Loading...
HomeMy WebLinkAbout2905 CORTE CELESTE; ; CB151908; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-16-2015 Residential Permit Permit No: CB151908 Job Address: Building Inspection Request Line (760) 602-2725 2905 CORTE CELESTE CBAD Permit Type: Parcel No: Valuation: RESDNTL Sub Type: RAD 2551465000 Lot #: 0 $21,168.00 Constuction Type: 58 Status: ISSUED Applied: 06/22/2015 Entered By: SLE Occupancy Group: # Dwelling Units: 0 0 Reference #: Structure Type: Plan Approved: 07/16/2015 Issued: 07/16/2015 Bedrooms: Bathrooms: 0 Inspect Area: Orig PC#: Plan Check #: Project Title: LEUNG RES-ADD 42SF TO KITCHEN REMODEL 160SF OF KITCHEN, REMODEL 1ST FLOOR POWDER ROOM & 2ND STORY BATHROOM Applicant: MURRAY LAMPERT CONSTRUCTION COMPANY STEC 3545 CAMINO DEL RIO SO SAN DIEGO CA 92108 619-285-9222 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Green Bldg Stands Plan Chk Fee $220.03 $0.00 $154.02 $0.00 $0.00 $2.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 Owner: LEUNG LIVING TRUST 12-17-02 2905 CORTE CELESTE CARLSBAD CA 92009 Meter Size Add'l Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (31 05541) Traffic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees Fire Sprinkler Fees TOTAL PERMIT FEES Total Fees: $518.59 Total Payments to Date: $518.59 Balance Due: Inspector: (j _;;(!_ Fl NAL,PPRO~AL Date: · ()-·b I Clearance: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40.00 $45.00 $55.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $518.59 $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which'LOU have oreviouslv been aiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otherwise exoired. City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-16-2015 Storm Water Pollution Prevention Plan (SWPPP} Permit Permit No:SW150249 Job Address; Permit Type; Parcel No; Reference #; CB#: Project Title; Applicant 2905 CORTE CELESTE CBAD SWPPP 2551465000 151908 LEUNG RES-ADDITION MURRAY LAMPERT CONSTRUCTION COMPANY STE C 3545 CAMINO DEL RIO SO SAN DIEGO CA 92108 619-285-9222 Emergency Contact STEVE LAW 619-203-2840 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Lot#; 0 Owner; Status; Applied: Entered By: Issued; Inspect Area: Tier: Priority: LEUNG LIVING TRUST 12-17-02 2905 CORTE CELESTE CARLSBAD CA 92009 ISSUED 06/22/2015 SLE 07/16/2015 1 L $48.00 $58.00 $0.00 $106.00 Total Fees: $106.00 Total Payments To Date: $106.00 Balance Due: ~::~N,t~.L, .APPROVAL I)A H: I/ z . /( /!9~_f SIGi\!/lliif~f {_;)~ $0.00 I THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0PLANNING D ENGINEERING 0BUILDING OFIRE []HEALTH [] HAZMATIAPCD ,...~ y (City of Building Permit Application Plan Check No. ~ l~ lq()~ 2.f I L9' 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value Carlsbad Ph: 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit ~" email: building@carlsbadca.gov www.carlsbadca.gov Date (0-'2..2 ·1~ JOB ADDRESS .z.qo? CORlE SUITE#/SPACEI/UNITI CE.t.E ST£ IAPN 1-55-(~(p -0/j -DO CT/PROJECT # I LOT# I PHASE# I# OF UNITS .I# BEDROOMS #BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) 1,.1\.PU L\JA, if~ SG Ff lo KliCH E:IV ON FIRST R£MOP£.J,II\JG ~;<ISIING i'\1ICt1£.N -t ADDJN6· Ft-OOR. Rf"MOP£/r-OF F1RST F~rooR POVV D~ R .f?OOM A.N P SEcuNP ~-IDR '( Bt\"1 H f? 0 0 M. (50 ¢i) { EXISTING USE I PROPOSED USE ~rARAGE (SF) PATIOS (SF) I DECKS (SF) FIREPLACE lAIR CONDITIONING I FIRE SPRINKLERS Kl1LHfN KITlH£1~ YES [)I NoD YES0No0 YESONoO APPLICANT NAME~" c ... £ , CANID R. PROPERTY OWNER NAME ,.._e;, vN fJ· {. FG-R R Y -r 1?D8 'r 1\1) Prtnary Contact · ADDRESS ~6 .., 6 CAMINO j)£t,... R tO ,s I ~l.llfE. c ADDRESS 2 q 0 5 cvRT£ CE:trE-S"Tt CITY SAN STATE CA ZIP OJJtO'b CITY CJi R J.-.S B.A ~ STATE CA ZIP q-;.ooq DIE(; 0 PHONE Wlq· Z~G. qz,-;,z. I FAX PHONE 7w o .fl ow.7'1DB I FAX EMAIL -._ RI\CH£t.-CVMUR~ATt-AM f£RT CuM EMAIL DESIGN PROFESSIONAL 'RAtHEt.-CAN10 R. CONTRACTOR BUS. NAME GRE-G·{; C4Nf0~ ADDRESS ., ADDRESS 1'(1/1\/Vf( Ljf"'fllf'll\:r ~/t-/1/ /)1.'/LP tf(U~"/'l..L._ r CITY SAM£ Arrt-' c AJ'Jr ZI\Nfo CITY SAME STATE }\ Nt JNFD AS AS A-PPi..-1( PHONE I FAX PHONE I FAX EMAIL EMAIL 6CAN10 R tV MURRAy v4MfERTcoM I STATE LIC. # STATE LIC.# lf-6 b'03S 'CLASS c I c~I.A)(:_d (Sec. 7031.5 Bus1ness and Professions Code: Any C1ty or County whrch requrres a permit to construct, alter, 1m prove, demoliSh or reparr any structure, pnor to 1ts Issuance, also reqUires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or {hat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500)). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: [1J have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code. for the performance of the work for which this permit is issued. [Yi11 have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are Insurance Co. (; V ~R £ ~-T N .k1 /f) N A J, IN S V R Policy No. 7ln 0 0 0 0 OS~ I Expiration Date 0 I 0 / · l (/) This section need not be completed if the permit is for one hundred dollars {$1 00) or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars {&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. _K) CONTRACTOR SIGNATURE -~ENT I hereby affirm that I am exempt from Contractor's License Law for the following reason: D D D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section _____ Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. DYes 0No 2. I (have I have not) signed an application for a building permit for the proposed work. 3. I have contracted with lhe following person (firm) to provide the proposed construclion (include name address I phone I contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinale, supervise and provide the major work (include name I address I phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons lo provide the work indicated (include name I address I phone I type of work): _K) PROPERTY OWNER SIGNATURE 0AGENT DATE ' I certify that I have read the application and state that the above information is correct and that the information on the plans is aCCtJrate. I agree to comply v.ith all City ordinances and State laws N:lating Ill building construction. I hereby aulhor~e representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolnion or construction of structures over 3 stores in height. ' EXPIRATION: Every permit issued by the Building Official under lhe provisions of lhis Code shall expire by limitation and become null and vod if lhe building or oork aulhor~ed by such permit is not commenced wilhin 180 days from lhe date of such permit or iflhe building or oork authorized by such permn is suspended or abandoned at any time after the oork is commenced for a period of 180 days (Section 106.4.4 Uniform Buikling Code). _2:S APPLICANT'S SIGNATURE . DATE Inspection List Permit#: CB151908 Type: RESDNTL RAD Date lnsJ)ection Item Inspector 01/12/2016 89 Final Combo 01/12/2016 89 Final Combo PO 1 0/30/2015 17 Interior Lath/Drywall MC 10/30/2015 18 Exterior Lath/Drywall MC 10/14/2015 84 Rough Combo PO 09/09/2015 13 Shear Panels/HD's PO 09/09/2015 15 Roof/Reroof PO 08/17/2015 11 Ftg/Foundation/Piers MC Tuesday, January 12, 2016 Act Rl AP AP AP AP AP AP AP LEUNG RES-ADD 42SF TO KITCHEN REMODEL 160SF OF KITCHEN, REMODE Comments Page 1 of 1 DATE: 07/13/2015 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1908 EsGil Corporation In Cl'artnersfiip witfi government for CBuift{ing Safety SET: II PROJECT ADDRESS: 2905 Corte Celeste PROJECT NAME: Leung SFR remodel and addition D APPLICANT D JURIS. D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. ~ The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: Telephone#: ) Email: Mail Telephone Fax In Person ~ REMARKS: City to place soils notice stamp on plans prior to issuance. By: Dwight Ashman EsGil Corporation D GA D EJ D MB D PC Enclosures: 07/06/2015 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 DATE: 06/30/2015 JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1908 EsGil Corporation In Partnersliip witli government for CBuiMing Safety SET: I PROJECT ADDRESS: 2905 Corte Celeste PROJECT NAME: Leung SFR remodel and addition ~PLICANT _/!!~URIS. 0 PLAN REVIEWER 0 FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ~ The applicant's copy of the check list has been sent to: Rachel Cantor D EsGil Corporation staff did not advise the applicant that the plan check has been completed. ~ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Rachel Cantor Telephone#: (619)285-9222 L_gate co~!facted: \..OI'SL)by:AAJ Email: rachel@murraylampert.com J.E/Mail YTelephone Fax In Person D REMARKS: By: Dwight Ashman EsGil Corporation D GA D EJ D MB D PC Enclosures: 06/23/2015 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 15-1908 06/30/2015 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PLAN CHECK NO.: 15-1908 JURISDICTION: Carlsbad PROJECT ADDRESS: 2905 Corte Celeste FLOOR AREA: 42 sq ft Addition 290 sq ft remodel REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 06/22/2015 DATE INITIAL PLAN REVIEW COMPLETED: 06/30/2015 FOREWORD (PLEASE READ): STORIES: NC HEIGHT: NC DATE PLANS RECEIVED BY ESGIL CORPORATION: 06/23/2015 PLAN REVIEWER: Dwight Ashman This plan review is limited to the technical requirements contained in the California version of the International Residential Code, International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that construction comply with the 2013 edition of the California Code of Regulations (Title 24), which adopts the following model codes: 2012 IRC, 2012 IBC, 2012 UPC, 2012 UMC and 2011 NEC. The above regulations apply, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad 15-1908 06/30/2015 • PLANS 1. Please make all corrections, as requested in the correction list. Submit THREE sets of plans for residential projects. For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 2. Please revise the code compliance note on sheet T1 to reflect the 2013 energy code. 3. Please review detail references. Architectural details are all referenced to sheet 7, and no sheet 7 was included. It appears that this should be sheet 6 as the provided details seem correct. • FIRE PROTECTION 4. Please indicate on the plans whether the existing residence has a fire sprinkler system installed. If so, then provide a note stating that any additions/alterations will be provided with an automatic residential fire sprinkler system. Section R313.2. 5. In existing buildings, when alterations, repairs or additions requiring a permit occur (or when one or more sleeping rooms are added), the dwelling unit shall be provided with smoke alarms located as required for new dwellings; the smoke alarms shall be interconnected and hard wired. Exception: Smoke alarms in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R314.3.1. 6. Specify on the plans that any existing smoke alarms that are more than 1 0 years old will be replaced. Section R314.3.2. Carlsbad 15-1908 06/30/2015 7. When alterations, repairs or additions are proposed for dwelling units within which fuel-burning appliances are installed (and in dwelling units having attached garages), the dwelling unit shall be provided with carbon monoxide alarms located as required for new dwellings; the carbon monoxide alarms shall be interconnected and hard wired. Exception: Carbon monoxide alarms in existing areas need not be interconnected and hard wired where the alterations or repairs do not result in the removal of interior wall or ceiling finishes exposing the structure, unless there is an attic, crawl space, or basement available which could provide access for hard wiring and interconnection without the removal of interior finishes. Section R315.2. 8. Exterior walls and projections shall comply with one of the following tables. Section R302.1. Please review and address the following specific concerns: a) The eaves at the new addition are dimensioned at 3'-7" from the property line. If the building is not equipped with fire sprinklers these will need to be detailed as 1 hour fire resistive construction. Use this table if the building DOES NOT have an automatic fire sprinkler system. Use this table if the building DOES have an automatic fire sprinkler system. • FOUNDATION REQUIREMENTS 9. Please revise the allowable soil pressure used in foundation calculations. Carlsbad allows a maximum of 1000 psf in the absence of a soils report. Using this exception will also require having the plans stamped by the city (This can be done at issuance). • ROOFING 10. Specify on the plans the following information for the roof materials, per Section R106.1.1: a) Manufacturer's name and product name/number. b) ICC approval number, or equal. ·Carlsbad 15-1908 06/30/2015 11. Show the required ventilation for attics (or enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters). The minimum vent area is 1/150 of attic area (or 1/300 of attic area if at least 40% (but not more than 50%) of the required vent is located no more than 3' below the ridge). Show on the plans the area required and area provided. Section R806.2. a) When using a radiant barrier, California energy design affects the attic ventilation area requirement: If using the Prescriptive method for energy compliance, then the attic vent area must be at the 1/150 area: If using the Performance method, either the 150 or 300 areas may be used, as documented on the energy forms. Section RA4.2.1. 12. Note on the plans: "Attic ventilation openings shall be covered with corrosion-resistant metal mesh with 1/16" minimum to%" maximum openings. Section R806.1. • FRAMING 13. Show stud size, height and spacing on the plans. Maximum allowable stud heights shall be per Table R602.3(5). 14. Please ensure that the Architectural and Structural plans match. See for example details 2 and 3 on sheet A-6, which show trusses per plan. The framing plan shows rafters. 15. Please show the ceiling joist size and spacing for the new addition. 16. Please complete and return the attached City of Carlsbad Special Inspection Agreement. • PLUMBING 17. Provide a note on the plans: The control valves in showers, bathtubs, and bidets must be pressure balanced or thermostatic mixing valves. CPC Sections 408, 409,410. 18. Specify on the plans: Water conserving fixtures: New water closets shall use no more than 1.28 gallons of water per flush, kitchen faucets may not exceed 1.8 GPM, lavatories are limited to 1.5 GPM, and showerheads may not exceed 2.0 GPM of flow. CPC Section 403 and 408. 19. Specify on the plans whether the existing house was built before or after 1994. For additions or improvements to a residence built before 1994, note on the plans that existing "noncompliant" fixtures (toilets that use more than 1.6 gallons of water per flush, urinals that use more than one gallon of water per flush, showerheads that have a flow capacity of more than 2.5 gallons of water per minute, and interior faucets that emit more than 2.2 gallons of water per minute) shall be replaced. Certification of compliance shall be given to the building inspector prior to final permit approval. California SB407. ·Carlsbad 15-1908 06/30/2015 • ENERGY CONSERVATION 20. Residential ventilation requirements: • Kitchens require exhaust fans with a minimum 100 cfm ducted to the exterior. Detail compliance by including a complying exhaust fan or a ducted range hood to the exterior. • Bathrooms require exhaust fans (minimum 50 cfm) to be ducted to the exterior. A bathroom is defined "as a room with a bathtub, shower, or spa or some similar source of moisture". • Residential bathroom exhaust fans shall be energy star rated and shall be control by a humidistat capable of an adjustment between 50 and 80% humidity. CaiGreen 4.506.1. Exception: Control by a humidistat is not required if the bathroom exhaust fan is also the dwelling whole house ventilation. All fans installed to meet all of the preceding requirements must be specified at a noise rating of a maximum 1 "Sone" (for the continuous use calculation) or 3 "Sone" (for the intermittent use calculation). Please show the capacity and sone rating for provided fans. • MISCELLANEOUS To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes 0 No 0 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Dwight Ashman at EsGil Corporation. Thank you. ·Carlsbad 15-1908 06/30/2015 -~~ <~~'· ·~ CITY OF CARLSBAD SPECIAL INSPECTION AGREEMENT 8-45 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca .gov In accordance with Chapter 17 of the California Building Code the following must be completed when work being performed requires special inspection, structural observation and construction material testing. lroject/Permit: ~~~~~~--~~~-Project Address: ____________ _ A. THIS SECTION MUST BE COMPLETED BY THE PROPERTY OWNER/AUTHORIZED AGENT. Please check if you are Owner-Builder D. (If you checked as owner-builder you must also complete Section B of this agreement.) Name: (Please prinl)_ ____ ~~~~~~-------------------·-·---~~------------ tftrst) (M 1,\ (Last) Mailing Addres""--~~~~~~~-~~~--~~~~~~~-~~~~~~~~~~~-~- Email ~~~~~-Phone: -~~~-___ _ I am DProperty Owner DProperty Owner's Agent of Record DArchitect of Record CJEngineer of Record State of California Registration NumbeL~~~-_______ Expiration Date:~--- AGREEMENT: I, the undersigned, declare under penalty of perjury under the laws of the State of California, that I have read, understand, acknowledge and promise to comply with the City of Carlsbad requirements for special inspections, structural observations, construction materials testing and off-site fabrication of building components, as prescnbed in the statement of spec1al1nspect1ons noted on the approved plans and, as required by the California Building Code. Signature: ___ _ _________________ Date 8. CONTRACTOR'S STATEMENT OF RESPONSIBILITY (07 CBC, Ch 17, Section 1706). This section must be completed by the contractor I builder I owner-builder. Contractor's Company Name __ ~~--~~-~~~~~~~~~~-Please check if you are Owner-Builder 0 Name: (Please print) ~~~----c::-~~~­ (Ftrst) Mailmg Address: (M 11 (La::>t) Email_~~~~~~~~~~~~~~~~~~~~~~--Phone:_~~~~~~-~~~- State of California Contractor's License Number·-~~~~~~~~~ Expiration Date·-~~~~~~- • 1 acknowledge and, am aware, of special requirements contained in the statement of special inspections noted on the approved plans, • I acknowledge that control will be exercised to obtain conformance with the construction documents approved by the building official; • 1 wi II have in-place procedures for exercising control within our (the contractor's) organization, for the method and frequency of report1ng and the d1stnbution of the reports; and • I certify that I will have a qualified person within our (the contractor's) organization to exerc1se such control. • 1 will provide a final report I letter in compliance with CBC Section 1704.1.2 prior to requesting final inspection. Signature~: ~~~~~~~~~~~~~--~~~~~~~~-Date ~~~~~--~~~~~- B-45 Page 1 of 1 Rev. 08/11 Cadsbad 15-1908 06/30/2015 [DO NOT PAY-THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 15-1908 PREPARED BY: Dwight Ashman BUILDING ADDRESS: 2905 Corte Celeste BUILDING OCCUPANCY: BUILDING AREA Valuation PORTION (Sq. Ft.) Multiplier addition 42 City Est remodel 290 City Est Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: Complete Review 0 Repetitive Fee ..,..1 Repeats I D Other D Hourly EsGil Fee DATE: 06/30/2015 Reg. VALUE ($) Mod. 21 '168 $221.031 $143.671 D Structural Only t------tiHr. @ • $123.781 Comments: In addition to the above fee, an additional fee of $43 is due (0.5 hour@ $86/hr.) for the CaiGreen review. Sheet 1 of 1 macvalue.doc + DATE: PROJECT NAME: PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECT ID: PLAN CHECK NO: SET#: ADDRESS: APN: VALUATION: SCOPE OF WORK: REMODEl 2ND 1 ' ! ! ( 1 ' D This plan check review is complete and has been APPROVED by: LAND DEVELOPMENT ENGINEERING DIVISION Final Inspection by Construction Management & Inspection Division is required: Yes No ( J • ( This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: ENGINEERING 760-602-2750 I Chris Glassen I 760-602-2784 Christopher.Giassen@carlsbadca.gov Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov . D VaiRay Nelson 760-602-27 41 VaiRay.Marshall@carlsbadca.gov Remarks: 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: North arrow Existing & proposed structures Existing street improvements Property lines (show all dimensions) Easements Right-of-way width & adjacent streets Show on site plan: Drainage patterns Driveway widths Existing or proposed sewer lateral Existing or proposed water service Submit on signed approved plans DWG No. Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. ADD THE FOLLOWING NOTE "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building". Existing & proposed slopes and topography Size, location, alignment of existing or proposed sewer and water service(s) that serves the project. Each unit requires a separate service; however, second dwelling units and apartment complexes are an exception. Sewer and water laterals should not be located within proposed driveways, per standards. Include on title sheet: Site address Assessor's parcel number Legal description/lot number For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. Show all existing use of SF and new proposed use of SF. Example: Tenant improvement for 3500 SF of warehouse to 3500 SF of office. Lot/Map No.: LOT #63 MAP #11018 Subdivision/Tract: CT 83-16 UNIT #1 Reference No(s): E-36 Page 2 of 6 REV 6/01112 E-36 5. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 15.16 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Grading Permit required. NOTE The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) All required documentation must be provided to your Engineering Construction Inspector The inspector will then provide the engineering counter with a release for the building permit No grading permit required. Minor Grading Permit required. See additional comments for project-specific requirements. 6. MISCELLANEOUS PERMITS RIGHT -OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-way permit required for: Page 4 of 6 REV 6/01112 E-36 PLAN CHECK 7. STORM WATER Construction Compliance Project Threat Assessment Form complete. Enclosed Project Threat Assessment Form incomplete. Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW ' ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMP) Compliance Storm Water Standards Questionnaire complete. Storm Water Standards Questionnaire incomplete. Please make the corrections, re-sign the questionnaire and resubmit with next submittal. Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavement/pavers Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Other: Page 5 of 6 REV 6/01/12 Attachments: E-36 PLAN 8. WATER METER REVIEW 9. FEES Domestic (potable) Use What size meter is required? Where a residential unit is required to have an automatic fire extinguishing system, the minimum meter size shall be a 1" meter. NOTE: the connection fee, SDCWA system capacity charge and the water treatment capacity charge will be based on the size of the meter necessary to meet the water use requirements. For residential units the minimum size meter shall be 5/8", except where the residential unit is larger than 3,500 square feet or on a lot larger than one quarter (1/4) acre where the meter size shall be%". Required fees have been entered in building permit. Drainage fee applicable Added square feet Added square footage in last two years? Permit No. Permit No. Project built after 1980 Impervious surface> 50% Impact unconstructed facility yes yes yes yes no no no no Fire sprinklers required Upgrade No fees required yes yes no (is addition over 150' from center line) no 10. ADDITIONAL COMMENTS Engineering Application Storm Water Form Right-of-Way Application/Info. Reference Documents Page 6 of 6 REV 6/01/12 STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www .carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: r5' Building Permit 0 Right-of-Way Permit 'My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Project Storm Water Threat Assessment Criteria* Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Water Discharge No T~~t Assessment Criteria ... My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threaf' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 -Low Threat Assessment Criteria ~ My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 -Moderate Threat Assessment Criteria 0 My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April30). Tier 3 -Significant Threat Assessment Criteria 0 My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or 0 My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, 0 My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct. I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. 'The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 Project Address: z.qo& coR -re C G. t-t:'ST£ Owner/Owner's Authorized Agent Name: 1? ACl1EJ.. CANruf!- Owner/Owner's Authorized Agent Signature: 1?.-Cu?t~ City Concurrence: By: Date: ~YES DNO C.b-~-1.1-15 Page 1 of 1 Assessor Parcel No. 2.5-fj~ 1'1 (1~5·0 ·oo Title: fRDfEC ( OESIMJf Date: O(JJ Z1--((p CAIJ(ijfJj> ~ ~ '~( ,~4?,~'''\ ··~ CITY OF CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov CARLSBAD Construction I; Perceived SWPPPTier Construction Threat Assessment Criteria* Threat to Storm Water Level Quality Tier 3 -High Construction Threat Assessment Criteria 0 Project site is 50 acres or more and grading will occur during the rainy season 0 Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 USDA-NRCS Erosion factors kr greater than or equal to 0.4) 0 Site slope is 5 to 1 or steeper 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 0 through April 30). Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 -Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria 0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k1 greater than or equal to 0.4) High 0 Site slope is 5 to 1 or steeper Tier2 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 0 Owner/contractor received a Storm Water Notice of Violation within past two years 0 Site results in one half acre or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium 0 All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 -Medium lns12ection Threat Assessment Criteria 0 Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA 0 Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kr greater than or equal to 0.4) Medium 0 Site slope is 5 to 1 or steeper Tier 1 0 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 0 Owner/contractor received a Storm Water Notice of Violation within past two years 0 Site results in one half acre or more of soil disturbance Tier 1 -Low 1ns12ection Threat Assessment Criteria Low 0 All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Exempt -Not Applicable -Exempt *The c1ty engineer may authonze mmor vanances from the construction threat assessment cntena 1n spec1al Circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 ... ·~ CITY 0 F ARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets uidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the US EPA Green Streets guidance? YES NO If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. If you answered "no" to both questions, then go to Step 2. E-34 Page 1 of 3 Effective 6/27/13 STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov determine if your project is a priority development project, please answer the following questions: 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public de on 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, . ~d 00 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared and 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the of motor vehicles used for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the to the ESA e. not with flows from * 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5541 or 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 vehicles 1 O.ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? the Pacific Ocean creates 2,500 square feet or more of su surface on the more than 10%? / ·./ you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to mplementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your nnlir<>t'innlc:.) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this uestionnaire, check the "my project meets PDP requirements" box and complete applicant information. you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject plementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for lopment projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete anntt•c~•nrt E-34 Page 2 of 3 Effective 6/2 7 I 13 ~~ %\: ·~ CITY OF RLSBA STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Does the redevelopment project result in the creation or replacement of impeNious surface in an amount of less than 50% of the surface area of the reviousl existin develo ment? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impeNious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "m ro·ect meets PDP requirements" box and com lete ap licant information. 0 My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box A~tjs8:? {oRif Cf::v£Srr; Applicant Name:"f? A CH£"' CANTOR Applicant Signature: t~ Accessor's Parcel Number(s): 1-'5') _1 if (I) -bo _00 Applicant Title: p 1\. OJ£(. f Des I {) N E R Date: L . 0 IV· 'J-2--I&J This Box for City Use Only City Concurrence: I YES I NO I X I By: ca:- Date: b'".2~-f5 Project ID: c B'5 -/qog * Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303{d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preseNes or their quivalent under the Multi Species ConseNation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 ~ ·!:. ~ CITY OF CARLSBA STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE v' My project is not in a category of permit types exempt from the Construction SWPPP requirements v' My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). v' My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) v' My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. OWNER(S)/OWNER'S AGENT NAME (PRINT) OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE E-29 STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/41NCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Page 1 of 3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION Site Address: 'j.'/ 0'5 Cbrfe. aer~rc Assessor's Parcel Number: 'J t:j 5 -If./'-bD Project ID: ..5L.t..J /5"0 C) 'f1 Construction Permit No.C-81 ~ 1-=J 0 !{ Estimated Construction Start Date Nll P J I)~'( Project Duration 3 Months Emergency Contact: Name ~Tt v~. kA.W. 24 hour Phone: (I 1'1 . .g_O 5. n10_ Perceived 'threat to Storm Water Quality 0 Medium B"'Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By: C {r.. G-23-IS Date:--------- REV 4/30/10 oo Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs c: c: c: "E "E 0 0 0 -o n u Ol ~ Q) -o Q) c: c: E c: E -o "' 0 c: Ol m c: o; m 2 2 15 c.. Q) Q) E ~ 'E m "' Ol (jj Qj ii)"' ii) c: ·s ;::-Ol ii) ~ ""OQJ c: Q) Ol c:-c.. Q) c: c c: c: ~ ';:: r:T Q) m m ii) Best Management Practice all c: m m m CD ·a. .E -c: "' 0 fJ w .<!: c: 0 s :E "' 3: "' m 0 Q) Q) Q) m "E m• (BMP) Description -7 "' u c: ..:: E Ol Q)Ol CD c: 0'-(.) "' -o -o Qi "' ~ .l!l s ~ <Ocn "' ~.5 ·ro c: -cOl c: s c: ~ "' Q) "5 -~ Q) Ill m ""0>, c: 0 :::J "' :::1 Q) E ,!!:QJ u "E 0 CD Ol ._ 0 <Ob!:! ~~ m ~ ·~ Q) m ~ ~ OOl 0 c: Q) 0 enE m 0:;:: <Om Q) )J m u s 0 -a 0::: N (f) ~ 3: Ol ·a. "E !!:! c .l!l m Q) E .:.:. Qi -:::1 .c EM :=en :0 $ -o r.c: Q) lL u (jj Q) :::1 -o :0~ ·--o c: .:.:. m u ~ 0 0 t:: ·-c.. 15 Q) > <IJU c: .Om ·:;; m ~~ u -o ~~ c: ' Q) ~ m ~ 0 Q) .J::. .c ~ ~~ m 0 0 mOl .l!l 0 ~0:: ~( 0 m 0 ~~ 0 ~ -._ (.!) wo Ci5 U5 en () u::: (.!) en en c.. Ci5E eno::: 0.. ~ Ci5 U:::i CASQA Designation -7 ,.._ 00 Ol ~ ~ "' ...,. 1.0 (l) ,.._ 00 0 ~ N ~ "' ,.._ 00 ~ ~ "' ...,. 1.0 (l) 00 u u u ~ w w w w w w ~ cr. cr. ch ch ch ch ::!: ::!: ::!: ::!: ::!: u w w ~ ~ w w w en en en en en en en 1--1--z z z z s s s s s s s Construction Activity w en I Grading/Soil Disturbance ·J " .J Trenching/Excavation Stockpiling Drilling/Boring Concrete/Asphalt Saw cutting Concrete flatwork Paving ConduiVPipe Installation V' Stucco/Mortar Work lv' Waste Disposal -../ J Staging/Lay Down Area J .J Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewatering Site Access Across Dirt Other (list): -L__ _L_ Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 •l~ '-,;.. ~-~ ~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 DATE: 6-22-15 PROJECT NAME: PROJECT ID: Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.eov PLAN CHECK NO: CB 15-1908 SET#: 1 ADDRESS: 2905 Corte Celeste APN: 255-146-50-00 [gl This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required 0 Yes [2:1 No You may a/so have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. 0 This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: rachel@murraylampert.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: ·PLANNING· 760.602-4610 cg} Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov D Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov D Remarks: ENGINEERING 760-602·2750 FIRE PREVENTION 760-602-4665 REVIEW#: 1 2 3 [8]00 [8]00 [8]00 [8]00 [8]00 P-28 Plan Check No. CB 15-1908 Address 2905 Corte Celeste Date 6-22-15 Review# 1 Planner Chris Sexton Phone (760) 602-4624 APN: 255-146-50-00 Type of Project & Use: __ Net Project Density: DUlAC Zoning: P-C General Plan: RLM Facilities Management Zone: .1l CFD (in/out) #_Date of participation: __ Remaining net dev acres: __ (For non-residential development: Type of land use created by this permit: __ ) Legend: [8] Item Complete 0 Item Incomplete -Needs your action Environmental Review Required: YES 0 NO 0 TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: YES 0 NO 0 TYPE __ APPROVALIRESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: __ Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES 0 NO 0 CA Coastal Commission Authority? YES 0 NO 0 If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103, San Diego, CA 921 08-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Habitat Management Plan Data Entry Completed? YES 0 NO 0 If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) lnclusionary Housing Fee required: YES 0 NO 0 (Effective date of lnclusionary Housing Ordinance-May 21, 1993.) Data Entry Completed? YES 0 NO 0 (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Housing Tracking Form (form P-20) completed: YES 0 NO 0 N/A 0 Page 2 of 3 07111 Site Plan: ~DO ~DO ~DO ~DO ~DO ~DO ~DO ~DO ODD Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44-Neighborhood Architectural Design Guidelines 1. Applicability: YES D NO D 2. Project complies: YES D NOD Zoning: 1. Setbacks: Front: Required 1.[. Shown 15' per CT 83-16, cui-de-sacs lots are allowed to have a 15 foot front yard setback Interior Side: Required 5'6' Shown 5'6" Street Side: Required N/A Shown N/A Rear: Required 1.1 Shown 1.1 Top of slope: Required N/A Shown N/A 2. Accessory structure setbacks: N/A Front: Interior Side: Street Side: Rear: Structure separation: Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ 3. Lot Coverage: Required <40% Shown 31% 4. Height: Required <30' with min. 3:12 roof pitch Shown <30' 5. Parking: Spaces Required .f. Shown .f. (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required __ Shown __ Additional Comments OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 6-22-15 P-28 Page 3 of 3 07111 ,~'~'' ': '""': ,~.,, *' .,,~,,CITY OF PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Building@carlsbadca.gov CARLSBAD B-18 Project Address: • Permit No.: Information provided below refers to worR being done on the above mentioned permit only. This form must be completed and returned to the Building Division before the permit can be issued. B-18 Building Dept. Fax: (760) 602-8558 Number of new or relocated fixtures, traps, or floor drains ....................................................... _Q_ New building sewer line? ......................................................................................... Yes __ No / Number of new roof drains?............................................................................................................... 0 Install/alter water line?......................................................................................................................... 0 Number of new water heaters? ......................................................................................................... _Q_ Number of new, relocated or replaced gas outlets? .................................................................... _1_ Number of new hose bibs? .................................................................................................................. __Q_ Residential Permits: New/expanded service: Number of new amps: 0 Minor Remodel only: Yes____::L_ No Commercial/Industrial: Tenant Improvement: Number of existing amps involved in this project: 0 Number of new amps involved in this project: a New Construction: Amps per Panel: Single Phase ............................................................... Number of new amperes __ O _____ _ Three Phase ................................................................. Number of new amperes __ O...,..-____ _ 0 Three Phase 480 ....................... _ .................... -........... Number of new amperes _______ _ Number of new furnaces, A/C, or heat pumps? ............................................................................ __Q_ New or relocated duct wort?? .......................................................................... Yes No v Number of new fireplaces? ................................................................................................................. _Q___ Number of new exhaust fans?............................................................................................................ !}_ Relocate/install vent?............................................................................................................................ 0 Number of new exhaust hoods?........................................................................................................ l Number of new boilers or compressors? ........................................................... Number of HP 0 Page 1 of 1 Rev. 03/09