HomeMy WebLinkAbout1998-03-10; City Council; Resolution 98-66t .J e REWION NO. 98-66 NOTE TO FILE: June 4,1998 RE: Agenda Bill #14,583 -APPROVAL OF PREPAYMENT AGREEMENT LOT LINE ADJUSTMENT, ADJ 468 AGREEMENT FOR.CANNON ROAD WEST FEE PROGRAM - KELLY RANCH Since 3/10/98 when the City Council adopted Resolution No. 98-66 (as amended), approving the Prepayment Agreement (as amended), we have continually attempted to get the revised Resolution and Agreement from the Engineering Dept. so that we could finish processing the documents. The changes approved by the Council include the “change of all references in both documents from Hillman Properties West to Kelly Land Co”. Isabelle has contacted Frank Jimeno on several occasions, and I have communicated with Bob Wojcik and David Hauser on several occasions (by Email and Phone) during this time requesting the amended documents. On May 14, 1998, Dave was in my office about another matter, and we also discussed this one. On May 19, 1998, Dave told me he was still working on this matter. Today, June 4, 1998, Dave called and told me that (per Lloyd) “Hillman will not sign another agreement”, that the documents approved on 3/10 will not be revised, and that Hillman will be coming forward with another approval and agreement which will cover the same project, and will go back to the Council. THE CLERK’S OFFICE THEREFORE, WILL NOT PROCESS THE AGREEMENT OR RESOLUTION SINCE THEY ARE NOT CORRECT. THESE DOCUMENTS WILL BE FILED AS IS, WITH A COPY OF THIS MEMO. KAREN R. KUNDTZ Assistant City Clerk F 0 0 $- , :-- x% - , .i , . 41’ ,’ .-- 2 .i 1 I Ii RESOLUTION NO. 98-66 2 3 4 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A PRE-PAYMENT AGREEMENT BETWEEN THE CITY OF CARLSBAD AND HILLMAN PROPERTIES WEST, A DELAWARE CORPORATION. WHEREAS, as a condition of Adjustment Plat 468, the applicant, Hillman Propertie’ West, a Delaware corporation, is required to pay a pro-rata share of the cost of construction c Cannon Road prior to further development of the project. WHEREAS, the City Council of the City of Carlsbad has required that the funding c Cannon Road West (Project) must be guaranteed before any development takes place in th area bounded by Local Facilities Management Zone 8. WHEREAS, City staff is actively pursuing formation of a facility fee district to finance th 12 Project; and 13 WHEREAS, although the Council anticipates the facility fee district will be formed in th 14 I/ near future, the Council is willing to consider alternative financing proposals during the perio from the present to the formation date of the fee district; and 15 WHEREAS, such interim financing program will only be considered as long as the COUnC 16 finds that the formation of the fee district is proceeding in a reasonable manner; and 17 WHEREAS, the Council finds that the formation of the fee district is proceeding in 18 reasonable manner; and 29 WHEREAS, the Council finds that the guarantee provisions related to the Project may t: met through an interim financing program using an agreement between certain property ownel and the City whereby the property owner agrees to prepay hidher fair share of the cos 20 21 22 associated with the project; and 23 WHEREAS, the Council finds that Hillman Properties West, a Delaware corporation, m: 24 enter into the attached agreement entitled “Waiver and Consent to Creation of a Facility lmpa 25 satisfaction of their obligation under the Project financing conditions. 26 Fee Program and Agreement to Pay Fair Share Cost of Cannon Road West” (Exhibit “A) 27 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsba 28 California, as follows: 1 I 0 0 1 1. That the above recitations are true and correct. 2 2. That the form of the PETITION, WAIVER, AND CONSENT TO CREATION OF P 3 4 FACILITY IMPACT FEE PROGRAM AND AGREEMENT TO PAY FAIR SHARE, Exhibit “A 5 attached hereto, is hereby accepted. 3. That the Mayor is hereby authorized to enter into the agreement shown in Exhibi 6 “A with Hillman Properties West, a Delaware corporation. 4. That the City Clerk is hereby directed to transmit the executed agreement fo recordation with copies to the City Engineer and Larry Clemens, Hillman Properties West, 201’ Palomar Airport Road, Suite 206, Carlsbad, CA 92009. 7 8 9 10 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Counc 11 held on the day of , 1998 by the following vote, to wit: 12 AYES: NOES: ABSENT: 13 14 15 16 CLAUDE A. LEWIS, Mayor 17 18 ATTEST: l9 (I II 20 21 22 23 24 25 26 27 28 ALETHA L. RAUTENKRANZ, City Clerk (SEAL) II L- . I. w-" I t I 0 0 1 -,,'.y , ,?, j .. '?y L \.r ! I ,y : .. , ,q: ,..< .> .e-? .. X{?<* .,\ . ~ .- ".l ~ ' <,/ ;+-; 3 ,:., \. RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City Clerk CITY OF CARLSBAD 1200 Carlsbad Village Drive Carlsbad, CA. 92008 SPACE ABOVE THIS LINE FOR RECORDER'S USE Parcel No. 208-020-30,33,34, and 35; 207-101-12 For Legal Description see attached Exhibit 'A' WAIVER, AND CONSENT TO CREATION OF A FACILITY IMPACT FEE PROGRAM AND AGREEMENT TO PAY FAIR SHARE COST OF CANNON ROAD WEST ("AGREEMENT") A. WHEREAS, the undersigned Property Owner is processing for financial purpose within the City of Carlsbad ("City") an adjustment plat known and identified as Adjustment PI: 468 ("Project"); and, B. WHEREAS, City has determined Project to be located within the boundaries of proposed benefit area for a Facility Impact Fee Program to be known as Cannon Road We! Facility Fee Program ("Fee Program"); and, C. WHEREAS, Fee Program is intended to be formed to finance those improvemenl generally described in Paragraph 1 below; and D. WHEREAS, Fee Program may take the form of a bridge and thoroughfare area c benefit fee (pursuant to Government Code Section 66484 and Carlsbad Municipal Code (CMC) Section 20.08.140), amendment to the Traffic Impact Fee (CMC Chapter 18.42), a new Development Impact Fee enacted pursuant to Government Code Section 66000 et seq, any combination thereof, or otherwise; and, ~ 1 E. WHEREAS, the Project is located within Local Facilities Management Plan LFMF 1 AGREEMENTSAG-25.FRM 9/25/96 a t 0 0 Zone 8 on property more particularly described within Exhibit 'A', attached hereto and made a part hereof (Property); and, F. WHEREAS, the LFMP for Zone 8 requires a guarantee for the construction c Cannon Road West, described in Paragraph 1 below, prior to the recordation of any final maps o the issuance of building or grading permits within the zone; and, G. WHEREAS, compliance with the applicable requirements of the LFMP for Zone is a condition of approval for the Project; and, H. WHEREAS, Property is further subject to the facility and improvemer requirements of Master Plan 174, including any amendments approved thereto; and, I. WHEREAS, Property Owner desires to proceed with processing of the Projec prior to City determination of the form or establishment of Fee Program; and, J. WHEREAS, City and Property Owner desire to agree to a guarantee whic insures Project's fair share of the financing for the improvements described in Paragraph 1 i advance of the formation of a Fee Program for the construction of Cannon Road West; and, K. WHEREAS, Property Owner voluntarily enters into this Agreement. NOW, THEREFORE, in consideration of proceeding with the processing of the Project, th undersigned Property Owner hereby agrees, waives and consents as follows: 1. Property Owner hereby consents to the City initiation of proceedings of a FE Program which will cause the construction and installation and/or financing of the followir improvements which are more specifically described as follows: Cannon Road to major arterial standards from Paseo Del Norte to El Camino Real (Cannon Road West) The improvements proposed for inclusion include all curbs, gutters, sidewalk, base and pavement, median landscaping and irrigation, median hardscape, streetlights, street monumentation, grading and excavation, storm drainage facilities, guardrails, two 455 foot multispan bridges and one 130 foot single span bridge. Attached hereto as Exhibit 'B' and incorporated herein is the draft fee study report entitled "City of Carlsbad Bridge and Thoroughfare Fee Study Report for Cannon Road West'' dated 2 AGREEMENTS/AG-25.FRM 9/25/96 I I t I1 0 0 September 21, 1995 ("Report"). Report formed the basis for the determination of the amount of Property Owner's deposit. 2. The costs of construction, engineering, design, construction inspection, contrac administration, construction engineering, environmental mitigation, legal and other incidenta expenses will be funded by the Fee Program, as more particularly described in Report. 3. Property Owner acknowledges its right to notice of and participation in all phase: of the establishment of Fee Program and expressly waives any right to challenge, protest o oppose the imposition or formation of Fee Program. Property Owner's waiver of its right tc protest establishment or formation of the Fee Program shall not prevent Property Owner fror protesting the amount of Property Owner's fair share payment under the Fee Program, or exter of the improvements for Cannon Road West. 4. a) Property Owner agrees to pay to City its estimated fair share for th improvements described in paragraph one (1) above ("Deposit"), currently estimated to be $7 per "Average Daily Trip" ("ADT") allocable to the estimated traffic generated by each buildin permit issued for the Project. The estimated traffic generation for the Project site is 7,678 AD1 The total estimated amount of Deposit is $560,494. b) Prior to approval of a final map, issuance of a grading permit or issuance of building permit within the Property, Property Owner shall pay a prorated share of the Deposit fc the Project to City in the amount set forth in Paragraph 4.a) above. for the number of uni proposed within that final map, minus the amounts of the credit provided for in subparagraph 4. below, to the extent that amount has not previously been subtracted from the Deposit. For tt purpose of computing the Deposit amount required pursuant to this Agreement, recordation of, or a portion of the residential lots shall require full payment of that portion of Deposit allocable each of the units included with the lot or lots being recorded. c) The actual amount of Property Owner's fair share payment under the Fc Program shall be determined by City Council at the time the Fee Program is established, subjc 3 AGREEMENTWAG-25.FRM 9/25/96 t 1 0 0 to the provisions of Paragraph 3 above. d) Payment of the Deposit by Property Owner and the contractual covenan created by this Agreement satisfies Property Owner's obligations, if any, for the construction o the improvements described in paragraph one (1) for each final map, grading permit or buildin< permit for which the Deposit is paid. e) Property Owner is obligated by Master Plan 174, including any amendment: made thereto, to construct portions of Cannon Road West, some of which are within the Fef Program and some of which are not within the Fee Program. Those portions of Cannon Roat West constructed by the Property Owner which are described in paragraph one (1) and ar included within the Fee Program (Reimbursable Portion) are fully reimbursable pursuant to th provisions of this paragraph. Those portions of Cannon Road West constructed by the develope which are not described in paragraph one (1) or are not included within the Fee Program are nc considered reimbursable. Property Owner and City agree that, for purposes of this Agreemen the dollar amount of the Reimbursable Portion of the Property Owner's Cannon Road We$ improvement obligation is estimated at $2,951,523 ("Reimbursement"). The actual amount of th Reimbursement shall be determined upon completion of the engineering report for the Fe Program and upon adoption of the Fee Program by the City Council. Upon substanti; completion of any grading work, improvement, or property acquisition of the Reimbursabl Portion of the Cannon Road West improvement, City shall within sixty (60) days reimbur: Property Owner an amount equal to the cost of the work as determined by the engineering repc used to determine the adopted fee. In the event that the engineering report is not completed the Fee Program has not been adopted by the City at the time of substantial completion of tt Reimbursable Portion of the Cannon Road improvements, City shall reimburse Property Own an amount equal to the estimated cost of the Reimbursable Portion of improvements construct( by the Property Owner as determined by the City Engineer. Upon completion of the engineeril ~ 4 AGREEMENTS/AG-25.FRM 9/25/96 I 1 e 0 report and adoption of the Fee Program by City Council, City shall determine the actual amouni of the Reimbursable Portion of the constructed improvements. Any difference in cost betweer the estimated and actual value of the Reimbursable Portion of constructed improvements shal be added to or subtracted from the Deposit due pursuant to paragraphs 7.a) through 7.j) below If Reimbursement exceeds the amount of the Deposit previously paid by Property Owner to City then the excess shall be a credit to be applied against Property Owner's future Deposi obligations. In no case shall the City reimburse the Property Owner pursuant to this Agreemen in an amount greater than the amount of the total fee due under the adopted fee program withou first entering into a subsequent reimbursement agreement between the City and Property Owner 5. Property Owner acknowledges that this Agreement to pay its fair share ant thereby participate in the financing of improvements is voluntary and that without this Agreemer Property Owner would be precluded from completing the Project until a satisfactory financin' I /I program had been developed to fund the construction of the improvements described i Paragraph 1 above. 6. This Agreement does not affect, in any way whatsoever, the obligation of Propert Owner to pay any other fees or assessments associated with Property Owner's developmen nor does this Agreement relieve Property Owner from providing other public facilities require under conditions of the Local Facilities Management Plan for Zone 8, Master Plan 174, includin any amendments approved thereto, or any tentative map approved over all or any portion of tk Property by the City. 7. a) If prior to January 1, 2005, the Fee Program for Cannon Road West established, subsequent to Deposit by Property Owner pursuant to this Agreement, Proper Owner's financial obligation shall be recalculated at that time, using the fee formula establish( under the approved Fee Program subject to the provisions of Paragraph 3 above. If the Fc Program obligation is different from the Deposit paid by Property Owner to City pursuant I1 AGREEMENTWAG-25.FRM 5 9/25/96 ti Y 1 I 0 0 Paragraph 4 hereof, plus any accrued interest on the Deposit, computed at the average rate o earnings on the City investment portfolio for the time period in question, City shall refund an] excess, or Property Owner will pay to City any additional amount due (Shortfall). b) Any refund shall be made from funds available through the collection of fee! and shall not be an obligation of City's General Fund or other revenue sources. Any refund sha be paid to the undersigned Property Owner, even if such party is not the owner of the Project a time of refund, unless otherwise directed, in writing by the undersigned Property Owner, to pa the refund to another party. c) In the event that insufficient funds are available from the fee revenues Property Owner shall be reimbursed in the order in which funds were deposited with City as so0 as sufficient funds become available, as determined by the City Council. d) No reimbursement is required until the City Council determines that sufficier funds are available. e) If a Shortfall exists, Property Owner shall be notified of the amount of SUC Shortfall by the Finance Director via certified mail. The amount of said Shortfall shall be due an payable to City 30 days after the mailing of such notice. 9 Interest shall not be charged on the shortfall. g) If payment in full of the Shortfall is not made by Property Owner within nine (90) days of notice of said Shortfall by the Finance Director, the amount due shall constitute lien upon the Property. City may deny the issuance of building permits and/or take any othc action allowed by law to deny further development of Property, and to collect such Shortk including, but not limited to, enforcement of the lien on the Property. City's recordation of a lic shall not affect its ability to recover the Shortfall by other legal means concurrently, but no doub recovery will be allowed. The cost of such collection shall be an obligation of Property Own and shall be added to the amount of the Shortfall payment due City. AGREEMENTS/AG-25.FRM 6 9/25/96 - , ' I1 0 0 h) Any payment received including without limitation, the Deposit, by the Cit) under this Agreement shall be deposited in an interest accruing special fund and may only be used to fund the construction of the facilities described herein. Upon the establishment of a Fee Program to fund these same facilities, any amount remaining in the special fund may be transferred to the Facility Fee Fund, at the discretion of the Finance Director. i) If Deposit has not been made to the City prior to the effective date of the Fer Program adopted by City Council, the Property Owner may elect to terminate this Agreement The Property Owner shall notify the City of their intent to terminate this Agreement in writing ir accordance with the provisions of paragraph 14 below. Upon receipt of such notification, an1 upon incorporation of the Project properties into the Fee Program, the City shall file a notice c release and termination of Agreement with the Office of the County Recorder of the County c San Diego. j) The City shall conform with the requirements of Section 66000 et seq. of thl Government Code in the receipt, accounting, disbursement and/or refund of any amounts pai, under this agreement. 8. If the Fee Program has not been established for any reason by January 1, 2005 the amount paid by Property Owner under this Agreement shall be deemed to represent Propert Owner's fair share cost for provision of those facilities described in paragraph one (1) above an no further payment will be due from or reimbursement due to Property Owner with regard ' those portions of the Property for which the Deposit has been paid pursuant to this Agreement. 9. This Agreement does not require City to issue building permits or othl development permits or grant approvals or relieve Property Owner of the obligation to comp with all applicable provisions of law, including but not limited to, Carlsbad Municipal Code Titk 18, 19, 20 and 21. IO. Compliance with the provisions of this Agreement is a condition of all futu 7 AGREEMENTS/AG-25.FRM 9/25/96 t . 0 e building permits for the Project. If Property Owner does not comply with the provisions of thi: Agreement, approval of the Project will not be consistent with the Zone 8 LFMP and a subsequent building permits for the Property shall be withheld by City. 11. The City may, at its discretion, elect to pursue any remedy, legal or equitablc against Property Owner or Property Owner's successors, heirs, assigns, and transferees tc secure compliance with this Agreement. 12. City shall not, nor shall any officer or employee of City, be liable or responsible fc any loss or damage incurred by Property Owner or any successor or assign of Property Ownel or by any occupant in Project, as a result of the lawful exercise of any remedies provided to Cit in this Agreement. Property Owner agrees to indemnify City for any liabilities incurred by City a a result of City's lawful exercise of these remedies. 13. This Agreement and the covenants contained herein shall be binding upon an inure to the benefit of the successors, heirs, assigns, and transferees of Property Owner an City, and run with Property and create an equitable servitude upon Property. 14. All notices provided for under this Agreement shall be in writing and shall b delivered in person or served by certified mail postage prepaid. Delivery of notice to Propert Owner shall be presumed to have been made three days after the date of mailing regardless ( receipt by Property Owner. /I Notices required to be given to Property Owner shall be addressed as follows: LARRY CLEMENS HILLMAN PROPERTIES WEST 201 1 PALOMAR AIRPORT ROAD, SUITE 206 CARLSBAD, CA 92009 1 Notices to the City shall be delivered to: FINANCE DIRECTOR CITY OF CARLSBAD 1200 CARLSBAD VILLAGE DRIVE CARLSBAD, CALIFORNIA 92008. AGREEMENTSAG-25.FRM 8 9/25/96 ' 0 0 Each party shall notify the other immediately of any changes of address that would require an! notice delivered hereunder to be directed to another address. 15. The undersigned entity further states, under penalty of perjury, that it is the owne of the property described herein, or an authorized agent of the owner, and has the authority tc sign this document including the creation of the covenants herein. 11 Executed this LbTH day of J&q&~Agg I19 ?5? . PROPERTY OWNER: Hillman Properties West, Inc., a Delaware Corporation CITY OF CARLSBAD, a Municipal Corporation of the State of California By: CLAUDE A. LEWIS, Mayor (sign here) D. LmVY CLk"5 (print name here) WCE rn\DEK, tj-tCLRKd ?mat3 -T (title and organization of signatory) By: (sign here) (title and organization of signatory) (Notarial acknowledgment of execution by PROPERTY OWNER must be attached.) (President or vice-president and secretary or assistant secretary must sign for corporation. only one officer signs, the corporation must attach a resolution certified by the secretary ( assistant secretary under corporate seal empowering that officer to bind the corporation.) APPROVED AS TO FORM: RONALD R. BALL City Attorney BY City Attorney 9 AGREEMENTS/AG-25.FRM 9/25/96 .< ' e e STATE OF CALIFORNIA 1 COUNTY OF SAN DIEGO ] ps. On September 26. 1996 before me, Kathleen Anne Farley , personally appeared D.L. Clemens % personally known to me ("pmvd subscribed to the within instrument and acknowledged to me that he/dm%ey executed the same in his/lerAheir authorized capacity(&), and that by his/herftkeir signature@) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. ,-.e ,-. VI1 VI - to be the person@) whose name($ is/= WITNESS my Band and official seal. Signature .. . I 0 4 .,@ I EXHBIT "A" LEGAL DESCRIPTION (APN ma-020-28) I ! I THAT PCKTION OF LOT "I" OF RANCHO AGUA HEDIONDA, IN THE CITY OF CARLSBAD, COUNTY CF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO, 823 I FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID SAN DIEGO COUNTY ON NOVEhEER 18, 1898, BElNG ALL OF PARCEL 1 AS DESCRIBED IN GRANT' DEED RECORDEL) MAY 23, 1985 AS FILE NO, 85-163065 OF 0FFICIAL:RECORDS OF SAID SAN ! i ! ! DIEGO CO ;,NTY. . .. EXCEPTING THEREFROM: THAT PORTlON OF SAID LOT "Iw, LYING WESTERLY AND NORTHWESTERLY OF A LINE CONNECTING CORNER NO. 17 AND CORNER NO. 6 OF LOT "I" OF SAID MAP NO. 823,SAlD LINE BEING SHOWN ON MfSCELLANEOUS MAP NO. 231, FILED IN THE OFFICE OF THE COUNM RECORDER 'MAY 25, 1951 AS THE WESTERLY LINE OF PARCEL NO. IO OF SAID MISCELLANEOUS MAP NO. 231. I 1 ALSO EXC:%PTING THEREFROM: THAT PORTION OF SAID LOT "I" AS DESCRIBED IN ANNEXATII'SN DOCUMENT TO THE CITY OF CARLSBAD PER DEED RECORDED OCTOBEF", -14, le69 AS FILE NO. 188181 OF OFFICIAL RECORDS. j ., I I +L7%&Le-. . ?-25= 76 I JOHN W. HltL, JR. L.S. 5689 HUNSAKER & ASSOCIATES SAN DIEGO, INC. 'I ' .. ! PAGE 1 OF 1 :DA M:\LEGALSU)753\763AO6,WC wo 963-e mm * 0 0 EXI-tlglT ?E’‘ CITY OF CARLSBAD BRIDGE AND THOROUGHFARE FEE STUDY REPORT FOR CANNON ROAD WEST September 21,1995 NBS/Lowry Project No. A68-015.063 _. Prepared By NBSLOWRY, INCORPORATED Engineers & Planners San Diego, California 0 e ~~~~ TABLE OF CONTENTS I , I ~~ SECTION Page Purpose .......................................................... 1 Process ........................................................... 1 Background ........................................................ 1 Description of Improvements ........................................... 2 CostEstimates ..................................................... 3 FundingSources .................................................... 3 TransnetHighwayFunds .......................................... 3 Community Facilities District No. 1 .................................. 5 AreasofBenefit .................................................... 5 LFMP5 ....................................................... 5 LFMP8 ...................................................... 6 LFMP13 ..................................................... 6 LFMP24 ..................................................... 7 Methodology to Determine Fee ......................................... 7 FeeCalculation ..................................................... 7 Feeprogram ....................................................... 8 FIGURES No. 1 Cost Allocations No. 2 Area of Benefit i APPENDICES ! ! A Cost Estimates B SANDAG Trip Generation Rates C Fee Spread e j -. 0 0 CITY OF CARLSBAD BRIDGE AND THOROUGHFARE FEE STUDY REPORT FOR CANYON ROAD WEST PURPOSE j The purpose of this report is to outline a proposed financing mechanism for a Bridge and Thoroughfare Fee District for the construction of Cannon Road, a major arterial roadway, from Paseo Del Norte to El Camino Red (hereafter referred to as Cannon Road West). This financing program is required pursuant to conditions of approval for Local Facilities Management Plans (LFMP) for Zones 8, 13 and 24. It is also necessary to provide an ultimate secondary access to a portion of Phase V of the Carlsbad Research Center pursuant to a project condition of approval for Carlsbad Tract 85-24, Unit No. 5, which is in Zone 5. ~ This report includes a project description and cost estimate for Cannon Road West, an identification of existing funding sources, a description of the area of benefit (including those properties which have a responsibility and a specific benefit from the construction of Cannon Road West), a description of the fee calculation methodology, an estimate of the average daily traffic projections from undeveloped properties within the benefit area, and a recommended fee structure. I PROCESS The proposed fee program will be reviewed by City staff. The next step in the process is a review by the Policy 33 Committee of the City. After Policy 33 review, staff will make any appropriate changes to this program and then schedule a property owner workshop to discuss this proposal with all affected owners. Ultimately, a fee program must be approved by the City Council. The fee will be collected with the issuance of all future building permits within the fee boundary or construction of all or a portion of Cannon Road West improvements will be required prior or concurrent with issuance of building permits. \ BACKGROUND As a result of approved Local Facilities Management Plans (LIMP) for Zones 8, 13 and 24, conditions were imposed requiring a guarantee for the construction of ! Cannon Road West prior to themcordation of any final maps or the issuance of building permits. I ~~~ ~ ~~~ ~~ ~ ~ ~ -I- F 0 0 DESCRIPTION OF MPROVEMENTS The road segment covered under this fee program includes the completion of Cannon Road to major arterial standards from Paseo del Nom to El Carnino Real (hereafter known as Cannon Road West). This major arterial road has four traffic lanes and a raised median within a 102 foot right-of-way. The total improvements necessary for completion of Cannon Road West inc\ude ths following: Full width grading of the roadway, all curbs, gutters, sidewalks, baie and pavement, median landscaping and irrigation, median hardscape, street lights, Street monumentation, storm drainage facilities, erosion control, guard rails, and other incidentals necessary to complete a four-lane major arterial roadway, The facilities also include two (2) 455-foot multi-span bridge structures across the salt water wetlands at the north end of Macario Canyon, and a 130-fOOt single-span bridge across the Aqua Hedionda Creek at El Camino Real. In addition, the project includes the cost'for full mitigation of the environmental impacts of the construction of the improvements noted above. .. The improvements do not include any franchise utility, water, sewer improvement, or reclaimed water facilities, or traffic signal costs. The cost of traffic signals are covered under the traffic impact fee program. The other costs are included with other fee programs and/or will be the responsibility of the adjacent developing projects which require the need for these facilities. The above improvements have been divided into two categories, namely 'frontage improvements" and "common improvements'. The 'common improvements" include the following: Full width grading of the roadway, paved road surface for two lanes (18-foot paved section on each side of median for a total of 36 feet of paved section), median curbs, and drainage improvements which are necessary to serve the center lanes and/or protect the roadway grading. It also includes the two 455- foot multi-span bridge structures at Macario Canyon and the 130-foot single- . span bridge near Camino Real. In addition, the improvements indude the cost for full mitigation of the environmental impacts of the construction of the improvements noted above. The soft costs inciuded are design, contract administration, construction inspection, and construction engineering. The "frontage improvements' include all other improvements necessary to complete Cannon Road West to four lane major arterial roadway standards. These remaining improvements would include the following: , ~ ~~ -2- e 0 ! Paving beyond the 36-foot paved section, outside curb and gutters, sidewalks, street lights, any frontage landscaping and irrigation, median landscaping and irrigation, median hardscape, and any other frontage improvements which would normally be required of the adjacent development projects. For the purposes of calculation of the Cannon Road West fee, the cost of the frontage improvements along properties which have a general plan designation of open space and which are environmentally constrained, are included in the "common improvements" and are not listed as a frontage obligation to the adjoining property owner. COST ESTIMATES The cost estimates for the project improvements were prepared using the latest plan revisions for Cannon Road West. These plans were prepared by ODay Consultants, Crosby, Meade, Benton and Associates, McDaniel Engineering, Utility Design Consultants, KIU+A, and VTN Southwest. The cost estimate was divided into seven reaches for the purpose of allocating improvements costs. Table 1 summarizes the cost estimates for the 'common improvements' and "frontage improvements". for the seven reaches. The total estimated cost for Cannon Road West is summarized in Table 1 and shown graphically on Figure 1. Detailed cost estimates are included as Appendix A of this Reaches 1A and 1 B were combined and utilize bids recently received by the Carltas Company for the Carlsbad Ranch project. I report. Reaches 1A through 1 F correspond to the former Reach 1 of Cannon Road. FUNDING SOURCES I There are presently two funding sources identified in the City's Capital Improvement Program for the construction of Cannon Road West. These two funding sources are as follows: Transnet Highway Funds i .. . 1 i j Cannon Road West is designated on the regional transportation improvement program (RTIP) as a regional facility and was allocated $3,450,000 in Transnet funds. The Transnet funds are limited to funding one-half of the construction costs of a basic four-lane facility, excluding outside curb and gutter, sidewalks, street lights, median landscape, and median hardscape improvements. The detailed cost estimates presented in Appendix A include a column entitled 'SANDAG Allowable," which summarizes the facility costs eligible for Transnet funding. One-half the amount of this column is significantly more than previously allocated. -3; e 0 i I I I I i 1 I I I ! I I I I I ! 1 I I I I I ~ - - - -. " " " . . - - ........- ......... .__,__,,_, , .__, 1 I I Table 1 SUMMARY OF COST ESTIMATE Reach Description Common Improvements IA 18 Armada Drive and Paseo Del Norte to Station 7+38 to 37+70 ~ ~~ $489,367 IC Armada Drive to Carisbad Station 37+70 to 50+00 Ranch Boundary 287,606 10 to Macario Bridge Carfsbad Ranch Boundary 1,274,587 Station 50+00 to 64+50 IE Macario Bridge Station 64+50 to 69+35 5,651,107 IF Macario Bridge to Kelly Ranch Boundary Station 69+35 to 72+61.30 431,156 ~~ ~ I1 KeUy Ranch Boundary to El Camino Red $1 1,085,346 TOTALS 2,951,523 I I Nom 1 South Improvements lmmovements Total Cost Frontage Frontage I $31 1,820 $1,182,564 $1,983,750 197,252 149,298 634,157 (1 1 (1) -0- 1,274,587 -0- -0- 5,651,107 -0- (2) 1 206.749 1,029,022 I 4,187,294 $7715,820 I $2,360,884 1 $14,162,050 (1) This frontage is considered open space and is therefore added to common improvements. (2) All but 8SHeet ofthe-Wi frontage is considered unbuildable and therefore is added to common improvements. I I -. 4 ! , i 0 0 Community Facilities District (CFD) No. 1 The list of improvements to be funded by CFD No. 1 includes a provision for $3,950,000 to be applied towards the construction of Cannon Road West. The total of these two funding sources will be applied to the 'common improvements." The resulting amount of unfunded costs will be utilized to calculate the Cannon Road West facility fee. This unfunded amount is summarized as follows: Description cost 1 L 1 1 I Total Cost Estimate I $ 14,162,050 I I I I Less ' North Frontage Improvements" < 2,360,884> Less 'South Frontage Improvements" < 715,820> I I I ~Cimmon Improvements I $11,085,346 I I I Less SANDAG Transnet Highway Funds < 3,950,000> Less CFD No. 1 Funds < 3,450,000> $3,685,346 Unfunded Costs for Fee Program I t AREA OF BENEFlT The area of benefit for the proposed Cannon Road West facility fee is shown on ' Figure 2. The area includes portions of LFMP Zones 5, 8, 13 and 24. with one exception, each of the properties within the proposed benefit area is obligated by virtue of a condition of development approval, or LFMP requirements to finance all or some portion of Cannon Road West. The relationship between developing properties within the area of benefit and the need to construct Cannon Road West is discussed in more detail on a zone by zone basis in the following paragraphs. LFMP Zone 5 There are 20 parcels under two separate ownerships in LFMP Zone 5 that are included within the proposed area of benefit. The 18 parcels under the ownership of Upland Industries are fully developed parcels created with Phase V of the Carlsbad Research Center (CRC). . These'18 parcels are subject to a tentative map condition of approval which requires construction of a secondary access prior to issuance of building permits on any of the parcels. Secondary access would occur with the extension of Faraday Avenue to Cannon Road and Cannon road east to El Camino -5-. 0 0 - ! I i I I I i I i I I I I i I I I I i I I I I t _. ..-............. I I I 0 0 Real or west to the existing terminus of Cannon road. Interim secondary access may be allowed by the City from Halley Way to Camino Hills Drive; however, City approval of the interim secondary access is conditioned upon the owner's participation in the financing of Cannon Road West. The remaining two parcels under the ownership of the lvaf Company are undeveloped and do not have any development approvals pending or otherwise. However, access to the lvar property must occur through Phase V of CRC and therefore, any development of the property would be subject to the same requirement for secondary access as was applied to the CRC properties. For this reason, the two lvar properties are included within the proposed area of benefit for the Cannon Road West facility fee. LFMP Zone 8 There are two parcels under two separate ownerships in LFMP Zone 8 that are subject to a LFMP requirement to guarantee funding of Cannon Road from El Camino Real to Car Country Drive prior to development of the property. LFMP Zone 8 properties which have been excluded from the area of benefit include City owned property in Macario Canyon and privately owned property located dong the north shore of the Agua Hedionda Lagoon. The property within Zone 8 located on the north shore of the Lagoon will access the freeway and other regional routes by way of Park Drive and Tamarack Avenue and thus were not included in the proposed facility fee program. LFMP Zone 13 There are 12 parcels under four separate ownerships in LFMP Zone 13 that are included in the proposed area of benefit Each of these parcels is subject to a LFMP requirement to financially participate in the funding of all or some portion of Cannon Road West. Several parcels in LFMP Zone 13 located along Paseo Del Norte are not 'within the area of benefit and would not be subject to the Cannon Road West Facility Fee. These excluded parcels are considered to have responsibility for Palomar Airport Road and are included in the existing Assessment District (AD) 86-1 for the construction of Palomar Airport Road from Paseo Del Norte to Palomar Oaks Way. Recent mapping efforts revised and extended the boundary line of the original assessment district boundary. However, the area of benefit for Cannon Road West as shown on Figure 2 excludes those proposed final map parcels which benefit from AD 86-1. I included within the proposed area of benefit. All properties within LFMP Zone 8 are 1 parcels into AD 86-1 to indude property that was formerly north of the original -6- 0 0 LFMP Zone 24 There are 14 parcels under seven separate ownerships in LFMP Zone 24 that are included in the proposed area of benefit. The existing mobile home park within Zone 24 is not included within the area of benefit. The approved Zone 24 LFMP requires that a financing plan guaranteeing the construction of Cannon Road from El Camin0 real to Car Country Drive be approved by the City prior to any development occurring within the zone. This requirement was placed on development within Zone 24 because the traffic on Cannon Road West generated by the development of Zone 24 is projected to exceed the Growth Management threshold requiring implementation of a financing plan requiring construction of the facility. METHODOLOGY TO DETERMINE FEE Since Cannon Road West is a major arterial roadway, and future parcels will gain access to this arterial by means of collector roadways, the measure of average daily trips (ADT) will be utilized as the methodology to apportion benefit within the boundary of the fee district There are a total of 50,958 ADT within the area of benefit. The approved LFMP zone plans, proposed and approved tentative maps, and recorded final maps were utilized to determine the projected land uses and development potential of each parcel included within the area of benefit. Projected ADT totals were then estimated using traffic generation rates obtained from the October 1993 edition of the SANDAG trip generation table (included in Appendix 8). The ADT projections for each parcel are listed within Appendix C of this report. The traffic projections listed in Appendix C are for future development only and do not include ADT figures for existing residences located on property within the proposed area of benefit Existing residences are exempt from the proposed fee program; however, any additional development in excess of the existing units on such a property is subject to the facility fee. There are presently three existing units within the proposed area of benefit, Wo in LFMP Zone 24, and one in LFMP Zone 8, FEE CALCULATION The proposed facility fee is calculated by dividing the total unfunded costs for Cannon Road West by the total number of ADT anticipated to be generated by the undeveloped property within the area of benefit. The unfunded cost, amounting to $3,685,346 was identified in the-previous section entitled 'Funding Sources.' The total ADT of 50,958, was previously identified in the section entitled 'Methodology to Determine Fee.' The proposed facility fee is therefore calculated by dividing the unfunded costs by the total ADT as follows: -7- e 0 Facility Fee = $3,685,346 + 50,958 ADT = $72,32/AOT, Say $73/ADT The actual fee for developing property within the area of benefit is calculated by multiplying the facility fee of $73/ADT by the total ADT generated by the proposed development. Appendix C shows the development potential, general planned land use, estimated ADT, proposed facility fee, and frontage obligations for each parcel in the area of benefit. it should be noted that the fees listed in Appendix C are estimates based upon currently proposed land uses and growth management projections. The actual fee will be determined at time of development based upon the approved land use and the trip generation rates projected at the time building permits are issued. Agreements have been entered into with two developments to pay their fair share cost of the Cannon Road West facility fee. These two developments identified as Carlsbad Tract 91-03 and Carlsbad Tract 85-24 Unit No. 5 were allowed to proceed with development on the condition that they deposit $50 per estimated ADT. The actual amount of their fair share payment shall be determined by the City Council at the time this fee program is established and will be based on the actual dollar per ADT approved by the City Councif times the number of trips established in the agreements. The number of ADT for each development is reflected in Appendix C and included in the total fee program. FE€ PROGRAM ! The following recommendations make up the full extent of the facility fee program: 1. Based on the above, the recommended Bridge and Thoroughfare District (B&TD) Fee for the Cannon Road West Facility is $73 per ADT. 2. The fee is to be paid at the time of building permit issuance. 3. The ADT for each project shall be based upon the latest edition of the Guide for Traffic Generation Rates for the San Diego Region produced by the San Diego Association of Governments (SANDAG). A single family detached residence has an ADT of 10. For multiple land uses and/or land uses not included in the Guidelines, the City Engineer shall determine the appropriate traffic generation rate. ! 4. All new development within the boundary of the B&TD that are not shown as exempt from the fee program will be subject to payment of the Fee. The exemptions include property held under public ownership. i -8- 0 e in proposed development or number of average daily trips) or periodically by the City, based on actual construction, incidental, and acquisition costs or engineering cost estimates andlor the actual number of units constructed or authorized to be constructed in the zone. 6. The City may use at its discretion all or a portion of the B&TD Fee fund to design and/or construct any portion of Cannon Road West. Alternatively, the City may give credits or make reimbursement payments to eligib\e developers, 7. A developer who acquires any right of way, designs andlor constructs any of the improvements or installs any required mitigation for the segments of Cannon Road West covered by the fee program may be eligible for credit and/or reimbursement, subject to the approval of the City Council. Only those improvements or work included within the cost estimates upon which the B&TD Fee is based are eligible for credit and/or reimbursement. 8. Credit and/or reimbursement (if funds are available) may be given for the actual costs incurred by the developer for the improvements subject to the limits defined below: p Credit The amount of credit is limited to the total amount of B&TD Fee which would be payable by the developer for hisher development but not to exceed the Estimated Cost of the Improvements as set forth in the fee program documents, or the developer's actual cost of the improvements, whichever is less. Once the credit has been determined for a development, the credit shall be considered to run with the land and be awarded on a building permit by permit basis to whomever is listed as the building permit permittee. . Reimbursement I Reimbursement of actual costs in excess of the eligible credit will be allowed, if funds are available, up to or in excess of the Estimated Cost of the Improvements upon approval by the City Engineer and subject to the following: (a) Each year during the preparation of the City's Capital Improvement Program (CIP), the City will consider the present and future construction needs for Cannon Road West. Any available funds shall first be appropriated from the annual fee revenues to guarantee the funding of the adopted CIP for this road. Any fee revenue funds remaining after the annual appropriation shall be -9- e e I ! I made available for reimbursement to qualifying developers. Nothing in this policy shall preclude the City from using any or all of the appropriated fee revenues to reimburse developers for constructing any portion of the road consistent with the future needs of the public as determined by City Council. (b) Before undertaking any work subject to reimbursement, the developer shall enter into a reimbursement agreement with the City, which would specify, among other things, the estimated reimbursement amount, the method of reimbursement, arid any right of way acquisition costs which are eligible for reimbursement. The agreement will acknowledge that any reimbursement will be subject to availability of funds, after sufficient amounts are resewed for design and/or the completion of the improvements. * (c) If the projected actual costs of construction are expected to exceed the Estimated Cost of the Improvements by a significant amount, a request for reimbursement must be made prior to construction of the improvements. The request must be approved by the City prior to awarding of a construction contract. me developer must adhere to a quasi-public bidding process and receive a minimum of three construction bids. The proposed work must be bid separate from any other construction work for the developer; The construction contract must be awarded on a unit price basis. Where grading work abuts the grading for the development, the grading quantities shall be based upon a vertical line extending from the edge of the right-of-way. Reimbursement shall not be made for any item not included in the estimated construction cost of covered improve- ments. (d) Once the construction is complete, the developer will submit evidence of all costs expended for the construction of the road, including any incidentals, for verification by the City Engineer. All cost data is subject to audit. If the actual construction costs exceed the estimated construction costs, then concurrent with the approval of the reimbursement agreement, the City must approve a revision to the fee schedule based upon the remaining property to be developed. The developer requesting reimbursement will be liable for any increase in fees so computed. 9. . The City will determine the portion of the B&TD Fee fund which is necessary to assure completion of the improvements and the portion of the fund which may be distributed for reimbursement. -10- 0 0 10. The portion of the B&TD Fee fund which is determined by the City to be available for reimbursement will be distributed to all developers who are eligible for reimbursement. if there are multiple claims for reimbursement, which total more than the available fund for reimbursement, then the fund will be distributed in the order in which the reimbursements are received unless an alternate methodology is determined by action of the City Council. 1 I. Construction of facilities and/or payment of BUD Fee shall satisfy the financing guarantee required by the Growth Management Ordinance for all of the facilities for which the fee has been established, provided, however, that any facility which is required, e.g. by the City's Cul-de-sac Policy, to support the proposed development has been completed. I ! -7 1- FW Nom3 kmr) Fm SOJh M cku wa 115.0 - s20,o s1.a fB( I 1m.Cu I S1.Y UZ w.7t s7.n s1.a 1 I : CUlWUd Amoul 0 tonmar hasd Camon R "*lO&wa~m. -I+=. -rb. +m (R.SW~~AMI~) wm 7 I ~corrrrsnFrcrup.~.9. "oumyowmr~ Numsuml brm 0.6 02 0.2 LS lno- 0.6 1245 0.2 0 124s 0.2 LS 0 LF "I 1 0 0 LS 2 0 lrro- 2 0 OEA 1 bvmm 0 1s 0 1 2wm 0.6 0.2 0 LS 1800 0.2 CY 0.6 0.2 02 CY " ttm 2Ck!ingbrdGde?q 1 M&lL.da nd - 3 R-RebwoOdH- 4 R- 0mhb 5 Ramva Tm'F CaIch Ha- 6 RWIe Wm sbudus 8 Urr*SYfiOd ExUntion a F4 7 Ffdouta Bubed Mra Fana 9 Ramvs hRRs~Ccbidknh 10 Ramva hR-lqa&!nfas 11 GnVdEapc 12 SmvepYMo 13 Slabhd cornbudion m 14 8' PK Sera M.in 15 (ItmWed-1bDIPSsrrM.k) 16 24' WC Ssrr Man 17 Amuw 18 1- Rddq 20 1TWC MIin 21 2(rSlalRr*h*d Mtrin i2 W PVC Ydn 23 1TO.l~Vlk.Csranbly 24 lkWa(lyV" 19 dPVCRe&nldWdULhr 26 1 lrrkrl&knSauiaWRnaU 2s WVhAmnW 28 TMudNrRe&8+r 29rebwOum Yle-Blrr*dlAlS*nbly 27 7Ljr h V8aM v.k. 31 PrasamRa~k~~im9.(lcn " " " "_ - s1s.cao.m s2o.Mo.m st.oo0.m s1.m sl.m.m m.m n.7w.w $0.76 w.82 90.78 s1.m a.50 s1.m S1B.Y) w.m $60.75 sz1oo.m L0.m s15,m.m sm.oo0.m s~.ooo.m sw.m $1.245.00 s1.m.w n.700.m ss.oo0.m m.m w.m so.m sm.oo0.m t0.m so1o.m n.mo.00 t1.m.m s7.700.m w.oo 10.m w.m w.m sotd w.m 90.m w.oo w.m 90.m s12.0cQ.m s1.m.00 w.os8.40 10.00 10.00 10.00 w.oo w.00 w.m 1o.m w.oo 90.m szzn7.m s19.zm.m s1s.ma.m 90.00 m.m s1.w.m mm sz3.7m.00 s1eszr.a m.oo t0.m t0.m slo.1w.m naoo mso n,7eo.m t0.m m.m tll.~.~ tJ.OW.00 0.800.00 IsI.al~oo $1 .m.00 $l.(m.al 90.00 x).W m.00 10.00 m.oo t0.m m.w m.w m.w som 90.00 10.00 10.00 n.rn0.m n.0cQ.m SI.NS.~ w.m t1.wo.m 586o.m t4r.om.m tl.7w.m s1.sz.w m.(10 w.m w.m w.m t0.m w.m w.oo Ld.06 w.m 1o.m t0.m so.m w.m ro.m m.m 10.00 10.00 10.00 w.m w.m 90.00 90.m m.m w.m s~~,m.m w.m m.m 1o.m w.m n7.m.00 $0.00 w.00 10.00 90.00 u6.on.w SIl.W.% 90.00 sx.41o.m s7.uiQ.a f(l.lLy1.00 s1.4l0.00 t0.m s1.2m.00 $0.00 u(l.20 W.oQ 90.00 90.00 10.o.00 ~.oe2n tol6.S n.ms sw7.75 SIxe.38 sal.- sl.425.00 S634.s 1.aoo.oo tZ0b.m $0.00 mm.m w.oo0.m w.m t0.m w.m s(1.oo0.m w.m m.00 s1.352.w sm.m $0.00 w.m t0.m w7.4m.25 w.m s31,mo.w t7.470.w w.37s.m s640.00 sm.2bs.m n.%.oo t3.1oo.m tt6.m.m n.oo0.m SZ.OW.00 ts.w.00 w.1s.m Lzoo0.m s8o.poo.m s0.m m.m m.m sl~.Ro.oo u.Bo0.m 10.00 sw.m siqvao.m slzoma t0.m ty.410.00 nz0.m stmo $24.237.50 1740.00 sr.w.00 10.00 w.OO 10.00 s12ise.n )10.114.(16 WS.00 moo 10.00 uIl.20 sl7r.w.w Ib.180.00 s1230.00 10.00 m.- LD16.50 m7.n tJ.ss1.s s1.4a.oo s2€8.oo tbdoo.00 w.50 sm.00 s1,m.s s1m.mo.co miooo.m s1.m.m m.7~.00 .~ asio ~- - 320 3- 0.6 0.2 0.2 CY 0 mm OEA 0 1- Is00 OSF 0 OSF .~ asio ~- - 320 3- 0.6 0.2 0.2 CY 0 mm OEA 0 1- Is00 OSF 0 OSF u.2ao.m s7.7w.m $34137.50 s1.m.m w.493.25 m.m o1.mo.m 17.47o.m 2075 0 0 1111 0 0 13 0 830 32 0 1886 0 0 1 an 0 20 0 3 0 0 2075 u 0 0 0 0 1111 LF 13 EA 0 0 630s 32v 0 1873 LF 0 1- LF 0 0 20 LF 3EA 1 Si.Q.00 s25.00 n5.m . . .". sBul.00 *.2es.00 n7.375.m I I 1 I I I a I l I 1 n1.ac mn SlM tlS.cm 91 91 I t1.W Sl~osl HZ.% SCD,Ui I t( sa3z SI S2.W fJ; $1 .ax m.3m Lzma 90 10. to, 10 00 $0 90 $0 90 90 m to )o VlJ a a nm n.u! so s1.1s.m n7.m tJ.4oo.m w0o.m t1.m.m s1.m.m sz.oo0.m s2.mo.00 szpoo.00 m.0w.m s740.m n:5ei.w sx1oo.m s1e.m.m 1 0 0 0 0 0 0 0 0 0 uu 300 583 207 0 2 2 2 2 45 1991 0 2225 mr 0 0 0 ?aom 2 0 1 4e2 0.8 2 0 0 1% 0 0 3EA (EA 0 0 ?EA 1EA 0 )EA 0 1EA 0" La 0 0 2EA ow 0. ow 0 OLF 0 OLF 4 4- i 1 sz.oo0.m sz.oo0.00 lo.6%.Qo H.1SS.W s8o.mm ROW.00 tll.ea.00 w.w.m s2zm.m s1s.mo.m oD,uo.m se.0o.m au5.m 115.s3e.00 w.m.Qo S3.MO.00 $1.440.00 wz2,.090.a usm.00 119.531130 S27%3u S1~*720.00 team0.w *u10.0 $3200 ss,,xD.oo Sll4MO.00 sz7oa.00 SlU00rn W.1~00 w.@3%00 SI Bsdso m~oo €33200 Ln.mua s1m.m m1m.m so.m uman s2rn.m wm.m n7.aao.00 nw,ooQ.oo Yl6.00 1 7 3 1 2 uu s(u 3s 207 8 " I 32 Fksttyhm&w 33 24' RCP 34 W RCP 3.5 41 RCP riWo.00 a200 as.m se4.m $77.00 n.en0.m 36 WRCP 37 TypTQ.bH.1 31) Tm 'A- M 39 "YTmyp'PWch&h *HmPmwrd*.l a*sN".W 44 cl.rll" 45 C" 46BM6-W 47 C P.C.C. 96nl 46 EHwcdM#4nP8vwna8 a" 500LTnmC901 51 PedrrClnRng 52~crW.uonmrl 9- 5Y**mkchQkr(whmHdukp 54 M-amIlic& 558**mkch".trWdY 55c**m*rckQkr(Endp*p. UI ell^^^^^ 57 Furi*, h kw hiplam SUun 9sdlAmnmUdaL- SeBaIitMlkn 61 m.1 m 605nD:Sulm 63 Tra: 24' Bor 62 Rod- 6490Oy" GBsbdli*RIBorr 65 saledU* 67 SDGh~l~lV~~ 41 Rb Rg 42 h Wdc 075 0 0 OEA 0 OEA 2s s2.wo.m taao .~_..~ ~. Il.BQ).Qo t4.3op.00 %.!io 4s 524 4210 4690 mr 13800 b?C2 1- moo I1 t 3 I 246 14 2 " 0 0 om SmLf 1'313 mrrc la 1003 T11 0 OLF BaJ 1m LF 11100 11100 SF 5145 84s SF 51mo 3som af ? ZEA 0 0 1EA om 02 02 La ma0 $1200 sa0 m.w $1.4 s10 m0.00 moo yoO.00 mam.00 sa00 rmuro S&lS.OO $440.00 W.O.00 s2m SlUb 10.9 $1030 $3.4 $150.00 a28.m s2.ia.m 10.00 $5200 m.1t s1m.am.m \ 16.4 1L4 LF 248 v 14 LF 2- " 141m 0 mso mw wm ?Ea ?Eaw 1m 640 875 19 .. s Sscr ?a mu 4375 433 u a5 M€A ¶a 11100 7050 m9c 6 4 8 4u lnprm 4 0 0" La 4EA e5 MEA - - " ~~- ~~~ Ma $vb796xa t36g97@.W -33 SUU31l.M SS7X -ma Q 5.00% U431.S sm3u.m s1l.em.m t(r3ro.s -J I - - " -~ - - - Mm tl.s?.rn..R LJa6m.m t7w.w sa395(.15241 SEOE.IQ - - ~~ ~ ~ oarplo 12.00% ~mparlalnprtlpna Sler.uo.95 1s.m W3l.Y W4xa.a os.4m.24 Slll.M30 SRm2 M.?m.lI Sal.41121LlO s1)S.mw mom.< HaW r*iap.am kqtSkedRl#&dW ! - - 1d.l ! tr,aazam wE%m.m S311.&11M $1.1- mm. 1 0 0 Cam Road. LsrrpQ a10 c.hb.d Rurh BMduy Satim 37*70 Io 50*W (Read! 10 Corrolrd C- Frcftap. FronlOg. Nm Sam Corrtinad Nc*k Sam Frorlap. Fr-mp. -P.mxA SAHDA - IlOlll Ouarlily artay "y Cuart~Iy Unl UrnLC& - C- hwld 101 M&lznlm~ see beh 102 Ckmw and Wnp 5.20 5.m 0.00 0.00 kra l.Mo.00 7.m.00 - " 104 UnCIBSYfica EICaMllm 39.300.00 39.300.00 000 0.00 CY 2.00 78.600.00 201 Sbtqade Preparallrm 82,134.00 46.2W.M 17.967.00 17,967.00 SF 0.15 12.320.10 7.000 00 0.00 0.00 7.m 78.600.00 0.00 0.00 78.M 6.9M.00 2.695.05 2.695.05 12.32 24.946.00 9.702.18 9.702.18 44.35 48.510.00 18.8653 18.865.8 86.24 400.00 0.M 000 40 16.601.00 0.00 0.00 16.60 0.00 9.427.50 9.427.50 18.05 0.00 12.570.00 12.570.00 202 Clerr II Awsgnls 8.u 2.956.82 1.663.20 54681 646 81 Tm 15.00 44,3523 203 Asonml Cauets Paunp 2.464.02 1.386.00 539.01 539.01 Tm 35.00 86.24Q.70 205 %red Suwy Mcfuned 1.00 1.00 0.00 0.00 €A 400.00 4w.w Ml Typs'bl' Meban CUD 2.554.00 2.5Y.00 0.00 0.00 LF 6.50 16.601.00 M3 Tyw G Ch 1- c*na 2.514.00 0.M 1.257.00 1.257.00 LF 7.50 18,855.00 324 KC Sidmh 12.570.00 0.00 6.285.00 6.285.00 SF 2.00 25.140.00 , 307 Mcdm L h t 7,MO.W 0.00 1,8ZQ.W 1,8ZJ.W SF 3Cd Ta*d Cwde Pawnp 3.3 12,TW.W 14.948.00 0.M 7.474.00 7.474.00 SF 3.50 52.318.00 403 TmMC Slga 6.00 1.00 2.00 3.00 EA 404 slriprlg 220.00 1.320.00 5.6C6.00 420.00 2.593.00 2.595.00 LF 0.1s 840.90 405 Sireel$#d 4.00 0.00 2.00 200 EA 3.m.00 12.000.00 406 slrsculm c- 2.m.00 0.00 1.Bso.00 200.00 LF 4M1 LegsnJrhlro*n 20.00 41.oM.00 19.00 4.00 6.00 9.00 EA 540 1~'~CUDatU 1SO.00 2.850.00 1.00 0.00 0.00 1.00 EA 600.00 600.00 600.00 900.00 1.350.00 2.0: 6( 551 24*RCP(13%0) 83.00 83.00 0.00 0.00 LF 0.00 0.00 600.00 60.00 4.sm.00 4.~.00 570 Tyw 'W Bra* Wch 50.00 50.00 0.00 0.00 LF 12.00 600.00 0.00 0.00 4% €4 571 Tm 075 Bmv M(d, 0.00 0.00 0.00 0.00 LF W.00 0.00 12.00 0.00 0.00 590 Ero5ioncm 5.20 5.20 0.00 0.00- 0.00 0.00 0.00 \ 10.00 52.00 5200 0.00 0.00 I ! Udd e.ws.10 4ls,~lo.a 190.w.w 1so~le..o1 96.7m.m 276.4 MobiUsUm 6 8ah 8 Corlingmcia 8 15.00% 4.m BL941.51 16,704.0 7.61216 530.72 3,951.52 11.w 0.M) 6,370.W 6.310.W 0.00 x.159.00 x.159.m 220.00 4a.00 €62.00 1.3: & 63.00 m.95 34.3% 0.00 6.000.00 6.OOO.00 0.00 37.000.00 4.000.00 - - " - - " I - m.ns.60 19m.70 14,818.~ 41.a - " 1 wed 499,33597 226.461.76 155.316.46 117.557.76 - 32893 Dcvpl e 12.m 59.920.32 27,1754t 18,637.97 l4.ltB.a MoM~~~F-~O 39.47 33.369.26 23297.47 17.633.66 493 - " 15.m 74.sm.0 HsMII Miliplaon Ac&ilh.ofRl#dWay TaW ; - - " 634,158.1 28?..bQB.U 197251.90 149.i93.35 417.74 , i I 1 j I 0 0 I 1 ! , CamonRad-CuldmdRvdlBandvytoMacnoMd0. SDWI xwm IO MISO (R& ID) KC37l CQTtdnS6 a* ComnOn Q-fw FraI80. Sam c4mMy urd UMC& Fr0n.o Nalh hnculw Fratwa solm -(O 5and4 *lornb .- 1za &.X t 97.4 54.4 21.7! 15.1: mo! U 1.v 8; 10.4 004 17.51 6.U 19.2 Frm.0. Nalh Qn* 0.00 ow 556.00 000 7N.M 2o.m.00 7.325.00 1.450.00 0.m 10.250.00 2.m.00 510.00 0.00 2.900.00 3.00 1.450.00 e61 .00 35.00 5.00 3.00 0.00 0.00 0.00 330.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 0.00 3.00 0.00 0.m 0.00 0.m 0.m Cartinsd Amcv4 CamCn - 12.000.00 M.260.00 84.260.00 12.000.00 97,440.00 80.00 80.00 54,486.00 58.w.00 32,w.w 1s.m.m 21.750.06 9,045.00 2s.m.m 0.00 1a.m.m 0.00 18.850.00 71.750.~ 0.m 19,600.00 0.m 57.155.00 . 400.00 4m.w 0.m 1.1m.oo 0.00 n70.00 0.00 o.m 15.m.00 33.000.00 10.440.00 0.00 S.670.00 80.400.00 18.120.00 17,500.00 0.00 19.200.00 B.wO.00 0.00 0.00 371.00 0.00 375.00 0.00 0.00 0.00 " " " see bslor 800 42.134.00 42.134.00 0.00 8.00 1.670.40 6o.m.00 2.17O.oO 0.00 0.00 2.900.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 om 0.m 0.00 19.4M.00 0.00 10.961.M o.m 0.00 19.4M.00 0.00 10.982aO 3.MS.00 10.875.00 14.65Q.00 35.87S.00 0.00 39.30s.00 9.800.00 0.00 101 MmQation I02 CkanfqardGuemg 104 U~~lsrwfied Gcanlicn 5jO Eroum Cortrd 32 Gars JJAweg#/s 81s 203 Asphat Cancrde Pmng 201 endm Regnratim 303 Type G Cub and c*ns 304 KC SdenL X1 Tw'BI'MedanCub YM ledred Corrrsts Pawng 401 GwrdRlI 307 MedML6I 205 Stred SVVC, M- 403 Tr-aff~c Sga 404 Srripng 4M Sr4w 406 .%rear@ cadrit 550 187)CP 551 2CRCP(l35&D) 531 T~DI'M' CbW 512 TypTld1 513 Typ 'el' 1- lrld 531 Wlnp Typs Helm 501 Rlp Rlp 1L1 Tar 571 TyP D7S Bra Dach 207ACPNnna3' 570 Tvpr 'W Br )I Ditch 402 chin li* :mu 552 24' RCP (1 7SO) 5b4 sp** Wdl 585 Hslhnl (lL36) 5% He8W (I l.34) M2 Rip R8v II.! Ion 503 RipRw2la WC?mnd.Crrral*,R~ 504 No.2WwRlpR.0 4cd Lmfoxr 591 RIP ~lp 1 rm 583 mi* Ha ld*.I (0.30) " mow 0.Wh 1.500.00 0.00 CY 2.00 55680 Ton 000ACn 1o.m 35.00 7X.M Ton 20.300.00 SF 15.W 1.450.~ LF 0.15 7.32500 SF 7.50 2.m 8.00 2.784.00 1w.9oo.m 3,632.40 2,900.00 2.900.00 I m.00 1 .m 5.m.m 14.650.00 iU.MO.00 5.600.00 5.00 5.00 10.87S.00 3.045.00 14.650.00 0.00 LF 1o25o.m SF 2.m.m SF 3.50 6.50 3.50 35.875.00 0.00 17.8M.w 9.m.oo 66om 0.00 1.123.00 LF 35.00 0.m EA 400.00 2.00 EA 220.00 2.900.4) LF 0.15 2.00 EA 3.m.m 440.00 . .. 435.00 6.000.00 4.000.00 3,1%.00 1o.62o.m 0.m s.6oo.m B.ooO.00 435.00 29.ooO.W 9.ooO.00 ." .. 1.650.00 232.00 5.00 1 .m.m 2.00 2Oo.m LF . 20.00 71.m LF 1n.m LF 0.m EA 1.500.00 45.00 60.00 126.00 302.00 0.00 0.00 ~.~. 51,660.00 1.575.00 17.5Qo.00 0.00 9.600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.350.00 0.00 3.960.00 0.00 2.00 EA 3.000.00 6.00 0.m 5.00 6o.m 0.00 145.00 330.00 302.00 1 .w 1 .00 1.00 2.00 20.00 50.00 2.33 15.00 10.00 8.00 0.00 3.00 EA 3,200.00 o.m EA 4.wo.m o.m CY 75.00 0.00 0.00 5.00 0.00 0.00 6.581.00 0.00 0.00 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0. 00 900.00 0.00 0.m 3 6.51 0.00 LF i4S.M Tcn 45.00 12.00 om LF 12 m 8.581.00 m.OO 18,120.00 3.980.00 2m.00 700.00 uoO.00 4,600.00 600.00 500.00 175.00 229.00 750.00 1.m.m 0.00 720.00 0.00 18.120.00 2.200.00 2.m.00 700.00 4.m.00 600.00 1.50O.00 500.00 175.00 0.00 750.00 "" 0.00 60.00 0.00 1.00 1.00 1.00 200 8.00 50.00 2.33 10.00 0.00 ynoo 2o.m 0.00 LF 1200 0.00 LF 0.00 EA 2200.00 60.00 ~~. - "" 18.1: 3.0 2.1 0.00 EA 700.00 0.00 EA 2.m.00 0.00 CY 75.00 0.00 CY 75.00 7S.m 1Y).00 0.00 CY 75.00 0.m EA ZIOO.~ 0.m LF 10.00 0.m CY 6.00 01 " n 2.3 4-64 81 1 .B 51 1: 2.2 7! " " " 711.OS.00 271.999.00 24135.00 lec.751.00 ~ 483.2 " MebiIZDL1O9.4BOndr@ CdJnpai.r@ - 4.00% ls.m lC%.66).t 20.441.40 10.879.S 9.8Sl.u) 7.Bm.M 40.759.8S 37.08275 28.76265 19.4 7271 323,678.n m9.15 228.183.W 577.6 %,841,46 35,3123 27,287.04 1m.ms.n 48.561.02 U.lW.37 W.m.56 69.72 bB.0' " mold - 846.131.6S lol.~.ao " " -0 Mwpad6W"Q) - 12.00% 15.001 " HmMII Mil IQDIIO~ 2W.000.00 2W.OOO.W x10.a koiWdRWc4W.y sub Told " - " 127437.20 811.OR.Do 373.721.82 28S.B.785.2B 373.721.82 91f.2 209.791.29 1274.%7= 1274.587Zu 0.00 0.00 9312 " TGU - " (l)AltraiDp.-lSmnsidaedopanrp.andh.n(onk~~ocommn~ I ! L 0 0 Cam Rad - Mscmio M6p SlallmU*%to64r35(ReM l€J - Cdmd Cm Frataw Fratsg8 Ne41 Sam CCdSfIDd NUTI 3ah nan cwmy ou~r~y ammty cuamy urit umt- M COnnm Frcdap. Frqmp. - SA( Amaul Am w 101 MctAWion 502 Onw RSng M 00 54.00 0.00 0.00 EA 1.400.00 89,600.00 - ” Eul Ping ClsSl50 1.511.00 1.511.00 0 00 0.00 LF 4 89.600.00 603 RLng Clssr 75 15.370.00 15.370 00 0.00 000 LF 52.W 799,240.00 799240.00 0.00 0.00 a 502 Dnva Rlng 14800 148.00 0.00 0.00 EA 1.400.00 207,200.00 0.00 000 79 605 Jad Sed 1M.W 130.00 0.00 0.00 LF 260.00 33.eu.00 207.2m.00 0.00 0.00 709 BamaRuhq 984.00 984.00 0.00 0.00 CF B0.W 78,720.00 78.720.00 1 M)6 Cave. ha Tw 25 981.W 9M.00 0.00 000 LF 48.00 47.232.00 0.00 0.00 1 €47 Cavete Lrna Tm 26 981.00 984.00 0.00 0.00 LF 47.552.00 80.00 78.720.00 0.00 0.00 Mb 7rduad ccrrrsle Paving 161.00 161.00 0.00 0.W LF 3.50 163.50 608 EIuMhm. Eli* 881.00 881.00 OW 0.00 CY 48.00 42.2b3.00 563.54 0.00 0.00 609 B.M 519.00 519.00 0.00 0.00 CY 65.00 33.735.00 42.2.%.00 0.00 0.00 33.735.00 0.00 0.00 1 173.Mo.w 1.11.m.m 0.00 0.00 0.00 0.00 1.1: 22.440.00 0.00 0.00 342570.00 0.00 0. 00 3.WO.00 4 0.00 0.00 3.800.00 0.00 0.00 30,555.m 0.00 0.00 225.00 0.00 0.00 750.00 0.00 0.00 291.00 0.00 0.00 1.Mb.00 0.00 0.00 2 295.0.00 0.00 0.00 6.000.00 om 0.00 12o.OO0.00 0.00 0.00 1’ 3.6oB.m.Bo.9 0.00 0.00 3.3 see wlaw 30.00 45.330.00 4s5.330.00 0.00 0.00 33.80.00 0.00 0.00 ; 78Ji19,Oo ow hOO 610 Con~rs(* - Foding 562.00 56200 0.00 . 0.00 CY 320.00 179.840.00 61 1 CWd* - Bn’dW 2.710.00 2.710.00 0.00 0.00 CY 4iQ.00 1.138.2W).w 612 Carrs(*-Pg0rorch 66.00 66.00 0.00 0.00 CY 340.00 22w.00 613 RbBv 570.450.~ 5?0.950.m o.m 0.00 LBS 0.60 342,570.00 405 slrsarfl 1.00 1.00 0.00 0.00 EA 3.000.00 3,000.00 406 Sf~$d - 490.00 490.00 0.00 0.00 LF 20.00 9.800.00 308 Tesusd concrete Pmq 8.710.00 a.m.00 0.00 0.00 SF 3.s 3o.m.m 506 RIP Rap Faonp 3.00 3.00 0.00 0.00 CY 75.00 m.00 40a Lcgl-cwwan 5.w 5.00 0.00 0.00 EA 150.00 750.00 404 shipinp 1.340.00 1.940.Do 0.00 0.00 LF 0.35 a1.m 128 Ranmlga 5.M) 5.00 0.00 0.00 EA 20.00 1.wQ.00 6t4 Eramuon- Typ. 0 986.00 9e8.00 0.00 0.00 CY 3oQ.00 295.m.00 615 MiYduwaa MsW 1.00 1.00 0.00 0.00 LS 6.OOO.W 6.000.00 616 FTab“ Clsbkl”bl-0 1.00 1.00 0.m 0.00 LS 120.o00.00 12o.m.w - Wd.) - 3.M)(1.893.50 ” - - ” McWlUon 6 Bondr (D 4.00% ~ ~~~~~ ~- I, W4275.93 15.Om 541,034.93 144275.93 0.00 0.00 5 4.292.2f0.41 4.232.210.41 0.m 0.00 4.2 515.W.S W3.831.Y 515.C63.25 0.00 0.00 5r 643.831,s 6 0.00 m0,Ooo.m zoa.oo0.m 0.00 Cadngemia @ ~1.0y.m 0.00 0.00 - Wd - ” - - fJ”0 12Om MU”6-0 15.00% ACdli!jUldR~dWIy “ HabiU Wigmlkm a - - Td 5.e4i.107m 5,851.10711 0.00 0.00 5.5 t \ , f > 0 0 Cam Rad - Mama Mdg. IO KeIy Raneh BMoay Statim W35 lo 72+61 .30 (Rea& 1F) j nm Combinad Camm Frcdap. Fronaps Na(h solm Ne som Qrvw owruly CUmy Qrvw urit Uritcort AmM C" COmrrn bmaul FrcdBp. Frcd.9. Amour(1) k=rowt(f) SAND* AlrmD 101 Mcalzatim SeetxkW 102 Ckanq and Wng 2.30 2.30 0.00 0.0011Crs 1,500.00 3.450.00 !:4 C;rlars;fied Excavstim wmca 55.600.00 o.w 3.~0 CY 3.450.00 0.00 0.00 3.45 2.00 131.XW.W 590 Bovm Calrd 2.30 230 0.00 0.00ACr. 131.200.00 10.00 0.00 0.00 23.00 131.m 2733 Asphat CUU&S Panng 674.28 414.72 101.23 158.33 Ton 23.00 35.00 23.599.w 0.00 14515.20 3.54299 5.541.8i 0.m 2 202 Class I1 A~prep.te BBW m.14 497.68 121.47 19o.m Tm 15.00 12137.04 7.464.% 1.822.lt 2.849.91 23.5s 201 %tpa Preparatim n,rr6.a, 13,824.09 3,xa~ 5,zv.n SF 0.15 3.371.40 1.07360 M6.14 ?bkB 1213; 303 TyprGCubardWlr 779.00 0.00 389.50 389.50 LF 7.50 5.B12.50 0.00 2.921.25 2.92f.S 3.37 304 PCC Sdewak 3.103.00 0.00 1.701 50 1.701.50 SF 2.00 6.Bo6.00 0.00 3.403.00 3,403.00 5.84 301 Type 'El' Meden Cub 481.00 481.00 0.00 0.00 LF M8 Tedwed Concrete Panng 2.555.00 2.555.00 0.00 0.00 SF 6.50 3.126.50 3.126.50 0.00 0.00 X12 3.50 8.942.50 401 Urd Roll 641.00 101.00 325.00 215.00 LF 8.942.50 35.00 22.435.w 0.00 0.00 M5 %red suvcl Mavncrl 2.w 2.w 0.00 0.00 EA 3.535.00 11.375.w 7.525.00 400.00 m.04 403 Trams Spa 3.00 2.00 0.00 1.00 EA m.00 660.00 440.00 m.00 0.00 0.00 M 404 S?dpnp 1,401.00 125.00 636.00 639.00 LF 0.15 210.15 0.00 m.00 16.75 6f 4M Srealifl 2.00 0.00 1.00 1.00 EA 3.WO.00 6.@30,00 95.70 0.w 3.~0.00 3.000.00 1.70 21. t 406 SrdC cm 411.00 0.00 311.00 100.00 LF 20.00 8120.00 ( 0.00 6.iZO.04 2.W.W 0.00 2.070.00 3.690.00 5.7a 0.00 3.m.00 3.200.00 6.a 1.70 620.M 0.00 0.00 62 0.00 30 - " 550 18'RCP 128.00 0.00 46.00 82.00 LF 45.00 5.760.04 514 Type'E1CvbIdd 2.00 0.00 1.00 1.00 EA 3.200.00 6.*00.00 411 Wads 85.00 51.00 17.00 17.00 LF 20.00 1.700.00 560 Jmdimshucb.. 1.00 1.00 0.00 0.00 EA 620.04 m.oQ 150.00 900.00 1.om.m 340.00 340.00 400 ispahknon 0.00 200 4.00 0.00 EA 300.00 wo.00 - - " .S&ktdA n2.m.a 1n.52931 s.098.20 35,578.18 19480 _. - MobilnbonhbKbe " cOrrin9aciOSe 4.00% lO.oM.16 15.00% 7,101.4b 1,563.~ 1.423.13 37.W.54 28,829.43 s.ea4.u 3,336.73 7.99 2S.W - - " sub(a(.l 300,12263 211.260.12 b6.524.47 4233Q.W 237.76 MP, (B M8~mh-Q 2S.351.21 5.58291 5.W.S 51.688.02 0378.61 0.350.71 28.33 Hatila Mitiptian 50.Ooo.00 50.WO.00 50.00 3568 *cg.sitimd RI#ofWy SLhtOw 4~1.1n.74 318.300.35 59.W.M 53.789.31 351.95 - - " 12.00% 15.00% 28,014.72 45.018.39 - - " s9.oM.w 53.769.31 - - " TOWS (l)~~lpeunouli~c~~~~wis-lo~- ! I 43t.tn.74 431.1n.74 0.00 0.00 0.00 Ut.% , ~ .. > P * 0. 0 I ! I , Itan 101 McedIzaIIm 203 Amat Cwrete Pswq 103 Sucharga RnnOnl iG2 CbsS II n9qep.10 aaw 201 wade Reparalion X3 Two G CUm and c*na 301 Two '51' Medan cub 304 KC Sidwak 308 re*utd Cmrete ~anw 207 M&an L h I 2C5 Slrd Suwy Maunnl 401 UlardRa4 305 Hanbcap Ramp {ex.) 403 Traffic Sign 404 Slnping 405 SWedm M6PCCB$WC4Cils*b 406 SWecti#t ConrjiI 554 18'RCP 551 24. RCP (13SD) 5% 'W RCP 555 47 RCP 531 Typ.'M'CbUlCU 511 Typ? lM 513 Tp'El'CubW 501 Rlp Rlp lt4 Tm 310 *c Sidank 2' 121 R- Corrrste Mch M9AcBsrm6. 510 AC WdrPan 502 Rip Rw lntm M6 Typ. 2 Rip Rap llssa.pla 570 Tvps 9' mar DRm 533 Typ 'A-5' Cknorl 120 Ren'mwD~m~&mn 125 Remova mad. 4c-3 L- 701 smxhnlErrnn(la, 702 s(NsMB.cldy 701 uu 45 p~no 7M ~ChU45pilng 7M c*Y 70 pHno 706 olinc*n70pHno 707 SbUQnl Concrde 7M Rsbr 709 Banie# RmiW 605Jcirasal 537 W Typ. HcarmI 514 rvpsw CUD WOI 306 nlndap ~urp (m) Cam R4 - KcPj RlM BMdvy 10 El Cmm Red Sation 72-61.3 lo 124.50 (Re 2) Nath Sam combmd C- Frcdnp. Frutap. QJmty culrcly chrtity ownw urd - xe be(0r 61.110.00 61.310.00 0.00 0.00 CY 9.874 59 5.515.B 217965 2.179.65 Ton 11.849.51 6.618.36 2.615.53 2.615% Ton m.lm~~ 183.a43.m n.sss.00 72.655.00 SF 9.576.00 4.7m.00 2.3w.m 2.31~.m LF M.833.00 0.00 25.440.00 25.390.00 SF 9.819.00 9.819.00 0.00 0.00 LF 66.781.00 0.00 33391.50 33.391.50 SF 17.544.00 0.00 8.772.00 8.7R.W SF 4.00 400 0.00 0.00 EA 7.232.00 321.00 4.331.00 2.y)o.W LF 2900 8.00 11.00 1O.W EA 2.00 000 1.00 1.00 EA 6.289.00 0.00 5.189.00 1.100.00 LF 21.W 0.00 10.00 11.w EA 99.00 99.00 0.00 0.00 CY 374.00 55.00 183.00 140.00 LF 1.090.00 1.056.00 0.00 34.00 LF 333.00 216.00 0.00 117.00 LF 110.00 0.00 0.00 11a.00 LF 2.00 2.00 0.00 0.00 EA 5.00 5.00 0.00 0.w EA 9.00 0.00 5.00 4.00 EA ~3.424.~) 400.00 41.51z.w 41.512.00 LF (1.00 6.00 0.00 0.00 & 0.00 0.m 0.00 0.m CY 100.00 100.00 0.00 0.00 LF 3.37 0.00 0.00 3.37 ton 465.00 0.00 0.00 M.00 LF 1.m 0.00 om 1.m TC+I nu 22.m 0.m 0.m CY m.w m.m 0.00 0.00 LF 1.00 0.00 0.w 1.m EA 52.00 52.00 0.W 0.00 CY 1.00 0.00 0.00 1.00 EA 1.00 0.00 0.00 1.m EA 75.00 37.50 16.75 18.75 LF 1.00 0.00 1.m 0.m a m.w 4.00 42.00 4z.w EA 1.151.00 759.~3 1%.m t%..n LF 114.00 75.24 1934 19.38 CY 102.00 6112 173 17.34 CY 26.00 17.16 4.42 4.42 EA 1,548.00 1.02%- zLo.16 263.16 LF l.Ed.00 698% 179.M 179.W CY 30.00 19.W 5.10 5.10 EA lz-s.9oo.m 901y.o~ i3.m.m arn.00 m 121.m z1l.w n.57 s.9 LF 178.00 176.00 0.00 0.00 LF urd cos? 2.00 35.00 15.00 0.15 2.00 7.50 6.50 3.50 3.50 400.00 35.00 SW.00 0.15 20.00 45.00 2.70 75.00 220.00 3.000.00 6o.m 3.m.00 80.00 3.000.00 3.m.00 35cQ00 75.00 36.00 10.00 4W.00 6.00 75.00 75.00 3.m.00 3.000.00 WO.00 250 150.00 40.00 48.00 66.m 2600 1.m.00 48.00 12m 2.00011) 400.00 0.75 80.00 Z80.00 CXmned M ~- lZZ,6a).00 35,610.65 177.742.67 49.371.95 71.820.00 233.740.50 63.823.50 61.404.00 1.m.00 253.120.00 6.380.00 1.OW.00 101.66o.m ' 12,513.60 63.OW.W 125.780.00 17.010.00 37.30 19,980.00 61.750.00 17.%a.00 4.WO.W a.WO.00 6.000.00 21.000.00 0.00 1.000.00 11e.m 2790.00 720.00 1.675.00 3,900.00 3.200.00 7.m.00 m.00 3.000.00 187.50 40.00 13.ax.m . . ._. . . . . 5.47200 zs,smm 6.m.00 33.lyw).00 74.m.00 W.000.00 102m.00 25.6OO.W 423.2w.m 45.7w.m COmrm Arout 1n,m.w 193,035.15 27.576.45 99.215.22 35,910.00 63.823.50 0.00 0.00 0.00 11.235.00 1.6w.00 1.760.00 0.00 60.00 0.00 0.00 267.30 2.475.00 79.m.00 12.960.00 0.00 17.m.m 21.000.00 6.000.00 0.00 1 .000.00 0.00 0.00 0.00 0.00 1.m.m NUUI Frcdnp. - (0 " 76.207.75 39.233.70 10.89ll.1 17.4u.W 0.00 0 .oQ so.m.m 116.870.2) 30.702.00 151.585.00 0.00 2.420.00 SW.00 3O.OW.W 103.780.00 s.226.a FMOp. Sam Amart "_ 76.287.B 39.2u.70 0 .m lO.ise.1 50.7m.w 17.955.00 0.00 116.870.25 30.702.00 0.00 90.300.00 540.00 2.2w.m 6.226.80 33.00(100 22.0W.W 6.300.00 0.00 7.020.00 4.i35.00 0.00 0.00 0.00 0.00 0.Q) 16.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.900.00 0.m 0.00 0.00 7.m.m 0.00 0.00 - uoQ.00 0.m 0.00 0.00 0.00 m.OO 0.m 0.00 3.ow.m 0.m 93.75 46.88 0.00 4Q.m 600.00 6.3m.W 3,611.52 m.24 19,75116 5,087.42 4375.80 1.127.10 um.m 5.74.00 4e.w.64 12.e31.~~ 39800.00 to.1oo.m ~7,7150 17.4w.n ~~,w.w 4,365230 45.7w.m 0.00 279.3131200' 71.944.00 2.550.00 8,800.00 0.00 0.00 12.m.00 0.00 0.00 0.00 2.790.00 118.02 720.00 46.88 0.00 ~500.m 1.127.10 930.24 5387.42 5.746.00 lZe31.ee 1om.00 17.454.n 71.su.00 4s.m 0.00 .%NO*( AkUrlbll - lU,63 345.61( 177X 49.37: 71.M ( mz ( I 1.m I 12.51: 633 I I 17,011 26 19.481 81.751 17.50 8.W 2880 6.m 21.m , 1.W 2.74 72 1.671 3.m 3.m 7.m w 3.ffl 18; I 13ZU s.47: l9.m 8.624 74.501 6o.mI 4i3.m l0267! 25.m 45.7(1( =.m ?Ak4cU 2.737.57264 1.2StsO.7S 797.447.42 6W.MS.44 1.6#7.71( c-e - McMnaaf 6 Band. e - " 4.m 15.ooY 109.5023l 410.63530 3.i57.111.U 390.91.37 15.m 4.33.650.72 500369.59 31.897.80 27235.42 75.w 188.W.97 119.617.11 lWlZ282 244.654 1.49ll.495.U 948.96242 8103u.6? -2 -me 12.00% 179.819.44 113,875.40 97.zy).U 224.7743 142.34426 121.533.05 m.= natw M~+UI ~.ooo.m 5O.ooO.W s.001 u474 - Wdll - " - - " . Marmgumd 6 Imouiicm 0 bcrpi~m d Rim d Way - Sk4dd - 4.167.283.53 1.953,m.W lZd.1- 1.028.02216 2918.00 " w,m.n - Tdsl 4.167.293.U 2.951.S22.0 208.74869 1.029,OZ.16 2.918.001 UndTcUdNRrd*l 14.1BT~17 11.w6.345.78 715,027 2f8Q.W.W lo.#= (l)AlbrlllSOledc(lh.~Fr~~i~~~~~b~~~~~ - " ThaNathF~lSc&Mdbj~hC&~WfS&SlWW j < 1 P ' qOT SO1 e 0 BAIEP GUIDE OF VEHICULAR TRAFFlC GENERATlON RAT€S FOR THE SAN OlEGO REGION 0 CTOIIR 1993 G- 1 .~WLITII 5.m Ma0 2 m\-ERSJtl Wl e slraa- 5- aX, Fm ~mry .819I54+Um FU td jM Cw - .. 2TE 5,. Ilsrtng ann) ,rearm M d MI-. 01 oenrn.r.d. trefk ~.nu~t~on 'Jr*m.w* m1.e and M. vuv owm 1810 Q.U fa tmd UYI 1- ~ll .ow ry av- -, . -o 5.n J,oqo regson '*ow rmn w umur la cn.nge *I tuwm eacum*nwban Orornos orowme. OI w me41 U)YICII HI UOO.I.* Fw ma* 9- ntwn~.uq, r.grons mwIc #.I.a *em wu *o :Po Sen ;#ego Trrlte Grruatm manum. b "0 US# mc unaoaus EWM WUUOAV VlMlCU wlo((am PUS WOW s (k. 1.:- w r - :~~?uu*t RIP ome11*nom 11*n coanrmAn lrrrrrI+A.L -UCI - *amcuxrvu(o~ so-, ................................... 30:10z1 :;n?w- AI- ............ ..._.... .................. [78202i :srnmuor ;oar* ArW~on 3lmcr.. 3 lllqnt 7ib.W .vu* *' -eaamm !w/u." -2/eam. lo0tngwr ~IOOO 10 R.- 6% 10.41 7% I6 5) 1- l6:41 ISS 15.51 AcrmuouLc Car we* A"lO#W.OC Sol#- N8tnlCooo MW .:la S- sutm 0.- ~euw ............. .......................... NtthlFaad Ma17 b Cu Wu* 5.w t0e.u 6 Amaut auto a.0- CMIW BCQ/ntm ooO/.ar" : 00/r.n w- 1 SOlnnlew tuumq m" :jS/vu~sn~-" 7SO/sunoh 13O/.r*r* m -'. SO/ 1000 10 R. 3001- 60/- lur - 4% I551 0. 0.51 4% lS.3 0% I5 5) 8% (S.5) 8% 15.5) - ..-....-........... ~zl.s1:1a~ OS 195) 9% 16:s) 7. 1s.)) SS 11-31 11. 16.51 88 14 01 11. I4:8 2O/IOc4 u n. 4001Um 20/- nrr 6. 17.3) CLycIu* S/" 1 C- ta Sm.gogw~ ......................... ie4;I~:ll) 9/100QIgR.M/lcn"l~m fw Suwu. a dmd .wnuh) co-mu' sum a.gsnm s- Cma .MW. tnan 60 =ma mor. mn 600.000 sa. n.. wuwulv 3+ -le# 11m1 I 1060 YI.L 300 000100.000 am sa- CWIU ......._._...........- -.-- i54aQl 1) .... so. 17.. WIU.V.YI 2- maw uwma# C0-w Shaoongcvlnr ...... ......._.._._._.... [I7 31.221 1030 mom 100.W300.000 I. R. r#usr~1(. I malo, ~IQD .r. 0H.ll.. ,*¶wm( YnOnoanooQ ylooonl c.ncr IL.8. man 10 m*m Ieso rnam ~w.000 sa n. W~UH~V~ Q- %!ora b aruq mrw sU-a spurn nuwlurr commrcl.) C0nr.n" Ilclsnaru S~¶cOunl cm * $1, iurn*nu* Stam Ye-lV8m S1m LvmDI SIW. Gu&m pwyn Cammuom Sham... ..... .......-......--.--- i46.elSl . :24)uM) r0/ I000 4 hc 4m1" 50/ 1 WO u hC WO/amm' 70/1000 n h 7W/un'" 12OllWO m h 11001~ " u)/lm 4 h 4W/w*. 50011000 I. R." 7W/l00O n R" 101 loo0 r h m/m" 6/1000 u h 1001" 70/ loo0 u h 000/a" so/ t000 - h wen" 30/1000 M. R. I SO/.Pn" 4011000 u R. SO/-" ~S0/1000Uh.20001"" " E" 'JntrrYlW I4 WWt ............_....__-..__- [st:- 2 I/- loom' JbnlQT co(l.O.1~ V.YII ______- -[9r>1) 1 wlturrr mm "qn ssnool ....... .........._ (7LlM) 14/mrO.r*11/10001hW&" HlddUIlVnOT nql .""_ WaRl2l 1 o/sumlt role E!mlmuw ........ ..^ ..".." -rs71+tol 1 41mroll~ I~IIOQQ 1 n wollon" 3ev cu. ...-....---. L1&8mq s/sn*~ wollo~o 1 n- 1- Ineusmr/~M1"--t7Llt2l :ndumY PW &u 0111111( Indummb Ctm 1- .ly M" (S2S3l 'NU- Slono. Sorra&nuab- 4% le0 n 16:s) FI~'.__..___.__ 3nk IWaIk4n onkt -[3&4+ut Or" a* 250 11 IS -14lrr' D-" 60/1oO01h8m1.Q." 100 ($0 orrmy*lr" N+m Onn- ZWIIOQO I. h 15Wla' 150/1000 = R lOOO/la" Sawnga 6 Lom l4oSar*"". Gvmd C" frnlQ) 201- 20/1000 .L h 1001" 3/w lo. It0 9% can 208 LI:O 12s It0 rn can 248 I73 7s Ian 28s It4 I98 153) 5. Imn In IW 14% i%n ZS 173) 2s 17.3 3% " 18:9 48 IC4 4% 173) 38 104 a* IS:% 9% (I:% 1% 183) 2% 104) 4% 473 m 1a:at 2% IQU 3S la41 9s J. Io. 118 Io. 0. 88 7% 101 9. 4. sr 101 9% l1St I18 ICS) Ibb) IC6) IS51 15.51 155) 15.5) 115) IS:% 15:s) IQII I5.S) 48 173 0% lag. 5% 1&4) 3% 16:8 38 48 lo. 158 13. IW 9% 158 n 17s Io. Ian rn I&# R I&* -I(vlooO u h ZWW s/1000 u h 9o/m 4llQoO n8 h W" l01looOUh lZO/d s/1000 n h we 211000 u h 0.- a/- amoouhw~* 12s lea 118 ILO ZQI ltlt 14s 1.39 15s I73 6S (6.8) In (ti) IZS ttn IO. 12:a 9s mn 12s l28t 15s Ian 1- la0 148 t1.W tm *, I 1 * 0 0 UNO uu lXP CAROQQn €SllY.RO WIUMT MmCU mmm1sr u WHI. I.tr 1r.W 1.w :".- TRIP ammnom nan Ioawawm - 1.e ..(L .rrrrr u 8 m U.W .. ;a4 u 121 LOOQI*o .......... . 158 3a41 *.lOI* -I'm -*".-,- =.JOfl mal* MIUIIII ;a2 10 11 OWUI junava Commucm OW8 ........... 177 7941 Lma. ~rnqn.d~w~ Cammuem OWr8 .. e%# 1n.n I00 000 (a It I ;82 IS 31 mora man 100 000 so. 11 d- (#ortea) ;orunment IC.nc CUII~I ;50 34 IS1 :~raorsl. Omc. 8smqm lenmll ......................... J311 ona. Cmvmmam* Onh Communw 1-1 nu*- mu me mu Urd Orom Une onw . .-,nu" O*owrmnl at Mot- VMlCw w.6Q .......... ................................................ ;003Ql~I PARKS ............................................................................... ld8:21:61 CJV la-) a.pm* ~aavwwat v~wmodIR~onyl~~ Amusanml I Theme1 5.n Owa Zoo 5.. world RIcIUnoa 3.m. 9cr.n M 0- ............................................. :S2.3+¶1 a.m. Laha Itrssn rruw 3omno Cnlr CJlWWOU- Galt Covru "4- 9UqutOyII~ CluO rmnls coun Smm i.oC1u. :"laoor SIMvn q.c.trcI llrmol 4lUW ~~~n.ntmw~* ._ ............................................ i60:17:~71 RI- .._.. ......... ........................................ W:l 1.31 S.nq!e f mmw O*trcnW rr.r.0.4 ou/.crel iorytormmwn aammn ,JI am rnuw-tarnm I.- man 20 W/KR~ UI rnv rnuttl-tamw unm mor8 UIM 20 OUlwn) WODll- imw amts Qnu +t,runmt Cammvnrrr aural Elc.u CJngl.0.U CM* fKlllW RI.I~~ .................... .......................... -- is137 121 O".NW Fort Fooa 1rl-I S3l40rn. nqn twn- 3aarnun I 7.nUOml TIIlyMIIATlW dur 0- Tmck Trmm.L N.1UOOn ?,IN b nta. Lon *.rn~l~ SI*- tnul) *a/ 1000 so n. 4OO/YI.'* j'-oom. 2OO/w8' 'Jirbom J001ure 3,room l00/acr8' : 5 mwtw C cwmm oamnna. :o/ low BO. n .J 300/~n- 1 71 IO00 m. n ,a 800/ecr.' 101 1000 .o. n- 'a/1owsa.n. ~so/wr.* 301 I 000 .o. n:* zoo1 I 000 - n.. I 300/wn* 30011000 m. 11.. ZOOO/.cn' 1500 171Q oncmt/ln*' SO/lOOO sa n. 500/W.' I .90/1000 14 R. 900/wr.- 50/-' 20/" 5/ .cn' 90/m I3O/wol"l" dO/W.' 1 '5/" ~00~1oaon. MWUUW. ~)lwn- 501 1000 n. n- S/.cn' 30/IHL MOlrCn" 1 IC" a/.nr u)/hocr mol" UQ.0. ZQ/la' - 1 Wwn. 301CM" 50/un 0 I/& ro/.a 0 1 wc lo/- 0.1 I rwc 80/1OQo .c R. 1 alae& U)I IOOQ u n.. 30o1.a wwuw :a/- un- a/- d 61- I" I/- - a/" I/" 201" I/- vw" 2/or*.ll. uw" 17/e4vamq W' 2101 loo0 n tL 7/Y 11001" " 1 W/loo0 IL R. 3/u Mo/wn' - 70011oaO n h It/ nu 1ooo1a' " 11011oo0 = R I I/&' ZS11~RR" ! 01 I oao 1c R I/#. sol" 3W/a- 1 70- I Zf -a* w/aloa/"- 3 ,a 21 8% ,041 8% I4 01 5% ,041 3% 19.1) :4% 19-11 13% 1911 15- 19 1) 3% IS11 SI 7% I5.R 7- IS51 6% 164) 6% tl.2) 4% e* 1e.41 4% 7% 17 31 6% 11:a 38 (271 4- la:*) I8 4% 7% 17 31 6% 11:a 38 (271 4- la:*) I8 om 8% 11.11 8. 111) 6% I2.U 9s t3.n 9.1 13n 3- IO:*) 1% IO.* ar 11:s) 4% 1a:41 9.1 I08 1% ,991 a% 1641 7% I40 108 1281 3s 11141 13% 11 I1 :4* l2.U 15s II 91 12% 13.7) 3% IS 11 71 10% 1551 12- ISSI 10% 13-71 11% 140 88 as 1e.q I 11% l4U 11. 146) ar - 13.71 7. I041 It. ms1 3% 16:4) BI 11-31 IOI 1731 10% (73) 0. I7 3) 12% 1041 . 1OI I8:Q BI IS:)) BI 1731 6. It41 BI (1:s) 0.48 9. I411 . n (6:I) 14s I73 I.. 173 16s 13:n 15% I3n .. or.uu-rRI~'llrrf~rr'~".I.ylr*-YIQY.CILIU--" . pnml*wQ~olr-m . T'.* en,"" "rn""..."" UY.I...~-~---~---'~- uaLi&I,la - rnluAnT.aI"".lr" 01vfRRO:~~l~aa".oll~~..lu.-~"~~~~~ I - CaS"I--w-* I nu8 . r.,.I-.n-~~*.r~r~*Iwuu'ir Imm--"a--*a- -. .I- rnluAnT.aI"".lr" 01vfRRO:~~l~aa".oll~~..lu.-~"~~~~~ I - O.~U."". I nu8 Imm--"am-*a- 6 rtnrnnr- UU~-O~HU.)*~Z~~ ,.--a- l.0oO-,h , p-l.~~~~-r-g~m~.lrol(lp*l~~--~n~~~~~"~YU"" - p.n--- Wn.O7SIW.)*lS1 1 c0"- F" "! 101 %-n' * I-nmlul"~.LD M 10. - C" M o-omsma 5aa 3or) m- 2- m rrYlEYL u3-k li" 30. MSiuru*r. - n.' 1- SI"- *.I - 101 M 9 * 0 0 FEE SPREAD I GOSS Net GmcdPh Acres Acres LmdUse .UT owner S73 Comm/In&Rss FeeiADT Fee Obligation Obligation Proposed Frontage Total Zone/ Assessol% Map Parcel Parcel No. Zone 5 1 212-130-17 2 212-130-18 3 212-130-19 4 212-130-20 5 212-130-21 6 2 12-1 30-22 7 212-130-23 8 2 12- 130-24 9 212-130-25 10 212-130-26 11 212-130-27 12 212-130-28 13 212-130-29 14 212-130-30 15 212-130-31 16 212-130-32 17 212-130-33 18 212-130-34 19 212-05041 20 212-050-43 Subtotal 2.53 2.1 PI 1.92 1.5 PI 1.50 1.2 PI 1.79 1.5 PI 2.93 2.1 PI 2.22 1.8 PI 2.08 1.4 PI 2.44 1.7 PI 6.19 2.7 PI 2.96 0.8 PI 8.16 3.3 PI 2.69 1.1 PI 2.39 1.1 PI 2.24 1.1 PI 7.24 3.4 PI 8.00 4.1 PI 6.29 4.5 PI 4.10 3.3 PI 1.83 0.7 PI 14.28 5.7 PI 83.78 220 157 125 157 220 188 146 178 282 84 345 115 115 115 355 429 470 345 76 596 4718 Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Industries Upland Indllstries Upland Industries Upland Industriu Upland Industries Upland Industries Upland Industries Ivar IVar $16,027 $1 1,448 $9,158 31 1,448 $16,027 S13,737 S10,684 $12,974 $20,606 $6.105 $25.185 $8,395 $8.395 $8,395 $25,948 $31,290 $34243 $25,185 $5.571 $43.501 $0 SO SO 60 so SO $0 so $0 $0 $0 $0 so $0 $0 $0 $0 $0 60 $0 S16.027 $11,448 $9,158 $1 1,448 $16,027 $13,737 S 10,684 $12,974 $20,606 $6,105 S25,185 $8,395 $8,395 $8,395 $25,948 $3 1,290 $34,343 $251 85 85,571 S43.501 $344,419 $0 $344,419 Zone 8 21 208-020-28 333.93 146.0 RlUtTR 7678 KeUy 22 212410-03 21.90 11.0 RL 110 Kirgis Subtotal 355.83 7788 .7 $560.523 $1,235,771 $1,796,294 $8,030 $0 $8,030 $568,553 SI,235.771 $1,804,324 Zone 13 23 24 25 26 27 28 29 30 31 32 33 34 34A 34B 212-010-14 211-010-19 2 1 1-0 10-23 211-010-05 21 1-010-24 hture lot 4 21 1-023-03 211-023-04 fihue lot 6 future lot 7 fiture lot 8 future lot 17 fhre lots 3&5 lkture lot 16 56.50 3.00 147.04 1.40 49.95 12.07 10.06 7.70 5.78 5.78 4.84 53.75 73.74 10.00 0.0 0.0 0.0 0.0 0.0 10.9 10.1 7.7 5.8 5.8 4.8 52.8 72.1 10.0 p ' os ' 0 SDGBE os OS LS5i SHZ 0 SDGBE os TR SDGBE om OPI lo00 GIA O/PI I445 Carltar om 1445 carhar OR1 1210 caritas Resort 7500 carttar Golf 600 carh os 0 carhas OR1 w zgu $0 so $0 $0 %1,353.712 $174,835 $95,265 s73,OOo $105,485 $105,485 $88,330 $547,500 $43,800 $0 $0 so $509.072 $0 60 $1,182,564 $0 $0 $0 $0 $0 $149,298 $0 $0 $0 $0 5509,072 $0 $1,353,712 51,357,399 $95,265 ~,ooo $105,485 $105,485 588,330 &5%,798 $43.800 $0 ! Subtotal 357.87 35444 $2,587,412 $1,840,934. $4,428,346 " I Zone 24 35 36 37 38 39 40 41 42 43 44 45 46 47 48 212-050-13 212-050-38 212-050-39 212-050-36 212-050-37 212-050-33 212-050-32 212-050-40 212-050-29 212450-30 2 12-050-34 212-050-22 212-050-35 208-020-17 5.00 4.9 RLM 157 1.29 1.1 RLM 35 1.12 1.3 RLM 42 1.20 1.2 RLM 38 1.39 1.4 RLM 45 9.52 9.4 RLM 301 0.84 0.7 RLM 10 56.28 194.0 RLM 1940 22.06 0.0 FU.M 48.37 0.0 RLM * 1.34 0.0 RLM 1.09 0.8 RLM 20 2.42 2.4 RM 130 14.42 13.7 RLM .- 290 High Steindoft steiiit SteindoIl SteindoR Tabatr Hicks CUlliQOGrOup wmpey wimpy wimpey wimpey Si& Sippel $11,446 $2,570 $3.037 $2,803 $3,270 $21,958 S30 $21.170 $141.620 $0 m $0 $1,460 $9,490 $0 $0 $0 $0 so $0 $0 $0 $0 $0 $0 $0 $0 $0 $1 1,446 $2,570 $3,037 $2,803 $3,270 $21,958 5730 $21,170 $141,620 '$0 $0 $0 $1.460 $9,490 i subtotal w.34 3008 Total 963.82 50958 ADT~artEombiacdhrtooncvalucwithinitf~n43above $2 19,555 $0 $219,555 S3,719,939 S3.076.705 SJ96.644