Loading...
HomeMy WebLinkAbout2912 CAMINO SERBAL; ; CB001737; Permit06/06/2000 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 06/06/2000 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad Residential Permit Permit No:CB001737 Building Inspection Request Line (760) 602-2725 2912 CAMINO SERBAL CBAD RESDNTL Sub Type: SFD Status: 2552830800 Lot#: 569 Applied: $290,160.00 Construction Type: VN Entered By: Reference #: CT88-03 1 Structure Type: SFD 5 Bathrooms: 4.5 SHELBOURNE-LA COSTA-VILL E PLAN 3, PHS 2, 3359 SF+624 SF GAR+51 SF PATIO Plan Check#: ISSUED 05/03/2000 RMA Plan Approved: Issued: 06/06/2000 Inspect Area: PD Orig PC#: PC99-149 PCOO-63 Applicant: DAVIDSON BUILDERS 1302 CAMINO DEL MAR DEL MAR CA92014 858 259-8500 Owner: Total Fees: $12,902.92 N/ALLEY-CARLSBAD L P P #1400 «r r<!«|"-.V '-•"• •>"-•%)i ^V^«. , -t&i*L- JL-O"* $0.ce Due: $12,902.92 Building Permit J* Add'l Building Permit Fee ** Plan Check Add'l Plan Check Fee ^ Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $1,289.58 $0.00 $838.23io.oo(^fm) $29.0t $OJ» WO Meter Sije ^ Add'l Reel. Watrff"C|4 'ftj|tf\iffar ^aa f *fvl^L^I I CC - SDCWA Fee PFF PFF (CFD License $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 flBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Master Drainage Fee: Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $0.00 $4,303.24 $5,280.91 $0.00 $0.00 $0.00 $580.00 $0.00 $0.00 $0.00 $203.00 $60.00 $76.00 $0.00 $0.00 $0.00 $0.00 $12,902.92 Inspector*. FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 City of Carlsbad Final Building inspection Dept: Building Er^jg^oring Planning CMWD StLite Fire Plan Check #: PCOO-63 Date: 02/22/2001 Permit* Project Name: Address: Contact Person: Sewer Dist: Inspected f Bv: / Inspected Bv: Inspected Bv: Comments: CB001737 SHELBOURNE-LA COSTA-VILL E PLAN 3, PHS 2, 3359 SF+624 SF GAR+51 2912 CAMINO SERBAL Phone: LC Water Dist: O x"7>-£7 Date /f./^- Inspected: ^« Date Inspected: Date Inspected: Permit Type: RESDNTL Sub Type: SFD SF PATIO Lot: 569 Y o/ Approved: S Disapproved: Approved: Disapproved: Approved: Disapproved: City of Carlsbad Bldg Inspection Request For: 02/26/2001 Permit* CB001737 Title: SHELBOURNE-LA COSTA-VILL E Description: PLAN 3, PHS 2, 3359 SF+624 SF GAR+51 SF PATIO Inspector Assignment: PD Type: RESDNTL Sub Type: SFD Job Address: 2912 CAMINO SERBAL Suite: Lot 569 Location: APPLICANT DAVIDSON BUILDERS Owner: Remarks: Phone: 7609426558 Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs Requested By: JORDAN Entered By: CHRISTINE Act Comments Inspection History Date Description Act Insp Comments 02/12/2001 39 Final Electrical AP PD 12/14/2000 18 Exterior Lath/Drywall NR PD 12/13/2000 82 Drywall/Ext Lath/Gas Test AP PD 12/11/2000 17 Interior Lath/Drywall CA PD 12/11/2000 18 Exterior Lath/Drywall CA PD 12/05/2000 16 Insulation AP PD 10/24/2000 13 Shear Panels/HD's AP PD 10/18/2000 13 Shear Panels/HD's WC PD 10/18/2000 15Roof/Reroof AP PD 09/05/2000 11Ftg/Foundation/Piers AP PD 08/22/2000 21 Underground/Under Floor AP RB 08/22/2000 22 Sewer/Water Service AP RB