HomeMy WebLinkAboutCD 16-07; COASTLINE COMMUNITY CHURCH; Admin Decision LetterMay 26, 2016
Bryan Smith
Fuscoe Engineering, Inc.
Suite 170
6390 Greenwich Drive
San Diego, CA 92122
SUBJECT: CD 16-07 -COASTLINE COMMUNITY CHURCH
The City Planner has completed a review of your application for the Coastline Community Church, {APN:
255-273-07-00) which is a modification to the existing circulation and parking. The proposed
modifications include:
• The addition of 25 parking spaces
• Removal of a pergola and landscape
In order for a Discretionary Permit Consistency Determination to be approved, all of the following
findings must be made:
1} No project condition, feature, facility or amenity is changed or deleted that had been considered
essential to the project's design, quality, safety or function.
2} The request represents an upgrade in overall design features and or materials and improves
upon the project's compatibility with the surrounding neighborhood.
3) The proposed revision does not change the density or boundary of the subject property.
4) The proposed revision does not involve the addition of a new land use not shown on the original
permit.
5) The proposed revision does not rearrange the major land uses within the development.
6} The proposed revision does not create changes of greater than ten percent provided that
compliance will be maintained with the applicable development standards of the Carlsbad
Municipal Code.
7) The proposed change will not result in any significant environmental impact, and/or require
additional mitigation.
8} The proposed change would not result in any health, safety or welfare impacts.
9} There were not any major issues or controversies associated with the original project which
would be exacerbated with the proposed change.
10} The proposed change would not be readily discernable to the decision makers as being
substantially different from the project as originally approved.
Community & Economic Development
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
CD 16-07 -COASTLINE.(:OMM~ITY CHURCH
~ -~
May 26, 2016. ,,, ·" .. ~ ii "1. F•
Page 2
After careful consideration of the circumstances surrounding this request, the City Planner has
determined that the application qualifies for a consistency determination with the approved permit and
therefore, approves the changes to the project based on Planning Division Administrative Policy No. 35.
Please submit two (2) blueline copies (24" X 36") of all applicable exhibits for the project file and a
reproducible 24" X 36" mylar copy of the amended site plan. The mylar must be submitted, stamped
"Consistency Determination," and signed by the City Planner prior to issuance of any grading or building
permits for the project. The Consistency Determination Title Block stamp, and other Title Block stamps,
can be downloaded from the City's website at
http://www.carlsbadca.gov/services/depts/planning/applications.asp. The Title Block (stamp) is located
at the bottom of the page.
If you have any questions regarding this matter, please feel free to contact your project planner, Christer
Westman at (760) 602-4614.
CITY OF CARLSBAD
DON NEU, AICP
City Planner
DN:CW:fn
c: Jim Grant, 5051 Avenida Encinas, Carlsbad, CA 92009
David Rick, Project Engineer
File Copy
Data Entry
HPRM