Loading...
HomeMy WebLinkAboutCD 16-07; COASTLINE COMMUNITY CHURCH; Admin Decision LetterMay 26, 2016 Bryan Smith Fuscoe Engineering, Inc. Suite 170 6390 Greenwich Drive San Diego, CA 92122 SUBJECT: CD 16-07 -COASTLINE COMMUNITY CHURCH The City Planner has completed a review of your application for the Coastline Community Church, {APN: 255-273-07-00) which is a modification to the existing circulation and parking. The proposed modifications include: • The addition of 25 parking spaces • Removal of a pergola and landscape In order for a Discretionary Permit Consistency Determination to be approved, all of the following findings must be made: 1} No project condition, feature, facility or amenity is changed or deleted that had been considered essential to the project's design, quality, safety or function. 2} The request represents an upgrade in overall design features and or materials and improves upon the project's compatibility with the surrounding neighborhood. 3) The proposed revision does not change the density or boundary of the subject property. 4) The proposed revision does not involve the addition of a new land use not shown on the original permit. 5) The proposed revision does not rearrange the major land uses within the development. 6} The proposed revision does not create changes of greater than ten percent provided that compliance will be maintained with the applicable development standards of the Carlsbad Municipal Code. 7) The proposed change will not result in any significant environmental impact, and/or require additional mitigation. 8} The proposed change would not result in any health, safety or welfare impacts. 9} There were not any major issues or controversies associated with the original project which would be exacerbated with the proposed change. 10} The proposed change would not be readily discernable to the decision makers as being substantially different from the project as originally approved. Community & Economic Development Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov CD 16-07 -COASTLINE.(:OMM~ITY CHURCH ~ -~ May 26, 2016. ,,, ·" .. ~ ii "1. F• Page 2 After careful consideration of the circumstances surrounding this request, the City Planner has determined that the application qualifies for a consistency determination with the approved permit and therefore, approves the changes to the project based on Planning Division Administrative Policy No. 35. Please submit two (2) blueline copies (24" X 36") of all applicable exhibits for the project file and a reproducible 24" X 36" mylar copy of the amended site plan. The mylar must be submitted, stamped "Consistency Determination," and signed by the City Planner prior to issuance of any grading or building permits for the project. The Consistency Determination Title Block stamp, and other Title Block stamps, can be downloaded from the City's website at http://www.carlsbadca.gov/services/depts/planning/applications.asp. The Title Block (stamp) is located at the bottom of the page. If you have any questions regarding this matter, please feel free to contact your project planner, Christer Westman at (760) 602-4614. CITY OF CARLSBAD DON NEU, AICP City Planner DN:CW:fn c: Jim Grant, 5051 Avenida Encinas, Carlsbad, CA 92009 David Rick, Project Engineer File Copy Data Entry HPRM