Loading...
HomeMy WebLinkAbout1992-06-16; City Council; Resolution 92-174h 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 e RESOLUTION NO. 92-174 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ESTABLISHING THE FEES FOR DEVELOPMENT-RELATED CITY SERVICES WHEREAS, the City Council of the City of Carlsbad has the authority to establish fees for City services; and WHEREAS, from time to time said fees are reviewed and evaluated to maintain an adequate fee structure recovering costs for City services; and WHEREAS, the City Council has determined the cost of providing development-related services; and WHEREAS, the City Council finds it necessary to recover the costs foi development-related services; and WHEREAS, the City Council has determined that the fees shown iI Exhibit A attached hereto are fair and reasonable in relation to the service received; and WHEREAS, the City Council has held the necessary public hearing anc I I allowed for public comment on the establishment of said fees. /// /// /// /// /// /// /// I w .w NOW, THEREFORE, BE IT RESOLVED by the City Council of the City 1 of Carlsbad, California that the fee schedule shown in Exhibit A attached 2 3 4 hereto is hereby adopted and shall become the official fee schedule for development-related services for the City of Carlsbad. Any fee area not 5 I/ included in said list shall remain under the control of previous resolution 6 adopted by this Council. All fees shall become effective sixty days after 7 a adoption of this Resolution. PASSED, APPROVED AND ADOPTED at a regular meeting of the City 9 Council of the City of Carlsbad on the 16th day of June Y 10 11 12 1992, by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Larson, Stanton and Nygaard 13 /I NOES: None 14 16 15 ABSENT: , None 17 18 I 2 :ATTEST “9. : “20b ’ -’ (SM) r 21. *. . ‘db - *. . ’ ALETM L. RAUTENKRANZ, City Clerk/ i’ - “ .- 22 23 *_ 24 25 26 27 28 II 0 - ,.-.. - - City of Carlsbad Proposed Fee Schedule Development Related Fees June, 1992 Total Fee Change Proposed 1990-91 Fee Description 10.00% 25 275 250 500 Design Review - Preliminary Review - Major 10.00% 5 55 50 500 DayCare Permit - Extension 13.64% 15 1 25 110 1,238 DayCare Permit 9.09% 10 120 110 2,700 CUP - Non-Profit 10.00% 5 55 50 500 CUP - Extension - non-profit 6.67% 25 400 375 500 CUP - Extension - Regular 6.67% 5 80 75 1,500 CUP - Amendment - Non-Profit 0.00% 0 1,000 1,000 1,500 CUP - Amendment - Regular 19.05% 400 2,500 2,100 2,699 CUP 11.11% 40 400 360 484 Coastal Development Permit - Other 36.36% 40 150 110 463 Coastal Development Permit - Single Family 87.50% 140 300 160 600 Construction Change Review - Major 200.00% 100 150 50 500 Construction Change Review - Minor 0.00% 0 240 240 240 Certificate of Compliance (3) Building Plan Check - 65% of Bldg Permit (3) Building Permit Fees (Base on state fee schedule) 4.26% 20 490 470 1,079 Appeal - Planning Commission - Other 9.09% 10 120 110 972 Appeal - Planning Commission - Single Family NA NA 120 0 893 (New) Appeal - City Council - City Engineer's Decision 4.26% 20 490 470 893 Appeal - City Council - Other 9.09% 10 120 110 730 Appeal - City Council - Single Family 4.88% 20 430 41 0 1,186 Administrative Variance - Other 4.17% 10 250 240 652 Administrative Variance - Single Family 6.25% 20 340 320 41 5 Adjustment Plat 0.00% 0 50 50 50 Additional Planning Inspections (first lnsp included in plan check f % Amount Fee Fee Cost Note ' Design Review - Preliminary Review - Minor 300 50 55 5 10.00% Drainage Fees (3x4) Duplicate Tracing Fees - Final Parcel Maps - per sheet 30 30 30 0 0.00% Duplicate Tracing Fees - Final Tract Maps - per sheet 30 30 30 0 0.00% Easement or Offer to Dedicate or Improve 200 160 200 40 25.00% EIA - All Others 1,321 21 0 220 10 4.76% EIA - Single Family 0.00% 0 10,500 10,500 10,237 EIR - Supplemental (Requiring a Public Hearing) 10.00% 25 275 250 500 EIR - Addendum 4.95% 260 5,510 , 5,250 12,290 EIR - 20 Acres and up 5.24% 110 2,210 2,100 5,806 EIR - 5 through 19 Acres 5.24% 110 2,210 2,100 4,924 EIR - 1 through 4 Acres 4.76% 10 220 21 0 1,088 Encroachment Permit (Before installation) 50 50 50 0 0.00% Encroachment Permit (After Installation) 100 100 100 0 0.00% Engineering Variance - Minor 85 82 85 3 3.66% Engineering Variance - Major 160 157 160 3 1.91% Environmental Monitoring Fee 150 110 150 40 36.36% Final Parcel Map (Minor Subdivision) 1,580 1,580 1,580 0 0.00% Final Tract Map (Base fee + $5 per Acre) 3,081 2,630 2,760 130 4.94% Fire Hydrant Fees - See Uti1 Maint dept - $2,500 Deposit (Base + acutal cost) I I I City of Carlsbad Proposed Fee Schedule Development Related Fees June, 1992 Fee DescriDtion ~~ ~~~ .- ~ ~ Fire Protection System Installation "Automatic Sprinkler Systems - See Schedule for Rates fire Alarm Systems - See Schedule for Rates -Other Fixed Fire Systems - See Schedule for Rates Fire Repeated Inspection on New Construction Fish &Game Fee - Negative Declaration Fish &Game Fee - EIR Future Improvement Agreements General Plan Amendment - 1 Acre or less General Plan Amendment - 1 to 5 Acres General Plan Amendment - 5 Acres and up Grading Permit - (See Schedule for Rates) Grading Plan Check - (See Schedule for Rates) Growth Management Fees - As established by Council Hillside Dev Permit - Single Family Hillside Dev Permit - Other Hillside Dev Permit Amendment - Single Family Hillside Dev Permit Amendment - Other Improvement Agreement Extension Improvement Inspection Fee (See Schedule Below) Improvement Plan Review (Plan Check) (See Schedule Below) Information to Planning Commission - Single Family Information to Planning Commission - Other Inspection Overtime (On Request) Landscape Plan Check - Same as lmpvt Plan Check Landscape Inspection - Same as lmpvt Construction lnsp Lighting Plan Checks - (Plan Check) (See Schedule Below) Local Coastal Plan - Amendment - Major Local Coastal Plan - Amendment - Minor Master Plan (Base Fee + $1 5 per Acre) Master Plan Pre Submit Master Plan Amendment (Minor) Master Plan Amendment (Major) (Base Fee + $10 per Acre) Monumentation (Cash deposit as required) Notice Fees - Based on Cost to Provide Notice Park In-Lieu Fees - (See attached schedule) PD or Condo Revision - 4 or less PD or Condo Revision - 5 to 50 PD or Condo Revision - 51 or more PD Revision - Non-Res - 4 or less PD Revision - Non-Res - 5 to 50 PD Revision - Non-Res - 51 or more PD or Condo - 4 or less PD or Condo - 5 to 50 PD or Condo - 51 or more PD - Non-Res - 4 or less PD - Non-Res - 5 to 50 PD - Non-Res - 51 or more I Note (New) (New) (New) (New) (8) (8) (4) (4) (3)(4) (3)(4) (New) (4) (1 ) (1 1 (1 1 (1 ) (1 ) (1 1 (1 1 (1) (1 ) (1 ) (1 ) (1 ) Total Fee Change Proposed 1990-91 Cost Amount I Oh Fee Fee 320 40 80 2,218 2,363 5,760 I 0 1,275 875 80 I 1,050 1,050 2,100 I 40 1,275 875 80 1,200 1,200 2,500 NA 0 0 0 150 150 400 NA 0.00% 0.00% 0.00% 1 4.29% 1 4.29% 1 9.05% 791 1 12.50% 180 340 160 340 16.67% 50 350 300 791 6.67% 5 80 75 857 8.11% 30 400 370 857 9.09% 10 120 110 1,518 75 100 41 0 390 1,733 120 110 100 5,531 2,642 20,911 6,249 3,947 15,456 599 2,786 6,192 1,315 3,243 7,298 2,103 6,613 11,022 1,705 5,551 10,504 5,780 1,580 9,980 0 1,580 3,680 I 5,531 1,700 10,475 3,750 1,700 3,860 cost cost 21 0 5,510 5,250 2,000 1',840 250 530 575 2,599 3,000 5,250 6,000 420 440 3,680 4,000 10,500 11,022 420 440 5,250 5,510 10,088 10,504 10 5.13% 20 9.09% 33.33% 25 (249) 120 495 NA 120 180 ~ 40 160 260 45 401 750 20 320 522 . 20 260 41 6 -4.31 O/O 7.59% 4.96% NA 7.59% 4.89% 19.05% 8.70% 4.95% 8.49% 15.43% 14.29% 4.76% 8.70% 4.97% 4.76% 4.95% 4.12% I a e City of Carlsbad Proposed Fee Schedule Development Related Fees June, 1992 I Fee Description Permit Amendments Not Specifically Identified Planned Industrial Permit Planned Industrial Permit - Amendment Planning Commission Determination - Single Family Planning Commission Determination - Other Planned Development Final Map - Minor (4 or less) Planned Development Final Map - Major (50 or less) Planned Developemnt Final Map - Major (51 or more) Planned Local Drainage Fees Precise Development Plan Precise Development Plan - Amendment Preliminary Review - Minor Preliminary Plan Review (Single Family Exempt) Public Facilities Fees - 3.5% of Bldg Permit Value Public Facilities Fees Agreement Quitclaim of Easement Redevelopment Permit (Minor) Redevelopment Permit (Major) Redevelopment Permit Amendment (Minor) Redevelopment Permit Amendment (Major) Research Time (By Written Request) - Per Hour Reversion to Acreage Right of Way Permit - Single Family Right of Way Permit - Municipal Projects paying insp fees Right of Way Permit - All other Non-Utility Right of Way Permit - Utility (By Contract) Satellite Antenna Permit School Fees - (Set by School Districts) Sewer Connection Permit Sewer Lateral Charges - 4" line 30' long - lo' deep Sewer Lateral Charges - 6" line 30' long - 10' deep Sewer Lateral Charges - Over lo' deep add $7.50 per ft Sewer Lateral Charges - Over 30' long add $1 2.50 per ft Sign Permit Sign Program Site Development Plan (Minor) Site Development Plan (Major) Site Development Plan Revision (Minor) Site Development Plan Revision (Major) Special Use Permit Special Use Permit - Flood Plain Special Use Permit - Flood Plain, Coastal High Hazard Area Special Use Permit Amendment - Flood Plain Special Use Permit Amendments - All Other Specific Plan Amendment (Minor) Specific Plan Amendment (Major) Specific Plan - Less than 5 acres Specific Plan - 5 to 25 acres Note (6) (4) (3) (7) (5) (2) (2) (Neb (2) " f4 I ~~~~ 3 0 Total Fee Change Proposed 1990-91 Cost Amount I % Fee Fee 2,245 535 2,650 2,649 25 587 721 530 375 21 0 790 20 60 60 600 400 220 830 25 70 70 70 25 10 40 5 10 10 13.21 Oh 6.67% 4.76% 5.06% 25.00% 16.67% 16.67% 3,899 9.09% 10 120 110 250 100.00% 230 230 0 388 10.00% 100 1,100 1,000 2,499 7.59% 120 1,700 1,580 50 388 1,838 4,967 356 1,384 80 500 224 224 224 40 260 110 1,310 75 750 100 250 30 80 80 50 280 150 1,400 80 800 100 500 35 90 90 10 20 40 90 5 50 0 250 5 10 10 25.00% 7.69% 36.36% 6.87% 6.67% 6.67% 0.00% 100.00% 16.67% 12.50% 12.50% 97 I 30 1 40 I 10 I 33.330/01 1,610 890 850 900 760 720 800 1,610 32 561 5,992 8,579 4,162 6,727 1,073 1,283 350 1,208 1,072 4,371 12,068 19,339 I 30 160 2,630 5,250 420 1,050 260 1,050 0 750 200 1,580 5,780 1,580 5,250 30 175 2,775 5,530 475 1,150 280 1,150 300 820 225 1,700 6,200 1,750 5,700 i 0 4.71% 40 5.56% 40 0.00% 0 15 1 45 280 55 100 20 100 NA 70 25 120 420 170 ~ 450 0.00% 9.38% 5.51% 5.33% 13.1 0% 9.52% 7.69% 9.52% NA 9.33% 12.50% 7.59% 7.27% 10.76% 8.57% I w City of Carlsbad w Proposed Fee Schedule Development Related Fees June, 1992 Total Fee Change Proposed 1990-91 Fee Description Specific Plan - More than 25 acres Amount I % Fee Fee Cost Note 900 I 7.14% 13,500 12,600 19,903 Street Light Energizing Fee (See table below) 6treet Name Change street Sign Deposits (As Required) 'Street Vacation structure Relocation ITentative Map Revision - No PD - 5 - 25 Units or Lots Tentative Map Revision - No PD - 26 - 100 Units or Lots Tentative Map Revision - No PD - 101 or more Units or Lots Tentative Parcel Map Processing Fee Tentative Parcel Map lyr Extension Tentative Tract Map Litigation Stay - 1/4 orginal Fee Tentative Tract Map RES - 5 - 49 Lots or Units Tentative Tract Map RES - 50 or more Lots or Units - Tentative Tract Map NON-RES - 5 - 49 Lots or Units - Tentative Tract Map NON-RES - 50 or more Lots or Units - Tentative Tract Map Extension - 1 to 25 Tentative Tract Map Extension Tentative Tract Map Extension - 101 or more Traffic Impact Fee - North / South Carlsbad Variance (Single Family) Variance (Other) Water Service Connection Fees - (Set by CMWD) Waste Water Discharge Permit Zone Change - 5 or fewer acres Zone Change - 5.1 to 25 acres Zone Change - 25.1 or more acres Zone Code Amendment $2,500 base + $100/1ot or unit over 5 (whichever is greater). $7,500 base + $25/lot or unit over 50 (whichever is greater). $2,500 base + $1 00/lot or acre over 5 (whichever is greater). $7,500 base + $100/lot or acre over 50 (whichever is greater). (3) (9) (9) (9) (9) (New) (New) (New) (5) (New) 339 490 267 3,987 3,813 5,365 1,611 365 12,524 20,782 12,524 20,782 295 374 427 1,573 1,762 112 2,532 2,675 2,680 3,181 - 110 530 160 1,050 1,310 2,100 1,580 424 1,050 2,630 1,050 2,630 0 0 0 260 530 0 260 790 1,970 1,050 - 1 20 490 1 80 1,150 1,425 2,350 1,611 365 240 225 260 280 575 I iii 2,175 1,150 NA 20 60 205 100 9.09% -7.55% 12.50% 9.52% 8.78% 1 1.90% 1.96% -13.92% NA NA NA 7.69% 8.49% NA 7.69% 7.59% 10.41% 9.52% (1) - Based on number of units or lots whichever is greater (2) - Minor Residential Development - Defined as - 50 or fewer units or lots, Whichever is greater Minor - Other Uses - Defined as less than 2 acres (3) - No change recommended - Previous council action establishing fees remains unchanged (4) - See attached schedule for rate table (5) - Based on fees established by Council on 1/15/91. (6) - Any Permit Amendment not identified assessed at 50% of original cost. (7) - Research Fee = Minimum $25.00 to Maximum $1 00.00 based on hours to completion. (8) - Fees set by State Statute. (9) - New fee structure assesses a base fee plus a cost per unit or lot. Specific costs are outlined under the appropriate headings above. I I c\ Base Fee Plus Per Grading Plan Check - 100 CY or less 100 - - ,Grading Plan Check - 101 to 1,000 CY 500 80.00 100 CY Grading Plan Check - 1,001 to 10,000 CY 1,300 80.00 1000 Cy Grading Plan Check - 10,001 to 100,000 CY 2,100 80.00 10,000 CY Grading Plan Check - 100,001 CY to 200,000 CY 2,900 80.00 10,000 CY Grading Plan Check - 200,001 CY or more 3,700 80.00 100,000 CY - Grading Permit Fee Schedule 1 I Base Fee Plus Per I I Grading Permit - 100 CY or less 25 - - Grading Permit - 101 to 1,000 CY 75 10.00 100 CY Grading Permit - 1,001 to 10,000 CY 175 52.50 1000 Cy Grading Permit - 10,001 to 100,000 CY 700 60.00 10,000 CY Grading Permit - 100,001 to 200,000 CY 1,300 180.00 10,000 CY Grading Permit - 200,001 CY or more 3,100 300.00 100,000 CY - i Improvement Plan Review Cost of Improvements Fee $0 to $20,000 6.00% - $200 Minimum $20,000 to $50,000 5.00% - $1,200 Minimum $50,000 to $1 00,000 4.00% - $2,500 Minimum $100,000 to $250,000 3.50% - $4,000 Minimum $250,000 to $500,000 2.75% - $8,750 Minimum $500,000 to $1,000,000 2.25% - $13,750 Minimum Over $1,000,000 1.50% - $22,500 Minimum (Improvement Plan Check Fees are based on the current City of San Diego unit prices. This includes the cost of curbs, gutters, sidewalks, asphalt or concrete paving, storm drains, etc.) - - Improvement Construction Inspection Fee Cost of Improvements Fee $0 to $250,000 5% - $250 Minimum $250,001 to $750,000 4.5% - $12,500 Minimum $750,001 to $2,000,000 4.0% - $33,750 Minimum $2,000,001 to $5,000,000 3.5% - $80,000 Minimum $5,000.001 and Over 3.0% - $175.000 Minimum I .. I Street Light Energizing Fee Watts Lumens Fee 70 5,800 48.00 + $73.35 per light 100 9,500 67.00 + $73.35 per light 150 16,000 90.00 + $73.35 per light 200 22,000 115.00 + $73.35 per light 250 30,000 148.00 + $73.35 per light (Above fees are the cost for energizing each street light for eighteen months) - F\USERS\DNEVI\OTHFEES 5 g City of Carlsbad Park In-Lieu Fees Value Fee Quadrant Per Unit Per Acre District 1 - NW 195,000 Single Family Detached & Duplex 1,755 Attached (4 units or less) 1,463 Attached (5 units or more) 1,170 Mobile Home 1,034 - - District 2 - NE 175,000 Single Family Detached & Duplex 1,575 Attached (4 units or less) 1,313 Attached (5 units or more) 1,050 Mobile Home 91 9 District 3 - SW 175,000 Single Family Detached & Duplex 1,575 Attached (4 units or less) 1,313 Attached (5 units or more) 1,050 Mobile Home 91 9 District 4 - SE 175,000 Single Family Detached & Duplex 1,575 Attached (4 units or less) 1,313 Attached (5 units or more) 1,050 Mobile Home 91 9 The Park Fee ordinance establishs a method of determining park land values in each quadrant I I City of Carlsbad Planned Local Drainage Area Fees Existing Fee Area Per Unit 1 0 2 0 3 3,808 4 1,686 5 2,658 6 200 7 2,273 8 0 9 2,878 10 1,196 11 1,630 12 4,445 13 2,858 Council will be adopting revised drainage fees as part of a new master drainage study. This study is currently being conducted by the Engineering Department. w 6 .' . m w City of Carlsbad Sewer Connection Fees General Connection Fee All Areas . 1,610 Plus Local Sewer Fees shown Below Current Sewer Service Fee By Area Fee Area A 279 Area B 491 Area C 407 Area D 785 Area E 803 Area F 879 Area G 76 Area H 51 4 Area I 285 Area J 982 Area K 1,981 Area L 776 Area M 38 .. City of Carlsbad Fire Protection System Installation Fees I I I h. Plan Review Automatic Sprinkler Systems - Commercial System $80 +.75/spklr -Tenant Improvement 40 - Residential-System 40 Inspection Fees KO. lcost 6 at $40 each 1 at 40 each 3 at 40 each Total I Fee I Fire Alarm Systems - 1 to 10 Devices - 11 or more Devices Other Fixed Fire Systems - Hood and Duct - Halon - Special Chemical Agent - Standpipe , - Paint Spray Booth 40 minimum 1 at 40 each 40 +$l.OO/device 2 at 40 each 40 1 at 40 each 60 2 at 40 each 40 1 at 40 each 40 2 at 40 each 40 2 at 40 each $320 +.75/spklr 80 160 - 80 120 +1 .OO/device 80 140 80 120 120 - .. 9'