HomeMy WebLinkAbout1992-06-16; City Council; Resolution 92-174h
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
0 e
RESOLUTION NO. 92-174
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, ESTABLISHING THE FEES FOR
DEVELOPMENT-RELATED CITY SERVICES
WHEREAS, the City Council of the City of Carlsbad has the authority
to establish fees for City services; and
WHEREAS, from time to time said fees are reviewed and evaluated to
maintain an adequate fee structure recovering costs for City services; and
WHEREAS, the City Council has determined the cost of providing
development-related services; and
WHEREAS, the City Council finds it necessary to recover the costs foi
development-related services; and
WHEREAS, the City Council has determined that the fees shown iI
Exhibit A attached hereto are fair and reasonable in relation to the service
received; and
WHEREAS, the City Council has held the necessary public hearing anc I I allowed for public comment on the establishment of said fees.
///
///
///
///
///
///
///
I
w .w
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
1 of Carlsbad, California that the fee schedule shown in Exhibit A attached
2
3
4
hereto is hereby adopted and shall become the official fee schedule for
development-related services for the City of Carlsbad. Any fee area not
5 I/ included in said list shall remain under the control of previous resolution
6 adopted by this Council. All fees shall become effective sixty days after
7
a
adoption of this Resolution.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City
9 Council of the City of Carlsbad on the 16th day of June Y
10
11
12
1992, by the following vote, to wit:
AYES: Council Members Lewis, Kulchin, Larson, Stanton and Nygaard
13 /I NOES: None
14
16
15
ABSENT: , None
17
18 I 2 :ATTEST
“9.
: “20b
’ -’
(SM) r 21.
*. . ‘db - *. .
’ ALETM L. RAUTENKRANZ, City Clerk/
i’ - “ .-
22
23
*_
24
25
26
27
28 II
0 - ,.-.. - -
City of Carlsbad
Proposed Fee Schedule
Development Related Fees
June, 1992
Total Fee Change Proposed 1990-91
Fee Description
10.00% 25 275 250 500 Design Review - Preliminary Review - Major
10.00% 5 55 50 500 DayCare Permit - Extension
13.64% 15 1 25 110 1,238 DayCare Permit
9.09% 10 120 110 2,700 CUP - Non-Profit
10.00% 5 55 50 500 CUP - Extension - non-profit
6.67% 25 400 375 500 CUP - Extension - Regular
6.67% 5 80 75 1,500 CUP - Amendment - Non-Profit
0.00% 0 1,000 1,000 1,500 CUP - Amendment - Regular
19.05% 400 2,500 2,100 2,699 CUP
11.11% 40 400 360 484 Coastal Development Permit - Other
36.36% 40 150 110 463 Coastal Development Permit - Single Family
87.50% 140 300 160 600 Construction Change Review - Major
200.00% 100 150 50 500 Construction Change Review - Minor
0.00% 0 240 240 240 Certificate of Compliance
(3) Building Plan Check - 65% of Bldg Permit
(3) Building Permit Fees (Base on state fee schedule)
4.26% 20 490 470 1,079 Appeal - Planning Commission - Other
9.09% 10 120 110 972 Appeal - Planning Commission - Single Family
NA NA 120 0 893 (New) Appeal - City Council - City Engineer's Decision
4.26% 20 490 470 893 Appeal - City Council - Other
9.09% 10 120 110 730 Appeal - City Council - Single Family
4.88% 20 430 41 0 1,186 Administrative Variance - Other
4.17% 10 250 240 652 Administrative Variance - Single Family
6.25% 20 340 320 41 5 Adjustment Plat
0.00% 0 50 50 50 Additional Planning Inspections (first lnsp included in plan check f
% Amount Fee Fee Cost Note
'
Design Review - Preliminary Review - Minor 300 50 55 5 10.00%
Drainage Fees (3x4)
Duplicate Tracing Fees - Final Parcel Maps - per sheet 30 30 30 0 0.00%
Duplicate Tracing Fees - Final Tract Maps - per sheet 30 30 30 0 0.00%
Easement or Offer to Dedicate or Improve 200 160 200 40 25.00%
EIA - All Others 1,321 21 0 220 10 4.76%
EIA - Single Family
0.00% 0 10,500 10,500 10,237 EIR - Supplemental (Requiring a Public Hearing)
10.00% 25 275 250 500 EIR - Addendum
4.95% 260 5,510 , 5,250 12,290 EIR - 20 Acres and up
5.24% 110 2,210 2,100 5,806 EIR - 5 through 19 Acres
5.24% 110 2,210 2,100 4,924 EIR - 1 through 4 Acres
4.76% 10 220 21 0 1,088
Encroachment Permit (Before installation) 50 50 50 0 0.00%
Encroachment Permit (After Installation) 100 100 100 0 0.00%
Engineering Variance - Minor 85 82 85 3 3.66%
Engineering Variance - Major 160 157 160 3 1.91%
Environmental Monitoring Fee 150 110 150 40 36.36%
Final Parcel Map (Minor Subdivision) 1,580 1,580 1,580 0 0.00%
Final Tract Map (Base fee + $5 per Acre) 3,081 2,630 2,760 130 4.94%
Fire Hydrant Fees - See Uti1 Maint dept - $2,500 Deposit
(Base + acutal cost)
I I
I
City of Carlsbad
Proposed Fee Schedule
Development Related Fees
June, 1992
Fee DescriDtion ~~ ~~~ .- ~ ~
Fire Protection System Installation
"Automatic Sprinkler Systems - See Schedule for Rates fire Alarm Systems - See Schedule for Rates
-Other Fixed Fire Systems - See Schedule for Rates
Fire Repeated Inspection on New Construction
Fish &Game Fee - Negative Declaration
Fish &Game Fee - EIR
Future Improvement Agreements
General Plan Amendment - 1 Acre or less
General Plan Amendment - 1 to 5 Acres
General Plan Amendment - 5 Acres and up
Grading Permit - (See Schedule for Rates)
Grading Plan Check - (See Schedule for Rates)
Growth Management Fees - As established by Council
Hillside Dev Permit - Single Family
Hillside Dev Permit - Other
Hillside Dev Permit Amendment - Single Family
Hillside Dev Permit Amendment - Other
Improvement Agreement Extension
Improvement Inspection Fee (See Schedule Below)
Improvement Plan Review (Plan Check) (See Schedule Below)
Information to Planning Commission - Single Family
Information to Planning Commission - Other
Inspection Overtime (On Request)
Landscape Plan Check - Same as lmpvt Plan Check
Landscape Inspection - Same as lmpvt Construction lnsp
Lighting Plan Checks - (Plan Check) (See Schedule Below)
Local Coastal Plan - Amendment - Major
Local Coastal Plan - Amendment - Minor
Master Plan (Base Fee + $1 5 per Acre)
Master Plan Pre Submit
Master Plan Amendment (Minor)
Master Plan Amendment (Major) (Base Fee + $10 per Acre)
Monumentation (Cash deposit as required)
Notice Fees - Based on Cost to Provide Notice
Park In-Lieu Fees - (See attached schedule)
PD or Condo Revision - 4 or less
PD or Condo Revision - 5 to 50
PD or Condo Revision - 51 or more
PD Revision - Non-Res - 4 or less
PD Revision - Non-Res - 5 to 50
PD Revision - Non-Res - 51 or more
PD or Condo - 4 or less
PD or Condo - 5 to 50
PD or Condo - 51 or more
PD - Non-Res - 4 or less
PD - Non-Res - 5 to 50
PD - Non-Res - 51 or more
I
Note
(New)
(New)
(New)
(New)
(8)
(8)
(4)
(4)
(3)(4)
(3)(4)
(New)
(4)
(1 )
(1 1
(1 1
(1 )
(1 )
(1 1
(1 1
(1)
(1 )
(1 )
(1 )
(1 )
Total Fee Change Proposed 1990-91
Cost Amount I Oh Fee Fee
320
40
80
2,218
2,363
5,760
I
0
1,275
875
80
I 1,050
1,050
2,100
I
40
1,275
875
80
1,200
1,200
2,500
NA
0
0
0
150
150
400
NA
0.00%
0.00%
0.00%
1 4.29%
1 4.29%
1 9.05%
791
1 12.50% 180 340 160 340
16.67% 50 350 300 791
6.67% 5 80 75 857
8.11% 30 400 370 857
9.09% 10 120 110
1,518
75 100
41 0 390 1,733
120 110
100
5,531
2,642
20,911
6,249
3,947
15,456
599
2,786
6,192
1,315
3,243
7,298
2,103
6,613
11,022
1,705
5,551
10,504
5,780
1,580
9,980
0
1,580
3,680 I
5,531
1,700
10,475
3,750
1,700
3,860
cost cost
21 0
5,510 5,250
2,000 1',840
250
530 575
2,599 3,000
5,250 6,000
420 440
3,680 4,000
10,500 11,022
420 440
5,250 5,510
10,088 10,504
10
5.13% 20
9.09%
33.33% 25
(249)
120
495
NA
120
180
~
40
160
260
45
401
750
20
320
522
. 20
260
41 6
-4.31 O/O
7.59%
4.96%
NA
7.59%
4.89%
19.05%
8.70%
4.95%
8.49%
15.43%
14.29%
4.76%
8.70%
4.97%
4.76%
4.95%
4.12%
I
a
e City of Carlsbad
Proposed Fee Schedule
Development Related Fees
June, 1992
I Fee Description
Permit Amendments Not Specifically Identified
Planned Industrial Permit
Planned Industrial Permit - Amendment
Planning Commission Determination - Single Family
Planning Commission Determination - Other
Planned Development Final Map - Minor (4 or less)
Planned Development Final Map - Major (50 or less)
Planned Developemnt Final Map - Major (51 or more)
Planned Local Drainage Fees
Precise Development Plan
Precise Development Plan - Amendment
Preliminary Review - Minor
Preliminary Plan Review (Single Family Exempt)
Public Facilities Fees - 3.5% of Bldg Permit Value
Public Facilities Fees Agreement
Quitclaim of Easement
Redevelopment Permit (Minor)
Redevelopment Permit (Major)
Redevelopment Permit Amendment (Minor)
Redevelopment Permit Amendment (Major)
Research Time (By Written Request) - Per Hour
Reversion to Acreage
Right of Way Permit - Single Family
Right of Way Permit - Municipal Projects paying insp fees
Right of Way Permit - All other Non-Utility
Right of Way Permit - Utility (By Contract)
Satellite Antenna Permit
School Fees - (Set by School Districts)
Sewer Connection Permit
Sewer Lateral Charges - 4" line 30' long - lo' deep
Sewer Lateral Charges - 6" line 30' long - 10' deep
Sewer Lateral Charges - Over lo' deep add $7.50 per ft
Sewer Lateral Charges - Over 30' long add $1 2.50 per ft
Sign Permit
Sign Program
Site Development Plan (Minor)
Site Development Plan (Major)
Site Development Plan Revision (Minor)
Site Development Plan Revision (Major)
Special Use Permit
Special Use Permit - Flood Plain
Special Use Permit - Flood Plain, Coastal High Hazard Area
Special Use Permit Amendment - Flood Plain
Special Use Permit Amendments - All Other
Specific Plan Amendment (Minor)
Specific Plan Amendment (Major)
Specific Plan - Less than 5 acres
Specific Plan - 5 to 25 acres
Note
(6)
(4)
(3)
(7)
(5)
(2)
(2)
(Neb
(2)
"
f4
I ~~~~
3
0
Total Fee Change Proposed 1990-91
Cost Amount I % Fee Fee
2,245
535
2,650
2,649
25
587
721
530
375
21 0
790
20
60
60
600
400
220
830
25
70
70
70
25
10
40
5
10
10
13.21 Oh
6.67%
4.76%
5.06%
25.00%
16.67%
16.67%
3,899
9.09% 10 120 110 250
100.00% 230 230 0 388
10.00% 100 1,100 1,000 2,499
7.59% 120 1,700 1,580
50
388
1,838
4,967
356
1,384
80
500
224
224
224
40
260
110
1,310
75
750
100
250
30
80
80
50
280
150
1,400
80
800
100
500
35
90
90
10
20
40
90
5
50
0
250
5
10
10
25.00%
7.69%
36.36%
6.87%
6.67%
6.67%
0.00%
100.00%
16.67%
12.50%
12.50%
97 I 30 1 40 I 10 I 33.330/01
1,610
890 850 900
760 720 800
1,610
32
561
5,992
8,579
4,162
6,727
1,073
1,283
350
1,208
1,072
4,371
12,068
19,339 I
30
160
2,630
5,250
420
1,050
260
1,050
0
750
200
1,580
5,780
1,580
5,250
30
175
2,775
5,530
475
1,150
280
1,150
300
820
225
1,700
6,200
1,750
5,700 i
0
4.71% 40
5.56% 40
0.00%
0
15
1 45
280
55
100
20
100
NA
70
25
120
420
170
~ 450
0.00%
9.38%
5.51%
5.33%
13.1 0%
9.52%
7.69%
9.52%
NA
9.33%
12.50%
7.59%
7.27%
10.76%
8.57%
I
w City of Carlsbad w
Proposed Fee Schedule
Development Related Fees
June, 1992
Total Fee Change Proposed 1990-91
Fee Description
Specific Plan - More than 25 acres
Amount I % Fee Fee Cost Note
900 I 7.14% 13,500 12,600 19,903
Street Light Energizing Fee (See table below)
6treet Name Change street Sign Deposits (As Required)
'Street Vacation structure Relocation
ITentative Map Revision - No PD - 5 - 25 Units or Lots
Tentative Map Revision - No PD - 26 - 100 Units or Lots
Tentative Map Revision - No PD - 101 or more Units or Lots
Tentative Parcel Map Processing Fee
Tentative Parcel Map lyr Extension
Tentative Tract Map Litigation Stay - 1/4 orginal Fee
Tentative Tract Map RES - 5 - 49 Lots or Units
Tentative Tract Map RES - 50 or more Lots or Units -
Tentative Tract Map NON-RES - 5 - 49 Lots or Units -
Tentative Tract Map NON-RES - 50 or more Lots or Units -
Tentative Tract Map Extension - 1 to 25
Tentative Tract Map Extension
Tentative Tract Map Extension - 101 or more
Traffic Impact Fee - North / South Carlsbad
Variance (Single Family)
Variance (Other)
Water Service Connection Fees - (Set by CMWD)
Waste Water Discharge Permit
Zone Change - 5 or fewer acres
Zone Change - 5.1 to 25 acres
Zone Change - 25.1 or more acres
Zone Code Amendment
$2,500 base + $100/1ot or unit over 5 (whichever is greater).
$7,500 base + $25/lot or unit over 50 (whichever is greater).
$2,500 base + $1 00/lot or acre over 5 (whichever is greater).
$7,500 base + $100/lot or acre over 50 (whichever is greater).
(3)
(9)
(9)
(9)
(9)
(New)
(New)
(New)
(5)
(New)
339
490
267
3,987
3,813
5,365
1,611
365
12,524
20,782
12,524
20,782
295
374
427
1,573
1,762
112
2,532
2,675
2,680
3,181 -
110
530
160
1,050
1,310
2,100
1,580
424
1,050
2,630
1,050
2,630
0
0
0
260
530
0
260
790
1,970
1,050 -
1 20
490
1 80
1,150
1,425
2,350
1,611
365
240
225
260
280
575 I
iii
2,175
1,150
NA
20
60
205
100
9.09%
-7.55%
12.50%
9.52%
8.78%
1 1.90%
1.96%
-13.92%
NA
NA
NA
7.69%
8.49%
NA
7.69%
7.59%
10.41%
9.52%
(1) - Based on number of units or lots whichever is greater
(2) - Minor Residential Development - Defined as - 50 or fewer units or lots, Whichever is greater
Minor - Other Uses - Defined as less than 2 acres
(3) - No change recommended - Previous council action establishing fees remains unchanged
(4) - See attached schedule for rate table
(5) - Based on fees established by Council on 1/15/91.
(6) - Any Permit Amendment not identified assessed at 50% of original cost.
(7) - Research Fee = Minimum $25.00 to Maximum $1 00.00 based on hours to completion.
(8) - Fees set by State Statute.
(9) - New fee structure assesses a base fee plus a cost per unit or lot. Specific costs are
outlined under the appropriate headings above.
I I
c\
Base
Fee Plus Per
Grading Plan Check - 100 CY or less 100 - -
,Grading Plan Check - 101 to 1,000 CY 500 80.00 100 CY
Grading Plan Check - 1,001 to 10,000 CY 1,300 80.00 1000 Cy
Grading Plan Check - 10,001 to 100,000 CY 2,100 80.00 10,000 CY
Grading Plan Check - 100,001 CY to 200,000 CY 2,900 80.00 10,000 CY
Grading Plan Check - 200,001 CY or more 3,700 80.00 100,000 CY -
Grading Permit Fee Schedule
1 I Base
Fee Plus Per I I
Grading Permit - 100 CY or less 25 - -
Grading Permit - 101 to 1,000 CY 75 10.00 100 CY
Grading Permit - 1,001 to 10,000 CY 175 52.50 1000 Cy
Grading Permit - 10,001 to 100,000 CY 700 60.00 10,000 CY
Grading Permit - 100,001 to 200,000 CY 1,300 180.00 10,000 CY
Grading Permit - 200,001 CY or more 3,100 300.00 100,000 CY -
i Improvement Plan Review
Cost of Improvements Fee
$0 to $20,000 6.00% - $200 Minimum
$20,000 to $50,000 5.00% - $1,200 Minimum
$50,000 to $1 00,000 4.00% - $2,500 Minimum
$100,000 to $250,000 3.50% - $4,000 Minimum
$250,000 to $500,000 2.75% - $8,750 Minimum
$500,000 to $1,000,000 2.25% - $13,750 Minimum
Over $1,000,000 1.50% - $22,500 Minimum
(Improvement Plan Check Fees are based on the current City of San Diego unit prices.
This includes the cost of curbs, gutters, sidewalks, asphalt or concrete paving, storm drains, etc.)
-
-
Improvement Construction Inspection Fee
Cost of Improvements Fee
$0 to $250,000 5% - $250 Minimum
$250,001 to $750,000 4.5% - $12,500 Minimum
$750,001 to $2,000,000 4.0% - $33,750 Minimum
$2,000,001 to $5,000,000 3.5% - $80,000 Minimum
$5,000.001 and Over 3.0% - $175.000 Minimum I .. I
Street Light Energizing Fee
Watts Lumens Fee
70 5,800 48.00 + $73.35 per light
100 9,500 67.00 + $73.35 per light
150 16,000 90.00 + $73.35 per light
200 22,000 115.00 + $73.35 per light
250 30,000 148.00 + $73.35 per light
(Above fees are the cost for energizing each
street light for eighteen months) -
F\USERS\DNEVI\OTHFEES
5
g
City of Carlsbad
Park In-Lieu Fees
Value Fee
Quadrant Per Unit Per Acre
District 1 - NW 195,000
Single Family Detached & Duplex 1,755
Attached (4 units or less) 1,463
Attached (5 units or more) 1,170
Mobile Home 1,034
-
-
District 2 - NE 175,000
Single Family Detached & Duplex 1,575
Attached (4 units or less) 1,313
Attached (5 units or more) 1,050
Mobile Home 91 9
District 3 - SW 175,000
Single Family Detached & Duplex 1,575
Attached (4 units or less) 1,313
Attached (5 units or more) 1,050
Mobile Home 91 9
District 4 - SE 175,000
Single Family Detached & Duplex 1,575
Attached (4 units or less) 1,313
Attached (5 units or more) 1,050
Mobile Home 91 9
The Park Fee ordinance establishs a method of
determining park land values in each quadrant
I I
City of Carlsbad
Planned Local Drainage Area Fees
Existing
Fee
Area Per Unit
1 0
2 0
3 3,808
4 1,686
5 2,658
6 200
7 2,273
8 0
9 2,878
10 1,196
11 1,630
12 4,445
13 2,858
Council will be adopting revised drainage fees
as part of a new master drainage study. This study is currently
being conducted by the Engineering Department.
w
6
.' . m w
City of Carlsbad
Sewer Connection Fees
General Connection Fee All Areas . 1,610
Plus Local Sewer Fees shown Below
Current
Sewer Service Fee By Area Fee
Area A 279
Area B 491
Area C 407
Area D 785
Area E 803
Area F 879
Area G 76
Area H 51 4
Area I 285
Area J 982
Area K 1,981
Area L 776
Area M 38
..
City of Carlsbad
Fire Protection System Installation Fees
I I I
h.
Plan
Review
Automatic Sprinkler Systems - Commercial System $80 +.75/spklr
-Tenant Improvement 40
- Residential-System 40
Inspection Fees
KO. lcost
6 at $40 each
1 at 40 each
3 at 40 each
Total I Fee I
Fire Alarm Systems - 1 to 10 Devices
- 11 or more Devices
Other Fixed Fire Systems - Hood and Duct - Halon - Special Chemical Agent - Standpipe
, - Paint Spray Booth
40 minimum 1 at 40 each
40 +$l.OO/device 2 at 40 each
40 1 at 40 each
60 2 at 40 each
40 1 at 40 each
40 2 at 40 each
40 2 at 40 each
$320 +.75/spklr
80
160
-
80
120 +1 .OO/device
80
140
80
120
120
-
.. 9'