP AP CA AP AP AP AP AP NF NF NF NF NF NF