HomeMy WebLinkAbout2908 CAMINO SERBAL; ; CB001734; Permit06/06/2000
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
06/06/2000
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
Residential Permit Permit No:CB001734
Building Inspection Request Line (760) 602-2725
2908 CAMINO SERBAL CBAD
RESDNTL Sub Type:
2552830700
$276,899.00
1
Lot#:
Construction Type:
Reference #:
Structure Type:
Bathrooms:
SFD
568
VN
CT88-03
SFD
3
SHELBOURNE-LA COSTA-VILL E
PLAN 2, PHS 2, 3193 SF+638 SF GAR+55 SF PATIO
Status:
Applied:
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
ISSUED
05/03/2000
RMA
Plan Approved:
06/06/2000
PD
PC99-149
PCOO-63
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA92014
858 259-8500
Total Fees: $12,542.94
Owner:
VALLEY-CARLSBAD L P
laments To Ml $0.00 Balance Due: $12,542.94
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
in J$1,240*^
$0f?.
$27.89
$0.00
.OO
Meter Size
Htfd'l Reel. Wafeif
Wetir Fee
SDCWA P*e
CFDPa^tfif^e
PFF
PFF (CFD Furusf
License Ta
Licen
und)
on Fee
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
JING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Master Drainage Fee:
Sewer Fee:
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$4,303.24
$5,039.56
$0.00
$0.00
$0.00
$580.00
$0.00
$0.00
$0.00
$168.00
$60.00
$72.00
$0.00
$0.00
$0.00
$0.00
$12,542.94
Inspector
FINAL APPROVAL
. 3-4-* iDate:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
City of Carlsbad
Final Building Inspection
Dept: Building EripBUfng Planning CMWD StLite Fire
26"..
Plan Check #:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected
Bv:
Inspected
Bv:
Inspected
Bv:
Comments:
PCOO-63
CB001734
SHELBOURNE-LA COSTA-VILL E
PLAN 2, PHS 2, 3193 SF+638 SF GAR+55
2908 CAMINO SERBAL
Phone:
LC Water Dist: O
S*)j&7) Date /^X- r*S' Inspected: 2*/<?i
Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
SF PATIO
Lot: 568
^/ Approved: I/
Approved:
Approved:
02/22/2001
RESDNTL
SFD
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 02/26/2001
Permit* CB001734
Title: SHELBOURNE-LA COSTA-VILL E
Description: PLAN 2, PHS 2, 3193 SF+638 SF GAR+55 SF PATIO
Inspector Assignment: PD
2908 CAMINO SERBAL
Lot 568
Type:RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
APPLICANT DAVIDSON BUILDERS
Owner:
Remarks:
Phone: 7609426558
Inspei
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: JORDAN
Entered By: CHRISTINE
Act Comments
Associated PCRs
Inspection History
Description Act Insp Comments
AP PD EMR
Date
02/12/2001 39 Final Electrical
12/14/2000 18 Exterior Lath/Drywall
12/13/2000 82 Drywall/Ext Lath/Gas Test
12/11/2000 17 Interior Lath/Drywall
12/11/2000 18 Exterior Lath/Drywall
12/05/2000 16 Insulation
11 /30/2000 84 Rough Combo
10/24/2000 13 Shear Panels/HD's
10/18/2000 13 Shear Panels/HD's
10/18/2000 15 Roof/Reroof
10/17/2000 13 Shear Panels/HD's
09/05/2000 11Ftg/Foundation/Piers
08/22/2000 21 Underground/Under Floor
08/22/2000 22 Sewer/Water Service
NR PD
AP PD
CA PD
CA PD
AP PD
AP PD
AP PD
WC PD
AP PD
WC PD
AP PD
AP RB
AP RB HAS FLAPPER