Loading...
HomeMy WebLinkAbout1986-08-12; City Council; Resolution 8747, 1 2 2 4 5 6 7 e 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 8747 A RESOLUTION OF THE CITY COUNCIL OF THE CITY CONSULTANTS FOR ENGINEERING SERVICES DURING THE CONSTRUCTION OF THE CARLSBAD BOULEVARD SEAWALL (CIP PROJECT NO. 3185) OF CARLSBAD, CALIFORNIA, AND WOODWARD-CLYDE The City Council of Carlsbad, California does hereby resolve as follows: 1. That an agreement between the City of Carlsbad and Woodward-Clyde Consultants for engineering services during the construction of the Carlsbad Boulevard Seawall (CIP Project No. 3185), attached hereto as Exhibit 'A' and made a part hereof, is hereby approved. 2. That the Mayor of the City of Carlsbad is hereby authorized and directed to execute said agreement for and on behalf of the City of Carlsbad. PASSED, APPROVED AND ADOPTED at a regular meeting of the 9 Carlsbad City Council held on the 12th day of August - 1986 by the following vote, to wit: AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine NOES: None ABSENT: None ATTEST: MARV H. CASLER, Mayor ALETHA L. RAUTEN (SEAL) 7 SUPPLEMENTAL AGREEUENT FOR ENGINEERING SERVICES DURING CONSTRUCTION OF THE CARLSBAD SEAWALL All conditions and provisions of the existing Consultant Agreement with Woodward-Clyde Consultants, Inc., approved by the City Council on January 1, 1986, as Agenda Bill No. 8484 are to remain in effect excep-t as follows: The duration of this Supplemental Agreement will extend through final acceptance of the "as-built" plans or Council's 'issuance of the Notice OF Completion for the Seawall project, whichever is later. The fees to be paid for Task 2 of this Supplemental Agreement will be on a time and materials basis, according to the hourly rates listed below, and not to exceed $60,000. These services will be requested "as needed" by City Staff. HOURLY RATES Principal Engineer $1 00.00 Structural Engineer 80.00 Assistant Project Engineer 62.00 Staff Assistant 33.00 The lump sum fee to be paid for Task 1, "Contractor Selection", is to be $2,500; this fee is payable upon award of the construction contract. The lump sum fee to be paid for Task 3, "As-built- Plans," is to be $6,500; this fee is payable upon . final acceptance of the "as-built" plans by the City. It is anticipated that this work would be done primarily by Woodward-Clyde Consultants with assistance on structural consultation and preparation of as-built plans by Safino, Butcher and Ormonde. The project consultation work will be managed by Louis 3. Lee of Woodward-Clyde Consultants. IN WITNESS WHEREOF, we have hereunto set our hands and seals. WOODWARD-CLYDE CONSULTANTS: CITY OF CARLSBAD: ‘I -3- SUPPLEMENTAL CONSULTANT SCOPE OF WORK TASK 1 CONTRACTOR SELECTION Make presentation at prebid meeting and attend tour of site. Respond to contractors questions and prepare addendums to the contract documents, as required. Review bids, assist City staff with selection of contractor and attend City Council meeting for award of contract. TASK 2 CONSTRUCTION INSPECTION Attend preconstruction meeting. Review plans, specifications and other contract documents with City resident inspector. Assist inspector in preparing forms to be used for documentation of construction. Review daily reports and documentation forms prepared by the City resident inspector (on a weekly basis). Make periodic site visits (a minimum of twice a month; other site visits as requested). Provide re-design, as required. (Revise plans, specifications and estimate and regultory requirements). Provide engineering consultation, as requested. Attend construction meetings, as requested. Attend punchlist and final “walk-throughs”, as requested. -4- TASK 3 AS-BUILT -PLANS Prepare summary of construction observations and design changes from City resident inspector's reports and documentation. Prepare final as-built plans from City inspector's notes and contractor's ftworking" as-built plans.