Loading...
HomeMy WebLinkAbout2909 CARLSBAD BLVD; ; 73-3556; Permit• •' **;$•?£ f .. ;' : .-;••*- -.->"«'( BUILDING PERMIT APPLICATION u Permit Nor City of CARLSBAD, CALIFORNIA 92008 Applicant to complete numbered spaces only. PnOn0 7 29-1181 JOB ADDR ESS .LEGAL1 DE3CR.Alt. «*-ATTACHED SHEET! CONTRACTOR (.,-, f* '!•• •t ,-rfK /•• - * ' ^ /J-' MAIL ADDRESS LICENSE NO. ARCHITECT O* DESIGNER MAIL Aoowess LICENSE MO- MAIL ADDRESS LICENSE NO. >*-' ' ' £ LEND*!MAIL ADDRESS UBE OP BUILDINC 8 Clawofwork:D ADDITION D ALTERATION D REPAIR D MOVE D REMOVE 9 Describe work:y 10 Change of use from Change of use to f-.'ff 11 Valuation of work: $ r 2-PLAN CHECK FEE PERMIT FEE SPECIAL CONDITIONS: Const. Occupancy Group Division Size of Bldg.No. of Stories Max. «cc. Load ION ACCEPTED BY ED FOfflSSU/N* BY/ / re'l¥hj Fire Zone Use Zone Ftr« Sprinklers Required Ove No. of Dwelling OFFSTREE^ Covered/^ PARKING SPACES:•df iI Uncovered NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THtS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK »S COM- MENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THtS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOTPRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THEPROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATINGCONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. Special Approvals ZONING HEALTH DEPT. FIRE OEPT. SOIL REPORT OTHER (Specify) Required Received Not Required SIGNATURE Of CONTHACyH OR AUTHORIZED ASENT WHEN PROPERLY VALIDATED ON THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK.M.O.CASH PERMIT VALIDATION CK.M.O.CASH INSPECTOR INSPECTION RECORD FOUNDATIONS: SET BACK TRENCH REINFORCING FOUNDATION WALL & WEATHER PROOFING CONCRETE SLAB FRAMING INT. LATHING OR DRYWALL EXT. LATHING MASONRY FINAL DATE REMARKS INSPECTOR USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC, 1-29-74 Slab:: O.K. to pour very clean work. T. Mata 2-7-74 Footings are all clean and good, steel work has been done. T. Mata 3-7-74 Rebar masonary: Very good .lob, all stell cells have spacers installed for steel spacing. Moved one electric conduit out of structural cell. T. Mata 3-28-74 Slab: O.K. to pour. T. Mata 3-22-74 Kitchen area south side has bad situation at 10' opening jam. Electric iiox and conduit are obstracting grout flo. Told them to correct, do" not grout. T. Mata 4-2-74 O.K. to pour. Clean grade. Needed steel bar at top of south wall, middle of oomplotti T. Mata • 3-19-74 Grout: Very well done, steel nneded^ at top partlon corner. said he would put it in. T. Mata