Loading...
HomeMy WebLinkAboutEA 2017-0007; CANNON PARK RESTROOM; Admin Decision LetterMemorandum July 19, 2017 To: From: Via Re: Aeryn Donnelly-Terrey, Park Planner q.f: f'fTI Drew, Associate Planner \)'11'ave de Cordova, Principal Planner EA 2017-0007 (PUB2017-0026) -CANNON PARK RESTROOM (cicyof Carlsbad Thank you for submitting an Early Assessment to construct a permanent restroom facility to replace the existing temporary restroom at Cannon Park. The restroom will have two ADA accessible bathrooms and one non-ADA accessible bathroom. The structure would be 22 feet 8 inches long by 12 feet 8 inches wide and approximately 13 feet tall with approximately 50 square feet of additional concrete impervious paving material to accommodate the new ADA path of travel from the existing sidewalk into the ADA accessible stalls. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of an Early Assessment is to provide you with direction and comments on the overall concept of your project. This Early Assessment does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. The Cannon Park site is zoned Open Space (OS}, which allows public restrooms as accessory to a primary permissible use, i.e., a public park. In the OS zone, a public park is permissible subject to issuance of a conditional use permit (CUP} by the Planning Commission, in accordance with the findings, conditions, and development standards and special regulations contained in Carlsbad Municipal Code (CMC} Chapter 21.42. Planning Division staff could find no record of a CUP having been issued for Cannon Park. Therefore, please submit a CUP application to the Planning Division for Planning Commission consideration of all existing and contemplated park-related uses on the site, including the proposed restroom facilities. Please note the special standards and regulations in CMC 24.42.140(8}(100} relating to public parks, including the need to include a master park site plan exhibit (see attachment}. The master park site plan exhibit shall inclu9e the general location of and maximum anticipated site area and building area of existing and proposed major and accessory park uses. Community & Economic Development Planning Division 1635 Faraday Avenue I Carlsbad, CA 92008 I 760-602-4600 I 760-602-8560 fax EA 2017-0007 (PUB2017-0026)-CANNON PARK RESTROOM July 19, 2017 Page 2 2. The project is located in.the Agua Hedionda Lagoon Segment of the Local Coastal Program (area of deferred certification) and may require a CDP issued by the California Coastal Commission (CCC) once local permits have been obtained. Please contact the San Diego Coast District Office of the CCC at (619) 767-2370 to discuss whether a Coastal Development Permit (CDP) issued by the CCC will be needed. 3. The proposed restroom facility may be found exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15303(d) & (e) -concerning new construction of small structures such as restroom facilities and utility extensions. Land Development Engineering: 4. Regarding temporary construction BMP/SWPPP requirements, concurrent the project design, applicant shall complete a Determination of Project's SWPPP Tier Level and Construction Threat Level Form pursuant to City Engineering Standards. Developer shall also submit the appropriate Tier level Storm Water Compliance form and appropriate Tier level Storm Water Pollution Prevention Plan (SWPPP) to the satisfaction of the city engineer. 5. Regarding permanent post-construction BMP requirements, concurrent the project design, applicant must complete the City's Stormwater Standards Questionnaire (E-34 form) .. Based on the outcome of the E-34, the project will either be subject to Standard Storm Water requirements or Priority Development Project (PDP) requirements. If determined to be subject to Standard Stormwater requirements, Applicant shall complete the City's E-36 form and incorporate applicable Standard Stormwater requirements into the project design. If determined to be a PDP, concurrent with design, Applicant shall prepare a Storm Water Quality Management Plan prior to approval of the project and incorporate all Standard Stormwater requirements together with Treatment Control (post-construction) BMPs and applicable hydromodification BMPs into the project design all in accordance with the City BMP Design Manual, latest version. If you would like to schedule a meeting to discuss this letter with your staff planner, please contact Pam Drew, Associate Planner at ext. 4644. DD:PD:sc c: Don Neu, City Planner Scott Donnell, Senior Planner Jeremy Riddle, Acting Senior Engineer File Copy Data Entry Attachment