HomeMy WebLinkAbout1983-02-15; City Council; Resolution 71407140 RESOLUTION NO.
A RESOLUTION BY THE CITY COUNCIL OF THE
CITY OF CARLSBAD, AUTHORIZING THE VISTA
SAM1 TATION DISTRICT TO EXECUTE AXENDMEPJTS
STEP 2 AND STEP 3 ENGINEERIPJG SERVICES FOR
PHASE I11 UPGRADING AND ENLARGEFTENT OF THE
TO CONTRACTS WITH BROWN AND CALDIVELL FOR
ENCINA WATER "xoN CONTROL FACILITY
WHEREAS, the CITY OF CARLSBAD, VISTA- SANITATION DlSTrlZCT,
(VSD) LEUCADIA COUNTY WATER DISTRICT, BTJENA SANITATION DISTRICT,
SAN &!ARCOS COUNTY WATER DISTRICT, and. ENCINITAS SANITARY DISTRICT
are parties to a Joint Powers Agreement ("Basic Agreement") which
provides for the operation anc? maintenance of a joint sewer
system commonly known as the ENCINA WATER POLLIJTIOPJ CONTROL
FACILITY (EWPCF) : and
WHEREAS, a.n expansion of Unit I of the EWPCF, known as Phase
111 Enlargement and Upgrading, is currently und-er construction
providing for an increase in capacity from 13.75 MGD to 18.0 MGD;
WHERRAS, VSD is the administrator for the Encina Joint
Powers of said Phase I11 Upgrading and Enlargement by virtue of
the Seventh Su;?plernent to said "Basic Agreement"; and
WHEREAS, VSD, as said administrator, has entered in%o
written agreements with Brown and Caldwell for Step 2 and Step 3
Engineering Services for said Phase I11 [Jpgrading and Enlargement
which agreements provide in part for cost reimbursement of
"Indirect Costs"; and
WHEREAS, said. agreements further provide that indirect costs
are the product of all direct labor costs multiplied by an
overhead rate: and
' :
WHEREAS, specific percentages were set forth in said agree-
ments as interim rates for billing purposes subject to later
adjustments by establishment of provisional rates: and
WHERZAS, all such provisional rates are subject to review
and adjustment upward or downward by the United States Environ-
mental Protection Agency (USEPA); and
WHEREAS, the USEPA has audited Brown and Caldwell's records
and has approved some of its overhead rates as final and approved
others as provisional; and
WHEREAS, there has been submitted to VSD by Brown and
Caldwell requests that the agreements for Step 2 and Step 3
Engineering Services be amended to reflect final and provisional
rates approved by the USEPA; and
WHEREAS, the Joint Advisory Committee to the Encina Joint
Powers has considered all such requests and has recommended to
said Encina Joint Powers that the request be approved and that
VSD be authorized to execute amendments to its agreements with
Brown and Caldwell to reflect changes in the overhead rates from
those interim rates established in the original agreements: and
WHEREAS, it is in the best interests of this City to execute
the Twenty-First Supplement to the "Basic Agreement", which
supplement provides authorization to VSD to execute the
amendments requested by Brown and Caldwell: and
WHEREAS, a copy of the Twenty-First Supplement is attached
hereto and incorporated herein by reference.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
CITY OF CARLSBAD, as follows:
-2-
.
Section No. 1: That the mayor of this City be, and is, hereby authorized to execute the Twenty-First Supple-
Kent to the "Basic Agreement" for the Encina
Joint Sewer System.
PASSED, APPROVED, AND ADOPTED at a regular meeting of the
City Council of the City of Carlsbad on thel5thIay of FebrUaT , -
1983, by the following vote, to wit:
AYES 5 NOES 0 Absent 0
-3-
Y
TWENTY-FIRST SUPPLEMENT TO BASIC AGREEMENT
OF ENCIP?A JOJNT POWERS AUTHORIZING VISTA
SAMJTATION DISTRICT TO AMEND ITS CONTRACTS
WITH RKOWTJ AND CALDLJELL FOR STEP 2 AND 3
ENGINEERIMG SERVICTS FOR PHASE I11 UPGRADING
AND ENLARGEMENT OF THE ENCINA WATER POLLUTION
CONTROL FACILITY
This Twenty-First Supplement is made and entered into this
/6d day of F~zWUM,~ , 1983, by and among: VISTA SANITATION
DISTRICT (VISTA), a County Sanitation District; CITY OF CARLSBAD
(CARLSBAD), a General Law City: SAN MARCOS COUNTY WATER DISTRICT
(SAN MA!?COS), a County Water District; BUENA SANITATION DISTRICT
(BUENA), a County Sanitation District; LEUCADIA COUNTY WATER
DISTRICT (I,EUCADIA), a County Water District; and ENCINITAS
SANITARY DISTRICT (ENCINITAS), a Sanitary District.
Recitals
A. VISTA, CARLSBAD, BUENA, SAN MARCOS, LEUCADIA, and
ENCINITAS own and operate the ENCINA WATER POLLUTION CONTROL
FACILITY and OCEAN OUTFALL (and related facilities), hereinafter
referred to as EWPCF.
B. An expansion of IJnit I of the EWPCF known as Phase I11
Upgrading and Enlargement is currently under construction provid-
ing for an increase in capacity from 13.75 MGD to 18.0 MGD.
C. VISTA is administrator of Phase I11 IJpqrading and
Enlargement by virtue of the Seventh Supplement to the "Basic
Agreement. 'I
D. Cn June 7, 1978, and August 29, 1980, respectively,
VISTA, as administrator for the Encina Joint Powers for Phase 111
Upgrading and Enlaryemcnt, entered into a contract with Brown and
Caldwell, wherein the latter agreed to furnish Step 2 and Step 3
Engineering Services, respectively, on a cost reimbursement
basis, approved by the IJnited States Environmental Protection
Agency (USEPA), and wherein the interim overhead rate to be
applied to the direct costs of Brown and Caldwell was agreed upon.
E. The aforesaid agreements provided in part that during
performance of the contract, the aforesaid interim overhead rate
would be later modified subject to approval by the USEPA.
F. The interim overhead rate of 1.45 established by the
agreement for 'Step 2 Basic Design Services has been heretofore
applied for billing purposes to VISTA.
G. The interim overhead rate of 1.50 established by the
agreement for Step 3 Engineering Services has been heretofore
applied for billing purposes to VISTA.
H. The USEPA has approved final overhead rates for Brown
and Caldwell in the percentages and for the years as follows:
Fiscal Year Rate
9-26-78 to 9-28-79
9-30-79 to 9-28-80
163.8%
148.1%
I. The USEPA has approved provisional overhea'd rates for
Brown and Caldwell for 9-30-80 to 9-25-81.as 165.0%.
J. Brown and Caldwell have request.ed of VISTA that the
latter amend its agreements with the former to reflect the
changes from the interim rates to final rates, where established,
and to further amend said agreements to reflect provisional rates
approved by the USEPA for 1980-1981 based upon 165.0%, and to
utilize said rate of 1.65 for billing purposes for the fiscal
year from 9-26-82 to 9-25-83 and from 9-26-82 to 9-25-84.
-2-
(' . ,. 0 e
K. The Joint. Advisory Committee to the
has approved each of the aforesaid requested
Encina Joint Powers
amendments and has
recommended to the said Encina Joint Powers that the agreements
with Brown and Caldwell be amended to reflect such amendments.
L. Copies of the proposed amendments to the agreements for
Step 2 and Step 3 Engineering Services are attached hereto marked
Exhibits ''A" through "E" and incorporated herein by reference.
M. This Twenty-First Supplement to the "Basic Agreement"
is made pursuant to the provisions of Article I, Chapter 5,
Division 7, Title I, of the Goverment Code of the State of
California commencing with Section 6500, relating to the joint
exercise of powers common to all public agencies; in this case,
being all of theparties hereto which are authorized to contract
with the others pursuant to the aforesaid provisions.
NOW, THEREFORE, the parties hereto agree as fol.lows:
1. VISTA, as administrator for the Encina Joint Powers for
Phase I11 rJpgrading and Enlargement of the EKPCF, is authorized
to execute each of the amendments, copies of which are attached
hereto marked Exhibits "A" through "E" and are more specifically
identified as follows:
Exhibj. t "A" :
!
Exhibit "R" :
Exhibit 'IC" :
Amendment 6 to Agreement for Step 2
Engineering Services Between Vista
Sanitation District and Brown and
Caldwell for Phase 111 Enlargement
and Ilpgrading of the EWPCF
Step 2 Special Engineering Services--
Phase 111 Enlargement and IJpgrading of the EMPCF
Amendment 2 to Master Agreement for
Step 3 Engineering Services Between
Vista Sanitation District and Brown
and Caldwell for Phase I11 Enlargc-
ment and [Jpyrading of the EWFCF.
-3-
. ,~
I. . 0
Exhibit 'ID'': Amendment 1 to Task Order No. 1 for
Step 3 Engineerins Services--Phase
111 Enlaryenent and Upgrading of the
EWPCF
Exhibit "E": Amendment 1 to Task Order No. 6 for
Step 3 Enyineerinq Services--Phase
III Enlargement and Upgrading of the
EWPCF
2. This agreement may be executed in counterparts and upon
execution thereof by all parties set forth on page 1 hereof,
shall be deemed to be an original. This supplement shall become
effective
by a party hereto.
on the last date that a counterpart hereof is executed
IN WITNESS WIIEREOF, each party has caused this Twenty-First
Supylenent to the "Basic Agreement" to be signed by its respec-
tive officials heretofore duly authorized by the legislative body
thereof.
Approved by Resolution
No.. on , 1983.
VISTA SANITATION DISTRICT,
BY Attest: Jean Hroolts, Clerk
Approved by Resolution
No* 7140 on
Feb- 15 , 1983.
!
Approved by Resolution
No. on , 1987
CITY OF CARIJSBAD,
MARY H. &UR, Mayor
LEUCADIA COUNTY WATER DISTRICT
-- BY
-4-
1.
-.
Agprovec! by Resolution
No. on ,1983.
Approved by Resolution -
No. on - , 1383,
Approved by Resolution
No. on
I 1933.
SAN MARCOS COIJNTY WATER
DISTRICT,
BUENA SANITATION DISTRICT ,
ENCINITAS SANITARY DISTRICT,
-5-
.. ~. . . ., - .. ." ... .. . .'
AMENDmNT 6 TO
AGREEMENT FOR STEP 2 ENGINEERING SERVICES
BETWEN VISTA SANITATION DISTRICT
AND BROWN AND CALDWELL FOR
PHASE I11 ENLARGEMENT AND UPGRADING OF THE
ENCINA WATER POLLUTION CONTROL FACILITY
THIS AMENDMENT TO AGREEMENT is made and entered into this
county sanitation district, hereinafter referred to as "DiStXiCt" or "Owner," and BROWN AND CALDWELL, a California Corporation, 1 hereafter referred to as "Engineer: ''
, 1982, by and between the VISTA SANITATION DISTRICT, a
1'
WITNESSETH:
WHEREAS, parties hereto entered into an Agreement (herein- after referred to as Basic Agreement) on June 7, 1978, for Step 2 engineering services regarding Phase 111 Enlargement and Upgrading of the Encina Water Pollution Control Facility: and
WHEREAS, the Basic Agreement was amended on December 6, 1978, (hereinafter referred to as Amendment No. 1) to expand the scope of work and compensation for Basic Step 2 services as a single construction contract; and
WHEREAS, the Basic Agreement was amended on Mach 7, 1979, (hereinafter referred to as Amendment NO..^) to expand the scope of work for the Planned Basic Step 2 Design Service because of
the change from biofiltration to activated sludge secondary treatment the estimated cost ceiling was increased from $1,040,000 to $1,303,163; and increased the Special Engineering Services allowance from $200,000 to $384,000 because of the additional design services associated with the preparation of the design in a series of multiple contracts; Amendment 2 also increased the cost ceiling for the Preliminary Design Services from $189,004 to $195,721; and
WHEREAS, the Basic Agreement was amended on May 2, 1979, (hereinafter referred to as Amendment No. 3) to increase the cost ceiling for the Preliminary Design Services from $195,721 to
$216,000; and
(hereinafter referred to as Amendment No. 4) to increase the allowance for Special Engineering Services from $384,000 to
$7 00,000 ; and
WHEREAS, the Basic Agreement was mended on October 9, 1979,
EXH I B I T "A"
PAGE 1 OF 3
i L.
2
WHEREAS, the Basic Agreement was amended on April 2, 1980, (hereinafter referred to as Amendment No. 5) to increase the estimated cost ceiling for the Planned Basic Step 2 Design Services
from $1,303,163 to $1,391,718; and
WHEREAS, Engineer nas billed District on a monthly basis for a compensation of engineering services provided in accordance
with the terms and conditions of the Basic Agreement and authorization from District; and
WHEREAS, in Engineer's monthly billings to District for services authorized on a cost reimbursement basis, an interim
billing overhead rate of 1.45 has been used in calculating the indirect costs for the Preliminary Design Services and an interim billing overhead rate of 1.50 has been used in calculating the indirect costs for the Basic Step 2 Services; and
WHEREAS, based on the figures audited by an independent
certified public accountant, the Engineer's actual overhead rate for the Fiscal Year (FYI 1977/78 was determined to be in excess of the above mentioned interim overhead billing rate and the
interim rate was modified by Amendment 2 to a provisional overhead rate of 1.64 for FY 1977/78; and
WHEREAS, in accordance with the provisions of the Basic Agreement, the U.S;'Environmental Protection Agency (USEPA) has approved an overhead rate for Engineer's FYs 1977/78, 1978/79 and 1979/80; and
WHEREAS, Engineer has requested and District agrees to increase the estimated cost ceiling for these engineering services
based on the final USEPA approved overhead rate; and
WHEREAS, it is necessary to modify certain portions of the Basic Agreement to establish these new overhead rates.
NOW, THEREFORE, it is agreed by and between the parties as follows:
l. Add the following to Paragraph A.2.a. (2) , Exhibit "B" of the Agreement:
In accordance with the above provisions, the following is a summary of the interim billing, provisional billing
and final USEPA approved overhead rates:
EXHIBIT "A"
PAGE 2 OF 3
3
Interim Provisional Final USEPA billing billing approved
overhead overhead overhead
Enqineerinq services rate rate rate
Preliminary design
services
1977/78
1978/79
1.45
1.45
Basic step 2 services
1978/79 1.50 1979/80 1.50
1.64 - 1.608 1.481
1.481
1.563
2. Change the amount in Paragraph C.1.b.l (Design Tasks) of Exhibit B for the estimated cost ceiling from
$1,391,718 to $1,405,040.
IN WITNESS WHEREOF, District and Engineer have caused this
Amendment to the Basic Agreement to be executed the day and date
first written above.
ATTEST : VISTA SANITATION DISTRICT
Approved by Resolution No. BROWN AND CALDWELL, a
California Corporation
on
BY Vice President
EXH I B I T "A"
PAGE 3 OF 3
BROWN AND CALDWELL
November 1, 1982
0 n GALDWELL. PE Cnrirmrn
1 V LUTQE. PE Pioaidmnl
E F MISCHE. PE Exec Vice Piel
J L HARTFORD, PE Vice Pros . _. - . ._ . ",
Mr. Dennis M. Reid General Manager
Encina Joint Powers
6200 Avenida Encinas
Carlsbad, California 92008 012-276"
Subject: Step 2 Special Engineering Services-Phase 111
Enlargement and Upgrading of the Encina Water Pollution Control Facility
Dear Mr. Reid:
The U.S. Environmental Protection Agency (USEPA) has finalized our overhead rates for fiscal years (FY) ending September 28, 1979, and September 26, 1980. Rased on the provisions of our agreement, we are incorporating these rates into proposed Amendment 6 to our June 7, 1978 Agreement for Step 2 engineering services regarding Phase 311 Enlargement and Upgrading of the Encina Water Pollution
Control Facility (EWPCF).
The Special Engineering Services performed during the Step 2 engineering service require an indirect cost adjustment if the
compensation was authorized as a cost reimbursement type compensation. Table P which is enclosed lists all the Special Engineering Services authorized in accordance with Article I1 of our agreement.
Table 2 which is enclosed lists the Special Engineering Services which have a cost reimbursement type compensation and these require
indirect cost adjustments. As can be seen from the table, the total additional billings would mount to $3,539.39. that the revised cost ceiling shown in Table 2 be approved as the
revised cost ceiling. the special engineering services allowance is less than that
authorized in Exhibit B, Paragraph C.2.
It is requested
With these additional indirect cost adjustments
BROWN AND CALDWELL 150 SOUTH ARROYO PARKWAY, BIN 83. ARROYO ANNEX. PASADENA. CA 91109 (213) 577-1020
A114N TA OAL.LAtr 1 I WOATt.1 1)tNVEH EUGENE PASADENA SACRAMENTO SEATTLE TUCSON WALNUT CfltiK WESTWOOO EXH I B I T "B" j2
PAGF 1 nF 4 Id
Mr. Dennis M. Reid November 1, 1982
Page two
Please sign this letter, if you concur with the revised cost ceilings shown in Table 2, and furnish a fully executed original for our files upon your approval. We have been informed by a representative of the State Water Resources Control Board that
a USEPA Form 5700-41 is not required for these increased rates.
If you have any questions regarding this request, please call
me or Mr. Paul Schulte, our project manager.
Very truly yours,
Approved by VISTA SANITATION
DISTRICT,
!
BROWN AND CALDWELL 150 SOUTH ARROYO PARKWAY, BIN 03, ARROYO ANNEX, PASADENA, CA 91109 (213) 577-1020
R9 VTO SEATTLE TUCSON WALNUT CREEK WESTWOOD kVfB1~ 3 I ATLANTA DALLASFT WOFITH DENVkR EUGENE) PAW t
nA.pr 3 nc ,!.I
.
Enqineerhg Service5 T* I Encina Phaae I11 - ep I1 specia -
sunmary Job
Sumbar 276-
Apgroved Total
invoiced
and paid
2 ,015.81
4,876.73
5,009.11
25,422.96
95,235.63
35,752.90
37,418.79
93,974.60
17,634.47
44.473.00
26,043.24
7,928.56
10,348.27
5,612.74
49,219 .OE
26,855.01
17,390.21
26.ao8.i:
1i ,372.73
15 ,098.O(
29,635. Of
36,908.X
12,410.0(
24,327.8;
ditianal ndiract cost
rofas- onal fco
Price :ailing
:stbated
cost :ailing
Total
compen-
sation
Engineering Service
- ~~
%now "AJI constructed" conditions
Application .Cor modification
Of Seconduy hcAPwnt %qll~ainlUlm assistanC(I
Review of Wastewater
ChrracterLstrcs
Asoisrance and =cordmation
vith Construction .%age- mnz Consultant ?art 1
Additional Xork :or Xultrple Contracts I
'*at. of Financial Tlan and Rsvonuo Program
Design Extension of Avenida
Enclnas
additionai Xork Lor Xulti2ls
Contracts 11
ilrnistanco and Cocrdrnation
vith Canstnctran maqe- mnt Consultant - I1
Printing of Cantract Document I - Contracts 1-9
Assirtanco with Bidding I Contracts 1-7
Assistance vrth Cost Sharing
arranpmnto
Assistance vith EligrSrlity
Acoustical Zonsultinq
service
assistance vrth aiddhg-I1
Addrtional arign Servicas I
Solids Transportation and Storage I'quzgmant
xedntenance and Fu.1 Dis- pMmq Station
XsrlJtance and Cccrdination vrth Constrxtion Xanaqe- mnt Conrultant, ?art 3
Znqzr.earing Serrices EKOm
7lant Hods1
Additional Design Services :I
Prxting ?t Cmtract
%cumants I1
Additional 3esicjn Resulting
from 'la1-s Engineering Stud
PralLmrnary Step 3 Engineerin
50
53
54
56
57
69
70
71
75
76
81
a2
86
a7
as
39
90
91
32
93
91
95
96
37
3,314
4,960
5,331
25,512
-
-
-
-
17,638
-
26,171
8,679
17,596
8,121
49,454 -
-
-
17,638
.E, 338
29,657
-
-
25,384
3,514
4,960
5,331
25,572
95,270
39,785
37,655
94,362
17,638
44 0 495
26,171
8.679
17,596
8,121
49,454
27,071
18,174
27.2.53
17,638
15.098
29,657
36,908
12,414
25.384
2,015.81
4,876.73
5.009.11
5,422.96
94,632.69
-
-
-
-
81,942
36,000
32,638
ai,m
-
39,441
-
- -
- -
23,338
15,668
23,494
-
- -
34,020
LO, 703 -
-
-
-
-
13,336
3,785
5,017
13,000
-
5,054
-
- -
- -
3,733
2,506
3,759
-
- -
2,888
1,711 -
-
-
-
..
(602.34)
(177.951
154.58
1,017.29
-
299.41
- -
-
577.15
370.a~
579.68
-
- -
55.34
:65.8a
3s.574.35
Ii ,573.37
95,391.59
17,634. 4Y
(4,772.41
26,043.28
7,928.56
10,348.22
5,612.74'
49,229 .OR
27,432.16
17,761.08
27~a8.43
17,372.31
15.098.30
29,635.96
36,963.34
1: ,675.94
24,127.87
Total 567, fa. 5: 688,200
Special Engineating
All>war.cc 700.300
EXH I I3 I T "B"
PAGE 3 OF 4
.
~able 2. Encina Phase 111.- BPP Step 2 Speciel Engineering Service.
RoguFring Favisions to Cost Caillngs, dollars
Engineering Services
Additional Work for Multiple
updato of Financial 21an and
Design Extension of Avanida Encinaa
Addttional Work for Multiple
Printing of Contract Doamants I -
Additional Cmrign Sarvican I
solids Transportation and
Storage Equipmant
nnintenanco ad he1 Diepenning
Station
Printing of Contract Occumants I1
Additional Dosign h3sulttng from Value Enginerring Study
Contracts I
Ravenus Proqrm
Contracts 11
:ontracts 1-9
sunwary job number 276-
Approve4
estimated cost ceiliJlg '
57
69
70
81,942
36,000
32,638
71 83,362
76 39,441
89 23,338
90
91
9s
15,668
23,494
34,020
20,703
378,605
%tal
coats invoiced and
paid a
81,899.63
31,967- 90
32,401.79
80,974.60
39,419.00
23 ,I22.01
14,884.23
23,049.75
34,020.00
IO ,699.06
372,417.97
Mdi tional indirect cost b
(602.94)
(177.9s)
154.58
2,017.39
299.41
577.15
370.85
579.68
55.34
26s. 88
3,539.39
+vised cont caili nq
81,297
31,790
32,557
02,992
39,719
23,699
15,256
23,630
34,076
10,964
._ ~
375,980
'Wen not include professional fee that van invoiced and paid.
bkdditional indirect costs rasulting from proposed overhead adjurtmmanu.
EXH I B 1 T "B"
PAGE 4 OF 4
AMENDMENT 2 TO
MASTER AGREEMENT FOR STEP 3 ENGINEERING SERVICES
BETWEEN VISTA SANITATION DISTIiICT AND BROWN AND CALDWELL
FOR
PHASE I11 ENLARGENENT AND UPGRADING OF THE ENCINA WATER POLLUTION CONTROL FACILITY
THIS ANEXDMXNT TO AGREEMENT made and entered as of day of , 1982, by and between the Vista Sanitation
District, hereafter referred to as "District" or llOwner", and Brown and Caldwell, a California corporation authorized to provide consulting engineering services, hereafter referred to as "Engineer".
WITNESSETH:
WHEREAS, District entered into a Step 3 engineering services agreement with the Engineer on August 29, 1980, for certain engineering services during construction of the Phase 111 Enlargement
and Upgrading of the Encina Water Pollution Control Facility (herein- after referred to as the "Xaster Agreement"); and
WHEREAS, the Plaster Agreement was amended by Amendment 1 to increase the scope of work and the estimated total compensation;
and
WHEREAS, Engineer has billed District on a monthly basis for a compensation of engineering services provided in accordance with
the terms and conditions of the Master Agreement and authorization from District; and
WHEREAS, in Engineer's monthly billings to District for services authorized on a cost reimbursement basis, an interim billing overhead rate of 1.50 has been used in calculating the indirect costs; and
Agreement, the United States Environmental Protection Agency (USEPA)
has approved an overhead rate for Engineer's Fiscal Year (FY) 1979/80; and
1981, and based on the figures audited by an independent certified
public accountant, the actual overhead rate for the fiscal year was determined to be in excess of the above-mentioned interim billing
overhead rates; and
WHEREAS, in accordance with the provisions of the Master
WHERkAS, Engineer's FY 1980/81 was concluded on September 25,
...
EXH I B I T "CN
PAGE. 1 OF 3
WHEREAS, in accordance with the provisions of the Basic Agreement, Engineer has requested that a provisional billing overhead
rate be established for Engineer's FY 1980/81; and
increase the estimated total compensation for these engineering services to allow for changes in the overhead billing rates; and
t4aster Agreement to sstahlish these revisions.
WHEREAS, Engineer has requested and the District zgrees to
WHEREAS, it is necessary to modify certain portions of the
NOW, THEREFORE, District and Engineer agree as follows:
1. Add the following to Paragraph A.1.a. (2), Exhibit "B" of the Agreement:
In accordance with the above provisions, the following is a summary of the interim, provisional and final USEPA approved overhead rates:
Interim Provisional Final USEPA billing billing approved overhead overhead overhead Period rate rate rate
1.563
September 29, 1979
September 26, 1980
-- through 1.50
September 27, 1980
September 25, 1981
through 1.50 1.62
2. In Paragraph C.1. of Exhibit "B", change the estimated total compensation from $1,239,000 to $1,287,500.
All other provisions of this Master Agreement between
District and Engineer shall remain in full force and effect.
3.
i
EXH I I3 IT "C"
PAGE 2 OF 3
..
/' .
IN WITNESS WHEREOF, District and Engineer have caused this
Amendment to the Master Agreement to be executed the day and date first written above.
ATTEST :
BY
Approved by Resolution No.
on
I
VISTA SANITATION DISTRICT
BY
BROWN AND CALDWELL, a California Corporation
BY
EXH I BI T "C"
PAGE 3 OF 3
.*.
AMENDMENT 1 TO
TASK ORDER NO. 1 FOR
STEP 3 ENGINEERING SERVICES
P.3ASE XI1 ENLARGEMENT AND UPGRADING
THE ENCINA WATER POLLUTION CONTROL FACILITY
OF
THIS ~ENDMENT TO TASK ORDER NO. 1 is made and entered into by and between the Vista Sanitation District, hereinafter referred
to a9 ''District" and Brown and Caldwell, hereinafter referred to as
"Engineer. "
WITNESSETH:
WHEREAS,' on July 18, 1980, District authorized Engineer to proceed with certain work under Task Order No. 1; and
WHEREAS, Engineer has billed District on a monthly basis for a compensation of engineering services provided in accordance with the terms and conditions of the Basic Agreement and autho-
rization from District; and
WHEREAS, Engineer's monthly billings to District far services authorized on a cost reimbursement basis, an interim billing overhead rate of 1.50 has been used in calculating the indirect costs; and
WHEREAS, in accordance with the provisions'of the Basic Agreement, the U.S. Environmental Protection Agency (USEPA) has approved an overhead rate €or Engineer's Fiscal Year (FYI 1979/80; and
WHEREAS, it is necessary to modify certain portions of the Basic Agreement to establish these new overhead rates.
NOW, THEREFORE, District and Engineer agree as follows:
1. In Article IV, Compensation of Task Order No. 1, add
the following: .
In accordance with the applicable provisions of Exhibit B of the B+c Agreement, the following is a sununary of the
interim and final USEPA approved overhead rates:
Interim Final USEPA billing approved overhead overhead
Period rate rate
September 29, 1979
September 26, 1980 through a. 50 1.563
EXH I B I T "D"
PAGE 1 OF 2
I 2. This Amendment to Task Order No. 1 is effective on the
date it is executed by the District.
VISTA SANITATION DISTRICT
BY .
EXH I B I T “D”
PAGE 2 OF 2
Date
31
AMENDMENT 1
TO TASK ORDER NO. 6
FOR STEP 3 ENGINEERING SERVICES
PHASE I11 ENLARGEMENT AND UPGRADING
OF THE ENCINA WATER POLLUTION CONTROL FACILITY
THIS AMENDMENT TO TASK ORDER NO. 6 is made and entered into by and between the Vista Sanitation District, hereinafter referred to as "District" and Brown and Caldwell, hereinafter referred to
as "Engineer".
WITNESSETH:
WHEREAS, on September 15, 1982, District authorized Engineer to proceed with certain work under Task Order Yo. 6; and
WHEREAS, Engineer has billed District on a monthly basis for a compensation of engineering services provided in accordance with the terms and conditions of the Basic Agreement and authorization from District; and
WHEREAS, in Engineer's monthly billings to District for services authorized on a cost reimbursement basis, an interim
billing overhead rate of 1.50 has been used in calculating the indirect costs for fiscal years through 1981/82; and
September 25, 1981, and based on the figures audited by an independent certified public accountant, the actual overhead rate for the fiscal year was determined to be in excess of the above-
mentioned interim billing overhead rates; and
Agreement, Engineer has requested that a provisional billing over- head rate be established for Engineer's fiscal year 1980/81; and
WHEREAS, Engineer's fiscal year 1980/81 was concluded on
WHEREAS, in accordance with the provisions of the Basic
' WHEREAS, Engineer has requested and District agrees to increase the estimated cost ceiling for these engineering services
based on the provisional billing overhead rate; and
Basic Agreement to establish these new overhead rates.
WHEREAS, it is necessary to modify certain portions of the
EXH I B I T "EN
PAGE 1 OF 3
NOW, THEREFORE, District and Engineer agree as follows:
1. In Article IV, Compensation of Task Order No. 6, add the
following:
In accordance with the applicable provisions of Exhibit B of the Basic Agreement, the following is a summary of the
interim billing and provisional overhead rates:
Interim
billing Provisional
overhead overhead
. rate rate Period
September 27, 1980
Septernber 25, 1981 through 1.50 1.62
2. In Article IV, Compensation of Task Order No. subparagraph a through d and substitute the following:
6, delete the
a. Equipment Contracts 2, 5, 3/4 and 6 (Account No. 1016-270)
Subtasks 1, 4, 7, 8 and 9
Basis of compensation: Cost reimbursement
Estimated cost ceiling: 32,186
Fixed professional fee: 4,632
b. Contracts 1 and 7/9, (Account No. 1016-240) Subtasks 1, 2, 4, 7, 8 and 9
Basis of compensation: Cost reimbursement
Estimated cost ceiling: 133 , 982
Fixed professional fee: 19,286
c. Contract 8, (Account No. 1016-230) Subtasks 1, 4, 5, 7, 8 and 9
Basis of compensation: Cost reimbursement
Estimated cost ceiling: 69,697
Fixed professional fee: 10,058
.
EXH I BI T "E"
PAGE 2 OF 3
a3
" 1)
d. Contract lO/ll, (Account No. 1016-250)
Subtaslcs 1 throucjh 8, 10 and 13
Basis of compensation: Cost reimbursement
Estimated cost ceiling: 541,737
Fixed professional fee: 79,485
3. This AmendmeiIc to Task Order No. 6 is effective on the date
it is executed by the District.
BROWN AND CALDWELL VISTA SANITATION DISTRICT
BY BY
Date
EXH I B I T "E"
PAGE 3 OF 3
d