RESOLUTION NO. 98-56 EXHIBIT 4
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CARLSBAD, CALIFORNIA, FOR APPROVAL AND
ACCEPTANCE OF AMENDMENT NO. 1 FROM
ADDITIONAL DESIGN SERVICES FOR
VISTAlCARLSBAD INTERCEPTOR SEWER REACHES
CONTRACT NO. 31821
MALCOLM-PIRNIE, INCORPORATED TO PROVIDE
VC5B TO VC8, CMWD PROJECT NO. 91-403,
WHEREAS, the City Council of the City of Carlsbad, California has
determined it necessary and in the public interest for approval and acceptance of a
Amendment No. 1 from Malcolm-Pirnie, Incorporated to provide additional design
services for Vista/Carlsbad Interceptor Sewer Reaches VC5B to VC8, CMWD
Project No. 91-403, Contract No. 31821 ; and
WHEREAS, funds appropriated in the amount of $2,664,281 have been
appropriated in the 1997-98 budget for the Vista/Carlsbad Interceptor Sewer, and
the project cost estimated for Amendment No. I is $72,595, therefore, there are
sufficient funds available.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Carlsbad, California, as follows:
1. That the above recitations are true and correct; and
2. That the attached Amendment No. 1 between Malcolm Pirnie,
Incorporated and the City of Carlsbad be approved and accepted; and
...
...
...
...
...
0 0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
3. That the Mayor is authorized and directed to execute the proposed
Amendment No. 1 between Malcolm Pirnie, Incorporated and the City of Carlsbad.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City
Council of the City of Carlsbad, California, held on 3rd day of March I
1998, by the following vote to wit:
AYES: Council Members Lewis, Nygaard, and Kulchin
NOES: None
ABSENT: Council Member Finnila
BSTAIN: Council Member Hall
ATTEST:
\
~A"
ALETHA L. RAUTENKRANZ, City clerk
(SEAL)
I
0 e
AMENDMENT NO. 1 TO AGREEMENT
44 This Amendment is entered into and effective as of the /3 day of
Fe& rea r/c/ , 199&, amending the agreement dated Auaust 26. 1997 by and between
the City of Carlsbad, a municipal corporation, hereinafter referred to as "City", and Malcolm
Pirnie. IncorDorated , hereinafter referred to as, "Contractor" for providing additional design
services for Vista/Carlsbad Interceptor Sewer Reaches VCSB throughVC8, CMWD Project No.
93-401, Contract No. 31821.
RECITALS
WHEREAS, the initial agreement, dated August 26. 1997 identified a scope of
work to Drovide desian services for Reaches VC5B to VC8 *of the Vista/Carlsbad lnterceotor
Sewer
; and
WHEREAS, the parties to this aforementioned agreement desire to alter the
scope of work as follows: to Drovide additional desian services for Vista/Carlsbad Interceotor
Sewer Reaches VCSB to VC8. CMWD Proiect No. 91403. Contract No. 31821; and
WHEREAS, a supplemental scope of work and fee schedule have been
negotiated and agreed to between the parties hereto, and as shown on Exhibit "A" Scope of
Services and Fee;
NOW, THEREFORE, in consideration of these recitals and the mutual covenants
contained herein, City and Contractor hereby agree as follows:
, 1. Contractor shall provide services as outlined on the attached Exhibit "A.
2. City shall pay Contractor for all work associated with Paragraph 1 above, GI-
$72,595. Contractor shall provide City on a monthly **f
B 2/2/98
0 0
+.
basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and
related activities and costs for approval by City.
3. Contractor shall complete all work outlined on the attached Exhibit “A by
Auaust 26. 1998 or by expiration of the agreement amended hereby.
4. All other provisions of the aforementioned agreement entered into on Auaust
27. 1997, by and between City and Contractor shall remain in full force and effect.
5. All requisite insurance policies to be maintained by the Contractor shall
include coverage for the amended assignment and scope of work.
Acknowledged and Accepted:
CONTRACTOR:
ATTEST: m
ALETHA 1. RAUTENKRANZ
City Clerk
EetJderw &.<*I kd v P 9 /F?K DATE (print nameltitle)
(Proper notarial acknowledgment of execution by Contractor must be attached.)
(President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer sqns the corporation must attach a resolution certified by the secretary or assistant secretary under corporate .;ear empowering that officer to bind the corporation.)
APPROVED AS TO FORM:
RONALD R. BALL .
2i2.98
0 0
STATEOF & - 1
COUNTY OF &fh24&dk 1 ss-
On '6%. i 21 199g before me, c%M Ck-, AIOspileJ p UAlrL
DATE NAME AND TITLE OF OFFlFER -
personally appeared L ,@id-h 0
NAME(S) OF SIGNER@) N personally known to me - OR - proved to me on the basis of satisfactory evidence to be the person(s) whc
name(s) is/are subscribed to the within instrument and acknowledged. to me that helshelthey executed the same
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the en
upon behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal. n \ SIGNATUR OF N TA
(This area for official notary seal.)
Title or Type of Document c4dA.d
Date of Document No. of Pages B
Signer(s) other than named above
1
CMWD 91-403
06/14/95 F
e 0
$@-frn@&
STATE OF w I
COUNTY OF
On & ;%&94f before me, %w cw, hbhifhf Pbk
NAME AND TIflPLE‘ OF OFFICE$
personally appeared )&“L G4 %w-
NAhlE(S) OF SIGNER(S)
$ personally known to me - OR - 0 proved to me on the basis of satisfactory evidence to be the person(s) whc
name(s) islare subscribed to the within instrument and acknowledged to me that helshelthey executed the same
hislherltheir authorized capacity(ies), and that by hislherltheir signature(s) on the instrument the person(s), or the en
upon behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
(This area for official notary seal.)
SIGNATURE IF NOTARY
Title or Type of Document
Date of Document No. of Pages R
Signer(s) other than named above
0
I
I.
CMWD 91-403
06/14/95
0 EXHIBIT "A 0
Sropc of Work
Project Manngemmt:
Tad I10 - Thd !9vjeclPtv~~.sv urd SchMt
The design scMe is being &ended by ttpprolcimatdy 6 weckv to allow for thk changes
did in thc December 12, I997 mtit~g. However. since the projcct has not progressed
as quickly as origirmlly ru~kipatd, 110 additiord colapulsation is rmjuosted for tlm exlanded
schedule.
T' I20 - Month@ Pmgrr.w h4eeiilrg.s
Two additional prn&tss nwctin8 will k nccc..sary due to the extended schedule. It 'u
anticipated that this effott will be included in Ttsk 130, Coordination Meetings.
Tad 130 - C'txdmUolt Mt*t*fing'.s
sevad meetings are mticipted lo wlrdilmle with nilway onicials for the new 42" diameter
sewer crossing near Oak Avmuc. Additional mrdination with the CMWU is also
anticipated am the mlt &he 3 bid alternatives thal will be prepared and IO discuss the flow
diversion to thc ding u~flectar system in Grand Avenue in order to compktdy abandon
the existing interceptor. Additional meetings or lollger duration meting HCP: anticipated to
discus the additional uaflic control rcquircd fw rhc jacking and receiving pit locations for
the tuicrotululdilrg allmlalivc.
Tad 140 - SllhLvmtlrcrrrr Mwttqyrnwt
The expanded scope will rcquirc additional manqymcnt and Foodhation of thc project
slhconsultants idding nxxiifications to the ucixting engineering rylcwncnts amently in-
Pl=*
Tad IS0 - Pm&w /&mtrnwWot~
This task includes preparation and diwniution of written project mmspondence to the
deign team and CMWD staff in order to maintain continuity within the project team.
Technical Servbx liut 220 - &IW.V .'(i.ryiL'(:~
Additional survey leervices will be required to verify the invert of the existing interceptor at
thc manhak in thc vicinity of thc propod connection at Oak Avenue and the railrod right-
uf-my, and "up field topogaplry wd sew invats in Grand Avcnuc a! Ronswclt Street
and Hennessey"'~ alley. Also itduded is the prepamion of a plat and lqyl description for the
port'wn of the scww that will be located in the niirord right-of-way. It is assumed that the
a 0
processing of the plat and Iegd description with the NCTO will be the responsibility of tho
CMWD.
. '/k& 310 - khnd 1'fw.s & Sjwc@ctr!itm
"fwt efluri included it1 this lnsk inchdcs thu additiar~ ol's I~CW plan & profile sheet and a new
dctail shcct for partial plans arrd sections cl~ Grand AvtnllJRoostvclt and Grand
AvenudHenncssey's dley. It io assumed !hilt the ctdditional aerial topo will be provided to
MPI by thc CMWD and that thctupo will require smc CADD hycr manipulation so that
the line type is consistent with he other. design dnwings. Additiolml utility research and
preliminary design will he performed under this tnsk. Also included under this task is the
addition of2 stnlcturally designed junction bows in thc railroad right-of-way. Also included
is the preparation of rnilroud loadis,y cakulations on the pipe lor submittal and approval by the tailmad. WI'D rcquirctncnrs will also he incorpolated inta the General Rcquirctncnts of
the Contract Spccitications and submitted for their approval.
lavk 3i I - Microlwdi~tg Dvsigit l;fltMl
A substantial etlclrt is trnticipafed in order lo prepare 2 weparate bid schedules and to
coordinate the Contract Speciliatior las~uasc! wit11 CMWD stnand the City af Carl~b8d
le@ staff Additionally, both a microtunneling qxxiticaticm and pipe jacking specification
will now hc naxsary w the result of this additional wclrk. It was originally anticipated that
ORIY one trcn&Icss mcrltod would bc uscd to cross Carlsbad Villagc Dh. Additionalfy,
because of the 2 camglctdy diffkcnt mcthads of constnlction being praposcd, it is apparent
that 2 difkrent profiles xRould be desi.ymrl and shown on the contract drawings in order to
obtain the most ccunpetitive bid ford mcrM ofcmstnlction. Ahhcwgh the base drawings
and utility rcsarch are already wstplete, a .uigifiunt amount of time will be necessary fbr
prelimitmy cJesig11 ami engi1wriltg plus shuwing the n(lditional it\fonnation on the drawings.
Om additional detail drawing is ankipllecl~o rrtlkx~ !he connections of the existing JdFersan
Street adlector systetn at Grand Avaw and Lagww Drive 111 the new interceptar with the
lower microtunncled profilc. Tabte I indicates the proposed fee fbr incorporating the 2
profiles onto 1 set of dcsign dlawings and TRbk 2 is the dtcrnativc fcc pmposnl for preparing
new drawings for the mictvtunded profile. We anticipate a significant d%rt to dearly
identiQ the required work for wclr sllcrntlt ivo if the itrfonrtarion is combined onto 1 set of
drawings. Wc rccommd that u Yqrzlrdte set of design dmwi~~~ be prepwed for the
mimh~nnel~bid alternate. Apprmimakly 10 additional sheets of traffic control plans will be
necessary for the n~icrott~nneling alternativc tho. In ctkct, this is now a 2 design projecl.
S'm thc p&@ nli&Tunlrdiny sc%mlt is sipificllntly long,er than oridnally scopcd, and
has become more complex with the crossing barnth the raifroad tracks with a 42" diameter
sewer, we would like to o@i thc scrvicev ot'Mr, Grey Rnines with Halcy and Aldrich hr
tcchnid rcvicw. cost review and attendance at meetings with railway olficials. Mr. Raines'
tunneling expcnisc would complenwnt the pipe inaterial expertise provided by Mr. Raz
Konyalian of cwr ummt desigl lwn. Mr. Kailws is currcntly providing the samc sewicx for
EarthTcch on the Reach 10 Intercepttx Prjeccl.
-. 0
lash 320 - hpN" ( 'osl i31itnuk
0
This task includcs quantity lake-oms and development of unit prices for thc cxtra work
identified in Task 320 above.
I:~~32~~l\pWOI~~Al:?('XlWI~Z~UIW
,
0 0
ea I 8 f
fn n s i p W
&E
-m ap nap
a= 'bs
- 3Q z
qE %mg
qp 3i
E 9 a a
c v1 5
r 1 s
kr .i
d C -
3- E ii E s z
u) d &
0-