HomeMy WebLinkAboutCDP 2018-0001; SELHAY ADU; Admin Decision Letters so'\-^
BFiitcon ^atyof
CarlstDadMINOR COASTAL DEVELOPMENT PERMIT
NOTICE OF DECISION
May 30, 2018
Ron Selhay
7260 Mimosa Drive
Carlsbad, CA 92011
RE: GDP 2018-0001 (DEV2018-0001) - SELHAY ADU
The city has completed a review of the application for a Minor Coastal Development Permit for the
development of a detached 1,200 square foot one-story Accessory Dwelling Unit (ADU) located at 7260
Mimosa Drive (APN 215-550-38-00)
It IS the City Planner's determination that the project GDP 2018-0001 (DEV2018-0001) - SELHAY ADU, is
consistent with the city's applicable Coastal Development Regulations (Chapters 21 201 - 21 205) and with
all other applicable city ordinances and policies The City Planner, therefore, APPROVES this request
based upon the following
1 That the total cost of the proposed development is less than $60,000
2 That the proposed development requires no discretionary approvals other than a Minor Coastal
Development Permit
3 That the development is in conformity with the public access and public recreation policies of Chapter
3 of the Coastal Act, in that no opportunities for coastal access are availabie from the subject site, nor
are public recreation areas required of the project because the project Is not located adjacent to the
shore
4 The proposed development will have no adverse effect on coastal resources, in that the location of
the property is not Immediately adjacent to any body of water and the lot is already disturbed and
developed with a single-family home
5 That the proposed development is in conformance with the Certified Local Coastal Program and all
applicable policies in that the site is designated for residential uses in that the site Is designated R-4
Residential which allows for residential development including a single-family home and an ADU
The development request is to construct a detached 1,200 square foot ADU located at the rear
portion of the site. The proposed one-story ADU will not obstruct views of the coastline as seen
from public lands or the public right-of-way, nor otherwise damage the visual beauty of the coastal
zone. No agricultural uses currently exist on the site, nor are there any sensitive resources located
on the property. Furthermore, the proposed ADU is not located in an area of known geologic
Instability or flood hazards.
Community & Economic Development
Planning Dn/ision 11635 Faraday Avenue Carlsbad, CA 92008-73141760-602-4600 | 760-602-8560 f | www carlstadca gov
CDP 2018-0001 (DEV2018-0001) - SELHA\^ADU, -
May 29,2018 ' ' ' '
Page 2
6 The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (Chapter
21 203 of the Zoning Ordinance) in that the project wiii adhere to the dty's Master Drainage Plan,
Grading Ordinance, Storm Water Ordinance, BMP Design Manual and Jurlsdictional Runoff
Management Program (JRMP) to avoid increased urban runoff, pollutants, and soil erosion No
steep slopes or native vegetation is located on the subject property and the site Is not located in an
area prone to landslides, or susceptible to accelerated erosion, floods, or liquefaction.
7 That the request for a minor coastal development permit was adequately noticed at least ten (10)
working days before the date of this decision pursuant to Section 21 201 080(B) and (C) of the
Carlsbad Coastal Development Regulations
8 That the City Planner has determined that the project is exempt from the requirements of the
California Environmental Quality Act (CEQA) per Section 15303 - New Construction or Conversion of
Small Structures of the State CEQA Guidelines and will not have any adverse significant impact on the
environment
9 The City Planner has reviewed each of the exactions imposed on the Developer contained in this
resolution, and hereby finds, in this case, that the exactions are imposed to mitigate impacts caused
by or reasonably related to the project, and the extent and the degree of the exaction is in rough
proportionality to the impact caused by the project
Conditions;
1 The City Planner does hereby APPROVES the Minor Coastal Development Permit, CDP 2018-0001, for
the project entitled Selhay ADU, (Exhibits "A" - "E"), dated May 30, 2018, on file in the Planning
Division and incorporated by this reference, subject to the conditions herein set forth
2 If any of the following conditions fail to occur, or if they are, by their terms, to be implemented and
maintained over time, if any of such conditions fail to be so implemented and maintained according
to their terms, the city shall have the right to revoke or modify all approvals herein granted, deny or
further condition issuance of all future building permits, deny, revoke or further condition all
certificates of occupancy issued under the authority of approvals herein granted, record a notice of
violation oh the property title, institute and prosecute litigation to compel their compliance with said
conditions or seek damages for their violation No vested nghts are gained by Developer or a
successor in interest by the city's approval of this Minor Coastal Development Permit
3 Staff IS authorized and directed to make, or require the Developer to make, all corrections and
modifications to the Minor Coastal Development Permit documents, as necessary to make them
internally consistent and in conformity with the final action on the project Development shall occur
substantially as shown on the approved Exhibits Any proposed development different from this
approval, shall require an amendment to this approval
4 The Developer shall comply with all applicable provisions of federal, state, and local laws and
regulations in effect at the time of building permit issuance
5 If any condition for construction of any public improvements or facilities, or the payment of any fees
in-lieu thereof, imposed by this approval or imposed by law on this Project are challenged, this
approval shall be suspended as provided in Government Code Section 66020 If any such condition is
determined to be invalid this approval shall be invalid unless the City Council determines that the
project without the condition complies with all requirements of law
V,
CDP 2018-0001 {DEV2018-0001) - SELHAY ADU
May 29, 2018
Page 3
"I
6 Developer/Operator shall and does hereby agree to mdemnrfy, protect, defend, and hold harmless
the City of Carlsbad, its Council members, officers, employees, agents, and representatives, from and
against any and all liabilities, losses, damages, demands, claims and costs, including court costs and
attorney's fees incurred by the city arising, directly or indirectly, from (a) City's approval and issuance
of this Minor Coastal Development Permit, (b) City's approval or issuance of any permit or action,
whether discretionary or nondiscretionary, in connection with the use contemplated herein, and (c)
Developer/Operator's installation and operation of the facility permitted hereby, including without
limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or
other energy waves or emissions This obligation survives until all legal proceedings have been
concluded and continues even if the city's approval is not validated
7 This approval shall become null and void if building permits are not issued for this project within 24
months from the date of project approval
8. Developer shall pay the citywide Public Facilities Fee imposed by City Council Policy #17, the License
Tax on new construction imposed by Carlsbad Municipal Code Section 5 09 030, and CFD #1 special
tax (if applicable), subject to any credits authonzed by Carlsbad Municipal Code Section 5 09 040
Developer shall also pay any applicable Local Facilities Management Plan fee for Zone 6, pursuant to
Chapter 21 90 All such taxes/fees shall be paid at issuance of building permit If the taxes/fees are
not paid, this approval will not be consistent with the General Plan and shall become void
I
9 Prior to the issuance of the building permrt, Developer shall submit to the city a Notice of Restriction
to be filed in the office of the County Recorder, subject to the satisfaction of the City Planner, notifying
all interested parties and successors in interest that the City of Carlsbad has issued a Minor Coastal
Development Permit on the property Said Notice of Restriction shall note the property descnption,
location of the file containing complete project details and all conditions of approval as well as any
conditions or restrictions specified for inclusion in the Notice of Restriction The City Planner has the
authority to execute and record an amendment to the notice which modifies or terminates said notice
upon a showing of good cause by the Developer or successor in interest
10 Approval of this request shall not excuse compliance with all applicable sections of the Zoning
Ordinance and all other applicable city ordinances in effect at time of building permit issuance, except
as otherwise specifically provided herein
11 Prior to hauling dirt or construction materials to or from any proposed construction site within this
project. Developer shall apply for and obtain approval from, the City Engineer for the proposed haul
route
CDP 2018-0001 (DEV2018-0001) - SELHAY ADU
May 29, 2018
Page 4
NOTICE
The project srte is within the appealable area of the California Coastal Commission This Minor Coastal
Development Permit (CDP) shall not become effective until ten (10) working days have elapsed, without
a valid appeal being filed with the Coastal Commission, following the Coastal Commission's receipt of the
city's notice of the CDP issuance ("Notice of Final Action") The filing of a valid appeal with the Coastal
Commission within such time limit shall stay the effective date of this CDP until such time as a final decision
on the appeal is reached by the Coastal Commission
Please take NOTICE that approval of your project includes the "imposition" of fees, dedications,
reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions "
You have 90 days from date of final approval to protest imposition of these fees/exactions If you protest
them, you must follow the protest procedure set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with
Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent
legal action to attack, review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT
APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading or other
similar application processing or service fees in connection with this project, NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute
of limitations has previously otherwise expired
If you have any questions regarding this matter, please feel free to contact Chns Sexton at 760-602-4631
or by email at chns sexton@carlsbadca gov
CriY OF CARLSBAD
^ ^
TERI DELCAMP
Pnncipal Planner
TDCSdh
Don Neu, City Planner
Tim Carroll, Project Engineer
California Coastal Commission (NoFA)
HPRM/File Copy
Data Entry