SUBJECT: CD 2019-0022 (DEV99-035) -POINSETTIA PARK -PHASE IV PARKING & RESTROOM
The City Planner has completed a review of your application for Consistency Determination CD 2019-0022
(APN: 214-140-1300), which is a modification to CUP 05-12 to include a parking lot and a restroom at the
northeast corner of the park, east of the tennis courts and on a vacant pad. The restroom would have
similar architecture and materials as other restrooms in the park. Both the parking lot and restroom would
be constructed at a later date as part of Phase IV park improvements. Prior to their construction, the Parks
& Recreation Department will include them in a MP update for City Council approval. A Consistency
Determination is requested so the parking lot and restroom may be included in the proposed MP update.
BACKGROUND
The California Coastal Commission (CCC) issued a Coastal Development Permit (CDP 6-92-182) for
Poinsettia Park on February 16, 1992. The approval included 20,000 square feet of building coverage and
412 parking spaces. The City Council adopted Resolution No. 92-255 at its August 11, 1992 meeting,
accepting the MP and approving Alternative A-2 in the MP, which included a 22,500 square-foot
community center/gymnasium, 2,800 square-foot tennis clubhouse, and 412 parking spaces. Finally, the
Planning Commission approved the conditional use permit for Poinsettia Park (CUP 92-05, superseded by
CUP 05-12) on October 7, 1992. The approval was consistent with the City Council-approved Alternative
A-2.
The MP was updated at the City Council's December 9, 2014 meeting. At that meeting the City Council
directed staff to pursue proposals for a feasibility study and business plan for an expansive two story
multi-use, multi-generational community recreation center at the park, which would replace the tennis
clubhouse, community center/gymnasium, and other uses. In 2017, the City Council determined
Poinsettia Park was not a feasible location for a multi-generational center. A dog park and pickleball
courts instead of the center were later approved. The remaining unplanned area of the MP is now
proposed for use as restroom and a parking lot.
After careful consideration of the request, the City Planner has determined that the request meets all of
the findings below and APPROVES this request. This request only conceptually approves a parking lot and
restroom at the northeast park corner. It does not approve the design of the parking lot or a specific
number of spaces. For approval of project specifics, more plan details and review will be necessary.
In order for a Discretionary Permit Consistency Determination to be approved, all of the following findings
must be made:
Community & Economic Development
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
co 2019-0022 (DEV99-03s)-PO1Nsm1A PARK 3'sJ ~~G & RESTROOM
October 31, 2019 · ,,., ""
Pa e 2
1) No project condition, feature, facility or amenity is changed or deleted that had been considered
essential to the project's design, quality, safety or function in that the project does not propose
removing any existing features and/or amenities and the site plan substantially conforms to the
original approval.
2) The request represents an upgrade in overall design features and or materials and improves upon
the project's compatibility with the surrounding neighborhood in that the restroom structure will
include similar architecture and materials as the existing restrooms; is a needed amenity in the
northeast area of the park and will complement the surrounding area; and is a typical park use.
Further, developing a vacant unimproved area with a parking lot and restroom will improve the
appearance of the park's main entrance and will provide a desired, conveniently accessible
public amenity.
3) The proposed revision does not change the density or boundary of the subject property in that
Poinsettia Park is designated for public park and not residential uses and the restroom and
parking lot do not represent an intensification of park uses or change park boundaries.
4) The proposed revision does not involve the addition of a new land use not shown on the original
permit in that the addition of a restroom and parking lot is consistent with the existing park
features approved by the original and amended CUP and no land use other than those
associated with park development are proposed.
5) The proposed revision does not rearrange the major land uses within the development in that no
land uses will be rearranged. The proposed restroom and parking lot would be located on a pre-
graded, undeveloped area of the park that was shown for parking and building development by
the original and amended CUP.
6) The proposed revision does not create changes of greater than ten percent provided that
compliance will be maintained with the applicable development standards of the Carlsbad
Municipal Code in that the MP was originally approved with 412 parking spaces. Currently, 361
parking spaces have been constructed and the proposed additional parking would not exceed
the maximum number approved. The MP was originally approved with a 22,500 square-foot
community center/gymnasium and 2,800 square-foot tennis clubhouse. While these features
have been omitted from the MP through subsequent approvals of other improvements, the
proposed restroom will be approximately 800 square feet and will not result in a change of
greater than ten percent of the approved building square footage.
7) The proposed change will not result in any significant environmental impact, and/or require
additional mitigation in that the proposed restroom and parking lot will be constructed on an
existing graded site that is surrounded by existing park uses. Building and grading permits will
be required for construction of the proposed amenities, which will ensure that construction
complies will all local, state and federal requirements.
8} The proposed change would not result in any health, safety or welfare impacts in that the
restroom structure and parking lot will meet all applicable standards, including parking,
grading, landscaping, structural and building code requirements.
CD 2019-0022 {DEV99-035) -POINSETTIA PARK -PHASE IV PARKING & RESTROOM
October 31, 2019
Pa e 3
9) There were not any major issues or controversies associated with the original project which would
be exacerbated with the proposed change in that there were no major issues or controversies
associated with the original approval {CUP 05-12).
10) The proposed change would not be readily discernable to the decision makers as being
substantially different from the project as originally approved in that the features shown in the
proposed MP Amendment are consistent with those approved by the CUP. The restroom design
will complement the existing restrooms; it will be conveniently located in the northeast end of
the park for patrons using the pickleba/1 courts, tennis courts, and the future dog park; and it
will serve a need that would have been included in the community center. The proposed parking
lot will be located in an area that was shown as parking in the original MP and will provide
additional parking facilities for patrons.
Therefore, the City Planner has determined that the application qualifies for a consistency determination
with the approved permit and approves the changes to the project based on Planning Division
Administrative Policy No. 35.
Please submit two (2) blueline copies (24" X 36") of all applicable exhibits for the project file. This could
include an overall site plan of the park with location of new uses shown. On the plans, please make sure
to note the restroom's architectural and material compatibility with the existing park restrooms. The
copies must be submitted, stamped "Consistency Determination," and signed by the City Planner prior to
issuance of any grading or building permits for the project. The Consistency Determination Title Block
stamp, and other Title Block stamps, can be downloaded from the City's website at
http://www.carlsbadca.gov/services/depts/planning/applications.asp. The Title Block (stamp) is located
at the bottom of the page.
If you have any questions regarding this matter, please feel free to contact your project planner, Pam
Drew at 760-602-4644.
CITY OF CARLSBAD
DON NEU, AICP
City Planner
DN:PD:mf
c: Scott Donnell, Senior Engineer
Tim Carroll, Project Engineer
HPRM/File Copy