HomeMy WebLinkAboutEA 16-04; PAR Widening at PDN; Project CorrespondenceMemorandum September 19, 2016 To: From: -~Daniel Zimny, Associate Engineer ~ ~ Pam Drew, Associate Planner .ru_~Dave de Cordova, Principal Planner Via Re: \1" EA 16-04-PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE Thank you for submitting an Early Assessment to: '1) extend by 50 feet the two left turn lanes from eastbound Palomar Airport Fload (PAR) to northbound Paseo Del Norte in addition to a 120 foot transitional taper lane; and 2) create a 230-foot long full dedicated right turn lane from eastbound PAR to southbound Paseo Del Norte in addition to a 120-foot longer taper transition. Signal modification, utility and signage relocation, sidewalk modification and ADA compliant curb ramps are also included in this portion of the project. The dedicated turn lanes will be located within the city and Caltrans public rights- of-way. In response to your application, the Planning Division has prepared this comment letter. Please note that the purpose of an Early Assessment is to provide you with direction and comments on the overall concept of your project. This Early Assessment does not represent an in-depth analysis of your project. It is intended to give you feedback on critical issues based upon the information provided in your submittal. This review is based upon the plans, policies, and standards in effect as of the date of this review. Please be aware that at the time of a formal application submittal, new plans, policies, and standards may be in effect and additional issues of concern may be raised through a more specific and detailed review. ' Planning: General 1. The project is exempt from environmental review per CEQA Guidelines Section 15301(c), minor alterations to existing higlhways and ~treets, sidewalks, gutters, bicycle and pedestrian trails and similar facilities involving negligible or no expansion of an existing use. 2. The project is located in the coastal zone, therefore, a Coastal Development Permit (CDP) application will need to be submitted to the city. land Development Engineering: 1. Based on the City's Stormwater Standards Questionnaire (E-34 form) provided with this application, this project is subject to Priority Development (PDP) Project requirements which require (among other things) Treatment Contrail (post-construction) BMP's. Concurrent with initial design, prepare a preliminary Storm Water Quality Management Plan (SWQMP) and incorporate all Standard & Economic Planning Division 1635 Faraday Avenue I Carlsbad, CA 92008 I 760-602-4600 I 760-602-8560 fax EA 16-04-PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE September 15, 2016 Pa e 2 Stormwater requirements together with Treatment Control (post-construction) BMP's and applicable hydromodification BMP's into the project design all in accordance with the City BMP Design Manual, latest version. Based on our cursory review the plans do not incorporate any post-construction BMP's. 2. After completion of a SWQMP, the construction plans shall be revised to include the construction Treatment Control (post-construction) BMP's and applicable hydromodification BMP's. Refer to the city Engineering standards for title sheet information on documenting TCBMP's for GIS inventory. 3. Please coordinate with city maintenance staff regarding location, access, easements and long-term maintenance permanent TCBMP's. 4. Since the proposed widening does not include parkway area behind the sidewalk, please coordinate with public utility companies regarding dry-utility conflicts or relocations. Clarify whether additional utility easements are required as part ofthis widening. 5. Directional (dual) pedestrian ramps are required per City Standards. Please secure CASp input whether the proposed apex pedestrian ramp meets current accessibility requirements. If you would like to schedule a meeting to discuss this letter with your staff planner, please contact Pam Drew, Associate Planner at ext. 4644, or your staff engineer, Jason Geldert, City Engineer at ext. 2758. DN:PD:sj c: Don Neu, City Planner Jason Geldert, City Engineer Scott Donnell, Senior Planner File Copy Data Entry .•.. - - - - ·--.... Darnell &AssociATEs, INc . TRANSPORTATION PLANNING & TRAFFIC ENGINEERING March 14, 2008 Susan Buchenau VP Asset Management Strategic Property Advisers, Inc. · 3250 Vista Diego Road · Jamul, CA 91935 D&A Ref. No.: 060809 Subject: Traffic Study for the Proposed Carlsbad Paseo Retail and Restaurant Project (CUP 07-03 /CDP 07-07) Dear Ms. Buchenau: In response to the City of Carlsbad's February 14,2008 comments, Darnell & Associates, Inc. (D&A) has revised our January l 0, 2008 traffic impact study for the proposed Carlsbad Paseo retail and restaurant project located on Paseo Del Norte between Cannon Road and Palomar Airport Road in the City of Carlsbad. A copy of our responses to each of the City's comments is pr<:>vided directly behind this letter and in the Appendix K. TILis report analyzes the traffic impacts associated with the proposed project on local roadways and interse1ctions under ~xisting, existing plus project, near term cumulative, near term cumulative plus project, 2030, and 2030 plus project conditions. If you have any questions, please feel free to contact the office. Sincerely, DARNELL & ASSOCIATES, INC . .Q~ ;-k-7~...-:- Sabita Tewani, AICP Senior Transportation Planner BillE Darnell, P.E. Firm Principal RCE22338 Bed/vsh/ cmt/v ls/st 060809 _Carlsbad_Paseo-Rpt4_(Mar 08)/03-08 Date Signed. 1446 FRONT STREET • SUITE 300 • SAN DIEGO, CA92101 PHONE: 619-233-9373 • FAX: 519-233-4034. E-mail: office@darnell-assoc.com - - - TRAFFIC STUDY FOR CARLSBAD P ASEO IN THE CITY OF CARLSBAD (CUP 07-03/ CDP 07-07) Submitted To: Strategic Property Advisers 3250 Vista Diego Road Jamul, CA 91935 Submitted By: Darnell & Associates, Inc. 1446 Front Street, Third Floor San Diego, CA 92101 619-233-9373 March 14,2008 060809 _Carlsbad _Paseo-Rpt4 _(Mar 08) TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................................... ! SECTION I -INTRODUCTION ............................................................ , ..................................................................... 2 PROJECT DESCRIPTION ........................................................................................................................................ 2 CONGESTION MANAGEMENT PROGRAM ........................................................................................................ 2 SCENARIOS STUDIED ........................................................................................................................................... 2 LEVEL OF SERVICE ............................................................................................................................................... 5 ANALYSIS METHODOLOGY ........................................... : .................................................................................... 5 REPORT ORGANIZATION ..................................................................................................................................... 6 SECTION II-EXISTING CONDITIONS .................................................................................................................... 7 EXISTING ROADWAY CHARACTERISTICS ...................................................................................................... 7 ROADWAY SEGMENT DAILY TRAFFIC ............................................................................................................ 7 KEY INTERSECTIONS ......................................................................................................................................... ! 0 INTERSECTION TRAFFIC COUNTS ................................................................................................................... ! 0 EXISTING LEVEL OF SERVICE CONDITIONS ..................................................... ~ ........................................... lO Existing Roadway Segments ................................................................................................. : .............................. 1 0 -Existing Intersections .......................................................................................................................................... 11 Existing Queuing Analysis ................................................................................................................................... 12 Existing Ramp Meters .......................... _. ................................................................................................................ 13 SECTION III-PROJECT RELATED CONDITIONS ............................................................................................... l4 TRIP GENERATION .............. ; ................................................................ ,. .............................................................. 14 TRIP DISTRIBUTION/TRIP ASSIGNMENT ........................................................................................................ l4 SECTION IV -IMP ACTS .......................................................................................................................................... 17 LEVELS OF SIGNIFICANCE STANDARDS ....................................................................................................... 17 EXISTING PLUS PROJECT CONDITIONS ......................................................................................................... 17 Existing Plus Project Roadway Segments ........................................................................................................... 17 Existing Plus Project Intersections ................................................................................. :· .................................... 20 Existing Plus Project Queuing Analysis .............................................................................................................. 20 Existing Plus Project Ramp Meters ..................................................................................................................... 22 NEAR TERM CUMULATIVE CONDITIONS ...................................................................................................... 22 Near Term Cumulative Traffic Volumes .............................................................................................................. 22 Near Term Cumulative Roadway Network .......................................................................................................... 22 NEAR TERM CUMULATIVE WITH PROJECT CONDITIONS ......................................................................... 27 Near Term Cumulative Roadway Segments ......................................................................................................... 27 Near Term Cumulative Intersections ................................................................................................................... 27 Near Term Cumulative Queuing Analysis ............................................................................... _ ....... ~ ................... 31 Near Term Cumulative Ramp Meters .................................................................................................................. 32 2030 CONDITIONS ................................................................................................................................................ 32 2030 Roadway Network ....................................................................................................................................... 32 2030 Trqffic Volumes .......................................................................................................................................... 32 2030 WITH PROJECT CONDITIONS ................................................................................................................... 32 2030 Roadway Segments ..................................................................................................................................... 37 2030 Intersections ............................................................................................................................................... 37 2030 Queuing Analysis ........................................................................................................................................ 40 2030 Ramp Meters ............................................................................................................................................... 40 SECTION V -PROJECT ACCESS AND CIRCULATION ....................................................................................... 42 PROJECT ACCESS ................................................................................................................................................ 42 Paseo Del Norte/Car Country Drive/North Project Access ................................................................................ 42 Paseo Del Norte/Carlsbad Company Stores/South Project Access ..................................................................... 42 DRIVEWAY QUEUING ........................................................................................................................................ 44 SIGHT DISTANCE ................................................................................................................................................ .45 ON-SITE CIRCULATION ...................................................................................................................................... 45 PARKING REQUIREMENTS ................................................................................................................................ 45 - SECTION VI-PROJECT MITIGATION ................................................................................................................. .47 DIRECT IMP ACTS ................................................................................................................................................. 47 NEAR TERM IMPACTS ........................................................................................................................................ 47 Palomar Airport Road/1-5 Northbound Ramp & Palomar Airport Road/Pas eo Del Norte ................................ 47 Pas eo Del Norte/Carlsbad Company Store Driveway ......................................................................................... 48 Eastbound Left Turn Queue at Palomar Airport Road/Paseo Del Norte ............................................................ 48 Southbound 1-5/Westbound Palomar Airport Road Ramp Meter ........................................................................ 48 FUTURE IMP ACTS .............................................................................................................................................. .48 Paseo Del Norte/Carlsbad Company Store Driveway ......................................................................................... 48 Northbound 1-5/Cannon Road &Southbound 1-5/Westbound Palomar Airport Road Ramp Meters .................. 48 PROJECT ACCESS ................................................................................................................................................ 49 SECTION VII-SUMMARY OF FINDINGS AND CONCLUSIONS ...................................................................... 50 - - - ii ..... LIST OF FIGURES Figure I -Vicinity Map ................................................................................................................................................. 3 Figure 2 -Site Plan ....................................................................................................................................................... .4 Figure 3 -Existing Conditions ....................................................................................................................................... 8 Figure 4-Existing Traffic Volumes .............................................................................................................................. 9 Figure 5 -Trip Distribution ......................................................................................................................................... 15 Figure 6 -Project Related Traffic Volumes ................................................................................................................. 16 Figure 7-Existing+ Project Traffic Volumes ............................................................................................................ 18 Figure 8 -Location of Approved and Pending Projects .............................................................................................. 25 Figure 9-Near Term Cumulative without Project Traffic Volumes ........................................................................... 26 Figure 10-Near Term Cumulative+ Project Traffic Volumes ................................................................................... 28 ·• Figure 11-2030 Conditions ........................................................................................................................................ 34 Figure 12-2030 Conditions without Project Traffic Volumes ................................................................................... 35 Figure 13-2030 Conditions with Project Traffic Volumes ....................................................................................... .36 LIST OF TABLES Table I -Level of Service Ranges ................................................................................................................................. 5 Table 2 -Existing Freeway Segment Level of Service Summaty ............................................................................... 10 Table 3 -Existing Peak Hour Segment Level of Service Summary ............................................................................ 11 Table 4 -Existing Intersection Level of Service Summary ......................................................................................... 12 Table 5 -Existing IL V Analysis ................................................................................................................................... I 2 Table 6-Existing Queuing Analysis for Palomar Airport Rd!Paseo Del Norte ......................................................... I2 Table 7-Existing Ramp Meter Operation .................................................................................................................. 13 Table 8 -Trip Generation Rates and Calculations Summary ...................................................................................... I 4 Table 9 -SANTEC/ITE Guidelines for Measures of Significant Project Impacts ...................................................... 17 Table I 0 -Existing + Project Freeway Segment Level of Service Summaty .............................................................. 17 - Table 11 -Existing+ Project Peak Hour Segment Level of Service Summary .......................................................... 19 Table I2-Existing+ Project Intersection Level of Service Summaty ....................................................................... 21 -~ Table 13 -Existing +·Project ILV Analysis ................................................................................................................ 21 Table 14-Existing+ Project Queuing Analysis for Palomar Airport Rd/Paseo Del Norte ........................................ 22 Table 15-Existing+ Project Ramp Meter Operation ................................................................................................. 23 Table 16-Summary of Approved and Pending Projects ............................................................................................ 24 Table 17 -Near Term Cumulative Freeway Segment Level of Service Summary ..................................................... 27 Table 18-Near Term Cumulative Peak Hour Segment Level of Service Summary .................................................. 29 Table 19-Near Term Cumulative Intersection Level of Service Summaty ............................................................... 30 Table 20-Near Term Cumulative ILV Analysis ........................................................................................................ 30 Table 21 -Near Term Cumulative Queuing Analysis for Palomar Airport Rd/Paseo Del Norte ............................... 3 I Table 22-Near Term Cumulative Ramp Meter Operation ........................................................................................ 33 Table 23-2030 Freeway Segment Level of Service Summary .................................................................................. 37 Table 24-2030 Peak Hour Segment Level of Service Summaty .................................................. : ....... : .................... 38 Table 25-2030 Intersection Level of Service Summary ............................................................................................ 39 Table 26-2030 IL V Analysis .................................................................................................................................... 39 -Table 27-2030 Queuing Analysis for Palomar Airport Rd/Paseo Del Norte ........................................................... .40 Table 28-2030 Ramp Meter Operation ...................................................................................................................... 41 Table 29-Signal Warrant Summary for Paseo Del Norte@ Carlsbad Company Store ............................................ .43 Table 30-Summary of Paseo Del Norte/Carlsbad Company Store-South Project Dwy LOS .................................... 44 -Table 31 -Driveway ADT and Vehicular Queuing Lengths ....................................................................................... 45 Table 32 -Parking Requirements Summary ............................................................................................................... .46 Table 33-Mitigated Intersection Level of Service Summary .................................................................................... .47 iii -.. '"' -... ... }> .... - -:""!'. """ - - - - APPENDICES APPENDIX A » 24-Hour Segment Counts » AM/PM Peak Hour Tum Counts » City of Carlsbad Arterial Segment Capacities » City of Carlsbad Street Design Standards > City of Carlsbad Parking Requirements » Excerpts from the SANTEC/ITE Guidelines for Traffic Impact Studies » Caltrans AADT and Truck Traffic Data (Not So) Brief Guide of Vehicular Trajj1c Generation Rates for the San Diego Region, SANDAG » Caltrans Ramp Meter Rates and D&A Ramp Meter Field Study Results » Excerpts from King's Fish House Traffic Study }> City of Carlsbad Driveway Standards » Comer Sight Distance Standards APPENDIXB » Approved and Pending Project Data » SANDAG Forecast Data » SANDAG Land Use Forecast )r Excerpts from City of Carlsbad Draft TIF Program APPENDIXC » Existing Conditions Analysis Worksheets APPENDIXD }> Existing+ Project Conditions Analysis Worksheets APPENDIXE }• Near Term Cumulative Conditions Analysis Worksheets APPENDIXF » Near Term Cumulative+ Project Conditions Analysis Worksheets APPENDIXG » 2030 Conditions Analysis Worksheets APPENDIXH » 2030 +Project Conditions Analysis Worksheets APPENDIX I » Signal Warrants » Traffic Signal Plans » Existing Striping Plan (Figure I-1) » Conceptual Striping Plan (Figure 1-2.) » Sight Distance at Paseo Del Norte/Car County Drive (Figure l-3) » Sight Distance' at Paseo Del Norte/Carlsbad Company Store-South Project Dwy (Figure I-4) APPENDIXJ )r Mitigated Analysis Worksheets APPENDIXK » Responses to City Comments iv - -'-·'<'.! - - - - - - EXECUTIVE SUMMARY The proposed Carlsbad Paseo consists of two quality restaurants totaling I 7,630 square feet, and 44,230 square feet of retail space. One proposed restaurant will have 8, I 4 3 square feet of building and outdoor dining area on a 10,725 square foot restaurant pad and the proposed second restaurant will have 9,487 square feet of building and outdoor dining area on a 12,613.5 square foot restaurant pad. As a project alternative 2,000 square feet of retail space will be converted to a delicatessen/ food court. The project site is located on Paseo Del Norte between Cannon Road and Palomar Airport Road across from Carlsbad Company Stores in the City of Carlsbad. The project as proposed generates 3,532 daily trips, 71 AM peak hour trips, and 300 PM peak hour trips. The proposed project alternate generates 3, 7S2 daily trips, 96 AM peak hour trips, and 302 PM peak hour trips. To assess the worst-case scenario, all traffic impacts were assessed based on the project alternative. Existing plus project conditions analyses demonstrates that the proposed project has no significant impacts to roadways and intersections in the project vicinity. The proposed project will, however, be part of a cumulative impact at the following locations under near term cumulative plus project conditions: Palomar Airport Road/1-S northbound ramp, Palomar Airport Road/Paseo Del Norte, Paseo Del Norte/Carlsbad Company Store Driveway, Eastbound Left Turn Queue at Palomar Airport Road/Paseo Del Norte, and the southbound I-S/westbound Palomar Airport Road Ramp Meter. The proposed project will also be a future impact at the following locations under 2030 conditions: Paseo Del Norte/Carlsbad Company Store Driveway, Northbound I-S/Cannon Road Ramp Meter, and Southbound I-S/Westbound Palomar Airport Road Ramp Meters. Project mitigation is discussed in Section VI. Project access, parking, and on-site circulation will adequat~ly accommodate project traffic.