Loading...
HomeMy WebLinkAbout1999-05-04; City Council; Resolution 99-156d . 0 e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 1 28 1 I I RESOLUTION NO. 99-156 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, FOR APPROVAL AND EXECUTION FOR ENGINEERING DESIGN SERVICES FOR FOUR TRENCHLESS TECHNOLOGY PROJECTS-SOUTH AGUA HEDIONDA REACH SAH3; INTERSTATE 5, 16-INCH WATER PIPELINE CROSSING; FOREST AVENUE 8- INCH GRAVITY SEWER PIPELINE; AND FOXES LANDING 406, CONTRACT NOS. 35831.36591,34951, AND 36561 SEWER LIFT STATION FORCE MAIN-CMWD PROJECT 92- WHEREAS, the City Council of the City of Carlsbad, California, has determined it i necessary and in the public interest to enter into a three part agreement on file in the Cii Clerk’s Office between Kennedy/Jenks Consultants, the Carlsbad Municipal Water Distric and the City of Carlsbad for preliminary engineering design services for water and sewc pipelines for the South Agua Hedionda Reach SAH3 18-inch Force Main and 24-inc Gravity Sewer Pipeline; Interstate 5, 16-Inch Water Pipeline Crossing; Forest Avenue 8-lnc Gravity Sewer Pipeline; and Foxes Landing Sewer Lift Station Force Main; CMWD Proje No. 92-406, Contract Nos. 35831, 36591, 34951, and 36561 ; and WHEREAS, the City Council of the City of Carlsbad, California, approves an authorizes the execution of the three party agreement for preliminary engineering desig services for an 18-inch force main and 24-inch gravity sewer pipeline and an 8-inch gravil sewer pipeline and a 12-inch sewer force main; and WHEREAS, the District requested proposals for the preliminary engineering desig services for the water and sewer pipelines and received three proposals; and WHEREAS, the District engineering staff reviewed the proposals and recommenc ~ the proposal received from KennedyIJenks Consultants, Inc. as the most responsivc I competent and fair and reasonable proposal; and WHEREAS, the proposal amount of $75,480 (City’s share of the cost is $62,480 fc design services plus $7,520 for contingencies and District share of the cost is $13,000 fc design services plus $2,500 for contingencies) is available in funds appropriated in th c c e 0 1 il 1998/99 Budget for the South Agua Hedionda Interceptor Phase II, Forest Sewage Gravii 2 3 Line, the Foxes Landing Sewer Lift Station, and the Waterline-Interstate 5 Crossing. NOW, THEREFOR, BE IT RESOLVED by the City Council of the City of Carlsbac 4 5 6 2. That the proposal by Kennedy/Jenks Consultants with an amount of $75,48 7 (City’s share of the cost is $62,480 for design services plus $7,520 for contingencies an 8 District share of the cost is $13,000 for design services plus $2,500 for contingencies) fc 9 preliminary design of water and sewer pipelines be accepted and approved. California, as follows: 1. That the above recitations are true and correct. LO 3. That the Mayor, as the Representative of the City of Carlsbad, is hereb 11 Consultants, the Carlsbad Municipal Water District and the City of Carlsbad for th l2 authorized and directed to execute a three party agreement between Kennedy/Jenk I.4 preliminary engineering design services for water and sewer pipelines for South Agu l3 Hedionda Reach SAH3; Interstate 5, 16-Inch Water Pipeline Crossing; Forest Avenue 8 I.5 Inch Gravity Sewer Pipeline; and Foxes Landing Sewer Lift Station Force Main; CMWC 16 Project No. 92-406, Contract Nos. 35831, 36591, 34951, and 36561. I.v 11 PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council c 18 19 20 21 the City of Carlsbad, California held on 4 th day of May , 1999, b the following vote to wit: AYES: Council Members Hall, Nygaard, Finnila & Kulchin 22 23 24 25 NOES: None ABSENT: Council Member Lewis MATT BALL, Mayor Pro Tern ATTEST: 26 27 28 CMWD 92-406 KAREN R. KUNDTZ, Assistant City Cler (SEAL)