July 10, 1995
Four-Sher Development
990 Highland Drive, Suite 202
Solana Beach, CA 92075
•
of Carlsbad
SUBJECT: CARLSBAD CORPORATE CENTRE -IDLLSIDE DEVELOPMENT PERMIT -
HDP 95-08
The City has completed a review of the application for a Hillside Development Permit for grading
into an existing manufactured slope which is greater than 15 feet in height and is at a slope greater
than 15%.
It is the Planning Director's determination that the project is consistent with the City's Hillside
Development Ordinance, Chapter 21.95 of the Carlsbad Municipal Code and therefore APPROVES
this request based on the following:
Findings:
1. The Planning Director has found that, based on the EIA Part II, this Subsequent Project was
described in the MEIR 93-01 and EIR 81-06 as within their scope; and there will be no
additional significant effect, not analyzed therein; and that no new or additional mitigation
measures or alternatives are required; and that therefore this Subsequent Project is within
the scope of the prior ErRs, and no new environmental document nor Public Resources
Code 21081 findings are required.
2. That hillside conditions have been properly identified on the constraints map which show
existing and proposed conditions and slope percentages;
3. The undevelopable areas of the project, i.e. slopes over 40%, have been properly identified
on the constraints map;
4. That the development proposal is consistent with the intent, purpose, and requirements of
the Hillside Ordinance, Chapter 21.95, in that the project's overall design will blend into the
dev.elopment pattern which has been established for the Carlsbad Airport Centre;
5. That the proposed development or grading will not occur in the undevelopable portions of
the site pursuant to provisions of Section 21.53.230 of the (::arlsbad Municipal Code, in that
the manufactured slope was created by previously authorized grading;
6. That the project design substantially conforms to the intent of the concepts illustrated in the
Hillside Development Guidelines Manual, in that the building has been sited to take
2075 Las Palmas Drive • Carlsbad, California 92009-1576 • (619) 438-1161
CARLSBAD CORPORATE CENTER -HDP 95-08
JULy 10, 1995
PAGE 2
advantage of the cut at the toe of slope to preserve the integrity of the top of slope and
therefore blend with the manufactured topography;
7. That the project design and lot configuration minimizes disturbance of hillside lands, in that
grading quantities are less than 10,000 cubic yards per acre and are will within the acceptable
levels established by the Hillside Ordinance.
Conditions:
1. Approval is granted for HDP 95-08, as shown on Exhibit "I", dated July 10, 1995,
incorporated by reference and on file in the Planning Department. Development shall occur
substantially as shown on the approved exhibit( s}. Any proposed grading and/or development
substantially different from this approval as determined by the Planning Director, shall
require an amendment to this Hillside Development Permit.
CITY OF CARLSBAD
Assistant Planning Director