Loading...
HomeMy WebLinkAbout1990-07-24; City Council; Resolution 90-246.A I1 e 0 1 2 3 4 5 6 RESOLUTION NO. 90-246 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A SUPPLEMENTAL AGREEMENT BETWEEN THE CITY OF CARLSBAD AND RECON FOR THE PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR CANNON ROAD, REACHES 3 AND 4 WHEREAS, a consultant agreement was approved on 0 7 9 Report on Cannon Road, Reaches 3 and 4; and 8 14, 1988, with RECON for the preparation of an Environmental WHEREAS, various changes and additions to the wo 10 11 required and have been included in a supplemental agreement WHEREAS, funds are currently available in Accoul 12 406-820-1880-3134 for these services. 13 NOW, THEREFORE, BE IT RESOLVED as follows: 14 15 16 Account Number 406-820-1880-3184. 17 18 Environmental Impact Report for Cannon Road, Reaches 3 2 19 Carlsbad and RECON for revisions to the preparation accepted and approved. 21 attached hereto as Exhibit A and made a part hereof, is 1 20 1. That the above recitations are true and corr 2. That the sum of $29,699 is hereby appropria. 3. That a supplemental agreement between the C: 22 /// 27 /// 26 /// 25 /// 24 /// 23 /// 28 /// 0 0 1 4. That the Mayor of the City of Carlsbad is 1 2 3 authorized and directed to execute said agreement for and on 1 of the City of Carlsbad. 4 PASSED, APPROVED AND ADOPTED at a regular meeting I 5 NOES: None 8 7 by the following vote, to wit: 6 Carlsbad City Council held on the 24th day of July i AYES: Council Members Lewis, Kulchin, Pettine, Mamaux and 9 ABSENT : None 10 11 12 l3 ll..kaLd@- ATTEST: 14 ALETiIA L. RAUTENKRANZ, Citk Clerk 15 16 17 ( SEAL) 18 19 2o I 21 22 23 24 25 (I 26 27 28 m 0 SUPPLEMENTAL AGREEMENT TO AGREEMENT FOR ENVIRONMENTAL IMPACT REPORT SERVICES DATED OCXOBER 14,1988 THIS SUPPLEMENTAL AGREEMENT to the above described agreement as approved by the City Manager on October 14, 1988, hereinafter referred to as "Agreement", is made and entered into as of the - day of J 1990, by and between CITY OF CARLSBAD, a municipal corporation, hereinafter referred to as "City" and REGIONAL ENVIRONMENTAL CONSULTANTS, INCORPORATED, hereinafter referred to as "Consultant". RECITALS WHEREAS, upon review of the preliminary Environmental Impact Report, it became apparent that additional studies were required to complete said report. NOW, THEREFORE, City and Consultant mutually agree to supplement the above referenced agreement as follows: 1. CONSULTANTS OBLIGATIONS A. Provide services in connection with archaeological testing as follows: 1) Prepare a testing plan for Loci A-C of site SDM-W-2848 and SDM-W-2876C and submit to the client. Prepare one (1) set client-requested revisions, if necessary. 1 0 0 2) Conduct a field survey to define the surface boundaries of site W-2848 Loci A and B. 3) Excavate 15 shovel test pits and five 1x1-meter test units at site W-2848. 4) Conduct a field survey to define the surface boundaries of site W-2876 LOCUS C. 5) Excavate 5 shovel test pits and two 1x1-meter test units at site W-2876 LOCUS C. 6) Document (photograph and map) milling features observed at site W-2876 Locus C. 7) Catalogue and analyze cultural materials collected during the excavations of the shovel test pits and test units for both W- 2848 and W-2876. 8) Prepare an archaeological technical report which describes the testing methodology, results of the surveys, excavations, and analysis. The report will include any recommendations for further investigations, if necessary. 9) Submit to the report to the client. Payment will be due upon delivery to and approval of the technical repQrt by the client. B. Provide services in connection with archaeological testing at an additional site as follows: 2 0 0 1) Perform archaeological testing for significance at site CR-1. a) Amend research design prepared for Cannon Road, Reaches 3 and 4 to include testing program to be completed at CR-1. b) Surface collect and map artifactual materials. c) Excavate fifteen shovel test pits and four 1x1-meter test units. d) Draw and photograph the possible features identified during excavation. e) ' Analyze materials recovered during the testing program. f) Submit two shell samples for radiocarbon dating. g) Incorporate testing results into the archaeological testing report for Cannon Road, Reaches 3 and 4. 2) Delete from previous scope of work in contract, Cannon Road, Reaches 3 and 4, dated October 14, 1988, tasks associated with testing to be completed at SDM-W-2876C. C. Revise the scope of the original agreement to include the following additional services: 1) Revise preliminary Environmental Impact Report (EIR) to reflect a change in the change of the flood control channel upstream from El Camino Real to a soft-bottomed channel according to plans furnished by the City. 3 a 0 2) Revise preliminary EIR to include biological mitigation being developed by P & D Technologies. 3) Revise preliminary EIR to include additional traffic information being developed by Urban Systems Associates as a part of this change order. 4) Furnish six copies of the revised preliminary EIR to the City for review and comment. 5) Revise the preliminary EIR to produce a draft EIR for public review, consistent with the original terms of this contract. 6) Attend two meetings to discuss the project with the City's project development team, if required. 7) Amend the traffic study to include the following: a) Revisions will assume reaches 1, 2, 3, and 4 will be constructed to four lanes concurrently in 1992, and that no phasing analysis of separate reach construction will be included. b) The City of Carlsbad will provide current ADT and intersection counts they have available from their ADT count program and the JHK & Associates traffic monitoring report. 4 m C) Once existing 1989 conditions are evaluated, estimates of 1990,1991, and 1992 traffic will be made before the Cannon Road construction. Then the traffic diversion effect of the Cannon Road construction will be evaluated. The effects to SR-78, El Camino Real, Elm Avenue, Tamarack Avenue, and Palomar Airport Road will be evaluated on an ADT basis. d) Peak hour effects at key intersections will also be evaluated. The intersections are: El Camino Real/Palomar Airport Road El Camino ReaVFaraday Avenue El Camino Real/Cannon Road El Camino Real/Tamarack Avenue Cannon Road/I-5 Ramps e) The peak hour effects to the El Camino Real/Tamarack Avenue intersection will include witwwithout the College/Elm/Tamarack connection in 1992. f) The number of lanes needed on Cannon Road by year will not be evaluated since four lanes will be assumed with the initial construction. g) The evaluation witwwithout the Cannon Road connection through to Oceanside in 1995 will be retained. 5 e 0 h) The wiWwithout 1995 Mar Vista connection will be deleted, assuming the connection. i) Consistency with adjacent FMZ plans will be addressed. j) The recommendations and conclusions will be revised according to the results of the revised analysis, k) Provide revisions in response to public review comments. 2. PERIOD OF SERVICE Work shall begin immediately after receipt of notification to proceed by the City Engineer. Work shall proceed in a diligent manner to conclusion according to a schedule approved by the City Engineer. 3. FEES TO BE PAID TO CONSULTANT Consultant shall be paid a lump sum fee upon completion of each item as listed below and detailed in Section 1. CONSULTANT'S OBLIGATIONS: A. Archaeological Testing Services $ 9,985.00 B. Archaeological Testing at Additional Site 6,214.00 C. Revise EIR to Change Flood Control Channel, Include Biological Mitigation and Amend Traffic Study 13,500.00 TOTAL FEE $29,699.00 6 , 0 0 IN WITNESS WHEREOF, this Supplement to Agreement dated October 14, 1988, has been executed by the parties through their duly authorized representatives as of the date first hereinabove written. REGIONAL ENVIRONMENTAL CITY OF CARLSBAD CONSULTANTS, INCORPORATED (RECON) By: Title: Mayor APPROVED As TO FORM: ATTEST: City Attorney City Clerk 7