SUBJECT: SDP 2018-0008 (DEV2016-0015)-VIASAT BRESSI RANCH CAMPUS-1ST EXTENSION
The Planning Division has completed its review of your application for the first extension of Minor Site
Development Plan SDP 2018-0008 -VIASAT BRESSI RANCH CAMPUS, submitted on October 19, 2020.
The Minor Site Development Plan, which allows for the development of one (1) office building totaling
100,000 square feet (SF), expansion of a previously-approved parking structure, and associated site
modifications, was approved on December 26, 2018, with an expiration date of December 26, 2020.
After careful consideration of the circumstances surrounding this request, it has been determined that (1)
the first extension of Minor Site Development Plan SDP 2018-0008 -VIASAT BRESSI RANCH CAMPUS
was submitted in a timely manner prior to the expiration date, and (2) that the findings required for
granting a Minor Site Development Plan extension can be made; therefore, the City Planner APPROVES
the first extension of Minor Site Development Plan SDP 2018-0008 -VIASAT BRESSI RANCH CAMPUS
for two (2) years from December 26, 2020, to December 26, 2022, based on the following findings and
conditions.
Findings:
1. All the findings contained in City Planner approval letter dated December 26, 2018 for S.DP 2018-
0008 -VIASAT BRESSI RANCH CAMPUS, apply to this extension and are incorporated herein by
reference and remain in effect.
2. That the first extension of Minor Site Development Plan SDP 2018-0008 remains consistent with the
General Plan, all titles of the Carlsbad Municipal Code and growth management program policies and
standards in place at this time.
3. The City Planner has determined that:
A. The project is a subsequent activity of the Bressi Ranch Master Plan, MP 178(K), a project for
which a program EIR was prepared, and this activity is within the scope of the program
approved earlier, and that the program EIR adequately describes the activity for the purposes
of CEQA); [15168(c)(2) and (e)]; and
B. This project is consistent with the Master Plan cited above; and
Community Development Department
Planning Division I 1635 Faraday Avenue Carlsbad, CA 92008-7314 I 760-602-4600 I 760-602-8560 f I www.carlsbadca.gov
SDP 2018-0008 (DEV2016-0015)-VIASAT BRESSI RANCH CAMPUS-lST EXTENSION
November 19, 2020
Pa e 2
C. The Bressi Ranch Master Plan Final EIR 98-04 was certified by the City Council on July 9, 2002
in connection with the prior project or plan; and
D. The project is consistent with the Climate Action Plan (CAP} through compliance with the
CAP checklist and the incorporation of project design features that reduce GHG emissions;
E. The project has no new significant environmental effect not analyzed as significant in the prior
EIR; and
F. None of the circumstances requiring a Subsequent EIR or a Supplemental EIR under CEQA
Guidelines Sections 15162 or 15163 exist; and
G. All feasible mitigation measures or project alternatives identified in the EIR 98-04, which are
appropriate to this Subsequent Project, have been completed, incorporated into the project
design or are required as conditions of approval for this Subsequent Project.
Conditions:
Note: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of a grading
permit or building permit, whichever occurs first.
1. This first extension of Minor Site Development Plan SDP 2018-0008 is granted from December 26,
2020, to December 26, 2022. If building permits for this project are not obtained within this time
period, the Minor Site Development Plan will expire on December 26, 2022, unless extended per
Sections 21.58.040 and 21.201.210 of the Carlsbad Municipal Code.
2. All of the conditions contained in City Planner approval letter dated December 26, 2018 for SDP •
2018-0008-VIASAT BRESSI RANCH CAMPUS apply to this first extension and are incorporated herein
by reference and remain in effect except for Condition No. 10, which is superseded by Condition No.
1 of this approval letter.
CITY OF CARLSBAD
TERI DELCAMP
Principal Planner
TD:CJ:cf
c: David Rick, Project Engineer
Don Neu, City Planner
Data Entry