HomeMy WebLinkAboutPRE 2019-0021; PATEL RESIDENCE; Admin Decision LetterOctober 4, 2019
Larry Lipkin
13607 Powers Rd
Poway CA 92064
FILE
LA 4..~ 1~v\ lD f Y / /'f
SUBJECT: PRE 2019-0021 (DEV2019-0162) -PATEL RESIDENCE
APN: 210-115-08-00
{"Cityof
Carlsbad
Thank you for submitting a preliminary review for the construction of a 5,345-square-foot, two-story
single-family residence, with an attached garage located in a 2,430-square-foot basement and attached
639-square-foot accessory dwelling unit (ADU) proposed on the east side of Carlsbad Boulevard, between
Cerezo Drive and Manzano Drive. The project site, an approximately 7,245-square-foot (0.16 acres) lot,
is currently undeveloped.
In response to your application, the Planning Division has prepared this comment letter. Please note that
the purpose of a preliminary review is to provide you with direction and comments on the overall concept
of your project. This preliminary review does not represent an in-depth analysis of your project. It is
intended to give you feedback on critical issues based upon the information provided in your submittal.
This review is based upon the plans, policies, and standards in effect as of the date of this review. Please
be aware that at the time of a formal application submittal, new plans, policies, and standards may be
in effect and additional issues of concern may be raised through a more specific and detailed review.
Planning:
General
1. General Plan and zoning designations for the property are as follows:
a. General Plan: R-4 Residential, 0-4 units/ac. Growth Management Control Point of 3.2 units/ac.
b. Zoning: R-1, One-Family Residential Zone
2. The property is located within the Appeal Jurisdiction and the Mello II Segment of the Local Coastal
Program. The Coastal land use designation and zone are the same as the General Plan and Zoning
above.
3. The project requires the following permits:
a. Coastal Development Permit (CDP). The project site is located within Coastal Development
Regulations for the Mello II Segment; a CDP is required pursuant to the provisions of the Local
Coastal Program (Carlsbad Municipal Code [CMC] Section 21.201.080).
Community & Economic Development
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
PRE 2019-0021 (DEV2019-0162)-PATEL RESIDENCE
October 4, 2019 3~'~:~ ·• ff ,. :i·· Page 2 ~,a:t. I -.· ~J. ',
b. Landscape plan. The plan will require•citv:, r~~i~w and,_appr~va~ if the area proposed to be
landscaped exceeds 500 square feet, and will have to comply with the city's landscape manual at
the following link:
http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24086
The applications will require action by the Planning Commission. Although the Planning
Commission's action is final, the project is appealable to the City Council, as well as the Coastal
Commission per CMC Section 21.201.130.A.
4. Based on the floor plans submitted (nine bedrooms and an ADU), the design and function of the house
and ADU reflect uses that would be inconsistent with the R-1 (One-Family) zone requirements. The
inconsistencies will not be supported by staff when processing a formal application. Please revise the
plans to reflect a design and function that would be aligned with the R-1 zone.
5. Pursuant to CMC Section 21.10.050, the proposed single-family residence exceeds the building height
of 24 feet with a roof pitch less than 3:12. The property owner is requesting a variance for height.
However, staff would be unable to make the necessary variance findings, pursuant to CMC Section
21.50.050, to support the request for a variance. The findings must show a hardship unique to the lot
which would warrant the variance. Staffs review did not observe any apparent hardship based on
the information presented for this preliminary review.
6. If a Variance application is submitted, the applicant must submit pertinent justifications per form P-4
which may be found on the city's website at the following link:
http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24129
7. The proposed loft will not be permitted as it appears to exceed the 24-foot height limit, however the
elevator is allowed to exceed the height limit pursuant .to CMC Chapter 21.46-020 -Allowed
protrusions above height limits.
8. The project appears to propose a parking garage basement. For this area not to be included in the
overall building height, it must qualify as a basement. Not enough information was provided to
determine if the garage qualifies as a basement. For this reason, a "basement exhibit" consistent with
CMC Section 21.04.045 must be provided with a formal application. If the lower garage level does not
qualify as a basement, building height will be measured from the existing grade or finished grade,
whichever is lower to the roof above. As proposed the plan exceeds the 24-foot height requirement
with less than a 3:li roof pitch.
9. Walls and fences are limited to a height of 42 inches in the front yard setback, including any required
safety railing. Walls over 30 inches may require a safety railing and, therefore, may not be permitted
in the front yard setback. Please contact the Building Division to determine what retaining walls may
require a safety railing.
10. The maximum height of walls within a side yard or rear yard setback is six (6) feet. Please provide
cross sections of the walls with the formal submittal.
PRE 2019-0021 (DEV2019-0162) -PATEL RESIDENCE
October 4, 2019
Page 3
11. New forthcoming requirements related to the city's Climate Action Plan {CAP) will likely impact
development requirements of this project. A formal application submittal will need to include a
completed CAP Checklist (Form P-30) to determine what requirements will apply to the project. New
CAP requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water
heating and traffic demand management requirements, as set forth in City Council Ordinance Nos.
CS-347, CS-348, CS-349 and CS-350 and City Council Resolution No. 2019-024 which are available on
the city's website at the fo_llowing address:
http://www.carlsbadca.gov/services/depts/pw/environment/cap/ordinances.asp
To the extent that some or all of the new CAP requirements are in effect at the time of application for
grading or building permits, the project will be required to comply with the effective requirements
even if different than what is proposed in the project's planning approvals. CAP requirements may
impact, but are not limited to, site design and local building code requirements. Once adopted as part
ofTitle 18 and in effect, plans submitted for grading or building permits must demonstrate compliance
with the new CAP requirements. If incorporating new CAP requirements results in substantial
modifications to the project after planning approvals are obtained, then prior to issuance of grading
or building permits, the applicant may be required to submit and receive approval of a Consistency
Determination or an Amendment application for the project through the Planning Division.
12. The plans for the Coastal Development Permit shall include all applicable information as listed in
Planning Form P-6 -Minor Coastal Development Permit/Single Family Residence on the city's website
at the following address:
https://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24831
All necessary application forms, submittal requirements, and fee information are available at the Planning
counter located in the Faraday Building at 1635 Faraday Avenue or online at
http://www.carlsbadca.gov/services/depts/planning/default.asp. You may also access the General Plan
Land Use Element and the Zoning Ordinance online at the website address shown; select Department
Listing; select Planning Home Page. Please review all information carefully before submitting.
Land Development Engineering:
1. Complete a Stormwater Standards Questionnaire. This questionnaire will guide you and the City in
determining what type of reports and storm water mitigation must be completed to satisfy state and
City storm water quality requirements. The questionnaire can be printed from the following website
link:
http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=22711
2. Preliminary analysis suggests that the project is a Standard Project and subject to installing site design
and source control BMPs per Chapter 4 of the Carlsbad BMP Design Manual and per the Standard
Project Requirement Checklist (E36) that will also need to be completed. The link to the form is at:
http://www.carlsbadca.gov/civicax/fi1ebank/blobdload.aspx?Blob1D=30141
PRE 2019-0021 (DEV2019-0162)-PATEL RESIDENCE
October 4, 2019
Page4
3. Plot three point turns for passenger vehicles using the MSHTO P-Vehicle turn templates for two cars
parked at the garage entrance. Both vehicles shall be able to make a three point turn to drive out of
the driveway onto Carlsbad Boulevard in a forward position. The driveway width at 13 feet does not
provide adequate space to make these turns. Twenty-four feet is typically the distance needed to
provide proper turns. Driveways as narrow as twenty feet wide have provided enough space when at
grade level and the back of the car can overhang planter areas beyond the driveway edge, but such a
condition is not applicable per this subterranean design.
4. Provide several cross sections across the property. Show proposed retaining wall and footings in
relation to the property line as well as side yard drainage conditions (i.e. positive drainage from
building, distance to drainage swale, etc.) complying with Section 1804.3 of the California Uniform
Building Code. Plot temporary vertical and sloping back cuts needed to construct the garage wall and
retaining wall at the northerly property line.
5. A Future Improvement Agreement will be required for public street improvements (curb, gutter,
sidewalk, etc.) along the property frontage.
6. Plot drain inlet, pipe and sump pump to address driveway drainage and garage back wall drains.
7. Provided the fire department can support a 20% driveway grade, the city engineer can support this
grade. Generally, the fire department can support a 20% grade if they determine they will not need
to access the driveway during an emergency.
8. Provide finish grades of the raised two-tiered front yard.
Building:
1. Project shall meet local C.A.P. requirements and the 2019 California Building Codes will be effective
January 1, 2020.
1. Fire comments to be sent under separate cover, if any.
PRE 2019-0021 (DEV2019-0162) -PATEL RESIDENCE
October 4, 2019
Page 5
If you would like to schedule a meeting to discuss this letter with the commenting departments, please
contact Chris Sexton at the number below. You may also contact each department individually as follows:
• Planning Division: Chris Sexton, Associate Planner, at (760) 602-4631
• Land Development Engineering: David Rick, Project Engineer, at (760) 602-2781
• Fire Department: Randy Metz, Fire Inspections, at (760) 602-4661
• Building: Mike Peterson, Building, at (760) 602-2721
Sincerely,
~/4
DON NEU, AICP
City Planner
DN:CS:mf
c: Raj Patel, 3170 Vista Way, Oceanside CA 92056
David Rick, Project Engineer
Fire Prevention
HPRM/File Copy
Data Entry