HomeMy WebLinkAbout1975-06-03; City Council; Resolution 36551
2
3
4
5
6
7
8
9
10
I1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
RESOLUTION NO. 3655
A RESOLUTION OF THE CITY COUNCIL OF THE
C ITY OF CARLSBAD, CALI FORN IA APPROV I NG AN
AGREEMENT BETWEEN THE C ITY OF CARLSBAD
AND BROWN AND CALDWELL FOR SEWER MASTER PLAN
AND FINANCIAL STUDY AND AUTHORIZING THE MAYOR
TO EXECUTE SAID AGREEMENT
The City Council of the City of Carlsbad, California,
does hereby resolve as follows:
1. That that certain agreement between the City of
Carlsbad and Brown and Caldwell for a Sewer Master Plan and Finan-
cial Study, a copy of which is attached hereto marked Exhibit $*AJ1
2nd incorporated herein by reference, is hereby approved.
2. That the Mayor of the City of Carlsbad is hereby
2uthorized and directed to execute said agreement for and on
behalf of the City of Carlsbad.
PASSED, APPROVED AND ADOPTED at a regular meeting of the
City Council of the City of Carlsbad, California, held on the
3rd day of J u'ne , 1975, by the following vote, to
wit:
AYES: Councilmen Frazee, Chase, Lewis and Councilwoman
NOES: Councilman Skotnicki ./
Casler.
ABSENT: None.
ATTEST:
( s EAL
AGREEKENT FOR ENGINEERING SERVICES TO
PROVIDE A SEWER MASTER PLAN AND FINANCIAL
PLAK FOR THE CITY OF CARLSBAD SEVER SYST2:M -
THIS AGREEMENT made and entered into this 17th
day of June , 1975, by and between the CITY OF CARLSBAD,
a municipal corporation of the State of California, herein-
after referred to as "City", and BROWN AND CALDWELL, a Cali-
fornia corporation , hereinafter referred to as "Engineer".
WITNESSETH:
WHEREAS, the City has determined that future growth
will necessitate the construction of additional collection
and transmission sewer systems; and
WHEREAS, it will be necessary and desirable to con-
struct additional sewer facilities to accommodate future
growth; and
WHEREAS, it will be necessary to set up a plan for
funding said construction; and
WHEREAS, it is desirable to establish policies and
procedures to administer the City sewer system; and
WHEREAS, the firm of Brown and Caldwell has provided
satisfactory services for the City in the past and has sub-
mitted a proposal in writing to perform the required ser-
vices; and
WHEREAS, it is desirable that the City retain the
services of Brown and Caldwell as consulting engineers to
perform the services in the manner, at the time and for the
compensation set forth herein;
I I. '0
NOW, THEREFO3IE, tne parties agree as follows:
1. Scope of Engineering -- Services. - The Erlgine-r will
provide professional engineering and management services
necessary for the coinpletion of the sewerage master plan
study and the sewerage financial plan and rat2 study as
follows:
Phase A. Sewerage Master Plan Study.
1. Study Area. An analysis will be made of
the existing City sewerage service area, adjacent sewered
and unsewered areas,including portions of the City of Oceanside,
and topography to define the study area and major sewerage
service areas for the master plan study.
2. Environmental Characteristics. A review *.
will be made of the physical and economic characteristics of
the study area which are significant to sewerage systems.
These characteristics include topography, climate and general
economic environment of the study area.
3. Area Development. Planned land use and
population growth and distribution will be defined based on
the recently adopted Land Use Element of the City's General
Plan,
4. Existing Sewerage System, An evaluation will
be made of the capacities and physical conditions of exist-
ing trunk and interceptor sewers to identify any existing
system deficiencies, to determine existing and future needs,
and to assess their adequacy and suitability for incorporation
2.
into a long-rage plan.
5 Wastewater Flov Zharacteristics. Present
wastewater flow ra-tes generated in the study area, during
both dry and biet weather conditions, will be defined for the
purpose of establishing unit design factors. Design factors
for sewers will include both average and peak rates of flow
on a per-capita or per-acre basis with allowances for storm-
water inflow and infiltration.
6. Basis of Project Development. Design criteria
and standards of construction will be established for the
construction of trunk and interceptor sewers and pumping
stations as well as the basis for construction cost estimates
and the annual costs of amortization, operation and mainte-
nance.
^.
7. Wastewater Management Plans. Sewerage sub-
areas will be defined,and projected wastewater flow rates
will be developed for each subarea. To expedite the computa-
tional processes involved, a digital computer model will be
utilized to generate these data at specified time. intervals.
Alternative sewerage system improvement plans will be devel-
oped and evaluated.
8. Long-range Improvement Program- Utilizing
the data generated in previous study tasks, a long-range
sewerage improvement program or master plan will be developed.
This plan will be set forth as a staged construction program
necessary to alleviate existing deficiencies and to serve
3.
future unsewered areas.
9. Short-term Capital Improvement Program. A
detailed five-year schedule will be developed for construc-
tion of those sewerage improvements immediately needed.
This program will be utilized as input to the sewerage finan-
cial plan and rate study.
10. Final Report, Fifty printed copies of the
final report will be submitted to the City,
Phase B, Financial Plan and Rate Study.
1. Review of Wastewater Utility Accounting and
Billing Procedures, Existing wastewater utility accounting
and billing procedures will be studied and revisions will
be recommended to meet reporting requirements stipulated in
.L
federal and state regulations to qualify for grants-in-aid.
Requirements for a wastewater utility accounting system
will be outlined which will demonstrate that collections and
disbursements are being made in compliance with State Water
Resources Control Board guidelines. Proposals may be includ-
ed for establishing a chart of accounts, a balance sheet, an
annual income statement showing functional cost detail, and
a fixed asset and depreciation accounting system appropriate
for cost allocation purposes.
2. Customer Inventory. Comprehensive customer
inventories will be prepared by means of field surveys to
assure completeness of the present billing roll. Each customer
served by the wastewater utility will be identified and
4.
classified as a single family residential, multiple unit
residential, commercial or industrial user, The number of
dwelling units serve6 within each multiple unit dwelling and
mobile home park also will be determined. Each commercial
user will be classified by enterprise category, to permit
implementation of user charges based on wastewater strength
characteristics as well as on wastewater volume,
3. Bill Analysis. A wastewater bill analysis
will be performed,and the annual revenues contributed hy
each customer class through user charges will be determined.
The tax assessment rolls will be analyzed,and the annual
revenues contributed by each customer class through ad
valorem taxes for sewer bond debt service also will be ."
determined.
4, Projected Wastewater Volumes, Loadings and
Number of Customers. The number of customers within each
customer class will be projected by year, for the next five
years, based on the planned development and expansion of the
existing service area. Future wastewater volumes and load-
ings will be projected based on the existing relationship
between water usage and wastewater discharges for each class
of customer and on the existing wastewater characteristics
for each class of customer.
5. Capital Improvement Program. The short-term
capital improvement program developed from the Sewerage
Master Plan Study and the Project Report for the Phase I11
5.
'.
Enlaryement and Upgrad<-ng of the Encina Water Pollution
Control Facility (JJPCF) will be utilized to determine the
scheduled construction dates and the current cost estimates
for necessary additions, replacements and kaprovements to
the local wastewater system and the City's share of the
Encina Phase I11 project. Projected construction costs
will be escalated on the basis of current trends in the
appropriate construction cost indexes, and projections of
capital expenditures by year for the next five fiscal years
will be prepared.
6. Policies for Financing System Expansion and
Capital Improvements. Recommendations will be prepared for
financing additions, replacements and improvements to waste-
water system facilities by existing users and by new appli-
cants for service. Policies will be formulated governing
implementation of the following:
(a) Developers and new applicants for service,
Contribution of in-tract facilities
and special facilities by developers,
Service lateral installation charges.
Sewer extension and oversizing
policies -
Connection charges or acreage
charges.
Annexation charges.
6.
(6) Formation of special assessment
districts.
(b) Existing users
(1) Capital outlays to be funded from
current revenues.
(2) Capital improvements to be financed
by long-term debt.
(3) Ad valorem taxes.
Recommendations also will be prepared regarding
the establishment and maintenance of a capital reserve fund
for the wastewater utility.
7. Annual Revenue Requirements. The current
wastewater utility operating and maintenance expense accounts
will be analyzed by individual subaccount. Projections by
..
year for the next five fiscal years will be prepared based on
system expansion attributable to area development, the capital.
improvement program and the enlargement and upgrading of the
Encina WPCF project. Projections will be adjusted for cost
escalation due to inflation.
An analysis will be made of existing and proposed
debt service expenses, capital outlays to be financed from
current revenues, capital reserve fund accruals and all other
cash requirements of the wastewater utility. The size of
the unencumbered fund balances and trust fund balances cur-
rently available to the wastewater utility will be ascertained,
and the net additional revenue requirements by year, for the
7.
*.
1, Cf
next five years, will be determined.
8. Sources of Funds. Revenues available to the
wastewater utility from the following sources of funds will
be evaluated:
(a) Contributions in aid of construction.
(b) Service lateral installation charges,
(c) Sewer extension charges .)
(d)
(e) Annexation charges.
(f)
Connection charges or acreage charges.
Funding from special assessment districts.
(9) State and federal grants in aid of con-
struction.
(h) Proceeds from the sale of bonds. ". -
(i) Ad valorem taxes.
(j) Interest income.
(k) User charges.
Revenues anticipated from each of the above
sources of funds during the next five years will be deter-
mined on the basis of the projected water and wastewater
volumes and number of customers and compared with the pro-
jected annual revenue requirements.
recovered from each source of funds to match the require-
ments of the use of funds will be established.
Amounts which should be
9. Design of Wastewater Utility Rates and Charges.
A cost-of-service study will be prepared for the wastewater
utility which recognizes the commodity-related, demand-
8.
related and customer-related elements of cost. Costs will
be allocated to each class of customer based on customer
usage characteristics, and the annual revenue requirements
to be recovered from each class of customer served will be
determined. Schedules of rates and charges will be prepared
for wastewater service that will equitably recover the cost
of providing the service to each class of customer served.
Resulting annual revenues will match the projected annual
revenue requirements. Appropriate wastewater strength sur-
charges will be developed for commercial and industrial users
that discharge extra-strength wastewater.
Consideration will be given to the following
additional factors in establishing the schedule of wastewater
utility rates:
(a)
(b)
Allowances for landscape irrigation and
consumptive water usage.
Equity of rates per: dwelling unit for
multiple-unit dwellings and mobile homes,
as compared to single family dwellings.
Compatibility of wastewater customer
classifications and rate structures with
State Water Resources Control Board and
U. S. Environmental Protection Agency
guidelines (Revenue Program Guidelines
for Municipalities Seeking Clean Water
Grants, State Water Resources Control
9.
".
Board, September, 1974).
Consistency of customer classifications
and procedures to facilitate combined
water and wastewater billing by the City.
Compliance with existing bond covenants
and statutory requirements,
10. Preparation of a Sewer Use Ordinance. The
present rules, regulations and ordinances applicable to the
wastewater utility will be studied and a proposed new Sewer
Use Ordinance will be developed for the City of Carlsbad
that will document the policies forrate-making, ad valorem
taxation, special assessments and connection charges appli-
cable to new customers joining the system, special charges
to areas to be annexed to the City, charges for sewer exten-
sions and oversizing, charges for installing service
laterals, and contributions of in-tract facilities and off-
site facilities by developers.
.e
e
11. Final Report. Fifty printed copies of the
final report will be submitted to the City.
2. Scope of City Staff Assistance. The City will
make its records available to determine existing sewer con-
nections and existing rates being charged to users. City
staff participation in assisting the Engineer and collecting
and researching information shall not exceed 866.67 man-
hours (5 man-months at 173.33 man-hours per month).
10.
Q. 3. Progress and Completion. Engineering services
as provided herein shall begin promptly following written
authorization by the City. Completion of Phase A (Sewer
Master Plan) and Phase B (Financial Plan and Rate Study) as
described in paragraph 1 above shall be in accordance with
the following schedule:
Phase A shall be completed within 180 calendar
days after written authorization to proceed.
Phase B shall be completed within 90 calendar
days after completion of Phase A.
4. Compensation. Fees for engineering services pro-
vided in paragraph 1 above will be determined on the basis
of the rates in the proposal dated March 3, 1975, and by the
direct nonsalary costs as hereinafter defined, except that
the total fee for engineering services will not exceed the
guaranteed maximum fee given in paragraph 5 below-
Direct nonsalary cost is an amount determined by
multiplying actual costs by a factor of 1.10.
salary costs include the following:
Direct non-
(a) Services directly applicable to the work
such as computer rental and programming costs associated
with engineering analyses for the project, special consul-
tants, laboratory charges, commercial printing and binding
and similar costs that are not applicable to general overhead.
(b) Identifiable reproduction costs applicable
to the work such as printing of drawings, photostating,
11.
.. c ;e
xultilithing, printing and similar costs,
(c) Identifiable coimunication expenses such as
long distance telephone, telegraph, cable, express charges
and postage other than for general correspondence.
(d) Living and traveling expenses of employees
when away from home office on business connected with the
work, except for automobile travel which shall be at the rate
of 15 cents per mile.
5. Guaranteed - Maximum Fee, The guaranteed maximum
fee for engineering and management services described in para-
graph 1, Phases A and B, shall be $45,000.00.
6. Payment of Fees. Charges determined on the basis
set forth in paragraph 3 above shall be billed on a monthly _I
basis on or before the 15th day of each calendar month
I
following any month in which Engineer performs services.
Invoices shall contain the following: (1) Each item of
direct salary costs showing the number of hours worked by
each person for whom a charge is made, together with the
nature of the work performed, (2) each item of direct non-
salary costs, (3) the precise proportion of each invoice
attributable to overhead and profit, and (4) an itemization
of any miscellaneous engineering services rendered containing
the data set forth in (l), (2) and (3) above. Invoices which
are not disputed in writing by the City and which are more
than 90 days past due shall be subject to interest charges
at the rate of seven percent per annum. Payment of fees
12.
-.. ..
shall not exceed ninety percent of the guaranteed maximum
fee until the City Council accepts Phase A and B reports.
7. Responsibility of the Engineer. The Engineer is
employed herein to render a professional service only and
any payments made to him are compensation solely for such
services as he may render and recommendations he may make in
the course of the project,
either expressed or implied, as to his findings, recommenda-
The Engineer makes no warranty,
tions, or professional advice other than they were promul-
gated after following a practice usual to the engineering
profession.
8. Changes in Scope of Project. If conditions be-
yond the control of the Engineer necessitate a change *. in
scope of the project after engineering and management work
under paragraph 1 above has commenced, the guaranteed maximum
fee shall be adjusted as follows: (1) Increased or de-
creased in proportion to the net change in the estimated
cost of the project, and (2) increased by the amount of
charges for any work accomplished to the date of change in
scope which cannot be incorporated into the changed project.
9. Suspension of Services or Termination of Agree-
ment.
pone or suspend all or any part of the engineering services
authorized under this agreement, or by written notice may
The City, for any reason, may by written notice post-
terminate the entire agreement. In the event of such suspen-
sion or termination, Engineer shall have the right to expend
13.
5.
additional time to assemble the work in progress for the
purpose of properly closing the job. Such additional time
shall not exceed ten percent of the total time expended on
the portion of the project affected by such notice or suspen-
sion or termination before the receipt thereof.
Yr. 4- -Ad, - -e C’e-8
7+
v
--*s*:z *
+L ” -Y 7w *
.,A $
,,I, fir.
In the event that suspension of services exceeds
twelve months in duration, the Engineer may, by not less
than thirty days’ notice, terminate this agreement as it
applies to the suspended portion of the project.
10. Status of Engineer. The Engineer will perform
the services provided for herein in its own way as an inde-
pendent contractor and in the pursuit of its independent
calling, and not as an employee of the City; and it shall be
under the control of the City only as to the result to be
accomplished, and the personnel assigned to the project, The
personnel assigned to the project by Engineer shall be those
listed under Section 2 of the proposal. dated March 3, 1975,
for Engineering and Management Services, Sewerage Master Plan
Study and Financial Plan and Rate Study, City of Carlsbad by
Brown and Caldwell, Consulting Engineers.
14.
11. Conformity to Legal Requirements. The Engin2er
shall cause all reconmendations to conform to all applicable
requirements of lzw, federal, state and local, to all re-
quirements of all bodies formed under federal, state or
local law whose approval must be obtained.
12. Ownership of Documents. Any plans, studies,
sketches, drawings or specificati.ons supplied, as herein
required, are the property of the City. In the event this
cofitract is terminated, any documents, plans, specifications
and drawings shall be delivered forthwith to the City.
13. Hold Harmless Agreement. The City, its agents,
officers and employees shall not be liable for any claims,
liabilities, penalties, fines or for any damage to goods, -..
properties or effects of any person whatever, or for per-
sonal injuries to or death of them, or any of them, caused
by or resulting from or claimed to have been caused by or
resulting from any act or omission of Engineer, or its agents,
employees or representatives; Engineer further agrees to
indemnify and save free and harmless the City and its author-
ized agents, officers and employees against any of the fore-
going liabilities and claims therefor, and any cost and
expense that is incurred by the City on account of any claim
theref or.
14. Assignment of Contract. The Engineer shall not
assign this contract or any part thereof or any monies due
or to become due thereunder without the prior written consent
15.
a.
of the City.
15. Subcontracting. If the Engineer shall subcon-
tract any of the work to be performed under this contract by
Engineer, the Engineer shall be fully responsible to the City
for the acts and omissions of its subcontractor and of the
persons either directly or indirectly employed by its sub-
contractor, as it is for the acts and omissions of persons
directly employed by it. Nothing contained in this contract
shall create any contractual relationship between any sub-
contractor of Engineer and the City. The Engineer shall bind
every subcontractor and every subcontractor of a subcontract-
or by the terms of this contract applicable to its work unless
specifically noted to the contrary in the subcontract in
question approved in writing by the City.
.~
16. Prohibited Interest. No official of the City
who is authorized in such capacity and on behalf of the City
to negotiate, make, accept or approve, or to take part in
negotiating, making, accepting or approving any architectural,
engineering, inspection, construction, or material supply
contract or any subcontract in connection with the construc-
tion of the project, shall become directly or indirectly
interested personally in this contract or in any part thereof.
No officer, employee, architect, attorney, engineer or in-
spector of or for the City who is authorized in such capacity
and on behalf of the City to exercise any executive, super-
visory or other similar functions in connection with the
16.
performance of this contract shall become directly or in-
directly interested personally in this contract or any part
thereof.
17. Verbal Agreement or Conversation, No verbal
agreement or conversation with any officer, agent or
employee of the City, either before, during or after the
execution of this contract, shall affect or modify any of
the terms or obligations herein contained, nor such verbal
agreement or conversation entitle the Engineer to any addi-
tional payment whatsoever under the terms of this contract,
18, Successors or Assigns.. Subject to the provi-
sions of paragraph 14 above, all terms, conditions and’-pro-
visions hereof shall inure to and shall bind each of the
parties hereto, their and each of their respective heirs,
executors, administrators, successors and assigns.
19. Application of ASCE Manual No. 45. Applicable
provisions of American Society of Civil Engineers Manuals
and Reports on Engineering Practice No. 45 shall apply to
all matters not otherwise covered by this agreement.
20. Effective Date. This contract shall be effec-
tive on and from the day and year first above written.
IN
cuted this
WITNESS WHEREOF, the parties hereto have exe-
agreement on the day and year first above
17.
written.
CITY OF CARLSBAD, a Municipal
Corporation of the State of
BY ATTEST;
BROWN AND CALDWELL, a California
Corporation
APPROVED AS TO FORM:
City Attorney
18.