RESOLUTION NO. 6739
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
IMPROVEMENT PROGRAM, ADOPTING THE 1982 CAPITAL BUDGET,
AND APPROVING VARIOUS FUND TRANSFERS.
CARLSBAD, CALIFORNIA, APPROVING THE 1982-86 CAPITAL
WHEREAS, THE City Council has reviewed the proposed 1982-86 Capital
Improvement Program; and,
WHEREAS, this five-year program includes a proposed Capital Budget
for 1982; and,
WHEREAS, funds are available for the support of the proposed 1982
Capital Budget; and ,
WHEREAS, the Council desires to approve the 1982-86 Capital
Improvement Program; and,
WHEREAS, the Council desires to adopt the 1982 Capital Budget and
to appropriate the funds and make necessary transfer to properly support
this Capital Budget;
NOW, THEREFORE, BE IT RESOLVED as follows:
1. The City Council does hereby adopt the 1982 Capital Budget as
described in Attachment I.
2. Funds are appropriated to support those capital projects as
shown in Attachment 11.
3. The City Council does hereby adopt the 1982-86 Capital
Improvement Program as described in Attachment 111.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council
on the 8th day of December , 1981, by the following vote, to wit:
AYES:
NOES: None
Council Pkrbers Packard, Casler, hear, Lewis and Kulchin
ABSENT: "e
F
RONALD C. PACKARD, MAYOR
ALETHA L. RAUTENKRANZ, CITY CLERK d
(SEAL)
1982 CAPITAL BUDGET
PROJECT ACTION SUMMARY
C.I.P. PROJECT NO. TITLE COST ACT I ON
1
5
10
19
34
35
41
44
46
48
55
56
57
Addition to Children's Library
Fire Station #4
Police, Fire, Utility Service Center
Jefferson-Buena Vista Schools
Agua Hedionda Bridge
Bicycle Lanes
Tamarack Avenue (B i rc h)
Warning Lights
Encina Phase I11 (cont'd)
San Marcos Interceptor
Water Pipeline Replacement
Tri-Agency Pipeline Intertie
Water1 ine Additions
13 PROJECT TOTALS
$ 114,000
150,000
2,736,045
121,000
1,337,300
40,300
140,000
26,400
949,425
10,000
50,000
21 5,080
1 90,000
Design, Construct and Equip.
Land
Land, Planning
Construct
Construct
Construct
Construct
Construct
Construct
Des i gn
Construct
Design & Construct
Construct
$6,079,550
Attachment.1
1982 CAPITAL BUDGET
PROJECT DESCRIPTIONS, FUNDING AND COSTS
1. ADDITION TO LIBRARY - CHILDREN'S ROOM (CIVIC FACILITY) - $114,000
Public Facilities Fees (1982 Design - $10,000; 1982 Construction - $84,000;
1982 Appurtenances - $20,000).
Demolish the existing children's patio (48x25); build addition of same size
extending present children's room by 1,200 sq. ft.
Beginning FY 1980-81 it was necessary for the library to move certain mate-
rials to the City storage facility to partially alleviate the over-crowded
conditions.
of usable floor space and would be the most economical short-term solution
to obtain badly needed room.
The expansion of the children's area would add 1,200 sq. ft.
5. FIRE STATION - 1-5 AT PALOMAR AIRPORT ROAD (CIVIC FACILITY) - $150,000
Public Facilities Fees (1982 - Land Acquisition - $150,000)
This project requires approximately one acre with a fire station of 4,500
sq. ft.
The Station is a part of the Master Plan for fire station locations. It is
located to reduce the response time to within five minutes to all indus-
trial, commercial, and residential buildings in the area south of Cannon
Road to the southern City boundary.
been determined.
The specific site location has not
10. POLICE, FIRE, UTILITY SERVICES CENTER (CIVIC FACILITY) - $9,954,180
($1,876,045 - General Capital Construction; $1,500,000 - Federal Revenue
Sharing; $5,048,135 - Public Facilities Fees; $1,500,000 - Water Enter-
prise) (1982 Land Acquisition and Planning - $2,736,045; 1983 Construction
and Appurtenances - $3,250,045; 1984 Construction and Appurtenances -
$2,006,045; 1985 Construction and Appurtenances - $1,962,045).
This project consists of the development of a site to house the Law Enforce-
ment Services Facility, Law Enforcement Firearms Training Facility, the
Headquarters Fire Station and Training Center, and the City Services
Center. The Law Enforcement Services Facility will consist of approx-
imately 37,500 sq. ft. At present, the Police Department is operating from
a physical structure that has become inadequate. The occupant/space is far
below acceptable levels and the logistics incurred by these constraints are
affecting operations. This project will be such that it can respond to
technological advances in the police services, changes in the concept of
the police role, and the changing needs of the growing community.
Attachment I
Page 2
The law enforcement firearms training facility consists of two acres of
land and a secure range located in an undeveloped rural area within easy
access of the proposed law enforcement services facility.
expected to meet the needs of the Police Department for the near future.
The necessity of the project is predicated on the fact that the present site
is "tentative" and there are no other sites available. The need to maintain
an appropriate firearms facility is critical.
proficiency of officers is the object of increased public scrutiny and
liability actions.
This project is
Firearms training and the
Due to the relatively low design and engineering costs associated with this
type of facility, planning and funding could be accomplished within a
* reasonable time period.
Surrounding communities and agencies are experiencing similar problems since
North San Diego County lacks both public and private facilites that could be
utilized to resolve the problem. As a result, several North County agencies
are using the present Carlsbad facility.
determine the feasibility of developing a regional firearms facility through
a joint powers agreement with other governmental agencies. This alternative
could offset development and operating costs of a new facility.
This project is being reviewed to
The Headquarters Fire Station and Training Center will require a 10,000 sq. ft. station which would have two fire engines, airport crash unit, inten-
sive care unit, and a tanker.
istrative Headquarters. The training facilities include a drill tower,
drill area for multi-company operations, test pit, and classroom facilities.
The,effectiveness of any Fire Department depends a great deal on the train-
ing a firefighter receives.
problems and bring several fire companies together to drill and teach basic
manipulative skills.
fighter has the necessary knowledge, skills and abilities to do the job.
This station would also serve as the Admin-
This facility would allow us to simulate fire
This facility will help us to insure that each fire-
The City Services Center will replace the existing yard facilities on Oak
Street and would include 5,000 sq. ft. of office space, 23,500 sq. ft. of
warehouses and shops, and 34,000 sq. ft. of outdoor storage.
The present Public Works yard cannot be expanded, and the Mechanical Main-
tenance Shop and activities create severe traffic circulation problems.
Additionally, the present Parks and Recreation yard is a non-conforming use
at its present location.
mize travel and response to the South Carlsbad area, thus aggravating the
apparent isolation of that area.
geographical center of the City to provide adequate storage and work
facilities.
Both operations are not ideally located to opti-
A central service yard is needed near the
Attachment I
Page 3
19. JEFFERSON/BUENA VISTA SCHOOL PARKS (PARKS & RECREATION) - $121,000
($25,000 Park Development Fees; $96,000 - Grants) (1982 Construction -
$121,000>
This project will provide two multi-purpose turfed athletic fields on
existing school sites. Included is grading, soil preparation, irrigation,
landscape screenings, backstops, benches, bleachers, and fencing. Both
sites are approximately 2.5 acres.
The School District will provide the land for development, City and
volunteers will be responsible for materials and labor.
the need for active play areas in the northwest quadrant of the City.
These projects meet
34. AGUA HEDIONDA BRIDGE (STREETS) - $1.337.300
($267,460 - SDG&E; $1,069,840 - HBRR Grant)(1982 Construction - $1,337,300)
(Design in progress, EIR being prepared).
Reconstruction of the Agua Hedionda Bridge and widening of Carlsbad
Boulevard from south of Tamarack to Cannon Road.
Carlsbad Boulevard is recognized as one of two major north/south arterials
in the City and as a congested street during peak seasons. The bridge has
long been in need of replacement,
deteriorating bridge and provide four lanes to alleviate congestion.
This project will replace the
35. BICYCLE LANES (STREETS) - $207.960 - Grants
(1982 Construction - $40,300; 1984 Construction - $38,200; 1985 Construc-
tion - $115,260; 1986 Construction - $14,200).
This project provides for construction of bicycle lanes on Elm from Monroe
to El Camino Real; Monroe/Park from Marron to Kelly; Chestnut from Monroe to
El Camino Real; Tamarack/Chinquapin from Carlsbad Boulevard to El Camino
Real; Adams Street from Chinquapin to Park; Grand from Jefferson to Carlsbad
Boulevard; Paseo Del Norte from Cannon to Palomar Airport Road; and Alga
from El Camino Real to El Fuerte.
General Plan specifies that bikeways should be provided for school routes,
commuter routes and commercial routes. Construction schedule as follows:
Chestnut from Monroe to El Camino Real, 1982; Monroe/Park from Marron to
Kelly, 1984; Elm from Monroe to El Camino Real, 1985; Tamarack/Chinquapin
from Carlsbad Boulevard to El Camino Real, 1985; Adams Street from
Chinquapin to Park, 1985; Paseo Del Norte from Cannon Road to Palomar
Airport Road, 1986; Alga from El Camino Real to El Fuerte, 1986.
Attachment I
Page 4
7
41. TAMARACK AVENUE (STREETS) - $140,000 - public Facilities Fees
(1982 Construction - $140,000).
Construct 500 feet of Tamarack in the old Birch Avenue right-of-way to make
Tamarack a through street. This project will complete a major element of
the City's circulation.
44. TRAFFIC SAFETY PROJECT - WARNING LIGHT (STREETS) - $26,400.
General Capital Construction (1982 Construction/Installation - $26,400)
Install flashing warning lights on Carlsbad Boulevard at Army and Navy
Academy. Installation is a safety factor recommended by the Traffic Safety
Commission.
46. ENCINA PLANT (SEWERS) - $1,653,532 - Sewer Construction (1982 Construction
- $949,425; 1983 Construction - S704,107)
This project is the construction of a major regional sewer treatment plant
under the auspices of the Joint Advisory Committee per a Joint Powers
Agreement between Carlsbad, Vista, San Marcos, Encinitas, Ruena and
Leucadia.
Carlsbad's share of the Encina Treatment Plant expansion.
48. SAN MARCOS INTERCEPTOR (SEWER) - $760,000 - Sewer Construction
(1982 Design - $10,000; 1983 Construction - $750,000)
Participation in the construction of an outfall sewer to be constructed by
the San Marcos County Water District.
Airport Sewer Service Area of the City.
The line would serve the Palomar
This line would provide additional capacity to the City at considerably less
cost than could be obtained by building equivalent capacity without joint
participation. This project is consistent with City policy.
55. PIPELINE REPLACEMENT (WATER) - $224,200 - Water Enterprise - (1982
Construction - $50,000; 1983 Construction - $56,000; 1984 Construction -
$40,000; 1985 Construction - $22,000; 1986 Construction - $56,200)
Replace deteriorating 4-inch, 6-inch, g-inch, 10-inch and 12-inch cast iron
and steel lines with 4-inch, 6-inch, 8-inch, 10-inch, and 12-inch asbestos
concrete pipe.
Attachment I
Page 5
1982 - Replace deteriorating 4-inch, 6-inch, 8-inch, 10-inch, and 12-inch
steel and cast iron lines with asbestos concrete pipe. Locations: Walnut,
Sycamore, Cherry, Juniper, Hemlock, and Redwood--all from Carlsbad Boulevard
to Garfield.
Roosevelt; Roosevelt from Elm to Grand; Grand from Madison to Jefferson;
Jefferson from Grand to Laguna; Chinquapin from Garfield to Sequoia; Locust
from Adams to Harrison; Arland from Buena Vista to Highland; Highland from
Chestnut to Pine.
Chestnut from Highland to Adams; alleys from railroad to
1983 - Replace deteriorating 12-inch steel and cast iron pipe with 12-inch
asbestos concrete pipe at various locations: Pi0 Pic0 from Las Flores to
easement; Highland from Pine to Basswood.
1984 - Replace deteriorating 12-inch steel pipe with 12-inch asbestos
concrete pipe at various locations: Jefferson from Laguna to Grand; alley
between State and Roosevelt from Oak to Grand.
1985 - Replace deteriorating 10-inch steel and cast iron pipe with 10-inch
asbestos concrete pipe at various locations: Hillside from Highland to
Park; Highland from Basswood to Chestnut.
1986 - Replace deteriorating 4-inch and 6-inch steel and cast iron pipe with
asbestos concrete pipe at various locations: Elmwood from Laguna to
Highland; Jefferson from Grand to Elm; Arland from Buena Vista to Highland;
Jefferson from Las Flores to Buena Vista; alley from Grand to Elm; Pine from
Tyler to Roosevelt; Davis from Buena Vista to Knowles; Palm from 1-5 to
Harding .
56. TRI-AGENCY PIPELINE INTERTIES (WATER) - $215,080 - Water Enterprise
(1982 Design - $19,500; 1982 Construction - $195,580)
This project will consist of the connection of the westward extension of the
Tri-agency pipeline to Ellery Reservoir.
Project will bring high pressure (200 psi) water to Ellery Reservoir at
pressure level such that Ellery water pumps will no longer be required to
maintain pressure in the Ellery pump zone.
pressure water, provide additional source of water to City service are.a and
increase the quantity of water that can be taken at any time.
This project will provide high
Attachment I
Page 6
57. WATERLINE ADDITIONS (WATER) - $232,500 - Water Enterprise 1982 (Construction
- $190,000; 1983 Construction - $17,000; 1984 Construction - $25,500)
To increase fire flows and capability to developing sections of the City.
1982 - To connect the westward extension of the Tri-Agency Pipeline to the
Ellery Reservoir and bring high pressure water to the reservoir at a level
whereby the pumps will no longer be required to maintain pressure in the
Ellery zone.
1983 - To increase fire flows from Skyline to the downtown service area 1800
feet of 16-inch asbestos concrete pipe will be installed and also to serve
this area 1700 feet of 8-inch asbestos concrete pipe will be installed
between Janis Way and El Camino Real.
1984 - Complete project of installing 16-inch and 8-inch asbestos concrete
pipe on Skyline and Janis Way and El Camino Real.
Attachment I
Page 7
G.C.C.
F.R.S.
P.F.F.
P.d.f.
P.L.d.
W.E.
S.C.
1982 CAPITAL APPROPRIATIONS
Fund
General Capital Construction
__.
Federal Revenue Sharing
Public Facilities Fee
Park Devel opmen t Fee (Park-in-Lieu)
P1 anned Local Drainage
Water Enterprise
Sewer Construction
Grants
Other
Amount
$1,902,445
860,000
404,000
25,000
-0-
455,080
959,425
1,206,140
267,460
TOTAL $6,079,550
Attachment I1
II
U Y
Vbb mvn m Vb.0 rva r wELIE4wwplo
Ill 0000000l 000 00000000
I I 1
I 4 00
I I I 0~0~0~0,0~0~0, I
OCIInOOInIn ooal-o-- -4w 4.4 m
I I I IO1 000000 I I 110-l
0 3
101 gg 000 I 0- I 0-0-
I 0
U c vu bhm vu nwr ww PlPlw
8 2% 0 plPl
I om I OM00 0 0 r- 0 0 4.0 0
om 0000 In* Intnoo
I 0-m- I o,oao~o~
W-In In, * 4
Vv) 2 ,"a n P4 pl Pl
m &J G nm ar Bl(1
h 0
IlOOi I 000000 I I 0-0, I I
I 0 I
r al I
al d 0- 0
ow 5
U .rl
.ri m
w P
a d al .A h
."'. i- d N
..
6.’
N
al M
p1
u) m m
0 w 01
0u)C omc
w 0 m
rl o! t-
4
m- Y C
t.l W
01 I I oooc NI I I
0 0 Fi 2
Ill ooc Ill
I 0 I 0
I1 oc II
C rc CI;
p. U e .-
.. .’
0 V W
5 6! ..
1\01 omc
cr) N d
I “0, I
0101 oooc N- I cr)- I
C 5
a c
I-
.: - ., . .. ...
01 I ooc Ne I I
3 4
C C CI
Ill1 oooc IIII
I C
U CI 4
Ill ooc Ill
I .C C
C
1.“
..
E
ONr “C Attachment I11
b Page ’2 )3 .
..., .. ___ .. ”. -
m
K '"I
hi00000000 mwoooeooo In00~ON000
ll11111l1 ooooooooc IIIIIIIII
101 I I1 I IC 00000000C I \o-I I 1-1 I I c - C C
G-
VI s \c
8 888 8
IO 1000 IO 1 oeoooeooc I N- I e- 0-hl- I 0- I
w mee 0 VI I-om 0 ,-I" 0,
888 8
-00 I I IO I I o~ooooooc
em0 0 0" I--
AN01 Il0,l I ....a
2
8P
mlol I I I I I (voooooooc e-'0-1 I I I I I
I 0
0 0
VI '9
2
crl
o m
CY \c ci
ci
m
I- s
2 h
r
U * d
0 U 0
U 0 r i
E C
01 00
\o VI
9'
59
YO-
00 OCO
OIn VI&
hl
U 5 .:
VI* knVI
0' Q r-
rl I- 'D
.)
0 0
* VI
2
0 0
hi hl
9
0 0 VI
VI *
0 0
m I-
9
O 03
u. u.
9
/
.-
: ;I
.-
.I
..* . --
\.Attachment 1'1 I [.Page 3
-b -__._. __ . . . - .. . . __.
..
.-.. I-
0 IO0 IO IO I 00000000
0 NO a QI
0, I 0" 0, I N* I y?
8 old N 9
In' m m -!
4 m 0- c
c 0 C
E L <
I
. I. .
N .m
,
.!
,-
..I -
..
d 4
!
.. 3
8
d 3
I
Attachment IIf
Page .4 / 5-
... I
/I '\
,
, ..
Attachment 1-11
Page 5
:I h / -3