HomeMy WebLinkAboutSDP 15-10; APG CarLsbad I, LLC; 2016-0015567; Permanent Stormwater AgreementRECORDING REQUESTED BY:
DOC# 2016-0015567
1111111111111111111111111111111111111111111111111111111111111111111111
City of Carlsbad
Development Services Department
Jan 13, 2016 03:40 PM
OFFICIAL RECORDS
Ernest J. Dronenburg, Jr.,
WHEN RECORDED MAIL TO:
SAN DIEGO COUNTY RECORDER
FEES: $42.00
City Clerk
City of Carlsbad
1200 Carlsbad Village Dr.
Carlsbad, CA. 92008
PAGES 10
SPACE ABOVE THIS LINE FOR RECORDER'S USE
ASSESSOR'S PARCEL NO. 209_120_10 --------------------------PROJECT ID. SDP 15-10
PROJECT NAME: Carlsbad Oaks North
PERMANENT STORMWATER QUALITY BEST MANAGEMENT PRACTICE MAINTENANCE
AGREEMENT
DATE OF AGREEMENT: JClf\\AD..f'-) llt 7 ;)... 0 / ~
APG Carlsbad I, LLC, SR22 Carlsbad Oaks Distribution, LLC, and
OWNER NAME: PRE IV C Oaks, LLC
PROJECT NAME: Carlsbad Oaks North
RESOLUTION NUMBER: City Planner letter, Approval Date: Oct. 26, 2015
CONDITION NUMBER: 24 -------------------------------------------------
DRAWING NUMBER: DWG 489-4A ~~~~~~-------------------------------------
STORM WATER MANAGEMENT PLAN (SWMP) NUMBER: _S_W_M_P_1_5-_2_3 ____ _
This Agreement is made and entered into by and between the City of Carlsbad, California, a
Municipal Corporation of the State of California, hereinafter referred to as "City"; and the Property
Owner, its successors and assigns, hereinafter referred to as "Owner". The term "successors and
assigns" as used in this Agreement includes, but is not limited to, an "Association" as defined in
Civil Code Section 1351 (a) and commonly referred to as a property owners association.
RECITALS
WHEREAS, Owner is proceeding to develop a property more particularly described in
Exhibit A, hereinafter referred to as "the Property"; and
IIFILES01V\Departments\CED\LandDev\PROJECTSISDPISDP 15\SDP 15-10 Carlsbas Oaks-Tecla\B & AIPERMANENT STORMWATER QUALITY BMP MAINTENANCE
AGREEMENT.doc 1
WHEREAS, development of the Property has been approved by the City, and is subject to
the requirements of the State of California Regional Water Quality Control Board-San Diego Region
Order No. ORDER NO. R9-2007-01/NPDES NO. CAS0108758, as promulgated within the City of
Carlsbad Public Works Department, Storm Water Standards Manual, 2004 Edition, hereinafter
referred to as "storm water regulations" and incorporated herein by this reference; and
WHEREAS, the Owner is required to comply with all Federal, State and Local storm water
regulations by employing permanent post-construction Best Management Practices (BMP's),
hereinafter referred to as "permanent BMP(s)" to ensure impacts to storm water quality are
mitigated to the Maximum Extent Practicable (MEP) prior to being discharged from the Property;
and
WHEREAS, the City and the Owner, its successors and assigns agree that the health
safety, and welfare of the residents of Carlsbad, California, require that permanent BMP(s) be
established, constructed, inspected, and operated and maintained in perpetuity on the Property;
and
WHEREAS, the storm water regulations require that permanent BMP(s) be established,
constructed and adequately inspected, operated and maintained by the Owner, its successors and
assigns, including any homeowner or property owner association; and
WHEREAS, the Owner has caused to be prepared a Storm Water Management Plan
(SWMP) report and drawing(s) which together detail the objectives, design, construction, inspection
and operation and maintenance responsibility requirements of the permanent BMP(s)
recommended to mitigate impacts to storm water quality due to the development of the Property,
hereinafter collectively referred to as the "Storm Water BMP Plan" and incorporated herein by this
reference; and,
WHEREAS, storm water regulations require that the City ensure the continued
existence and inspection, operation and maintenance of the permanent BMP(s); and
WHEREAS, the City has required the recordation of this Agreement as a condition of
approval of the project that secures the construction, inspection, operation and maintenance of on-
\IFILES01V\Departments\CED\LandDev\PROJECTSISDPISDP 15\SDP 15-10 Carlsbas Oaks-Tecla\B & AIPERMANENT STORMWATER QUALITY BMP MAINTENANCE
AGREEMENT.doc 2
site permanent BMP(s) by the Owner, its successors and assigns, including any property owners
association, in perpetuity, and
NOW, THEREFORE, in consideration of the approval of this project, the foregoing
promises, the mutual covenants contained herein, and the following terms and conditions,
Owner and City agree as follows:
1. Owner shall comply with all the requirements of said storm water regulations and any
applicable amendments thereto, and with any other provisions of law.
2. The permanent BMP(s) shall be established and constructed by Owner, its successors
and assigns, in accordance with the plans and specifications identified in the Storm Water BMP
Plan and modification to the approved permanent BMP(s) shall not be made without prior approval
of the City Engineer.
3. Owner, its successors and assigns, including any homeowner or property owner
association, shall adequately, inspect, operate and maintain the permanent BMP(s). This includes
private (non-public) pipes and channels built to convey storm water to the facility, as well as all
private structures, improvements, and vegetation provided to control the quantity and quality of the
storm water runoff and any associated practices and programs. Adequate maintenance is herein
defined as good working condition so that the permanent BMP(s) are performing in accordance with
their design objectives and functions.
4. Owner, its successors and assigns, shall inspect applicable permanent BMP(s) as often
as conditions require, or at frequencies recommended in the approved Storm Water BMP Plan, but
in any event at least once each year prior to the rainy season. The purpose of the inspection is to
assure continued safe and proper functioning of the facilities. The inspection shall cover the entire
facilities, berms, outlet structure, pond areas, access roads, etc. Owner shall submit an inspection
report annually to the City in a form as proscribed in the Storm Water BMP Plan or as may be
proscribed by the City. Deficiencies shall be noted in the inspection report. Any deficiencies,
repairs or maintenance obligations shall be noted in a record form and immediately remedied by the
Owner.
\IFILES01V\Departments\CED\LandDev\PROJECTSISDP\SDP 15\SDP 15-10 Carlsbas Oaks-Tecla\8 & AIPERMANENT STORMWATER QUALITY BMP MAINTENANCE
AGREEMENT.doc 3
5. Owner shall maintain inspection, operation and maintenance records for at least five (5)
years. These records shall be made available to the City for inspection upon request at any time.
6. Owner, its successors and assigns, hereby grant permission to the City, its authorized
agents and employees, to enter upon the Property and to inspect the permanent BMP(s) whenever
the City deems necessary. The purpose of inspection is to follow-up on reported deficiencies to
respond to State and Federal mandated storm water facility inspection requirements and/or to
respond to citizen complaints. The City shall provide Owner, its successors and assigns, copies of
the inspection findings and a directive to commence with the repairs or corrective measures if
necessary.
7. In the event the Owner, its successors and assigns, fails to take corrective action to
maintain the permanent BMP(s) in good working condition acceptable to the City, the City may
enter upon the Property and take whatever steps necessary to correct deficiencies identified in the
inspection report and to charge the costs of such repairs to the Owner, its successors and assigns.
This provision shall not be construed to allow the City to erect any structure of permanent nature on
the land of the Owner outside of the easement for the permanent BMP(s), if an easement is
provided, or outside the limits of the permanent BMP(s) facility footprint described on the Storm
Water BMP Plan, if an easement is not provided. It is expressly understood and agreed that the
City is under no obligation to routinely maintain or repair said facilities, and in no event shall this
Agreement be construed to impose any such obligation on the City.
8. Owner, its successors and assigns, will perform the work necessary to keep the
permanent BMP(s) in good working order as appropriate. In the event a maintenance schedule for
the permanent BMP(s) is outlined in the approved Storm Water BMP Plan, the schedule shall be
followed.
9. In the event the City pursuant to this Agreement, performs work of any nature, or
expends any funds in performance of said work for labor, use of equipment, supplies, materials,
and the like, the Owner, its successors and assigns, shall reimburse the City upon demand, within
thirty (30) days of receipt thereof for all actual costs incurred by the City hereunder. If not paid
\IFILES01V\Departments\CED\LandDev\PROJECTSISDPISDP 15\SDP 15-10 Carlsbas Oaks-Tecla\8 & AIPERMANENT STORMWATER QUALITY BMP MAINTENANCE
AGREEMENT.doc 4
within the prescribed time period, the City shall secure a lien against the Property in the amount of
such costs. The actions described in this section are in addition to and not in lieu of any and all
legal remedies available to the City as a result of Owner's failure to maintain the permanent
BMP(s).
10. Owner agrees that the permanent BMP(s) are privately-owned, operated and
maintained by the Owner and acceptance of the work by the City shall not constitute a responsibility
of the City to maintain them nor a Waiver of Defects by City.
11. Owner agrees that all residual material that is a byproduct of the proper operation and
maintenance of permanent post-construction BMP's (waste) will be disposed of according to all
federal, state and local regulations.
12. Unless otherwise specifically provided herein, all notices, demands or other
communications given hereunder shall be in writing and shall be deemed to have been duly
delivered upon personal delivery, or by Federal Express (or similar reputable express delivery
service) or by facsimile transmission with back-up copy mailed the same day, or as of the second
business day after mailing by United States Certified Mail, return receipt requested, postage
prepaid, addressed as shown below. Notices required to be given to Owner shall be addressed as
follows:
Notices to the Owner shall be delivered to the following:
Name: APG Carlsbad I, LLC,
SR22 Carlsbad Oaks Distribution, LLC, and
PRE IV C Oaks, LLC
Address: 127 Lomas Santa Fe Dr.
Solana Beach, CA 92075
Telephone No.: (858) 314-3116
Notices to City shall be delivered to the following:
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
Attention: City Engineer
Telephone No.: (760) 602-2730
Facsimile No.: (760) 602-8562
\\FILES01V\Departments\CEDILandDev\PROJECTS\SDP\SDP 15\SDP 15-10 Carlsbas Oaks-Tecla\B & A\PERMANENT STORMWATER QUALITY BMP MAINTENANCE
AGREEMENT.doc 5
Each party shall notify the other immediately of any changes of ownership or
address that would require any notice delivered hereunder to be directed to another Owner and/or
to another address. In the event Owner fails to notify City of any change of ownership, the new
Owner and the Owner whose name appears above, or whose name and address has been
subsequently provided to the City pursuant to this provision, shall jointly be responsible for the
operation and maintenance of any permanent post-construction BMP's on the Property and for any
required annual verification statements until such time as the City is provided notification of the
name and address of the new or subsequent Owner, pursuant to the provisions of this section.
13. The City or any officer or employee thereof shall not be liable for any injury to persons
or property occasioned by reason of the acts or omission of Owner, its agents or employees in the
performance of this Agreement. Owner further agrees to protect and hold harmless City, its officials
and employees from any and all claims, demands, causes or action, liability or loss of any sort
because or arising out of acts or omissions of Owner, its agents or employees in the performance of
this Agreement, including claims, demands, causes of action, liability, or loss because of or arising
out of the design or construction of the permanent post-construction BMP facilities. Said
indemnification and Agreement to hold harmless shall extend to injuries to person and damages or
taking of property resulting from the design or construction of said permanent BMP(s) as provided
herein, and to adjacent property owner as a consequence of the diversion of waters from the
design, construction or maintenance of drainage systems, streets, and other improvements.
14. This Agreement shall be recorded against the Property and shall constitute a covenant
running with the land and shall be binding upon Owner.
15. Invalidation of any one of the provisions of this Agreement shall in no way effect any
other provisions and all other provisions shall remain in full force and effect.
Ill
Ill
Ill
Ill
\\FILES01V\Departments\CED\LandDev\PROJECTS\SDP\SDP 15\SDP 15-10 Carlsbas Oaks-Tecla\B & A\PERMANENT STORMWATER QUALITY BMP MAINTENANCE
AGREEMENT.doc 6
LEGAL DESCRIPTION
Order Number: NCS-728411-SD
Page Number: 9
Real property in the City of Carlsbad, County of San Diego, State of California, described as
follows:
PARCEL A:
LOT 13 OF CARLSBAD TRACT NO. 97-13-02, CARLSBAD OAKS NORTH PHASE 2, IN THE CITY OF
CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF
NO. 15505, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY,
JANUARY 23, 2007 AS DOCUMENT 2007-0047588 OF OFFICIAL RECORDS.
PARCEL B:
NON-EXCLUSIVE EASEMENTS FOR PEDESTRIAN INGRESS AND EGRESS, BRUSH MANAGEMENT
AND DRAINAGE OVER THE COMMON AREAS AS SET FORTH AND SUBJECT TO THE TERMS AND
PROVISIONS CONTAINED IN THAT CERTAIN "DECLARATION OF COVENANTS, CONDITIONS
AND RESTRICTIONS FOR CARLSBAD OAKS NORTH BUSINESS PARK" RECORDED FEBRUARY 5,
2007 AS INSTRUMENT NO. 2007-0081082 OF OFFICIAL RECORDS.
APN: 209-120-10-00
First American litle Insurance Company