Loading...
HomeMy WebLinkAboutPRE 2020-0012; LA COSTA GLEN PROFESSIONAL OFFICE BUILDING; Admin Decision LetterJuly 1, 2020 Paul J. Klukas 1530 Faraday Ave., Suite 100 Carlsbad, CA 92008 Ccityof Carlsbad SUBJECT: PRE 2020-0012 (DEV2020-0118) LA COSTA GLEN PROFESSIONAL OFFICE BUILDING APN: 255-012-05-00 Thank you for submitting a preliminary review of a four-lot subdivision which includes the construction of an approximately 20,000-square-foot (sq. ft.) office building on a 3.15-acre vacant lot proposed at APN: 255-012-05-00, located on the west side of Calle Barcelona, west of El Camino Real. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of a preliminary review is to provide you with direction and comments on the overall concept of your project. This preliminary review does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. Planning: General 1. General Plan and zoning designations for the property are as follows: a. General Plan: R-Regional Commercial b. Zoning: P-C-Planned Community c. Master Plan: Green Valley Master Plan -MP 92-0l(B) d. The project is located within the Coastal Zone and is within the East Batiquitos Lagoon/Hunt Properties Segment. 2. The project requires the following permits and the Planning Commission will be the decision-making authority: a. Nonresidential Planned Unit Development Permit (PUD) b. Site Development Plan (SDP) c. Coastal Development Permit (CDP) d. Hillside Development Permit (HDP) e. Habitat Management Plan Permit (HMP) f. Minor Subdivision (MS) Community Development Department Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov PRE 2020-0012 (DEV2020-0118)-LA COSTA GLEN PROFESSIONAL OFFICE BUILDING June 29, 2020 Pa e 2 3. The proposed project was previous~;;!J: 'ro'. for a General Plan Amendment (GPA) 06-02, Master Plan Amendment (MP) 92-d'fM Local Coastal Program Amendment (LCPA) 06-01, Habitat Management Plan Permit (HMP) 06-11, Site Development Plan (SDP) 05-16, Hillside Development Permit (HDP) 05-11, Coastal Development Permit (CDP) 05-51 and Minor Subdivision (MS) 05-28 , including the adoption of a Mitigated Negative Declaration. The non-legislative development permits (the HMP, SDP, HDP and CDP) have expired because the subdivision map MS 05-28 expired in 2018. The GPA, MP, and LCPA were approved to designate two lots (Parcel 3 and Parcel 4) to an Open Space (OS) Land Use designation on the General Plan and to correct some mapping errors, and to include the additional OS designation for Planning Area 2 of MP 92-0l(B). The LCPA was required to incorporate the changes on the LCP Land Use Map and approve the modification to the Green Valley Master Plan. The city subsequently updated the General Plan Land Use designation and the LCP Land Use Map to reflect the GPA. A condition of approval from Resolution No. 6215 for the MP required the applicant to submit a digital copy and a camera-ready master copy of the amended Green Valley Master Plan -MP 92-0l(B) to the City Planner reflecting the amendments from the GPA and LCPA. However,the condition of approval was not satisfied and will be required to be completed as part of the proposal for the development of the office building. 4. A project description which is required to be included with the application must provide details regarding the use of the existing parking lot on Parcel 2 -who uses it, if it is part of an agreement with adjacent properties, and if the proposed project would affect any existing agreements. In addition, with the subdivision of the property into two lots, an access easement agreement over Parcel 2 for the benefit of Parcel 1 will be required as a condition of the subdivision. Depending on how parking and access on the two parcels is designed, reciprocal access agreements between the two parcels may· be required. 5. The project site is subject to the General Community Development Guidelines contained within the Green Valley Master Plan, Section IV, pages IV-l-lV-34, which includes standards related to grading, pedestrian and bicycle trails, landscape guidelines, signage and lighting. The project site is also located within Planning Area 2 -Retail Center of the Green Valley Master Plan and will require compliance with development standards such as building height, setbacks and parking as listed in the Master Plan, which can be located in Section VI, pages Vl-15 -Vl-25. 6. The project is subject to the design criteria listed in the Green Valley Master Plan. The design of the office should reflect an architectural design that is consistent with the existing retail center south of Calle Barcelona known as The Forum. The project as proposed is appealing; however, is not consistent with the architectural style and materials of The Forum. The office should be harmonious in style, materials, colors, design elements, and roof lines. For the comprehensive list of design criteria, please refer to the development standards for Planning Area 2 -Retail Center found in Section VI, pages Vl- 19 -Vl-21. 7. The site plan should include details regarding loading, refuse collection and storage areas. Loading, refuse collection and storage areas shall be in the rear of the office building and must be screened to minimize visibility from public rights-of-way or parking areas. For more information, please refer to -------------· ------ PRE 2020-0012 {DEV2020-0118}-LA COSTA GLEN PROFESSIONAL OFFICE BUILDING June 29, 2020 Pa e 3 the development standards for Planning Area 2 -Retail Center in the Green Valley Master Plan found in Section VI, pages Vl-23 -Vl-24. 8. New requirements related to the city's goals to reduce greenhouse gas (GHG} emissions will likely impact development requirements of this project. A formal application submittal will need to include a completed Climate Action Plan Checklist (Form P-30} to determine what requirements will apply to the project. New GHG reduction requirements are related to energy efficiency, photovoltaic, electric vehicle charging, water heating and traffic demand management requirements, as set forth in the California Green Building Standards Code and in Carlsbad Municipal Code (CMC} Chapters 18.21, 18.30 and 18.51 which is available on the city's website at the following address: http://www.qcode.us/codes/carlsbad/view.php?topic=18&frames=on To the extent that new GHG reduction requirements are in effect at the time of application for grading or building permits, the project will be required to comply with the effective requirements even if different than what is proposed in the project's planning approvals. GHG reduction requirements may impact, but are not limited to, site design and local building code requirements. If incorporating new GHG reduction requirements results in substantial modifications to the project after planning approvals are obtained, then prior to issuance of grading or building permits, the applicant may be required to submit and receive approval of a Consistency Determination or an Amendment applicatlon for the project through the Planning Division. 9. An updated Biological Resources Technical Report (BTR} prepared by a registered biologist in accordance with the specific requirements of CMC Chapter 21.210, and the Habitat Management Plan for Natural Communities in the City of Carlsbad (HMP} is required with the submittal of the application to develop the proposed office building. More information regarding the HMP can be referenced online at: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?BloblD=27193 The BTR is a required document that will need to address any changes to conditions of biological resources on the site, update information on potential impacts as a result of the project, and additional recommended mitigation, if any. The project is also in the Coastal Zone within the East Batiquitos Lagoon/Hunt Properties Segment; therefore, there shall be no net loss of sensitive upland or riparian habitat, and preservation of coastal sage scrub and maritime succulent scrub is required. There are additional conservation standards to be applied in the Coastal Zone such as a 20-foot buffer between preserved upland habitats and development. For guidelines on the required contents of the BTR and Coastal Zone requirements, please reference the "Guidelines for Biological Studies," which can be referenced online at: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24331 10. The project shall demonstrate compliance with the Hillside Development Regulations contained within CMC Chapter 21.95 and the Hillside Development and Design Guidelines, which may be referenced online at: https://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?BloblD=24084 PRE 2020-0012 (DEV2020-0118)-LA COSTA GLEN PROFESSIONAL OFFICE BUILDING June 29, 2020 Pa e4 11. The development proposal appears to affect steep slopes (i.e., 25 percent inclination or greater), which may possess endangered plant/animal species and/or coastal sage scrub and chaparral plant communities (referred to as dual criteria slopes). A Slope Analysis/Vegetation Constraints Map must be submitted to the city with any initial project application which analyzes dual criteria slopes in accordance with the Hillside Development Regulations (CMC Chapter 21.95). Procedures for hillside mapping can lie found in CMC Section 21.95.130. 12. A conceptual landscape plan shall be submitted with the project application in compliance with the city's Landscape Manual. Please show all existing trees to be removed on the landscape plan. The Landscape Manual can be found online at: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24086. 13. The project is subject to City Council Policy Statement No. 84, Development Project Public Improvement Policy. Pursuant to the Policy, applicants are required to send a public notice within 30 days of submittal of development applications. Please see the Policy for additional information: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=24117 14. Please show all existing and proposed walls and fences and include height and material details.Please refer to the Green Valley Master Plan for design criteria regarding height and materials for walls and retaining walls, contained within Section VI, page Vl-22. Wall and fence height shall be measured from the lowest adjacent grade on either side. Please clearly show wall heights measured from the lowest adjacent grade. All necessary application forms, submittal requirements, and fee information are available at the Planning counter located in the Faraday Building at 1635 Faraday Avenue or online at http://www.carlsbadca.gov/services/depts/planning/default.asp. You may also access the General Plan Land Use Element and the Zoning Ordinance online at the website address shown; select Department Listing; select Planning Home Page. A digital copy of the Green Valley Maser Plan can be obtained by emailing Jessica Bui, Associate Planner, at iessica.bui@carlsbadca.gov. Please contact the Planning Division to schedule an appointment to submit the application at (760)602-4610 or planning@carlsbadca.gov. Land Development Engineering: 1. Complete a Stormwater Standards Questionnaire, Form E-34, to determine whether this project is subject to 'Priority Development Project' (PDP) requirement or 'Standard Project' requirements. The questionnaire is available in the city website at: http://www.carlsbadca.gov/civicax/filebank/blobdload.aspx?Blob1D=22711 Preliminary analysis suggests that the project is a Priority Development Project and must comply with PDP stormwater requirements of the BMP Manual. A Storm Water Quality Management Plan (SWQMP) must be prepared and submitted at time of application. PRE 2020-0012 (DEV2020-0118}-LA COSTA GLEN PROFESSIONAL OFFICE BUILDING June 29, 2020 Pa e 5 2. Biofiltration basins are preferred for stormwater pollutant control. Use of proprietary BMP technologies may only be accepted if basins are infeasible. 3. A preliminary hydrology study will be required to determine the pre-development and post- development discharge flows. Provide preliminary recommendations to mitigate any increase in flows. 4. Since the project's total ADT exceeds 110 ADT, the project is required to prepare a Traffic Impact Analysis (TIA} using the City of Carlsbad traffic impact analysis (TIA} guidelines available in the city website at: http:ljwww.carlsbadca.gov/civicax/filebank/blobdload.aspx?B1ob1D=22758 5. If the project's employee ADT exceeds 110 ADT, the project is required to prepare a Transportation Demand Management Plan. A draft TOM plan will be required for the discretionary application and an approved TOM plan will be required prior to the issuance of a building permit. 6. An additional VMT Analysis consistent with our VMT Analysis Guidelines may be required for CEQA purposes. Currently our TIA guidelines do not include this but will soon be updated to reflect the changes. 7. Submit preliminary Geotechnical Study that provides design recommendations for this proposed development including grading of building pads for all outdoor building structures, and design recommendations for treatment BMPs and hydromodification facilities proposed for this project. 8. A preliminary title report dated within 6 months of the application date is required with the submittal of a discretionary application. 9. Meet with the Fire Department to identify the necessary fire protection measures required for this project (additional fire hydrants, sprinkler system, etc.). 10. The project is located within a Very High Fire Hazard Zone. The minimum width for the drive aisle is 28 feet subject to Fire Department approval. The plan has been sent to the Fire Department for comments on this issue. 11. Provide a letter from OMWD regarding the water line in the drive aisle. It should address whether the dead-end water line is acceptable for the fire flow and water service and also whether the water line shall be public or private. 12. Provide a letter from a CASP consultant regarding whether ADA access is required from Calle Barcelona. 13. The previously approved project required a bus stop on Calle Barcelona. Coordinate with NCTD as to whether this bus stop is still required. PRE 2020-0012 (DEV2020-0118)-LA COSTA GLEN PROl'ESSIONAL OFFICE BUILDING June 29, 2020 Pa e 6 1. All construction submittal drawings shall be submitted to the Fire Department for review in accordance with the California Fire Code. Please contact Darcy Davidson, Assistant Fire Marshal at Darcy.Davidson@carlsbadca.gov or (760) 602-4665 for more information regarding applicable Fire codes and policies. If you would like to schedule a meeting to discuss this letter with the commenting departments, please contact Jessica Bui at the number below. You may also contact each department individually as follows: • Planning Division: Jessica Bui, Associate Planner, at (760) 602-4631 • Land Development Engineering: Allison Mclaughlin, Project Engineer, at (760) 602-2732 • Fire Department: Darcy Davidson, Assistant Fire Marshal, at {760) 602-4665 DON NEU, AICP City Planner DN:JB:mf c: Continuing Life Communities, LLC, 1940 Levante St., Carlsbad, CA 92009 Allison Mclaughlin, Project Engineer Fire Prevention HPRM/File Copy Data Entry