Loading...
HomeMy WebLinkAboutCD 2017-0020; UPTOWN BRESSI RETAIL CENTER; Admin Decision LetterAugust 28, 2017 Norman Barrett Smith Consulting Architects Suite 125 13280 Evening Creek Drive San Diego, CA 92126 SUBJECT: CD 2017-0020 (DEV12023)-UPTOWN BRESSI RETAIL CENTER Ccityof Carlsbad The City Planner has completed a review of your application for a Consistency Determination, CD 2017- 0020, which is a modification to the Uptown Bressi Retail Center located at the southwest corner of Palomar Airport Road and El Fuerte Street, north of Gateway Road, and east of Colt Place. The proposed modifications to the retail center will occur on the following Sheet Numbers: Sheet ASl: • Add parking stalls behind Buildings A and B • Add parking stalls in front of Building C • Revise parking layout between Buildings C and H • Add decorative festoon lighting between Buildings E and Data minimum height of 14 feet above the street surface Sheet AS2: • Revise the roof plan layout to reflect the building changes at Buildings C and G Sheet AS3: • Revise site section Building D to reflect the Building D tower change Sheet A2: • Floor plan E: add additional storefront on the west-facing elevation consistent with the center's architecture • Floor plan F: revise the location of the mechanical and fire riser rooms in order to add additional west-facing storefront consistent with the center's architecture Community & Economic Development Planning Division j 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov CD 2017-0020 (DEV12023}-UPTOWN BRESSI RETAIL CENTER August 28, 2017 Pa e 2 Sheet A4: • Elevations a, b, d, e & g: note the height of the festoon lighting above finish floor • Elevations band d -Building D: revise northwest tower height to 35 feet similar to other tower elements within the center • Elevation d-Building D: revise southwest tower height to 30 feet similar to other tower elements within the center • Elevation g -Building E: add storefront at the northwest elevation consistent with the center's architecture • Elevation h -Building F: add storefronts at the northwest and southwest elevations consistent with the center's architecture • Elevations g and h -Buildings E and F: add minor fa~ade changes to accommodate the addition of the additional storefronts Sheet AS: • Elevation b-Building G: add tower element to northwest elevation at a height of 35 feet similar to other tower elements within the center • Elevation f-Building G: add tower element to northwest elevation at a height of 35 feet similar to other tower elements within the center In order for a Discretionary Permit Consistency Determination to be approved, all of the following findings must be made: 1} No project condition, feature, facility or amenity is changed or deleted that had been considered essential to the project's design, quality, safety or function in that the overall number of parking spaces provided will meet the minimum number {491 spaces) required, and the addition of parallel parking spaces behind the proposed market and pharmacy will not interfere with truck circulation. 2} The request represents an upgrade in overall design features and or materials and improves upon the project's compatibility with the surrounding neighborhood in that minor fa~ade changes to accommodate the additional storefronts matches the approved design theme of the center and represents an overall upgrade. 3} The proposed revision does not change the density or boundary of the subject property. 4) The proposed revision does not involve the addition of a new land use not shown on the original permit. 5) The proposed revision does not rearrange the major land uses within the development. 6} The proposed revision does not create changes of greater than ten percent provided that compliance will be maintained with the applicable development standards of the Carlsbad Municipal Code. 7} The proposed change will not result in any significant environmental impact, and/or require additional mitigation. 8} The proposed change would not result in any health, safety or welfare impacts. 9} There were not any major issues or controversies associated with the original project which would be exacerbated with the proposed change. CD 2017-0020 {DEV12023) -UPTOWN BRESSI RETAIL CENTER August 28, 2017 Pa e 3 10} The proposed change would not be readily discernable to the decision makers as being substantially different from the project as originally approved in that the revised tower height to Building D and added vertical architectural relief (tower) to Building G is similar in height and design to other tower elements within the center. After careful consideration of the circumstances surrounding this request, the City Planner has determined that the application qualifies for a consistency determination with the approved permit and therefore, approves the changes to the project based on Planning Division Administrative Policy No. 35. A signed copy of the approved plan is attached for your records. If you have any questions regarding this matter, please feel free to contact your project planner, Greg Fisher ·at {760) 602-4629. CITY OF CARLSBAD ~~ DON NEU, AICP City Planner GF:sc Attachment: Approved Exhibits c: Min Kang, Shea Properties, Suite 200, 130 Vantis, Aliso Viejo, CA 92656 David Rick, Project Engineer File Copy Data Entry HPRM