Loading...
HomeMy WebLinkAbout1999-06-15; City Council; Resolution 99-2181 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 e RESOLUTION NO. 99-218 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE FINAL OPERATING BUDGET AND CAPITAL IMPROVEMENT CITY OF CARLSBAD AND ESTABLISHING CONTROLS ON CHANGES IN APPROPRIATIONS FOR THE VARIOUS PROGRAM FOR THE FISCAL YEAR 1999-00 FOR THE FUNDS ~ WHEREAS, the City Council of the City of Carlsbad, California has reviewed the proposed final Operating Budget and Capital Improvement Program for fiscal year 1999-00 and has held such public hearings as are necessary prior to adoption of the final budgets. WHEREAS, the Planning Commission made a finding of General Plan Consistency for all projects receiving an allocation of funds for fiscal year 1999-00 on May 5, 1999 pursuant to Planning Commission Resolution No. 4555, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That certain documents now on file in the office of the City Clerk of the City of Carlsbad entitled, "City of Carlsbad, 1999-00 Operating Budget and 1999-00 to Buildout Capital Improvement Program - Preliminary" as amended in accordance with Exhibits A through D attached hereto and incorporated by reference herein, is hereby adopted as the Operating and Capital Improvement Budgets for the City of Carlsbad for the fiscal year 1999-00. 2. That the amounts reflected as estimated revenues for fiscal year 1999-00 as shown in Exhibits A and B are hereby adopted as the budgeted revenues for 1999-00. 3. That the estimated revenues for fiscal year 1998-99 are hereby revised as shown in Exhibits A and B. 1 4. That the amounts designated as the 1999-00 Budget request in 1 Exhibits A and B are hereby appropriated to the department or fund for which they I I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 0 are designated, and such appropriation shall not be increased except as provided herein. 5. That total appropriations for each fund may only be increased or decreased by the City Council by passage of a resolution amending the budget except as provided herein. 6. That the following controls are hereby placed on the use and transfers of budget funds: A. No expenditure of funds shall be authorized unless sufficient funds have been appropriated by the City Council or City Manager as described below. i. The City Manager may authorize all transfers of funds from account to account within any department. ii. The City Manager may authorize transfers of funds between departments within the same fund in an amount up to $100,000 per transfer. iii. The City Manager may delegate the authority to make budget transfers. iv. The City Manager may authorize budget adjustments involving offsetting revenues and expenditures; the City Manager may authorize increases in an appropriation for a specific purpose where the appropriation is offset by unbudgeted revenue which is designated for said specific purpose. v. The City Council must authorize all transfers of funds from the budgeted Contingency Account. B. The City Manager may authorize emergency out of state travel for public safety or emergency services purposes. C. The City Council must authorize any increase in the number of authorized permanent personnel positions above the level identified in Exhibit C. D. The City Manager may authorize the hiring of temporary or part time staff as necessary, within the limits imposed by the controls listed above. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 I a * 7. That the legal level of budgetary control is the fund level. Budgets may not legally be exceeded at the fund level without appropriate authorization by the City Council. 8. That all appropriations for Capital Improvements Projects remaining unexpended at June 30, 1999, are hereby appropriated for such capital projects for the 1999-00 fiscal year. 9. That all appropriations for grants remaining unexpended at June 30, 1999, are hereby appropriated for the 1999-00 fiscal year. IO. That 1998-99 appropriations in the approximate amount of $3,573,027 are hereby continued into 1999-00 for the purposes shown in Exhibit D. All appropriations for outstanding encumbrances as of June 30, 1999, are hereby continued into 1999-00 for such contracts or obligations. 11. That the reimbursement for business mileage will be set at the rate established from time to time by the IRS (as of June 1999, the business mileage reimbursement is $0.31 per mile.) 12. That the amount of funds available for the loans under the Employee Computer Purchase Program be increased by $200,000 to a total amount available of $350,000. PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council on the 15th day of June , 1999, by the following vote, to wit: AYES: Council Members Lewis, Nygaard, Finnila and all P NOES: None ABSENT: Council Member Ku w., (SEAL) 0 e tXHltllI A 1999-00 PROPOSED OPERATING BUDGET ~~ ~ OVERVIEW Carlsbad is a full-service City providing the following services to its citizen’s and customers: Police department Development services 0 Fire department including paramedic services Street construction and maintenance 0 Water delivery system Library and arts programs 0 Sewer system 0 Recreation programming for all ages 0 Solid waste services 0 Park lands Housing programs School programs and facilities are provided by four different school districts located within the City boundaries, Although the City Council has no direct control over these school districts, the Council recognizes the importance of quality school facilities and programs to Carlsbad’s residents; Council has worked closely with the schools in the past to provide assistance, when possible. The Council‘s commitment to quality schools is also evidenced this year in their goals as noted below. The budget process for the City of Carlsbad begins in January each year, with a review and update of the City Council’s five- 1999 strategic Goals year vision statements. These v City of Carlsbad statements are shown on the first I - r--snw- +L, page of this budget document. Through the vision statements, - EIISUI~: LIE effective and efficient delivery of top- quality services to our Community. Council continually defines and clarifies their vision of Carlsbad. The Strategic Goals for the City are developed next. The goals further define the methods to be used to achieve the vision and call out areas in which Council would like to place special emphasis during the year. Once these are developed, staff develops operational goals based on Council’s direction. These operational goals are the basis for the development of the operating budget. 0 Create diverse, broad-based economic strategies to ensure the financial health of the Community and the City. Integrate a comprehensive, efficient transportation system with “quality-of-life” centered land use decisions. Enhance educational oppottunities and school facilities for all segments of the Community. - I I Carlsbad’s operating budget allocates the revenues generated through taxes, fees and other charges to the various programs and services provided by the City to the community. The operating budget is a tool which guides the achievement of Council’s vision and goals for the City. It allocates the resources and sets the priorities for all of the programs offered by the City. Thus, it is an integral part of making Carlsbad a wonderful community in which to live, work and Play- The recommended operating budget for fiscal year 1999-00 totals $103.7 million with revenues for the year estimated at $108.2 million. General fund revenues are estimated at $64.4 million and budgeted expenditures are $61.6 million. The $2.8 million of revenues in excess of expend,itures are expected to be combined with $4.2 million from the General fund balance and 0 0 transferred to the Capital Improvement Program (CIP) to fund needed capital projects. The CIP can be found in the last section of this document. Economic Profile The past two years have been exciting for Carlsbad. We have seen the return of economic prosperity to our community after the long and painful recession of the early 1990’s. Our industrial corridor has blossomed bringing in new jobs. New jobs create the need for housing, which has been reflected in the strong housing market over the past several years. It is expected that Carlsbad will issue more thai 2,000 residential building permits this year compared to 1,400 in 1997-98. The price of housing is also on the rise, boosting the property taxes received by the City. The healthy economy coupled with continued low inflation has kept consumer confidence high allowing for increased retail sales and tourism. At the same time, we saw the opening of a 200,000 square foot specialty outlet center and Legoland, a family theme park, in the central part of Carlsbad. These contributed to increased tourism and the highest level of transient occupancy taxes ever received by the City. All of these together contribute to a robust local economy which should be able to provide the funds to support the increased demands for City services. It is expected that the economy will continue at this level throughout fiscal year 1999-00. The City’s revenue projections reflect an expectation of increasing housing prices, continued strong development, but at a lower growth level than in the past two years, and continued consumer confidence. We have also projected increases in sales tax and transient occupancy taxes based on the increase in tourism .expected from Legoland and several new hotels currently under development. In anticipation of the growth of our City population, both transient and permanent, staff is recommending some enhancements to our services in 1999-00 to .ensure the maintenance of a high-quality of life for Carlsbad’s residents. REVENUE The following table shows the total operating revenues the City anticipates receiving for 1998- 99, as well as those estimated for 1999-00. REVENUE SUMMARY BY FUND TYPE (In Millions) PROJECTED ESTIMATED PI FUND 1998-99 1999-00 DIFFERENCE ( GENERAL FUND $61.9 $64.4 $2.5 SPECIAL REVENUE ENTERPRISE INTERNAL SERVICE REDEVELOPMENT 10.1 9.8 -0.3 25.7 22.9 -2.8 8.8 9.4 0.6 1.8 1.7 -0.1 I TOTAL $1 08.3 $108.2 40.1 Revenue estimates for the operating budget indicate that the City will receive a total of $108.2 million, a $100,000 decrease over the current year projections. The majority of the decrease is in the Enterprise funds which are offset by increases in the General fund. These and other funds will be discussed in more detail below. 0 0 General Fund General fund revenues provide a representative picture of the local economy. These revenues are of particular interest as these resources fund basic City services such as Police, Fire, Library, Street and Park Maintenance and Recreation programs. The table below shows a summarized outlook for the major General fund revenues. FUND SIGNIFICANT REVENUES TO THE GENERAL FUND (In Millions) ~~ PROJECTED ESTIMATED PE 1998-99 1999-00 DIFFERENCE C I PROPERTY TAX SALES TAX TRANSIENT OCCUPANCY TAX DEVELOPMENT RELATED REVENUES ALL OTHER REVENUES $14.2 $15.8 $1.6 16.5 17.8 1.3 6.9 7.5 0.6 7.7 6.7 -1 .o 16.6 16.6 0 .o 1 ITOTAL GENERAL FUND REVENUE $61.9 $64.4 $2.5 I Sales tax is the single largest revenue source to the General fund representing 28% of the fund. Sales taxes are estimated at $17.8 million for 1999-00, an increase of 8%, or $1.3 million, over the projected 1998-99 receipts. The increase can be attributed to the full-year operation of Legoland, the projected opening of a number of new restaurants and the Phase I1 expansion of Carlsbad Company Stores, an upscale outlet mall. The expansion will add an additional 20 stores to the over 50 stores already in the mall and is expected to be completed by the end of 1999. The remaining increase is based on Statewide estimates of 5% average growth in sales 18 taxes due to the healthy economy and high consumer confidence. This estimate also includes l4 16\ approximately $500,000 that is restricted to ,o K!\ / "- spending on public safety services under 8: Proposition 172. Proposition 172 requires that the 6 - 1/2 cent increase in California sales taxes be 4 - - - ProDertv Ta deposited to State and local public safety trust 2 - funds and allocated to local agencies to fund public 0 I I safety services. 1994 1995 1996 1997 1998 1999 2000 This year it is expected that property taxes will grow to $1 5.8 million, a $1.6 million, or I1 % increase, over 1998-99's estimate. Property taxes continue to be the second largest source of revenue to the City bringing in approximately 25% of the total General fund revenues. By law, the assessed values upon which property taxes are based are only allowed to increase by 2% per year. However, the majority of the growth is expected to come from the new development and the increase in housing prices. Statewide there has been an 8.8% increase in home prices over the past year and a recent article showed a 16% increase in new home prices in North San Diego County over the past year. The next most significant General fund revenue is the Transient Occupancy Tax (TOT or hotel tax) which is estimated at $7.5 million for 1999-00, an increase of 9% over 1998-99 estimates. Most of the increase can be attributable to the opening of two new hotels. The Grand Pacific Palisades Hotel, located near Legoland, opened in March 1999. It has 90 hotel rooms and 181 D "Sales Tax 0 0 issued 1,842 building permits, which already surpasses last N*$ mmX%X6%~8Z28~ mmomo~moooooo rrrrr rrhl(Vhlh(e4 year’s total of I ,339. It is expected that this will decrease to about 1,100 per year for the next five years. The 1998-99 development-related revenues, which include Planning, Engineering and Building department fees as well as building permits and other permits and licenses, are expected to total $7.7 million this year. The projections for 1999-00 show a 13% decrease in these revenues for a total combined revenue projection of $6.7 million. The majority of the decline is in the Engineering fees which are expected to taper off after the high amount of activity experienced during the last three years. All other revenues include franchise taxes, transfer taxes, vehicle license fees, ambulance fees, recreation fees, and other charges and fees. These revenues total $16.6 million, which is equal to the projections for 1998-99. We are projecting increases in the franchise fees, business licenses taxes and vehicle license fees of between 7% and 10% based on the population and job growth in the City. These increases are offset by a $500,000 drop in other revenue. Other revenue in 1998-99 contained several unusual receipts which are not expected in the next year. Overall, the outlook for the General fund revenues in the upcoming year is very good. All indicators point to a strong local economy persisting through 1999-00, especially in the building and tourism industries. However, the Vehicle License Fee (VLF) threat that we talked about last year is still lurking on the horizon. Vehicle license fees are paid when you register your vehicle and were put in place in lieu of personal property tax on automobiles. The amount allocated to cities was to offset the amount of personal property taxes lost. [I/ Although the State reduced the VLF last year by 25%, the revenue lost was CPPLI~~IA replaced with the State’s General fund money. However, the bill has been ABC 123 reintroduced this year calling for the complete elimination of the fee. Although Sacramento lobbyists say the current proposals have little chance of passage, Assemblyman McClintock is pursuing a ballot initiative that would amend the State Constitution to exempt the first $1 0,000 of a vehicle’s value from taxation and to phase the fees out completely over three years. In order to qualify for the March 2000 ballot, campaign workers must collect 670,000 signatures by August 23. Currently, the City of Carlsbad receives about $3.4 million in VLF annually. If this ballot initiative were successful, there is no guarantee that the State would replace the lost revenue. Clearly, this could have a very negative impact on our budget. 0 0 Other Funds Revenues from Special Revenue funds are expected to total $9.8 million, a decrease of $2.5 million from 1998-99. The types of functions supported within Special Revenue funds include programs funded by specific revenue streams such as Section 8 Housing Assistance, Housing Trust fund, Community Development Block Grants (CDBG), and maintenance assessment districts. Most of the decrease is due to $1.8 million in revenue received from the Villages of La Costa in 1998-99 as a part of their affordable housing fee which was used to set up the Carlsbad Homebuyer Assistance Program. The other significant changes were in the Citizen's Option for Public Safety (COPS) Grant and the Law Enforcement Block Grant, both which provide supplemental funding for local law enforcement. These grant programs require an annual appropriation to fund the programs which usually occurs in the middle of the fiscal year. For that reason, the revenues for the next year of the program have not been shown. The COPS grant has been used to fund two bicycle patrol officers. There are sufficient revenues available from the current grants to continue the program into 1999-00. The Law Enforcement Block Grant is used to purchase safety equipment and other one-time expenditures. Enterprise fund revenues for 1999-00 are projected at $22.9 million, down 10.8%, or approximately $2.8 million, less than 1998-99 projections. Enterprise funds are similar to a business in that rates are charged to support the operations which supply the service. Carlsbad Enterprises include the water and sanitation services, solid waste management, and the Carlsbad Golf Course. The water, recycled water and sanitation operating funds all show decreased revenues this year. The decline is mainly due to decreased rates and less .. interest income to the funds. During 1998-99, computer models were developed to better forecast future operational expenses and establish subsequent revenue requirements. Based on staff's review of the fund balances and the improved forecasting of rates using these models, a recommendation was made to reduce water and sewer rates and to transfer portions of the fund balances to the Capital Improvement Program. The average water rate was reduced by 6% and the average sewer rate was reduced by 13%. These rate changes will go into effect in July 1999. The fund balance transfers totaled $8 million in the water fund and $5.9 million in the sewer fund. These monies will be used to finance various water and sewer capital projects over the next several years. Interest Income is also projected to decrease due to the decreased revenues and decreased cash balances. Operating revenues to the Golf Course Enterprise fund of $600,000 represent the proposed transfer of funds from the General fund. These amounts are needed to provide sufficient funds to the golf course to pay taxes, assessments, and expenses as needed for the future municipal golf course. This is a $1 million decrease from the prior year which included additional amounts that were used to pay off the balance of Palomar Airport Road assessments. All necessary land has been purchased and development planning is underway. More information about the proposed golf course can be found in the Capital Improvement Program in the last section of this document. Internal Service funds show an estimated revenue of $9.4 million for 1999-00, an increase of $600,000, or 7%, over 1998-99 projections. Internal Service funds provide services within the City itself and include programs such as the self-insurance funds for Workers' Compensation, Liability Insurance and Health Insurance, as well as Information Systems and Vehicle Maintenance and Replacement. Departments pay for services provided by these funds. The goal of the Internal Service funds is to match their budgeted expenses with charges to the departments after allowing for a certain level of reserves within the fund. m / 0 e The Internal Service fund demonstrating the largest revenue increase is the Information Systems fund, up $838,000, or 52%. Charges by Information Systems were increased this year based on projected increases in their proposed budget from new positions and programs. More information on these can be found in the next part of this letter on Expenditures. Vehicle Maintenance revenues have also increased due to increases in the rates and/or services provided to the departments. Redevelopment revenues are expected to total $1.7 million, a slight decline from 1998-99 levels. This decrease is primarily due to the elimination of the Seascape mortgage revenue bond administrative obligations and the associated $35,000 annual fee. Property tax revenues are not expected to change significantly as the increment on assessed values increased only 1.5% last year. @ EXPENDITURES Proposed City operating expenditures for 1999-00 total $103.7 million which represents an increase of $300,000, or .3%, from the current 1998-99 budget. Although the total amount has not changed significantly, there are a number of changes within the programs found in each of the funds. These will be discussed later in this document. Budqetarv Policies Budget policies this year began with the assumption that departments would be allowed to maintain their "base budget." This is an amount allocated to each program sufficient. to fund current services at current levels. The base budget is an approximation of the adopted budget, for each department for fiscal year 1998-99, adjusted for approved salary increases and revised assessments or charges from Internal Service funds. In addition, departments were allowed to submit requests for additional resources. These requests were considered if the department could show how the outcome of the new program, or increase in service level, would help to achieve Council's vision of Carlsbad, and fit within Council's strategic goals for 1999. The proposed budget also incorporates certain organizational and structural changes resulting from the strategic planning initiatives undertaken the past several years. During 1997-98, the City completed an organizational redesign process which analyzed the City's current structure and made recommendations for a new design which will contribute to the overall effectiveness of the organization. During 1998-99, the City continued to implement these recommendations. The budget reflects these changes with the most significant ones occurring in the Public Works area. Budqet Recommendations Through the application of these guidelines and policies, the proposed 1999-00 operating budget of $103.7 million was developed. The budget includes funds to enhance the services already being provided to the community as well as the addition of several new programs. The majority of the new programs and increases in services were anticipated and are the result of new facilities being built, the need to keep up with technological changes and the changes required due to the growth of the City as prescribed by the General Plan, and growth management. There are also several enhancements proposed to ensure that the City remains at the forefront in addressing the health and safety needs of its citizens. IZ 0 0 In total, 33.5 new full and % time employees are proposed in the 1999-00 Operating budget; an increase of 6%. About one-third of these positions are the direct result of the opening of the new library in southern Carlsbad. Increased hourly staff totals approximately 24 full-time equivalents (FTE) with most of these going to operating the new library and maintaining service at the Cole library. These additions will bring the total City workforce to 586.5 full and 3/4 time employees and 135.5 hourly FTE. These changes and others are addressed in more detail below. New City Facilities The largest and the most long-awaited of the City facilities which will be opening in 1999-00 is the new Carlsbad library on Dove Street. This 64,000 square foot facility will provide a full range of library services. The operation will be state-of-the-art with over 150 computer work stauons; most of which will be available to the public. Other features include a 220 seat auditorium, a 2,000 square foot art gallery for traveling art exhibits and productions and a children’s garden for outside reading and programmed children’s library activities. Operating this facility, in addition to the current Cole library, will require 11 new full-time positions and over 20 hourly full-time equivalents (FTE) with a total additional cost of $1.5 million. In addition to the library, the City will also be consolidating several of its offices into one new building located on Faraday Avenue. This building will improve customer service by providing a single location in which to serve the development community. It will bring together staff from the Public Works, Community Development and Administrative Services areas and provide sufficient space to accommodate current and future needs. Relocation is planned for the fall of 1999. The operating budget proposes 1.75 full-time and one hourly FTE to support staff at the new building. Poinsettia Park, Phase 1A was competed this year which added two baseball fields and a restroom to the existing park facilities. Staff is requesting one hourly FTE to provide the additional recreational opportunities at the expanded park. Health and Safetv The health and safety of our citizens has always been a top Council priority. This is reflected in the 1999-00 budget allocations. Over 35% of the recommended General fund budget has been allocated toward police and fire programs. There are ten new positions proposed in the budget this year to continue Council’s focus on health and safety. Some of the positions deal with the growing population. These positions include two new patrol officers, clerical support for the traffic division, a new DARE officer, a communications operator and a fire prevention officer. In addition, a CAL-ID evidence technician is proposed to provide faster processing of major crime scenes resulting in an increase in the incidence and speed of suspect identification. Also, the fire department would like to hire a battalion chief in place of a captain specialist which is currently allocated. The battalion chief will be responsible for coordinating all training of the fire department staff and oversee the establishment of a reserve firefighter program. Another new program recommended for the police department is the addition of laptop computers for all patrol officers. Putting this type of technology in the hands of our officers will mean that they will spend more time on the streets, keeping Carlsbad safe, and less time behind their desks. The cost of this program is $150,000, and will be paid using forfeited funds received as a result of the department’s narcotics enforcement efforts. In addition to the traditional safety staff, the budget includes two positions to deal with the health and safety of our water. One will work on developing a Storm Water Quality Management program for the City which will reduce the amount of pollutants going into our local lagoons. This program is mandated by the federal government. The other will insure the quality of our I 0 0 potable water system by testing to ensure that there is no cross-over between the recycled water system and the potable water system. The final program being added in this category is the “Guard Start” program. This program takes relatively few staff resources (.4 FTE) and will offer the American Red Cross “Guard Start” program to the City’s youth between the ages of 11 and 14. The program teaches children about water safety and will provide an opportunity for these children to advance into a professional lifeguard position in the future. Technoloay Technology is a tool used to enhance and improve.the way we currently deliver our services. It is an area which is rapidly changing and it is often difficult to determine whether the promises being made can actually be delivered and whether the benefits derived are worth the cost. Often ,. with new technologies, it is difficult to envision how a particular tool will benefit you until you have the tool at hand. It has been the City’s philosophy during these rapidly changing times to keep up with the current technology and use it to its fullest extent to the benefit of our citizens. The City does not want to be on the extreme edge of technological change. Instead, we have positioned ourselves at the forefront, using tried and tested applications in innovative ways. Over the past several years, the City has invested heavily in new hardware and software, but has not kept up on the staff resources needed to fully implement the applications. Included in the 1999-00 budget are requests for five new positions which will allow us to use the technology we currently own, and future applications, to their fullest extent. Three of the positions will support our current applications, one will assist departments in installing new systems and updates as they occur and the final position is for a new program - the City of Carlsbad’s web site. During 1998-99, Council approved a contract with an internet site development company to create a web site for the City. The site will be developed in phases: going from a static one- way informational tool to a fully interactive site through which citizens and customers can conduct business with the City on a 24-hour basis. The requested position will be the one charged with maintaining the technical aspects of the web site. City Growth The City’s population is growing at about 5% per year. It is anticipated that this growth will continue for several more years into the future. In addition to resident population, our employment population has also grown significantly with the addition of almost seven million square feet of industrial and commercial property over the past three years. This growth puts great demand on many City services. There are several positions being recommended in the 1999-00 operating budget in order to continue our level of service in response to the growth. ,_ . We are requesting the addition of two maintenance workers and three utility workers in Public Works. These individuals will help deal with the increased maintenance caused by the rapidly expanding infrastructure and insure that all water valves and fire hydrants are in proper working condition. Some maintenance staff will also be rotated as needed to provide additional support to our construction inspectors. In this way, we are able to reduce our reliance on expensive consulting services at times of peak workload and provide seamless succession when employee turnover occurs. 14 e * We would also like to expand the opportunities for internships within the City in the next fiscal year by increasing the building intern from a half-time position to full-time and adding two interns in the City Manager’s Office. The building intern is expected to primarily recruit from the City’s current employees. It will give the building department additional staff when the demand for their services is high and provide a pool of trained individuals to fill vacancies as they occur. The internships would typically be for a six-month time period. The two interns in the City Manager’s Office are being requested to replace the vacant Assistant to the City Manager position. These interns would typically be hired for one to two year assignments with the expectation that during this period the intern will work with a variety of departments, customers and projects. The internship program will fulfill the need for special projects staff throughout the City as well as providing a pool of qualified applicants for City positions. Other changes recornmended in the operating budget include an office specialist in the Human Resources department and a 1.3 hourly FTE to keep up with the demand in several recreation programs including enrichment classes, Kidz Camps and the Stay ‘N’ Play program. Proposed Budqet bv Fund Tvpe From the discussion above, it can be seen that although the total dollars in the prcposed budget are not changing- significantly from the previous year, there are major changes in the programs being proposed. Some of the fiscal impact of staff additions will be offset by decreases in the retirement (PERS) rates paid by the City. The rates went down between 20% to 30% this year, resulting in total savings across all funds of approximately $1.2 million. The discussion below of. proposed expenditures by fund and program will provide more information about the changes occurring in the proposed budget. , BUDGET EXPENDITURE SUMMARY (In Millions) BUDGET BUDGET PERCE FUND 1998-99 1999-00 DIFFERENCE CHAN GENERAL FUND $60.9 $61.6 $0.7 SPECIAL REVENUE 7.3 6.6 -0.7 -1 ENTERPRISE 23.6 23.5 -0.1 INTERNAL SERVICE 9.9 10.4 0.5 REDEVELOPMENT 1.7 1.6 -0.1 TOTAL $1 03.4 $103.7 $0.3 General Fund The General fund contains most of the discretionary revenues that finance the basic core of City services. However, this should not diminish the importance of the other operating funds, as they also contribute to the array of services available within Carlsbad. Total proposed budget for the General fund is $61.6 million which is 1 % greater than the current budget of $60.9 million. The Council contingency account, which is available for unanticipated emergencies or unforeseen program needs, is budgeted at $4 million, or 6%, of the 1999-00 budget requests. This is approximately equal to the amount budgeted last year of which $2.2 million is remains as of April 30, 1999. 0 e I GENERAL FUND BY MAJOR SERVICE AREA (In Millions) BUDGET BUDGET F MSA 1998-99 1999-00 DIFFERENCE ( POLICY/LEADERSHIP $2.5 $2.5 $0.0 ADMINISTRATIVE SERVICES 4.7 3.8 -0.9 PUBLIC SAFETY 22.2 21.7 -0.5 COMMUNITY DEVELOPMENT 5.1 5.1 0.0 COMMUNITY SERVICES 7.3 8.9 1.6 PUBLIC WORKS 12.6 11.5 -1 .I NON-DEPARTMENTAL 4.3 4.1 -0.2 CONTINGENCY 2.2 4.0 1.8 I I TOTAL $60.9 $61.6 $0.7 There are several reasons for the minor change in the General fund proposed budget compared to the 1998-99 budget despite the increases in staffing and programs that were previously discussed. A comparison by Major Service Area (MSA) is discussed below. P The Policy/Leadership Group includes all elected officials and the City Manager’s Office. Although there was no change in the total appropriations requested, there was a change in the make-up of this group. The Administrative Services Director was created under a reorganization which took place last year. This position had been budgeted in the City Manager’s Office. For 1999-00, it has been moved along with the clerical support and supplies budget to the Administrative Services MSA. This decrease was joined by a decrease in the City Clerk‘s budget for reallocations of staff and offset an increase of $82,000 in the City Attorney’s budget for a new paralegal position to assist with the workload of the attorneys. k Administrative Services decreased mainly due to a one-time appropriation made in 1998- 99 for the records management system. Council approved the funding of a City-wide records management program which will provide quick access to documents and maps stored in electronic form for use by staff and citizens. The total appropriated in 1998-99 was $1.3 million. Ongoing costs are approximately $200,000 per year for the staff support to run the system. Increases in this MSA were mainly seen as a result of the transfer of the Administrative Services Director from the Policy/Leadership Group. P Public Safety shows a minor decrease which resulted from an unusually high budget for the fire department in 1998-99. In 1998-99, Council approved the pay off of certain lease agreements for the Regional Communications System in the amount of $1.6 million. The 1999-00 budget does not have a comparable item. This decrease was offset by increases in staffing and programs for the police and fire departments as described earlier. > In the Community Development area, decreases in all areas from the PERS retirement rate decrease were offset by an increase in Building due to the intern program discussed earlier and in the Geographic Information System (GIS) for software implementation. The software implementation will allow direct access to all mapping data from the various geographic information systems used by the City. 0 0 P The largest change in Community Services is due to the opening of the new library on Dove Street, and enhancements to recreation - G > Public Works shows a decrease of $1 .I million in their proposed budget compared to the previous year. Approximately $600,000 of the decrease is due to budgeted special studies paid by developers which are not recurring in 1999-00. Other decreases are due to the reorganization of personnel in the Public Works divisions and the lower PERS rates. programs as previously explained. fJzJ s@@ -p > Non-departmental expenses include payments for debt service, administrative and audit fees and other expenses not associated with any one department. These are detailed at the end of the Administrative Services area in the program detail section of the budget document. Significant changes include no funding for the community activity grants in 1999-00. During 1998-99, Council set aside an additional $685,000 in a special fund which brought the fund to a total of $1 million. The interest from this fund will be distributed to community groups on an annual basis. Council has designated a sub-committee to design this program during the upcoming fiscal year. Another significant addition to the non-departmental group for 1999-00 is a $2 million transfer to an Infrastructure Maintenance fund. This fund is proposed as “seed” money to begin a new program. The program will set aside funds on an on-going basis for the repair and replacement of the base infrastructure of the City: everything from streets and sidewalks to public buildings. Our City is relatively new so we have not yet experienced the significant costs of maintaining our infrastructure as it ages. We are just beginning to see major repairs needed on some of our older roads. These costs will increase as the City grows older. The Infrastructure Maintenance fund will give the Council the financial ability to deal with these significant maintenance. expenses as they occur. The value of such a system is just now being recognized at the State level as seen in a recent report from the Legislative Analyst‘s Office. Her report suggested that as much as 6% of the State’s annual General fund revenue be set aside to fund replacement of fixed assets. Carlsbad has an opportunity to be a leader in best management practices by establishing a system that will recognize the cost of depreciation in the annual budget each year. For this reason, staff is recommending a commitment of $2 million this year to begin the program. A full report and recommendations for future years will be brought to Council during fiscal year 1999-00. > Capital outlay expenses totaling approximately $741,000 have been included in the General fund budget. Chanqes In Other Funds Special Revenue funds, at $6.6 million, show a decrease in anticipated spending of approximately $700,000, or 9.7%. No appropriations for the police grants (COPS’and the block grant) are shown in the 1999-00 budget as these funds will be appropriated when the grants are received. The 1998-99 budget for these funds is $437,000. There is also a $413,000 decrease in the Community Development Block Grant program compared to the previous year. This represents the appropriations that were carried from the previous year. The funding for this program has remained relatively steady at approximately $700,000 to $800,000 per year. 0 0 Enterprise funds total $23.5 million, which is a decrease of less than one percent. Operating costs for both potable water and recycled water have increased by a total of $550,000, based on staff additions discussed earlier. These increases were offset by a $572,000 decrease in the Golf Course fund budget. The 1998-99 budget had been increased to pay off the balance of the assessments due under the Palomar Airport Road Assessment District. Current appropriations will pay for the other annual assessments on the property and minor maintenance of the land. Internal Service funds show a budget increase of $476,000, made up of various increases in decreases in these funds. The Risk Management fund decreased due to a change in liability coverage provider which resulted in a $160,000 reduction in rates. The Vehicle Maintenance budget also declined due to the sale of fuel to Waste Management in 1998-99 while their fuel island was under repair. This will not occur in 1999-00. Increases are proposed for both the Vehicle Replacement and Information Systems budgets. Information Systems increases include additionaf staff support for the new library and various software applications, increased costs for the help desk, Year 2000 compliance and strategic planning. The amount budgeted in Vehicle Replacement represents the cost of vehicles and equipment due for replacement in 1999-00. A list of these requests can be found in the appendix to this document. The Redevelopment Agency budgets have decreased for 1999-00 by a total of $1 17,000 due to less special studies and consultant services, decreases in PERS rates, and a slightly lower debt service payment. SUMMARY As can be seen from the previous information, the City of Carlsbad is in a period of solid economic growth which is anticipated to continue for at least the next year or two. As the City expands, it is evident that the planning and foresight by the City Council and residents has provided a sound economic base from which to grow, Along with the population increases have also come increases in the resources which will allow the City to maintain the quality of life in Carlsbad. Strong growth can be seen in all of the City’s base revenues: property taxes, sales taxes and transient occupancy taxes. The increased job opportunities from the development of the industrial and commercial areas is creating a higher demand for housing which will increase the property taxes. The opening of the Four Seasons resort in 1997, the Carlsbad Company Stores in late 1997, Legoland in 1999, as well as some smaller hotels and motels, will provide higher TOT revenues and sales taxes. In addition, the development revenues are providing the funding to pay for the services provided to the building industry. All of these events add to the diversity and strength of Carlsbad’s economic base which will provide the funding for additional services needed to maintain the quality of life in Carlsbad. The requests in this year’s budget reflect the anticipated achievement of Council’s vision and goals for the City. It allocates the available funding in a manner which proactively plans for the future. This plan will insure top quality services are provided to all who live, work and play in Carlsbad. 2 0 CITY OF CARLSBAD OPERATING FUNDS a PROJECTED FUND BALANCES FOR FY 1998-99 UNRESERVED PROJECTED BALANCE ESTIMATED ESTIMATED FUND BALANCE FUND JULY 1,1998 REVENUES EXPENDITURES TRANSFERS JUNE 30,1999 IGENERAL FUND 31,497,698 61,859,000 55,388,006 37,968,692 I I ISPECIAL REVENUE I I I INFRASTRUCTURE MAINTENANCE POLICE ASSET FORFEITURE COPS GRANT 0 0 0 382,386 141,500 80,000 141,389 175,000 180,911 0 443,886 135,478 LAW ENFORCEMENT BLOCK GRANT HOUSING SECTION 8 HOUSING TRUST FUND AUDIO-VISUAL INSURANCE LIBRARY ENDOWMENT FUND LIBRARY GIFTSIBEQUESTS TREE MAINTENANCE MEDIAN MAINTENANCE STREET LIGHTING SUENA VISTA CRK CHNL MNT STATE GRANTS (CLSA) STATE GRANTS (PLF) ARTS SPECIAL EVENTS SENIOR NUTRITION SENIOR DONATIONS CDBG ENTITLEMENTIREHAB ARTS GENERAL DONATIONS 124,241 88,155 722,974 2,191 0 28,615 606,830 123,417 996,955 602,068 32,637 98,792 42,451 0 117,551 10,190 33,002 92,508 2,674,164 3,347,100 65,400 251,800 4,100 608,600 427,000 776,800 132,500 168,700 90,800 27,800 195,495 54,000 775,520 49,200 119,024 2,719,261 21 1,660 69,500 0 20,000 545,100 405,800 542,171 7,590 181,000 34,537 23,413 194,037 51,000 775,520 20,000 97,725 43,058 3,858,414 (1,909) 251,800 12,715 670,330 144,617 1,231,584 726,978 20,337 155,055 46,838 1,458 120,551 10,190 62,202 ENTERPRISE WATER OPERATIONS 12,822,200 16,128,500 13,694,937 (8,000,000) 7,255,763 RECYCLED WATER OPERATIONS 691,600 1,441,300 1,483,087 649,813 SEWER OPERATIONS 7,819,100 5,789,500 4,821,504 (5,920,000) 2,867,096 SOLID WASTE MANAGEMENT 1,786,600 663,000 132,100 2,317,500 GOLF COURSE 2,814,500 1,680,000 865,000 3,629,500 IINTERNAL SERVICE I I I ~~ WORKERS COMP SELF INSURANCE 1,339,448 639,000 838,435 RISK MANAGEMENT 2,877,689 841,000 883,543 HEALTH INSURANCE (180,871) 2,708,000 2,498,033 VEHICLE MAINTENANCE 81,662 1,651,000 1,580,682 VEHICLE REPLACEMENT 4,207,981 1,392,000 1,201,100 INFORMATION SYSTEMS 701,794 1,614,400 1,769,600 ~~ IREDEVELOPMENT 1,140,013 2,835,146 29,096 151,980 4,398,881 546,594 I I OPERATIONS DEBT SERVICE LOW AND MOD INCOME HSNG 162,582 132,780 435,938 360,000 21 9,424 869,231 1,265,000 1,120,000 (360,000) 654,231 851,068 382,500 97,450 1,136,118 ITOTAL OPERATING FUNDS $72,496.126 $108,244.967 $92.989.939 ($13,920,000) * $73,831.154 I I I CITY OF CARLSBAD OPERATING FUNDS 0 PROJECTED FUND BALANCES FOR FY 1999-00 PROJECTED PROJECTED BALANCE ESTIMATED ESTIMATED FUND BALANCE FUND JULY 1,1999 REVENUES EXPENDITURES TRANSFERS JUNE 30,200( GENERAL FUND I 37,968,692 64,384,000 61,641,289 (7,000,000) 33,711,403 SPECIAL REVENUE INFRASTRUCTURE MAINTENANCE POLICE ASSET FORFEITURE COPS FUND LAW ENFORCEMENT BLOCK GRANT HOUSING SECTION 8 HOUSING TRUST FUND AUDIO-VISUAL INSURANCE LIBRARY ENDOWMENT FUND LIBRARY GIFTSIBEQUESTS TREE MAINTENANCE MEDIAN MAINTENANCE STREET LIGHTING BUENA VISTA CRK CHNL MNT STATE GRANTS (CLSA) STATE GRANTS (PLF) ARTS SPECIAL EVENTS SENIOR NUTRITION SENIOR DONATIONS CDBG ENTITLEMENT/REHAB ARTS GENERAL DONATIONS ENTERPRISE WATER OPERATIONS RECYCLED WATER OPERATIONS SEWER OPERATIONS SOLID WASTE MANAGEMENT GOLF COURSE 0 443,886 135,478 97,725 43,058 3,858,414 (1,909) 251,800 12,715 670,330 144,617 1,231,584 726,978 20,337 155,055 46,838 1,458 120,551 10,190 62,202 7,255,763 649,813 2,867,096 2,317,500 3,629,500 2,000,000 40,000 5,000 0 3,063,395 1,525,000 60,400 10,000 3,000 61 1,000 429,000 778,000 32,000 153,500 90,200 24,800 195,500 52,000 704,567 21,800 15,430,000 1,400,000 4,810,000 677,000 600,000 0 190,000 0 0 2,992,035 230,265 56,895 10,000 7,000 551,879 446,044 716,685 8.724 150,500 199,185 25,610 192,426 119,200 709,567 0 16,474,486 1,498,380 4,974,471 189,743 370,000 2,000,000 293,886 140.478 97,725 114,418 5,153,149 1,596 251,800 8,715 729,451 127,573 1,292,899 750,254 23,337 46,070 46,028 4,532 53,351 5.190 84,002 6,211,277 551,433 2,702,625 2,804,757 3,859,500 [INTERNAL SERVICE WORKERS COMP SELF INSUR 1,140,013 666,000 908,744 RISK MANAGEMENT 2,835,146 887,400 1,200,179 HEALTH INSURANCE VEHICLE MAINTENANCE 29,096 2,457,000 2,537,409 151,980 1,608,000 1,456,221 VEHICLE REPLACEMENT 4,39a,881 1,292,000 1,727,544 INFORMATION SYSTEMS 546,594 2,452,030 2,525,089 IREDEVELOPMENT I 897,269 2,522,367 (51,313) 303,759 3,963,337 473,535 I OPERATIONS DEBT SERVICE LOW AND MOD INCOME HOUSING 219,424 95,000 422,093 380,000 272,331 654,231 1,270,000 1,082,000 (380,000) 462,231 1,136,118 353,750 11 9,895 1,369,973 TOTAL OPERATING FUNDS $73,831,154 $108,181,342 $103,733,558 ($7,000,000) $37,567,535 * Amount represents transfer to Capital Improvement Program 0 CITY OF CARLSBAD 0 OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 %INCR (DEC) 1998-99 rl 98-99 BUD 1996-97 1997-98 ESTIMATED 1998-99 1999-00 TO ACTUALS ACTUALS EXPENDITURES BUDGET BUDGET 99-00 BUD DEPARTMENT IGENERAL FUND I 213,740 944,200 413,300 61 8,026 213,740 1,020,027 482,872 631,592 11.4% -3.0% -1 5.2% 13.0% I I ~ ~~ ~~~~ ~~ POLICY AND LEADERSHIP GROUP CITY COUNCIL 198,867 CITY MANAGER 903,568 CITY CLERK 336,417 CITY ATTORNEY 568,277 CITY TREASURER 112,087 187,979 829,595 295,918 604,001 100,884 2,018,377 238,130 989,282 409,520 71 3,780 134,740 2,485,452 296,588 1,315,180 505,796 1,494,005 148,500 3,760,069 13,002,664 8,717,634 21,720,298 517,590 309,455 132,680 2,397,750 1,723,387 5,080,862 4,900,390 543,250 8,270 554,340 2,529,270 386,306 8,921,826 "I 106,298 2,295,564 138,832 2,487,063 -2.9% -0.1% TOTAL POLlCYlLEADERSHlP GROUP 2,119,216 ADMINISTRATIVE SERVICES 0 1,066,915 414,685 1,169,301 0 0 1,325,000 466,188 1,519,688 1,319,500 0 1,343,214 524,360 1,529,139 1,319,500 0.0% -2.1% -3.5% -2.3% -88.7% ADMINISTRATION 0 FINANCE 1,084,277 PURCHASING 391,747 HUMAN RESOURCES 991,134 RECORDS MANAGEMENT 0 2.650.901 4.630.376 4.716.213 -20.3% TOTAL GENERAL GOVERNMENT 2,467,158 PUBLIC SAFETY .. 12,093,782 10.117.431 7.5% -13.8% POLICE 9,802,181 FIRE 7,234,412 TOTAL PUBLIC SAFETY 17,036,593 COMMUNITY DEVELOPMENT COMMUNITY DEVELADMIN 570,161 GEOGRAPHIC INFORMATION 161,627 ECONOMIC DEVELOPMENT 101,747 PLANNING 2,002,143 11,493,780 9,890,850 21,384,630 555,215 186,361 129,951 2,245,909 1,583,622 4,701,058 3,428,825 363,730 7,320 393,400 2,331,445 342.263 10,430,622 7,597,002 18,027,624 510,016 142,738 99,820 2,215,355 1,267,581 4,235,510 2,769,286 277,983 6,181 545,717 2,076,612 268,196 5,943,975 .. ~~ ~ ~ -2.2% -6.8% 17.6% -7.2% -3.2% 5.4% 0.1% 39.8% 43.6% 13.0% 11.2% 0.8% 8.7% 22,211,213 555,215 263,137 142,997 2,476,498 1,635,473 5,073,320 3,504,750 378,331 7,320 498,711 2,507,988 355.515 BUILDING 1,076,912 TOTAL COMMUNITY DEVELOPMENT 3,912,590 COMMUNITY SERVICES LIBRARY 2,534,746 CULTURAL ARTS PROGRAM 281,223 SISTER CITY PROGRAM 6.61 9 PARK PLANNING/RECREATION MGT 680,773 RECREATION 1,998,668 SENIOR PROGRAMS 257,109 TOTAL COMMUNITf SERVICES 5,759,138 ~ 6,866,983 ~ ~~ 7,252,615 ~~ ~ 23.0% c 0 CITY OF CARLSBAD 0 OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 1998-99 1996-97 1997-98 ESTIMATED 1998-99 DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET PUBLIC WORKS PUBLIC WORKS ADMIN 0 86,279 673,839 702,654 ENGINEERING 3,682,939 4,174,293 4.117,657 4,798,929 PARK MAINTENANCE 1,859,280 1,854,761 2,325,000 2,436,638 STREET MAINTENANCE 1,429,136 1,660,395 2,227,000 2,378,863 FACILITIES MAINTENANCE 1,178,285 1,303,571 1,473,500 1,706,213 Major Facility Maintenance (Transfer) 212,600 200,000 200,000 200,000 TRAFFIC SIGNAL MAINT 299,487 474,797 373,589 402,006 TOTAL PUBLIC WORKS 8,661,727 9,754,096 11,390,585 12,625,303 NON-DEPARTMENTAL COMMUNITY PROMOTION (CCVB) 207,593 BEACH PARKING 35,600 COMMUNITY CONTRIBUTIONS 0 HIRING CENTER 75,046 HOSP GROVE PAYMENT 797,500 AUDIT 33,550 PROPERTY TAX ADMlN FEE 170,222 DUES & SUBSCRIPTIONS 38,916 MlSC / TRANSFERS OUT 1,685,574 ASSESSMENT SERVICES 18,779 INFRASTRUCTURE MAINT TRANS 0 GOLF COURSE TRANSFER 470,000 HARMONY GROVE FIRE COST 318,533 TOTAL NON-DEPARTMENTAL 3,851,313 256,487 362,180 489,180 38,100 36,000 36,000 225,000 770,000 770,000 75,774 79,630 80,070 828,521 800,000 800,000 22,823 80,000 94,800 177,909 198,000 190,000 13,572 30,000 46,500 331,952 58,000 78,000 22,893 25,000 59,261 0 0 0 490,000 1,680,000 1,680,000 20,246 0 0 2,503,277 4,118,810 4,323,811 SUBTOTAL GENERAL FUND 43,807,735 45,133,760 55,388,006 58,689,538 CONTINGENCIES 0 0 0 2,201,660 TOTAL GENERAL FUND 43,807,735 45,133,760 55,388,006 60,891,198 1999-00 BUDGET 544,084 4,142,076 2,351,831 2,287,791 1,636,155 200,000 385,845 11,547,782 243,000 36,000 0 80,000 800,000 50,000 210,000 50,000 0 56,000 2,000,000 600,000 0 4,125,000 57,641,289 4,000.000 61,641,289 %INCR (DEC) 98-99 BUD TO 99-00 BUD -22.6% -1 3.7% -3.5% -3.8% -4.1% 0.0% -4.0% -8.5% -50.3% 0.0% -100.0% -0.1% 0.0% -47.3% 10.5% 7.5% -100.0% -5.5% 1 -64.3% I I -4.6% I ~ -1.8% I 1 81.7% I I 1.2% e CITY OF CARLSBAD 0 OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 %INCR (DEC) 1998-99 98-99 BUD - 1996-97 1997-98 ESTIMATED 1998-99 TO 1999-00 DEPARTMENT ACTUALS ACTUALS EXPENDITURES BUDGET 99-00 BUD BUDGET SPECIAL REVENUE FUNDS I POLICE ASSET FORFEITURE 458,154 COPS FUND 38,865 LAW ENFORCEMENT BLOCK GRANT 21,282 HOUSING SECTION 8 2.838,313 HOUSING TRUST 31,532 AUDIO VISUAL INSURANCE 102,582 LIBRARY ENDOWMENT FUND 0 LIBRARY GIFTS/BEQUESTS 41,511 TREE MAINTENANCE 526,886 MEDIAN MAINTENANCE 394.1 18 STREET LIGHTING 646,820 BUENAVISTA CRK CHNL MNT 203,783 STATE GRANTS (CLSA) 267,057 STATE GRANTS (PLF) 38,541 ARTS SPECIAL EVENTS 18,345 SENIOR NUTRITION 175,854 SENIOR DONATIONS 29,673 CDBG ENTITLEMENT/REHAB 573,556 ARTS GENlGALLERY DONATIONS 782 519,301 157,455 46,534 2,696,750 143,602 114,172 0 36,471 508,758 356,718 674,175 7,048 189,631 37,583 18,828 209,436 47,486 752,587 870 80,000 180.91 1 11 9,024 2,719,261 21 1,660 69,500 0 20,000 545.1 00 405,800 542,171 7,590 181,000 34,537 23,413 194,037 51,000 775,520 20.000 153,017 317,897 119,024 2,897,316 257,362 70,297 0 50,491 585,206 432,928 723,953 7,590 181,978 47,900 25,899 195,495 104,000 1,122,415 25.772 190,000 0 0 2,992,035 230,265 56,895 10,000 7,000 551,879 446,044 716,685 8,724 150,500 199,185 25,610 192,426 11 9,200 709,567 0 6,606,015 24.2% -100.0% -100.0% 3.3% -10.5% -19.1% 0.0% -86.1% -5.7% 3.0% -1 .O% 14.9% -17.3% 315.8% -1.1% -1.6% 14.6% -36.8% -100.0% -9.7% TOTAL SPECIAL REVENUE FUNDS 6,407,654 6.517.405 6.180.524 7.318.540 .. ,. .. (ENTERPRISE FUNDS I WATER OPERATIONS RECYCLED WATER OPERATIONS SANITATION OPERATIONS SOLID WASTE MANAGEMENT GOLF COURSE TOTAL ENTERPRISE FUNDS IINTERNAL SERVICE FUNDS 13,100,861 1,055,743 3,899,664 133,869 252,505 18,442,642 13,729,352 1,174,301 3,609,819 11 0,482 21 5,636 18,839,590 571,457 668,422 2,285,740 1,359,628 1,758,563 1,431,287 8,075,097 13,694,937 1,483,087 4,821,504 132,100 865,000 20,996,628 838,435 883,543 2,498,033 1,580,682 1,201.100 1,769,600 15,894,306 1,527,605 5,015,429 190,897 942,310 23,570,547 905,628 1,335,751 2,546,402 1.582.346 1,462,509 2,046,308 16,474,486 1,498,380 4,974,471 189,743 370,000 23,507,080 908,744 1,200,179 2,537,409 1,456,221 1,727,544 2,525,089 10,355,186 3.7% -1.9% -0.8% -0.6% -60.7% -0.3% 0.3% -10.1% -0.4% -8.0% 18.1% 23.4% 1 1 I WORKERS COMP SELF INSURANCE 783,954 RISK MANAGEMENT 874,475 HEALTH INSURANCE 2,169,937 VEHICLE MAINTENANCE 1,364,655 VEHICLE REPLACEMENT 2,105,350 INFORMATION SYSTEMS 1,280.350 TOTAL INTERNAL SERVICE FUNDS 8,578,721 8,771,393 9,878,944 4.8% DEPARTMENT 0 CITY OF CARLSBAD 0 OPERATING FUNDS BUDGET EXPENDITURE SCHEDULE FISCAL YEAR 1996-97 THROUGH 1999-00 %INCR (DEC) 1998-99 1996-97 1997-98 ESTIMATED 1998-99 ACTUALS ACTUALS EXPENDITURES BUDGET rl BUDGET 1999-00 :::E:: REDEVELOPMENT 1 OPERATIONS 539,517 381,846 435,938 483,946 -6.7% 1,623,988 TOTAL REDEVELOPMENT 2,246,565 2,126,522 1,653,388 1,741,408 -12.8% 11 9,895 LOWAND MOD INCOME HSNG 75,548 65,185 97,450 137,542 -3.4% 1,082,000 DEBT SERVICE 1,631,500 1,679,491 1,120,000 1,120,000 -12.8% 422,093 TOTAL OPERATING FUNDS 79,483,317 80,692,374 92,989,939 103,400,717 103,733,558 0.3% REVENUE SOURCE 0 CITY OF CARLSBAD - OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED REVENUE REVENUE AS % DIFFERENCE ESTIMATED OF FY 98-99 1998-99 TO REVENUE 1997-98 1998-99 PROJECTED 1999-00 1999-00 GENERAL FUND TAXES PROPERTY TAX SALES TAX TRANSIENT TAX FRANCHISE TAX TRANSFER TAX TOTAL TAXES LICENSES AND PERMITS BUILDING PERMITS BUSINESS LICENSES OTHER LICENSES & PERMITS TOTAL LICENSES & PERMITS STATE SUBVENTIONS VEHICLE LICENSE FEES OTHER TOTAL STATE SUBVENTIONS CHARGES FOR SERVICES PLANNING FEES BUILDING DEPT. FEES ENGINEERING FEES AMBULANCE FEES RECREATION FEES PROPERTY RENTALS OTHER CHARGES OR FEES TOTAL CHARGES FOR SERVICES FINES AND FORFEITURES INTEREST INTERDEPARTMENTAL CHARGES OTHER REVENUE SOURCES TOTAL GENERAL FUND $12,410,095 $14,181,000 14,817,057 16,500,000 6,046,092 6,900,000 1,713,526 1,873,000 835,530 720,000 35,822,300 40,174,000 2,094,523 2,200,000 1,603,744 1,700,000 1,184,990 1,230,000 4,883,257 5,130,000 2,970,189 3,124,000 234,323 476,000 3,204,512 3,600,000 1,148,396 1,393,860 2,327,574 747,425 985,942 221,087 595,863 7.420.147 .. 900,000 1,650,000 1,756,000 800,000 1,046,000 350,000 603,000 7,105,000 331,318 800,000 1,589,461 1,900,000 1,919,341 1,650,000 824,466 1,500,000 55.994.802 61.859.000 .. .. 11.5% 1,627,000 7.6% 1,256,000 8.2% 563,000 8.6% 161,000 -10.0% (72,000 8.8% 3,535,000 -10.0% (220,000) 7.6% 129,000 -10.0% (123,000) -4.2% (214,000) 10.7% 334,000 6.9% 33,000 10.2% 367,000 -1.6% (14,000) -10.0% (165,000) -28.8% (506,000) 7.4% 59,000 2.0% 21,000 2.0% 7,000 2.0% 12,000 -8.3% (586,000) 2.0% 16,000 -4.9% (93,000) 0.0% 0 -33.3% (500,000) 4.1% 2,525,000 REVENUE SOURCE ISPECIAL REVENUE FUNDS 1 INFRASTRUCTURE MAINT FUND TRANSFER FROM GENERAL FUND POLICE ASSET FORFEITURE ASSET FORFEITURES INTEREST OTHER TOTAL COPS GRANT STATE FUNDING (AB3229) INTEREST TOTAL LAW ENFORCEMENT BLOCK GRANT FEDERAL GRANT INTEREST TOTAL HOUSING - SECTION 8 INTEREST FEDERAL GRANT OTHER TOTAL HOUSING TRUST FUND INTEREST INCLUSIONARY HOUSING FEES OTHER TOTAL AUDIO-VISUAL INSURANCE INTEREST INSURANCE FEES TOTAL LIBRARY ENDOWMENT FUND INTEREST DONATIONS TOTAL e CITY OF CARLSBAD e OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED ESTIMATED REVENUE REVENUE REVENUE 1997-98 1998-99 I 1999-00 I 0 :i-i 2,000,000 0 2,000,000 78,527 124,000 30,000 37,389 17,000 10,000 500 k. 0 115,916 141,500 40,000 161,229 166,000 10,888 9,000 5,000 172,117 175,000 Il 5,000 85,027 88,708 3,964 3,800 88,991 92,508 16,605 12,000 2,567,339 2,612,164 63,486 50,000 2,647,430 2,674,164 315,667 375,000 1,240,949 1,110,000 605,414 1,862,100 2,162,030 3,347,100 2,121 400 73,494 65,000 75.615 65,400 0 1,800 0 250,000 0 251,800 AS % DIFFERENCE OF FY 9599 1998-99 TO PROJECTED 1999-00 ~ 0.0% 2,000,000 0 2,000,000 -75.8% (94,000) -41.2% (7,000) -100.0% (500) -71.7% (101,500) -100.0% (166,000) -44.4% (4,000) -97.1% (170,000) -100.0% (88,708) -100.0% (3,800) -100.0% (92,508) -16.7% (2,000) 10.2% 266,231 250.0% 125,000 14.6% 389,231 0.0% 0 3.6% 40,000 -100.0% (1,862,200) -54.4% (1,822,100) 0.0% 0 -7.7% (5,000) -7.7% (5,000) 455.6% 8,200 -100.0% (250,000) -96.0% (241,800) REVENUE SOURCE LIBRARY GlFTSlBEQUESTS GIFTWBEQUESTS INTEREST TOTAL TREE MAINTENANCE INTEREST MISC. REIMBURSEMENTS TREE MAINTENANCE FEES INTERDEPARTMENTAL TOTAL MEDIAN MAINTENANCE INTEREST MEDIAN MAINTENANCE FEES OTHER TOTAL STREET LIGHTING INTEREST INTERDEPARTMENTAL STREET LIGHTING FEES OTHER TOTAL BUENA VISTA CREEK CHNL MAINT INTEREST BUENA VISTA FEES TOTAL STATE GRANTS (CLSA) INTEREST GRANTS TOTAL STATE GRANTS (PLF) INTEREST GRANTS TOTAL ARTS SPECIAL EVENTS INTEREST DONATIONS TOTAL 0 CITY OF CARLSBAD - OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED ESTIMATED REVENUE REVENUE REVENUE 1997-98 1998-99 1999-00 34,900 3,000 37,324 4,100 1,000 2,424 1,100 2,000 3,000 31,975 35,000 61 1,000 597,058 608,600 70,000 66,200 70,000 502,000 498,883 501,600 2,000 0 2,000 37,000 4,616 5,000 388,670 427,000 5,000 1,500 5,000 418,000 382,554 417,000 6.000 429,000 m 55,070 52,000 53,000 53,500 53,500 53,500 634,395 668,800 669,000 16,999 2,500 2,500 759,964 776,800 778,000 k - - - 31,510 32,500 131.881 132,500 0 100,371 100,000 32,000 32,000 3,717 2,700 151,000 128,849 166,000 2,500 153,500 132,566 168,700 5,329 4,200 86,000 40,838 86,600 4,200 90,200 46,167 90,800 2,681 1,800 23,000 20.223 26,000 1,800 24,800 22,904 27,800 AS % OF FY 98-99 PROJECTED -33.3% -9.1 % -26.8% 5.7% 0.0% 0.1% 0.0% 0.4% 20.0% 0.2% 0.0% 0.5% I .9% 0.0% 0.0% 0.0% 0.2% -1.5% -100.0% -75.9% -7.4% -9.0% -9.0% 0.0% -0.7% -0.7% 0.0% -1 1.5% -10.8% DIFFERENCE 1998-99 TO 1999-00 (1.00( (101 (1,lOb 2,00c C 40C C 2,400 1 ,ooc 1 .ooc 0 2,000 1,000 0 200 0 1,200 (5001 (100,000) (100,500) (2001 (15,000) (15,200) 0 (600) (600) 0 (3.000) (3,000) 0 CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED AS % DIFFERENCE ESTIMATED REVENUE REVENUE OF FY 98-99 199599 TO REVENUE REVENUE SOURCE 1997-98 1998-99 PROJECTED 1999-00 1999-00 SENIOR NUTRITION GRANTS DONATIONS TOTAL SENIOR DONATIONS INTEREST DONATIONS TOTAL CDBG ENTITLEMENTIREHAB INTEREST OTHER 113,322 101,137 94.300 96.113 94.358 101,200 1 I 209,435 195,495 Ll 195,500 6,597 4,000 4,000 53,077 50,000 48,000 59,674 54,000 52,000 m 45 0 52,900 OI 0 OI GRANT REVENUE 755,633 722,620 704,567 TOTAL 755.678 775,520 704,567 I+ ARTS GENERAUGALLERY DONATIONS INTEREST 1,768 1,700 1,800 DONATIONS TOTAL 4,178 47,500 20,000 5,946 49.200 21,800 w TOTAL SPECIAL REVENUE FUNDS 8,409,366 10,057,987 9,799,162 0.1% 6: -0.1% (56 0.0% 5 0.0% 0 -4.0% (2,000 -3.7% (2,000 0.0% c -100.0% (52.90C -2.5% (18,052 -9.2% (70,953: 5.9% 100 -57.9% (27,500: -55.7% (27,400 -2.6% (2,017,025’ 0 CITY OF CARLSBAD 0 - OPERATING FUNDS ~ REVENUE ESTIMATES FOR 1999-00 ACTUAL REVENUE REVENUE SOURCE 1997-98 ENTERPRISE FUNDS PROJECTED REVENUE 1998-99 11,289,500 3,093,000 100,000 75,000 176,000 825,000 160,000 170,000 200,000 40,000 ESTIMATED OF FY 98-99 1998-99 TO REVENUE AS Oh DIFFERENCE PROJECTED 1999-00 1999-00 WATER OPERATIONS WATER SALES 10,410,505 READY TO SERVE CHARGES 2,988,929 NEWACCOUNT CHARGES 108,063 BACK-FLOW PROGRAM FEES 78,415 PENALTY FEES 178,404 INTEREST 844,930 ENGINEERING & PLAN CHECK FEES 167,671 SERVICE CONNECTION FEES 168,216 AGRICULTURAL CREDITS 192,663 OTHER 120,539 -3.1% 4.0% 0.0% 0.0% 0.0% -57.6% 0.0% 0.0% 0.0% 0.0% (346,5001 123,000 0 0 0 (475.000: 0 0 0 0 10,943,000 3,216,000 100,000 75,000 176,000 350,000 160,000 170,000 200,000 40,000 15,430,000 16,128,500 -4.3% (698,500) TOTAL 15,258,335 860,500 80,800 440,000 60,000 0 RECYCLED WATER WATER SALES 839,031 I 807,000 1 -6.2% (53,500) 15.1% 12,200 0.0% 0 0.0% 0 0.0% 0 I4 93,000 60,000 1,400,000 READY-TO-SERVE CHARGE 56,519 RECYCLED WATER CREDITS 378,627 INTEREST 58,406 OTHER 5,670 TOTAL 1,338,253 -2.9% (41,300) 1,441,300 5,299,220 SANITATION OPERATIONS SERVICE CHARGES 5,200,000 40,000 67,500 440,000 42,000 I4 4,600,000 40,000 70,000 100,000 4,810,000 -11.5% (600,000) 0.0% 0 3.7% 2,500 -77.3% (340,000) -100.0% (42,000) LATERAL CONNECTiONS 20,000 PRE-TREATMENT CHARGES 74,140 INTEREST 436,597 OTHER 7,685 TOTAL 5,837,642 -16.9% (979,500) 5,789,500 SOLID WASTE MANAGEMENT INTEREST 84,113 87,000 196,000 380,000 0 90,000 199,000 3.5% 3,000 2.1% 8,000 388,000 1.5% 3,000 0 0.0% 0 677,000 2.1% 14,000 600,000 0 -64.3% (1,080,000) -64.3% (1,080,000) 600,000 0.0% 0 22,917,000 -10.8% (2,785,300) RECYCLING FEES (AB939) 175,199 NON-JURISDICTIONAL FEES 403,169 OTHER 66 TOTAL GOLF COURSE 662.547 663.000 TRANSFER FROM GENERAL FUND 490,000 1,680,000 0 1.680.000 OTHER TOTAL 162,409 652,409 .. 25,702,300 TOTAL ENTERPRISE FUNDS 23,749,186 0 CITY OF CARLSBAD OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED OF FY 98-99 1998-99 TO REVENUE REVENUE REVENUE AS % DIFFERENCE ESTIMATED REVENUE SOURCE 1997-98 1998-99 PRO.JECTED 1999-00 1999-00 INTERNAL SERVICE FUNDS -5.9% (5,000: 6.4% 32,000 WORKERS COMP SELF-INSURANCE INTEREST 114,164 85,000 8o.ooo INTERDEPARTMENTAL 668,869 504,000 I 536,000 I OTHER TOTAL 50,278 50,000 t"i 50,000 833,31 1 639,000 666,000 0.0% 0 4.2% 27,000 " " " 0.0% 0 LIABILITY SELF-INSURANCE INTEREST 171,947 150,000 150,000 INTERDEPARTMENTAL 930,185 691,000 737,400 I 6.7% 46,400 I OTHER TOTAL 0 OH 0.0% 0 1,102,132 841,000 887,400 5.5% 46,400 HEALTH INSURANCE 23,531 1,617,392 -50.0% (5,000) -1.9% (40,000) ~~ INTEREST INTERDEPARTMENTAL 10,000 2,094,000 5,000 2,054,000 REIMBURSEMENTS 331,206 604,000 398,000 -34.1 % (206,000) TOTAL 1,972,129 2,708,000 2,457,000 -9.3% (251,000) H " " VEHICLE MAINTENANCE INTERDEPARTMENTAL 1,600,000 1,443,987 1.523.000 5.1% 77,000 0.0% 0 " -100.0% (120,000) " " -2.6% (43,000) INTEREST 2,742 8,000 I 8,000 I OTHER 43,556 120,000 0 TOTAL 1,490,285 1,651.000 M VEHICLE REPLACEMENT 1,052,298 248,378 4.7% -18.9% 51,000 (35,000) INTERDEPARTMENTAL INTEREST 1,142,000 150,000 1,091,000 185,000 OTHER TOTAL 35,062 116,000 -100.0% (116,000) 1,392,000 1,292,000 -7.2% (100,000) i"--i 1,335,738 " " " INFORMATION SYSTEMS INTEREST 51,214 50.000 50,000 0.0% 0 53.5% 837,630 0 837,630 0.0% 51.9% " " " INTERDEPARTMENTAL 1,298,200 1,564,400 OTHER 0 0 u 2,402,030 TOTAL 1,349,414 1,614,400 I==+ 2,452,030 TOTAL INTERNAL SERVICE FUNDS 8,083,009 8,845,400 9,362,430 5.9% 517,030 - a CITY OF CARLSBAD @ OPERATING FUNDS REVENUE ESTIMATES FOR 1999-00 ACTUAL PROJECTED OF FY 98-99 1998-99 TO REVENUE REVENUE REVENUE AS Yo DIFFERENCE ESTIMATED REVENUE SOURCE 1997-98 1998-99 PROJECTED 1999-00 1999-00 REDEVELOPMENT FUNDS OPERATIONS RENTAL INCOME 47,485 47,500 ADMINISTRATIVE FEES 71,380 71,380 INTEREST 3,612 3,000 OTHER TOTAL 2,395 10,900 124,872 132,780 -4 47,500 42,600 2,500 2,400 95,000 0.0% 0 -40.3% (28,780) -16.7% (500: -78.0% (8.500) -28.5% (37,780) DEBT SERVICE TAX INCREMENT 1,208,387 1,215,000 1.2% 15,000 1,230,000 INTEREST TOTAL 64,563 50,000 40,000 -20.0% (10,000: 1,272,950 1,265,000 1,270,000 0.4% 5,000 H LOW AND MOD INCOME HSNG TAX INCREMENT 302,097 302,500 INTEREST 322,069 80,000 OTHER TOTAL 5,550 0 629,716 382,500 '$ 303,750 50,000 353,750 0.4% 1,250 -37.5% (30,000) 0.0% 0 -7.5% (28,750) TOTAL REDEVELOPMENT FUNDS 2,027,538 1,780,280 -3.5% (61,530) 1,718,750 ITOTAL OPERATING $98.263.901 $1 08.244.967 $108.181.342 -0.1% $ (1.821.825) I ., .,, .. ., . r e m EXHIBIT B 1999-2000 PROPOSED CAPITAL IMPROVEMENT PROGRAM INTRODUCTION The City of Carlsbad Capital Improvement Program (CIP) is a planning document which incorporates the current budget for capital projects with future planned revenues and expenditures. This year’s CIP reflects the continued commitment to constructing the necessary facilities, in response to the current and anticipated development activity occurring throughout the City. Projects are continuously evaluated and prioritized to ensure the City’s resources for facilities are allocated based on a well thought out plan. The proposed 1999-2000 Capital Improvement Program totals $62.6 million, with projected revenues totaling $50.6 million. Development remains strong, and this is expected to continue through 1999-2000. As development occurs within the City, there comes a corresponding increase in the demand for development- related services and new facilities. To ensure that the necessary infrastructure and facilities are built on a schedule that meets or exceeds the needs of Carlsbad’s citizens and businesses, the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management Plan requires that a standard level of facilities is available to meet the new demands, or development cannot proceed. The CIP is also a tool available to Council to address the issue of resource availability weighed against the demand for facilities. This report and the accompanying the actions taken to fulfill these needs. CIP documents and schedules reflect 0 m - 1999-2000 CIP Growth Assumptions Residential Non-Residential 1 Year Units Square Feet 1999-2000 1,250 765,000 2000-2001 1,139 472,000 2001 -2002 1 ,304 450,000 2002-2003 1,150 656,000 2003-2004 687 644,000 Years 6-1 0 3,635 4,303,000 Years 1 1-2030 5,939 5,607,000 I I I I I I ~~ I Total Future 15,104 12,897,000\ L I ~~ Residential development for 1998-99 was projected at 1,439 building permits. However, recent estimates anticipate over 1,700 units by the end of the current fiscal year. Construction of residential units is expected to decrease slightly, to about 1 ,I 00 units per year for the next five years. Non-residential development is also expected to decrease following the completion of Legoland and most of the Carlsbad Ranch area. Major non-residential projects planned in the next few years include several hotel, timeshare, and commercial developments. REVENUES Revenues for Capital Projects from now until buildout total $462.6 million and may be segregated into four major categories: 1) fees generated by development in Carlsbad, 2) special district fees and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit Districts), 3) Water and Sewer replacement reserves, and 4) other sources including grants, bond issues, and contributions from other agencies. Approximately 43.6% of all capital revenues are received as a result of development, and are dependent upon assumptions made about the City's annual growth in dwelling units and commerciallindustrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact Fees (TIF), Park-ln- t 0 0 Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees (MFF), and Sewer Connection charges. Existing and proposed Community Facilities District and Bridge and Thoroughfare Benefit District revenues comprise 18.1% of the total. Water and Sewer replacement revenues generated by user fees equal approximately 16.8% of total revenues, and.the remaining 21.5% are related to Federal & State grants, license tax on new construction, the County sales tax program (Transnet), San Diego Gas & Electric funding, and contributions from other agencies. Funding Sources 1999-2000 to Buildout Total Revenue = $462.6 million Other 21 5% Water/Sewer Replacement 16.8% Development Special 43.6% Districts 18.1 % I Calculation of Future Fees The revenue projections of the proposed Capital Improvement Program reflect the growth assumptions identified in the previous section. The following information delineates how those assumptions were applied to estimate future development revenues. The mix of multi-family and single-family residential units was assumed to be 35% and 65% respectively and reflects the anticipated mix of residential development shown in current plans for each Local Facilities Management Zone. The building permit valuation used for computing Public Facilities Fees was $89,500 per multi-family dwelling unit, and $175,000 per single-family dwelling unit. A building permit valuation of $38 per square foot of construction is used to calculate non-residential Public Facilities Fees. In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average daily trips was computed for each type of use. A multi-family residential dwelling unit was assigned eight trips per day and a single-family unit was assigned ten trips per day. Each residential trip was valued at the current TIF of $87. The trips-per-day value for commercial and industrial buildings was averaged at 32 trips per 1,000 square feet of development, although the actual volume of trips generated by commerciallindustrial building can vary widely depending on the ultimate land use. The value assigned to each commercial/industriaI trip was $35, the current TIF. c -. C 0 0 The implementation of CFD No. 1 in 1991 reduced the total amount of projected PFF and TIF revenues, as some projects previously funded from these sources are now funded through this CFD. CFD No, 2 is proposed to fund Rancho Santa Fe Road and Olivenhain Road, but has not yet been formally established. A prepayment program is in place to enable development to proceed within this proposed district. CFD #3 is a proposed district for the funding of Melrose Drive and Faraday Avenue extensions. There are two existing and one proposed Bridge and Thoroughfare Fee District included in this year's CIP. BTD No. 2 (Poinsettia' Lane - Aviara Parkway) was formed to finance the construction of Poinsettia Lane between Aviara Parkway and El Camino Rea\ and Ayiara Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. A proposed BTD No. 4 is being considered as the financing mechanism for College Boulevard and Cannon Road extensions east of El Camino Real. PROPOSED CAPITAL PROJECTS Project construction is reliant upon the availability of capital and operating funds in addition to established Growth Management requirements for facilities. Wherever project scheduling changes were proposed, projects were evaluated and prioritized, using compliance with the Growth Management Plan as the most important factor. The acceleration of street projects which will improve traffic flow in the industrial corridor was one of the results of this evaluation process. The proposed scheduling of park projects also reflects changes made as a result of this analysis. Growth Management requirements and the availability of revenues has resulted in the highest level of planned capital spending in the last ten years, as shown, on the following chart (appropriations include amounts brought forward in each year). $160,000,000 $140,000,000 $120,000,000 $1 00,000,000 $80,000,000 $60,000,000 $40,000,000 $20,000,000 $- 89/90 90/91 91/92 92/93 93/94 94/95 95/96 96/97 97/98 98/99 2 0 0 PROPOSED CAPITAL PROJECTS 1999-2000 TO BUILDOUT The CIP for 1999-2000 to buildout outlines approximately 164 future projects at a total cost of $438.6 million. CIP Expenditures by Category 1999-2000 to Buildout Total Expenditures = $438.6 million I Parks ' Other Drainage 16.1% 5.8% 5.3% Streets 30.7% I I The largest expenditure category is for street, traffic signal and interchange projects at $134.4 million, or 30.7%, of the total. Included are the construction of several major roadways which will add east-west connections and improve the flow of regional traffic as well as local .traffic throughout the City. Several of-these roads will provide additional routes to the neighboring cities of Oceanside, Vista and San Marcos. Following is a list of major street projects in the 1999-2000 to Buildout CIP: 0 Faraday Avenue to Cannon Road 0 Faraday Avenue and Melrose Drive Extensions east of El Camino Real 0 Poinsettia Lane to El Camino Real 0 Poinsettia Lane east of El Camino Real 0 Cannon Road to El Camino Real 0 Cannon Road and College Boulevard East of El Camino Real 0 Rancho Santa Fe Road to San Marcos and Encinitas The second largest level of expenditures at $83.2 million, or 19% of the total planned capital expenditures, is construction and maintenance of City facilities such as libraries, administrative facilities and police and fire facilities. The South Carlsbad Library is currently under construction, and is expected to open in September 1999. 39 e 0 This 64,000 square foot facility is estimated to meet the City's needs up to a population of 100,000 residents. Upon completion of the South Carlsbad Library, the Cole Library, located at the north end of the City, will undergo renovation. The Capital Improvement Program includes funds to reconstruct and expand this facility in future years. Additional facilities include the Faraday Administrative Offices which are expected to be completed by September 1999, as well as a Public Works Center scheduled for construction next year. A new City Hall is planned for construction in the future; the timing and location have not been determined. The third largest expenditure category is for park projects totaling $70.7 million, or 16.1 %, of the ' ' total. Park PrOjeCtS include acquisition and development of acreage within all quadrants, of Carlsbad. Future park projects include: Northwest Quadrant Northeast Quadrant Park Acquisition and Development Park Acquisition and Development Community Center Larwin Park Development Cannon Lake Park Development Hosp Grove-Buena Vista Lagoon Recreational Improvements Southwest Quadrant Southeast Quadrant Poinsettia Park Phase II Alga Norte Park Development Zone 19 Park Development Alga Norte Pool Zone 19 Park Community Center Leo Carrillo Park Development In addition, a business park recreational facility in the industrial area is planned, as well as the Carlsbad Municipal Golf Course. Sewer projects total almost $61.9 million, and include the construction of the South Agua Hedionda interceptor, the Vista/Carlsbad trunk line interceptor, cleaning and refurbishment of existing sewer lines and access holes, the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina parallel ocean outfall and cogeneration projects. The largest of these projects is the Vista/Carlsbad interceptor; construction will occur along Jefferson Street from Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way, and is expected to span over several years. Water projects total about $40.3 million (9.2%) and include reservoir construction and improvements and recycled and potable pipelines. Some of the major areas in which these installations or upgrades are planned include segments of College Boulevard, Poinsettia Lane, El Fuerte, and along El Camino Real. The 1999-2000 to buildout CIP also includes funding for sea water desalination and other water resource development programs. Specific timing and cost estimates for all capital projects are identified in the Current and Future (1 999-2000 to Buildout) Projects schedule following the narrative. 4 0 e PROPOSED CAPITAL PROJECTS -THE NEXT FIVE YEARS Some of the major projects planned for the next five years are discussed below. Library Facilities - Construction of the South Carlsbad Library is over 80% complete, with the opening planned for September 1999. The Cole Library is scheduled to undergo remodeling upon the completion and opening of the new library in the south. Faradav Administrative Offices - The City currently has several administrative facilities located in different areas throughout the City which are no longer able to accommodate current and anticipated space needs. The Faraday Building is currently under construction, and will be used by staff from Public Works, Community Development, and Administrative Services. This consolidation will improve customer service by providing a single location to serve the development community. Relocation to the new building is planned for the fall of 1999, once construction is complete. In addition to improved customer service, it is expected the consolidation will improve efficiency and interdepartmental communication. Public Works Center - Design of a new Public Works Center is underway, and construction could begin in 1999-2000. This facility, located next to the Safety Center, will include a purchasing warehouse, general offices, and yard facilities for the Public Works Departments. currently being processed for the City’s 250 acre golf course iq$- located in the industrial corridor directly south of the future Veterans Memorial Park. Once approved, development of the golf course will proceed. shown on the following map. The extensions of Cannon Road and Poinsettia Lane to El Camino Real and Faraday Avenue to Cannon are all located west of El Camino Real and are being constructed primarily as a result of residential developments in those areas. College Boulevard and Cannon Road extensions to the east and north, as well as Faraday Avenue and Melrose Drive extensions, are located east of El Camino Real and will alleviate traffic on Palomar Airport Road. The widening and realignment of Rancho Santa Fe will improve regional and local traffic flow generated in the southern part of the City. Carlsbad Municipal Golf Course - Environmental permits are e/ Streets - Several large street construction projects are planned for the next 5 years as 0 0 I Proposed Major Road Projects Bu RAILROAD MAJOR ROAD PROJECTS Q 0 Coastal Rail Trail - The Coastal Rail Trail is a non-motorized multi-modal trail in the railroad right-of-way between Oceanside and downtown San Diego. Once built, the trail will be 44 miles long and will accommodate bicycles, joggers, rollerbladers and skateboarders. The current CIP includes funding for construction of the section between the Oceanside Transit and Encinitas Coaster stations. 0 Leo Carrillo Park - The master plan of Leo Carrillo Park is complete, and the development of phase two is scheduled to begin in 1999-2000 on this 10.5 acre site. Park development will consist of parking lots, restrooms, walkways and large group picnic facilities. The general theme for this park will be passive in nature with the option for interpretive programming. Northeast and Northwest Quadrant Parks - The City has accelerated plans for park facilities. In 1999-2000 there are plans to purchase land for future park sites in both the northeast and northwest quadrants, with development of those sites in the years to follow. These parks will include ball fields and other recreational amenities. 0 Aha Norte Park - This park will include the development of 30 acres in the Southeast Quadrant with amenities such as ball fields, soccer fields, tennis courts, picnic areas, tot lots, restrooms and parking facilities. Design is planned for 2001-2002 with construction in the years to follow. e 0 0 Zone 19 Park - Construction is expected to begin in approximately three years on this 24 acre site located in the southwest quadrant north of Poinsettia Lane and west of El Camino Real. This park may include ball fields, soccer/football fields, basketball and tennis courts, tot lots, and picnic areas. Poinsettia Park Phase II - Within the next five years, development of the final phase of Poinsettia Park is scheduled. Amenities may include a community centedgymnasium, enclosed soccer field, tot lots, picnic areas, a tennis complex, and additional parking. 0 South Carlsbad Villaae Storm Drain - Construction of the South Carlsbad Village Storm Drain from Oak Avenue to the Agua Hedionda Lagoon along the easterly portion of the northern San Diego railroad right-of-way will control flooding and standing water along its route. 0 South Aqua Hedionda InterceDtor - This interceptor sewer includes a sewage lift station and force main, and will provide sewer service to those areas generally tributary to the south side of the Agua Hedionda Lagoon. Construction will occur along Cannon Road from Leg0 Drive to El Camino Real and along Faraday Avenue from Cannon Road to the existing Faraday Avenue. The following phase will begin at Cannon Road and El Camino Real and proceed east to the Raceway Property. The design for this project has begun and will continue into next year; construction could begin in the following year (2000-2001). 0 Vista/Carlsbad InterceDtor - The Vista/Carlsbad Interceptor project involves installation of a new and upgraded sewer trunk line through the downtown portion of Carlsbad to the Encina Water Pollution Control Facility. The interceptor will run along Jefferson Street from- Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way. This project is required to handle buildout flows and replace deteriorated pipeline, and is funded in part by the City of Vista. SUMMARY The proposed 1999-2000 to Buildout CIP continues to reflect an aggressive plan for new facilities. It is being driven by the continued pace of development and the need to insure that facilities are available to service the developing areas as well as the current residents. Significant progress is being made to construct major traffic circulation projects in response to current and future development. Carlsbad’s philosophy has been to build quality capital facilities which meet, and at times exceed, Growth Management standards. Practices such as phasing projects over a period of years to match funding availability as well as maximizing the use of available resources, have been implemented in order to meet the needs of Growth Management. The 1999-2000 to Buildout Capital Improvement Program reflects the commitment of Carlsbad’s Council and staff to continue providing its residents with a better quality of life. e 0 GROWTH MANAGEMENT PLAN The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in 1986. The plan was established in an effort to manage development within the City by linking residential, commercial, and industrial development directly to standards for availability of public services and facilities. The Growth Management Plan adopted has established precise' standards for eleven public facilities. Standards must be met at all times as growth occurs. Facilities for which standards have been established are as follows: - City Administrative - Wastewater Treatment - Circulation - Fire - Water Distribution - Schools - Library - Parks - Drainage - Open Space - Sewer Collection The Plan requires that appropriate public facilities be available, in conformance with the adopted performance standards, as development occurs. Unless each of the eleven public facility standards have been met, no new development can occur. The Growth Management Plan impacts both the Operating Budget and the Capital Improvement Program. The detailed level of planning required by Growth Management has allowed Carlsbad's Capital Improvement Program to anticipate the funding needed for capital improvements through buildout of the City. The timing of construction of facilities is governed by the rate of development and the 11 performance standards. New public facilities often. require additional staffing and other resources, which affects the Operating Budget. Facilities such as community centers, parks, and fire stations have been constructed and opened to the public under this program. The Capital Improvement Program has been designed to specifically address areas where new or expanded facilities will be needed to maintain compliance with the adopted performance standards. With the adoption of the 1999-2000 CIP, compliance with the Growth Management Plan is assured. 0 a CALIFORNIA ASSEMBLY BILL 1600 (AB 1600) In 1987, the California Legislature passed Assembly Bill 1600 (AB 1600) which set forth the process a city or county must follow to establish developer fees to finance public facilities. This legislation applies to fees established, increased, or imposed on or after January I, 1989, the effective date of the law. AB 1600 contains four general requirements: I. A "nexus" or connection must be established between a development project or class of project and the public improvement being financed with the fee. All AB 1600 fees adopted by the City have met the nexus test. For example, Traffic Impact, Bridge and Thoroughfare District and Drainage Sewer Benefit Area Fees were all established under AB 1600. 2. The fee must be segregated from the General fund. Carlsbad segregates all capital funds not only from the General fund, but also each classification of fee as well. 3. Fees collected by a city or county must be spent or committed to a project within a five year period. Funds are viewed to be committed if they are programmed to be spent on a specific project@). If the money is not spent, findings must be made describing the continuing need for that money each fiscal year after the five years has expired. The City of Carlsbad commits the revenues from these fees through its Capital Improvement Program budget. This budget, which is adopted by the City Council, sets forth the City's Capital expenditure program from the current year to projected build out of the City. The expenditure plan is updated annually as part of the City's budget process. 4. Refunds must be made only if the City cannot make the required findings. At this time, no refunds are due because the City's Capital Improvement Program commits all AB 1600 fees to projects to be constructed. both in the current year and in the future. .. 1 1 0 0 CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR PI 1998-99 FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PI1 AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNEnLOCAL TRANSNET/HlGHWAY TRANSNET/BlKE TRANSNETETP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD#2 CFD#3 BTD#2 POINS. LN-AVIARA PKWY BTD#3 CANNON ROAD WEST * BTD#4 COLLEGEICANNON FEDERAL GRANTS SDG & E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX JULY 1,1998 UNRESERVED BALANCE 3,818,164 313,487 2,807,608 21,723,652 4,181,832 2,586,877 884,629 677,195 I ,a35,280 3,696,442 3,185,062 1,200,890 26,283 1,274,359 373,253 96,942 1,859,969 1,165,262 32,691,71 I 12,849,302 0 3,091,167 523,659 0 4 0 5,273,625 886,807 19,141,077 9,705,312 1,964,996 6,118,850 8,601,526 2,132,557 6,002,296 ESTIMATED ESTIMATED CAPITAL REVENUES EXPENDITURES 2,554,079 1,454,084 7,744 73,381 1,784,016 1,242,269 8,082,399 2,757,116 470,843 4,337,178 11 8,022 0 62,686 0 224,712 18,900 356.1 a4 0 1,962,937 1,828,336 8,065,776 2,003,739 995,386 2,000,263 692 0 33,555 0 73,264 138,889 209,115 267,536 141,078 1,727,866 17,155,045 11,884,665 12,378,831 20,448,689 7,407,202 1,486,845 0 0 355,261 648,490 2,671,478 1,972,040 0 0 245,000 78,776 0 0 721,068 216,046 2,943,525 625,962 4,960,609 1,267,061 7,450,269 758,368 888,803 264,962 4,957,607 2,513,526 9,959,060 1,616,817 68,290 33,832 1,550,194 665,338 ESTIMATED DEBT SERVICE & OTHER 962,497 0 942,310 0 0 0 0 0 0 750,000 0 0 0 0 0 0 0 0 169,743 0 0 40,000 15,872 0 0 0 0 0 1,116,426 0 160,000 1,177,344 42,351 0 0 JUNE 30,1999 PROJECTED BALANCE 3,955,662 247,850 2,407,045 27,048,935 315,497 2,704,899 947,315 883,007 2,191,464 3,081,043 9,247,099 196,013 26,975 1,307,914 307,628 38,521 273,181 6,435,642 24,452,110 18,769,659 0 2,757,938 1,207,225 0 166,228 0 5,778,647 3,204,370 21,718,199 16,397,213 2,428,837 7,385,587 16,901,418 2,167,015 6,887,152 OTHER 2,614,485 843,776 2,124,453 0 I ,m,a08 TOTAL 163,304,560 99,698,505 64,455,427 5,376,543 193,171,095 OTHER 2,614,485 843,776 2,124,453 0 I ,m,a08 TOTAL 163,304,560 99,698,505 64,455,427 5,376,543 193,171,095 * PROPOSED DISTRICTS. 0 0 CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 1999-2000 FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PI1 AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNETlHlGHWAY TRANSNET/BIKE TRANSNET/STP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFD #3 BTW2 POINS. LN-AVlARA PKWY BTW3 CANNON ROAD WEST BTW COLLEGEICANNON FEDERAL GRANTS SDG & E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX JULY 1,1999 PROJECTED BALANCE 3,955,662 247,850 2,407,045 27,048,935 315,497 2,704,899 947,315 883,007 2,191,464 3,081,043 9,247,099 196,013 26,975 1,307,914 307,628 38,521 273,181 6,435,642 24,452,110 18,769,659 0 2,757,938 1,207,225 0 166,228 0 5,778,647 3,204,370 21,718,199 16,397,213 2,428,837 7,385,587 16,901,418 2,167,015 6,887,152 ESTIMATED REVENUES 7,250,000 0 0 3,829,609 228,011 804,633 133,560 292,163 55,650 1,141,923 2,500,000 550,000 0 0 120,000 1,980,000 532,699 0 7,116,403 0 0 242,000 100,000 0 6,683,600 0 131,462 1,400,000 4,556,371 2,000,000 950,000 3,678,819 2,725,000 0 1,550,000 1998 - 99 JUNE 30 1999 - 00 CONTINUING NEW APPROPR. APPROPR. PROJE( TOTAL CIP c 34,184 24,184 10,000 16,t 14.21 1,835 5,068,835 9,143,000 c 1,505,050 1,505,050 0 1 127,557 107,557 20,000 E 10,264,068 3,577,568 6,686,500 BALAF APPROPR. 0 3,500,000 3,500,000 0 150,000 150,000 1 555,855 5,855 550,000 1.1 10,635,896 8,335,896 2,300,000 3 3,897,224 2,220,224 1,677,000 22 0 0 0 9 219,100 219,100 0 9 0 0 0 0 1,240,000 1,240,000 I 270,905 120,000 2,017,665 37,665 1,980,000 390,905 21 565,517 65,517 500,000 5,938,514 0 5,938,514 4! 14,923,214 4,410,000 19,333,214 13,6: 5,135,960 5,135,960 0 12,2: 0 0 0 2,491,611 450,000 1' 1,131,775 1 ,I 31,775 0 I 2,941,611 0 0 6,825,655 142,055 6,683,600 0 0 0 0 m 813,804 950,000 4,14 1,763,804 2,441,733 1,857,000 3c 4,298,733 12,821,374 2,427,083 96 7,472,900 1 1,773,700 5,699,200 34 1,818,297 1,818,297 0 1525 4,375,161 1,599,569 2,775,592 2,7C 8,357,650 5,728,983 2,628,667 1,9E 1,379,932 720,405 659,527 12,57 5,826,304 2,791,323 3,034,981 11,02 15,248,457 I i ~ OTHER 1,333,808 0 1 ,I 80,336 01 1,180,336 I 15 TOTAL 193,171,095 50,551,902 I 79,790,693 62,552,466 I 142,343,159) 101,37 0 0 CITY OF CARLSBAD CAPITAL FUNDS REVENUE ESTIMATES FOR 1999-2000 FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13 & 16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNET/HlGHWAY TRANSNET/BlKE TRANSNETKTP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFM3 BTD#2 POINS. LN-AVIARA PKWY BTW3 CANNON ROAD WEST BTD#4 COLLEGEKANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS (C,D,E,F) SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX 1995-96 ACTUAL REVENUES 2,888,993 20,454 42,191 3,172,700 375,038 271,399 234,755 12,911 68,857 772,544 24,122 8,503 97 660,599 82,683 213,662 253,417 1,037,967 7,279,245 3,017,345 0 1,265,756 408,294 0 165,994 0 488,794 0 2,669,428 1,233,895 230,676 2,442,896 1,107,737 133,308 1,415,803 1996-97 ACTUAL REVENUES 3,000,585 18,033 79,365 4,618,487 701,492 283,688 44,222 403,682 278,736 1,101,838 1,155,361 103 520,948 237,167 189,854 2,596,708 277,695 269,106 10,676,209 6,085,033 0 2,289,588 26,238 0 421,036 0 863,504 253,024 2,823,755 2,014,974 593,808 2,266,441 2,185,341 127,079 1,471,758 1997-98 ACTUAL REVENUE 1,581,221 18,471 289,482 8,562,805 1,203,795 20731 7 69,997 326,350 701,093 1,691,916 4,103,007 3,310,960 1 ,524 98,380 321,253 45,414 293,629 9,494,392 15,184,782 2,247,234 0 213,180 291,424 0 79,745 0 1,061,677 452,181 5,200,226 1,750,325 1,073,366 3,738,617 2,506,152 254,554 1,610,623 1998-99 ESTIMATED REVENUE 2,554,079 7,744 1,784,016 8,082,399 470,843 1 18,022 62,686 224,712 356,184 1,962,937 8,065,776 995,386 692 33,555 73,264 209,115 141,078 17,155,045 12,378,831 7,407,202 0 355,261 2,671,478 0 245,000 0 721,068 2,943,525 4,960,609 7,450,269 888,803 4,957,607 9,959,060 68,290 1,550,194 1999-2000 ESTIMATED REVENUE 7,250,000 '0 0 3,829,609 228,011 804,633 133,560 292,163 55,650 1,141,923 2,500,000 550,000 0 0 120,000 1,980,000 532,699 0 7,116,403 0 0 242,000 100,000 0 6,683,600 0 131,462 1,400,000 4,556,371 2,000,000 950,000 3,678,819 2,725,000 0 1,550,000 OTHER 542,320 1,352,547 2,471,355 843,776 0 TOTAL CAPITAL FUNDS 32,542,382 49,227,405 70,456,647 99,698,505 50,551,902 OTHER 542,320 1,352,547 2,471,355 843,776 0 TOTAL CAPITAL FUNDS 32,542,382 49,227,405 70,456,647 99,698,505 50,551,902 NOTE: REVENUES INCLUDE INTERFUND LOANS AND TRANSFERS. 45 0 0 FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13 & 16 PARK FEE PI1 AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNETIHIGHWAY TRANSNET/BIKE TRANSNET/STP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFD#3 BTW2 POINS. LN-AVIARA PKWY BTW3 CANNON ROAD WEST BTW COLLEGUCANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX CITY OF CARLSBAD CAPITAL FUNDS BUDGET EXPENDITURE SCHEDULE 1996-1997 TO 1998-1999 1998-99 1999-2000 1999. 1996-97 1997-98 1998-99 (1) CONTINUING NEW TOTAI ACTUAL ACTUAL ESTIMATED 3,~7,56a 6,606,500 10, 3,068,165 1,137,693 2,416,581 APPROPR. APPROPR. APPR, 1,505,050 0 1, 252,506 768,416 2,184,579 1,285,908 474,493 2,757,116 5,068,835 9,143,000 14, 0 28,638 4,337,178 24,184 10,000 0 0 0 0 3,500,000 3, 0 0 0 0 150,000 301,226 3,449 18,900 21 9,100 0 0 0 0 0 0 26,780 19,705 73,381 107,557 20,000 275,234 926,582 2,578,336 786,134 1,751,812 2,003,739 2,220,224 1,677,000 3,; 0 0 498,066 0 0 5,855 550,000 499,666 1,732,856 2,000,263 8,335,896 2,300,000 IO,( 0 0 0 37,665 1,980,000 2,l 2,516,379 74,694 267,536 0 1,240,000 1 ,: 251,114 13,684 138,889 270,905 120,000 261 35,816 1,727,866 65,517 500,000 279,582 9,994,978 11,884,665 14,923,214 4,410,000 19,. 3,540,881 5,235,076 20,618,432 5,938,514 0 5,' 5,135,960 0 5.1 255,722 670,688 1,486,845 0 0 0 0 0 83,345 589,053 688,490 2,491,611 450,000 2,E 17,505 246,276 1,987,912 1 ,I 31,775 0 1 ,I 0 0 0 0 421,302 79,475 78,776 142,055 6,683,600 6,E 0 0 0 0 0 484 255,507 216,046 813,804 950,000 1,i 0 98,843 625,962 12,821,374 2,427,083 15,; 1,334,650 1,395,000 2,383,487 2,441,733 1,857,000 4,; 1,773,700 5,699,200 7,4 462,810 343,806 665,338 1,818,297 0 1,8 20,795 540,536 33,832 1,599,569 2,775,592 4,3 2,170,009 1,937,045 1,659,168 2,628,667 5,728,983 83 2,447,648 2,595,405 3,690,870 720,405 659,527 13 151,251 115,641 424,962 2,791,323 3,034,981 5.8 187,625 608,373 758,368 OTHER 602,662 1,122,720 2,124,453 TOTAL CAPITAL FUNDS 21,737,710 32,796,260 69,831,970 I 79,790,693 62,552,466 142,3 1,180,336 0 1 ,I (I) 1998-99 ESTIMATED AMOUNT INCLUDES ACTUAL EXPENDITURES & ENCUMBRANCES. P c3 p? 0 a 2 Is 99 zp is 0% r a z E + Zk LQ Q !=a nV am J w E ON '5 8 56 7:: :% Ib? =g - gz $8 >z - mB N - *o >; z8 0 N - 0N E8 $g 0 - Nr E8 gQ 0 N - -0 $3 m - a+ oz E8 n 2g $E i5 $$ :P 4 0 z z Y t I- I- o k!p $0 aW, 0 B 5 $0 7 az - - 2 P s - a a a G i! i 3 fn 5 $ VI z 8 z a W s 000.-000000 0- m- d o- m' 0- 0- m- m- m- ooo*oooooo oomoooomom mrmwmoom~o - 0. 0 N. o. b. U7 Lo. W. u1 (D m(Or Nr 7 $z$$g$$kyy (3B(30,$oa0(3 u oEo us zm $2 z 0 3 3 3 ;I 3 z 5 9 8 22% W z z z s I- z W i gl E5 z5 ZE 3 40$g$"(;0 $$4[LS38>>Z mIYgooo440 9 [L t33ZSZ Z$ ? [L ~~ooozzz 2 umyyg?::g ~,~<ooommz ZgELYrr333 ><3d;&p g~gg~~~s$~ +E+++ T rr "" mm wmmm om mmmo .-. h :e %%$% 0 - - VI Lu t 4 0 9 W U ob w -I a: 0 2 sssgsg:: ow0 (3 (3 zm OH so E$ yB zgzt3 ; ZZfS3 $%;p3sw $pzsdsP oz$!+P%s om+,griP 4aEom g2:0003 W?w$$$g .o.akk2E gggE5x:g 2=~www~ 222 2 2 SZEO msz w oornw$ UFWZ W~WZZZZ zzz z z - - fn Lu t u 3 J > 5 z0 on6 ZGZ z ^^ 2;g e'p $88 ss zz >>> gzgiii mm ae=%%% $go%%% 3EE999 &&&!J! ddd%%% iiiFFE mmmvoo 000000 oovmmm -121333 FZ6F mmbw "ON mmom I 0 n! 0 n 2 L $2 EO ?? 05 Em ze as 3: z to n? >? n! < 7 w p? n - E Ei c3 0 d E I- =+ :$ $5 zp $z &q 9 z Ha <m >v K 0% J W K n 00 00 ow Ln0 N- 0. 0. 9 9 0 0 0. m 0 7 0 0 0 u) 9 T 00 00 wo Nu) N 0. 7 '4 9 8888 9 r '9 0 9 mmNo 0. 9 9 0mu)o N-NN 53:' wwuw 1 an a D t 2 V r d 8 z + II W -m $g& 9E5; 8.09;: + KO"=.% a: rym"=. u) ?g20 y d a2,2z 2 COG0 32g; z Obww : O2tt zamm E 5666 g Sznn 5 uzzw ZFii IOao 2 - - u) Y c h 2 a 3 W + u) a F 3 0 u) - - u) V 2 P w 0 0 : xoovxoo 222g222 a 5 m U (0 m B 9 t 4 g6 a 82 0 g; gg z- i;! :ggs$s! gs$;$;j luuggg$;: gaLi3zo; 2zzoz"': OBZalrgg: h~goboj woagggu: zmz gF;g$s$: di$gccgY$$ 92r;;o'?ji n6dP9:a; ~~:~$;~; iis2jF$ia; 5 z; E - a: cz m$"oKzi OZ~rnW IL>+UUOII< u~mmvoou 88 R 00 F) 5 B pz c3 0. L 2 EO ws E1 ze g: <g r 9 E to n? Urn 02 A w ct Q I 0 n =I- d 2 Eg 52 zp zk EG am 0% iT 2 :: C 2: n z -I W - - r Y B E 2 0 0 e UI -I > 3 OOOOOOOoOrOO D - g%ggs%gg gxs. 00000000 O -NnWNS=O -7 *.- r zg% 2" ? r w 0 2 2 [I) F uxu++uuu gkksk ~ kSi=ggkkk [I) yan~a ++ - 0 d 55 "li a< t P E i7J 5s z m -: 5 60 5 22 !$!a 00 02 %z 2 3 2; 6, 5 ZW ;Yg 2 ow WWnwu~$[I) oo[I)z+2<G[I)$:z ++ ,,g4gmokuq"a $ E 44sE4$f=PgZ2 ooEEEjzZ.w"ao<o Q4";oE?wWw>u ;~;uIooi~wo-w~z ~u~au<o-,oooOo~ Raa446:?2286. ;:$$P$ia$aaaag zz =00000 WE OE 0 zz XI u<+ W > u< EZ OSG ZZ[I)6o~oOz,~~ oozzua~~a8Z3$~ ~U>$>>omzzzzzw oo<<aa ouauaug ~~$~~$o>zEEzeo E~U<<<OO~~~~~S <<EEEEzzpggggoj y~zs$;$~fsz~f~ ppp~~~""ovo"oo Qaenagnnhnini~ ~$uuuu<<<<4u<u ++FEEEFEEFEEEE E 6%" [I)mm[I)m[I)[I)lnwln[I)[I)[I)m uuuuuuuuuuuuuu ul %%Sl NN SE m mmmm ulul om : % E2 $5 ?e cc 0 0 + EO 22 zz 0% ZF z 2 n ko n? <m a w J cc - - F :: Fi B z L 6 P d % (3 0 L 2k 2s 99 g5 zg $z :G z na 0, a% a >F ct i W 2 I 0 0 d E I- E2 gz sg EO g: <z :? r s am oz i5 Zi W n' w I (3 0 d E J E 2 k E c z W > 0 z -I E a 0 a i w p? n c 3 0 z P 3 m 0 0 0 Q) Q) 0) c;' r - - v) 0 z a 5 6 e s r v) z - - v) t- z W I > W z z 2 s a 2 9 m ". ... z 0 (0 a. m m. c (D z x 6 ". m N s *. '4 * * (0 7 W '4 m 4 r In r? '4 m 9 m r (0 2 v ". El (D - - m ; I'. IC m N. N. (0 -f x m 2 i m (D 2 :: 2 B 0 W 0 z z $ P e _I -I 0 2 0 0 0 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT EAR 1 1999 - 2000 I FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNETlLOCAL TRANSNETlHlGHWAY TRANSNETBIKE TRANSNETlSTP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFD #3 BTDM POINS. LN-AVIARA PKWY BTD#3 CANNON ROAD WEST BTDM COLLEGElCANNON FEDERAL GRANTS SDG & E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREA (C-D-E-F) SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX BEGINNING BAL 7/1/99 378,094 140,293 901,995 21,980,100 291,313 2,704,899 947,315 663,907 2,191,464 860,819 91 1,203 190,158 26,975 1,307,924 36,723 856 207,664 497,128 9,528,896 13,633,699 0 266,327 75,450 0 24,173 0 4,964,843 762,637 8,896,825 13,605,890 1,708,432 4,756,920 15,301,849 348,718 5,113,452 REVENUE 7,250,000 0 0 3,829,609 228,011 804,633 133,560 292,163 55,650 1,141,923 2,500,000 550,000 0 0 120,000 1,980,000 532,699 0 7,116,403 0 0 242,000 100,000 0 6,683,600 0 131,462 1,400,000 4,556,371 2,000,000 950,000 3,678,819 2,725,000 0 1,550,000 EXPENDITURES 6,686,500 20,000 0 9,143,000 10,000 3,500,000 150,000 0 0 1,677,000 2,300,000 550,000 0 1,240,000 120,000 1,980,000 500,000 0 4,410,000 0 0 450,000 0 0 6,683,600 0 950,000 1,857,000 2,427,083 3,034,981 659,527 5,728,983 2,775,592 0 5,699,200 ENDING 941,594 120,293 901,995 16,666,709 509,324 9,532 930,875 956,069 2,247,114 325,742 1,111,203 190,158 26,975 67,914 36,723 856 240,363 497,128 12,235,298 13,633,699 0 58,327 175,450 0 24,173 0 4,146,305 305,637 11,026,114 12,570,909 1,998,905 2,706,755 15,251,257 348,718 964,252 OTHER 153,472 0 0 153,472 TOTAL 113,380.402 50.551.902 62,552,466 101,379,839 .. .. .. .. (1) BEGINNING BALANCE ON 7/1/99 IS NET OF CONTINUING APPROPRIATIONS. 0 0 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT YEAR 2 2000 - 2001 1 BEGINNING FUND BAL 7/1/2000 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 941,594 1,750,000 1,786,000 905,594 PUBLIC ART 120,293 0 20,000 100,293 GOLF COURSE 901,995 0 0 901,995 PUBLIC FACILITIES FEE 16,666,709 3,333,871 4,689,000 15,311,580 ZONE 5,13,16 PARK FEE 509,324 118,000 0 627,324 PIL AREA I NW 9,532 351,907 0 361,439 PIL AREA 2 NE 930,875 198,949 150,000 979,824 PIL AREA 3 SW 956,069 296,336 0 1,252,406 PIL AREA 4 SE 2,247,114 555,650 2,800,000 2,764 TRAFFIC IMPACT FEE 325,742 893,084 672,000 546,826 TRANSNEnLOCAL 1,111,203 1,900,000 1,700,000 1,311,203 TRANSNETlHlGHWAY 190.1 58 0 0 190,158 TRANSNEnBlKE 26,975 755,000 755,000 26,975 TRANSNET/STP 67,914 0 0 67,914 TDA 36,723 0 0 36,723 STATE GRANTS 856 104,000 104,000 856 COUNTY GRANTS 240,363 44,334 0 284,697 ASSESSMENT DISTRICTS 497,128 0 0 497,128 CFD #I 12,235,298 6,451,766 110,000 18,577,064 CFD #2 13,633,699 0 5,702,400 7,931,299 CFD #3 0 500,000 500,000 0 BTDM POINS. LN-AVIARA PKWY 58,327 197,360 200,000 55,687 BTD#3 CANNON ROAD WEST 175,450 2,000,000 0 2,175,450 BTDM COLLEGEICANNON 0 0 0 0 FEDERAL GRANTS 24,173 5,024,000 5,024,000 24,173 SDG&E 0 700,000 700,000 0 PLANNED LOCAL DRAINAGE 4,146,305 565,034 260,000 4,451,339 SEWER BENEFIT AREAS 305,637 3,400,000 3,391,000 314,637 SEWER CONNECTION 11,026,114 6,051,232 3,918,552 13,158,793 SEWER REPLACEMENT 12,570,909 1,300,000 4,206,645 9,664,264 WATER - RECYCLED WATER 1,998,905 150,000 1,059,527 1,089,378 WATER CONNECTION 2,706,755 3,149,716 1,561,226 4,295,245 WATER REPLACEMENT 15,251,257 2,025,000 7,796,424 9,479,833 REDEVELOPMENT BONDS 348,718 0 0 348,718 GAS TAX 964,252 1,600,000 745,900 1,818,352 OTHER 153,472 1,210,000 1,210,000 153,472 TOTAL 101,379,839 44,625,238 49,061,674 96,943,403 0 e CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT YEAR 3 2001 - 2002 I FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNETlHlGHWAY TRANSNETlBlKE TRANSNETETP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFD #3 BTD#2 POINS. LN-AVIARA PW BTD#3 CANNON ROAD WEST BTD#4 COLLEGElCANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX BEGINNING BAL 7/1/2001 905,594 100,293 901,995 15,311,580 627,324 361,439 979,824 1,252,406 2,764 546,826 1,311,203 190,158 26,975 67,914 36,723 856 284,697 497,128 18,577,064 7,931,299 0 55,687 2,175,450 0 24,173 0 4,451,339 314,637 13,158,793 9,664,264 1,089,378 4,295,245 9,479,833 348,718 1,818,352 REVENUE 1,700,000 0 0 3,754,316 60,000 497,630 825,383 304,684 55,650 963,134 2,000,000 905,000 0 0 0 0 18,982 0 6,987,748 757,781 6,180,000 1,216,400 400,000 1,200,000 0 0 692,945 400,000 2,226,126 1,300,000 150,000 3,601,716 2,025,000 0 1,650,000 EXPENDITURES 1,664,625 20,000 0 4,339,000 0 600,000 1,800,000 0 0 447,000 1,700,000 905,000 0 0 0 0 0 0 5,810,000 8,686,673 6,180,000 1,200,000 0 1,200,000 0 0 1,600,000 355,000 6,559,991 1,141,835 159,527 2,549,808 1,515,202 0 362,000 ENDING 940,969 80,293 901,995 14,726,896 687,324 259,069 5,206 1,557,089 58,414 1,062,960 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 19,754,812 2,407 0 72,087 2,575,450 0 24,173 0 3,544,284 359,637 8,824,928 9,822,429 1,079,851 5,347,153 9,989,631 348,718 3,106,352 OTHER 153,472 3,000,000 3,000,000 153,472 TOTAL 96,943,403 42,872,495 51,795,661 88,020,237 e 0 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT YEAR 4 2002 - 2003 I BEGINNING FUND BAL 7/1/2002 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 940,969 700,000 433,000 1,207,969 PUBLIC ART 80,293 0 20,000 60,293 GOLF COURSE 901,995 0 0 901,995 PUBLIC FACILITIES FEE 14,726,896 3,490,008 2,050,000 16,166,904 ZONE 5,13,16 PARK FEE 687,324 106,341 0 793,665 PIL AREA 1 NW 259,069 496,080 0 755,149 PIL AREA 2 NE 5,206 225,383 0 230,589 P II AREA 3 SW 1,557,089 303,293 0 1,860,382 PIL AREA 4 SE 58,414 , 23,651 0 82,066 TRAFFIC IMPACT FEE 1,062,960 1,019,007 447,000 1,634,967 TRANSNET/LOCAL 1,611,203 1,700,000 1,700,000 1,611,203 TRANSNEnHlGHWAY 190,158 0 0 190,158 TRANSNEnBlKE 26,975 0 0 26,975 TRANSNETKTP 67,914 0 0 67,914 TDA 36,723 0 0 36,723 STATE GRANTS 856 0 0 856 COUNTY GRANTS 303,679 0 0 303,679 ASSESSMENT DISTRICTS 497,128 0 0 497,128 CFD #I 19,754,812 6,348,161 110,000 25,992,974 CFD #2 2,407 (0) 0 2,407 CFD #3 0 0 0 0 BTD#2 POINS. LN-AVIARA PW 72,087 783,600 500,000 355,687 BTD#3 CANNON ROAD WEST 2,575,450 95,000 0 2,670,450 BTD#4 COLLEGBCANNON 0 10,645,000 10,645,000 0 FEDERAL GRANTS 24,173 0 0 24,173 SDG&E 0 0 0 0 PLANNED LOCAL DRAINAGE 3,544,284 1,063,490 2,600,000 2,007,774 SEWER BENEFIT AREAS 359,637 400,000 0 759,637 SEWER CONNECTION 8,824,928 2,163,316 5,888,262 5,099,982 SEWER REPLACEMENT 9,822,429 1,300,000 691,835 10,430,594 WATER - RECYCLED WATER 1,079,851 150,000 159,527 1,070,324 WATER CONNECTION 5,347,153 3,407,609 1,514,682 7,240,081 WATER REPLACEMENT 9,989,631 2,025,000 1,635,178 10,379,453 REDEVELOPMENT BONDS 348,718 0 0 348,718 GAS TAX 3,106,352 1,700,000 250,000 4,556,352 OTHER 153,472 0 0 153,472 TOTAL 88,020,237 38,144,939 28,644,484 97,520,692 e 0 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT YEAR 5 2003 - 2004 1 BEGINNING FUND BAL 7/1/2003 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 1,207,969 1,100,000 1,313,000 994,969 PUBLIC ART 60,293 0 20,000 40,293 GOLF COURSE 901,995 0 0 901,995 PUBLIC FAClLlTlES FEE 16,166,904 2,259,351 11,678,000 6,748,255 ZONE 5,13,16 PARK FEE 793,665 108,000 0 901,665 PIL AREA 1 NW 755,149 159,676 0 914,825 PIL AREA 2 NE 230,589 225,383 0 455,971 PIL AREA 3 SW 1,860,382 304,684 0 2,165,066 PIL AREA 4 SE 82,066 23,651 0 105,717 TRAFFIC IMPACT FEE 1,634,967 774,753 447,000 1,962,721 TRANSNETlLOCAL 1,611,203 1,700,000 1,700,000 1,611,203 TRANSNEnHlGHWAY 190,158 0 0 190,158 TRANSNET/BIKE 26,975 0 0 26,975 TRANSNETISTP 67,914 0 0 67,914 TDA 36,723 0 0 36,723 STATE GRANTS 856 0 0 856 COUNTY GRANTS 303,679 0 0 303,679 ASSESSMENT DISTRICTS 497,128 0 0 497,128 CFD #I 25,992,974 5,428,836 110,000 31,311,810 CFD #2 2,407 0 0 2,407 CFD #3 0 0 0 0 BTD#2 POINS. LN-AVIARA PKWY 355,687 500,000 0 855,687 BTD#3 CANNON ROAD WEST 2,670,450 0 0 2,670,450 BTDM COLLEGUCANNON 0 0 0 0 FEDERAL GRANTS 24,173 0 0 24,173 SDG&E 0 0 0 0 PLANNED LOCAL DRAINAGE 2,007,774 1,101,717 0 3.1 09,492 SEWER BENEFIT AREAS 759,637 400,000 0 1 ,I 59,637 SEWER CONNECTION 5,099,982 1,426,594 6,191,472 3351 04 SEWER REPLACEMENT 10,430,594 1,300,000 861,835 10,868,759 WATER - RECYCLED WATER 1,070,324 200,000 159,527 1 ,I 10,797 WATER CONNECTION 7,240,081 2,379,524 2,530,428 7,089,177 WATER REPLACEMENT 10,379,453 2,025,000 1,796,272 10,608,181 REDEVELOPMENT BONDS 348,718 0 0 348,718 GAS TAX 4,556,352 1,750,000 0 6,306,352 OTHER 153,472 0 0 153,472 TOTAL 97,520,692 23,167,169 26,807,534 93,880,327 0 a CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT YEAR 6-10 2004 - 2009 I BEGINNING FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNEnLOCAL TRANSNEnHlGHWAY TRANSNETBIKE TRANSNETETP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFD #3 BTW2 POINS. LN-AVIARA PKWY BTW3 CANNON ROAD WEST BTW COLLEGEKANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX BAL 7/1/2004 994,969 40,293 901,995 6,748,255 901,665 914,825 455,971 2,165,066 105,717 1,962,721 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 31,311,810 2,407 0 855,687 2,670,450 0 24,173 0 3,109,492 1 ,I 59,637 335,104 10,868,759 1 ,I 10,797 7,089,177 10,608,181 348,718 6,306,352 REVENUE 4,310,000 0 0 16,573,633 615,337 697,613 1,520,636 1,275,776 3951 15 4,686,500 8,000,000 0 0 0 0 0 0 0 13,322,590 0 0 2,500,000 1,500,000 0 0 900,000 3,715,653 2,000,000 8,274,598 6,500,000 1,000,000 12,279,854 10,125,000 0 8,500,000 EXPENDITURES 2,165,000 0 0 23,275,000 0 0 600,000 2,550,000 500,000 3,985,000 8,000,000 0 0 0 0 0 0 0 38,933,500 0 0 3,226,800 2,000,000 0 0 900,000 11 0,000 0 5,40571 6 2,973,309 797,635 8,031,000 2,874,000 0 555,000 ENDING 3,139,969 40,293 901,995 46,888 1,517,002 1,612,438 1,376,608 890,842 832 2,664,221 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 5,700,899 2,407 0 128,887 2,170,450 0 24,173 0 6,715,145 3,159,637 3,203,986 14,395,450 1,313,162 11,338,031 17,859,181 348,718 14,251,352 OTHER 153,472 0 0 153,472 TOTAL 93,880,327 108,692,305 106,881,960 95,690,673 G 0 0 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT 3 BEGINNING FUND GENERAL CAPITAL CONST. PUBLIC ART GOLF COURSE PUBLIC FACILITIES FEE ZONE 5,13,16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNETILOCAL TRANSNETIHIGHWAY TRANSNEnBlKE TRANSNETKTP TDA STATE GRANTS COUNTY GRANTS ASSESSMENT DISTRICTS CFD #I CFD #2 CFD #3 BTD#2 POINS. LN-AVIARA PW BTD#3 CANNON ROAD WEST BTD#4 COLLEGEKANNON FEDERAL GRANTS SDG&E PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX BAL 7/1/2009 3,139,969 40,293 901,995 46,888 1,517,002 1,612,438 1,376,608 890,842 832 2,664,221 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 5,700,899 2,407 0 128,887 2,170,450 0 24,173 0 6,715,145 3,159,637 3,203,986 14,395,450 1,313,162 11,338,031 17,859,181 348,718 14,251,352 REVENUE 3,000,000 0 1,000,000 16,921,289 373,977 1,370,421 2,724,068 527,284 669,191 7,717,007 800,000 0 0 0 0 0 0 0 6,412,839 (0) 0 1,200,000 1,500,000 0 0 0 7,646,625 9,700,000 10,541,724 20,900,000 2,200,000 16,359,445 22,275,000 0 20,700,000 EXPENDITURES 4,763,000 0 1,765,200 16,391,000 1,840,000 2,980,000 3,425,000 1,410,000 565,000 10,364,000 800,000 0 0 0 0 0 0 0 12,104,500 0 0 514,000 3,664,000 0 0 0 14,265,000 6,600,000 6,675,079 6,575,266 2,369,007 0 0 0 13,325,000 ENDING 1,376,969 40,293 136,795 577,176 50,979 2,859 675,675 8,126 105,023 17,228 1,611,203 190,158 26,975 67,914 36,723 856 303,679 497,128 9,239 2,407 0 814,887 6,450 0 24,173 0 96,770 6,259,637 7,070,631 28,720,184 1,144,155 27,697,475 40,134,181 348,718 21,626,352 OTHER 153,472 0 0 153,472 TOTAL 95690.673 154538.869 110.395.052 139.834.490 .. .. ,. .. c 0 0 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 1999 TO BUILDOUT GRAND TOTALS ALL YEARS 1 BEGINNING TOTAL TOTAL FUND BALANCE REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 378,094 19,810,000 18,811,125 1,376,969 PUBLIC ART 140,293 0 100,000 40,293 GOLF COURSE 901,995 1,000,000 1,765,200 136,795 PUBLIC FACILITIES FEE 21,9ao,100 50,162,077 71,565,000 577,176 ZONE 5,13,16 PARK FEE 291.31 3 1,609,666 I ,850,ooo 50,979 PIL AREA 1 NW 2,704,899 4,377,959 7,080,ooo 2,859 PIL AREA 2 NE 947,315 5,853,360 6,125,000 675,675 PIL AREA 3 SW 663,907 3,304,219 3,960,000 8,126 PIL AREA 4 SE 2,191,464 I ,778,559 3,865,000 105,023 TRAFFIC IMPACT FEE 860,819 17,195,410 I 8,039,ooo 17,228 TRANSNET/LOCAL 91 1,203 18,600,000 17,900,000 1,611,203 TRANSNET/HIGHWAY 190,158 1,455,000 1,455,000 190,158 TRANSNEnBlKE 26,975 755,000 755,000 26,975 TRANSNETETP 1,307,914 0 1,240,000 67,914 TDA 36,723 120,000 120,000 36,723 STATE GRANTS 856 2,084,000 2,084,000 856 COUNTY GRANTS 207,664 596,015 500,000 303,679 ASSESSMENT DISTRICTS 497,128 0 0 497,128 CFD #I 9,528,896 52,068,343 61,588,000 9,239 CFD #2 13,633,699 757,781 14,389,073 2,407 CFD #3 0 6,680,ooo 6,680,000 0 BTD#3 CANNON ROAD WEST 75,450 5,595,000 5,664,000 6,450 BTD#4 COLLEGEICANNON 0 11,845,000 11,845,000 0 FEDERAL GRANTS 24,173 11,707,600 11,707,600 24,173 SDG&E 0 1,600,000 1,600,000 0 PLANNED LOCAL DRAINAGE 4,964,843 14,916,927 19,785,000 96,770 SEWER BENEFIT AREAS 762,637 17,700,000 12,203,000 6,259,637 SEWER CONNECTION 8,896,825 35,239,961 37,066,155 7,070,631 SEWER REPLACEMENT 13,605,890 34,600,000 19,485,706 28,720,184 BTD#2 POINS. LN-AVIARA PW 266,327 6,639,360 6,090,aoo 824,887 WATER - RECYCLED WATER 1,708,432 4,800,ooo 5,364,277 1,144,155 WATER CONNECTION 4,756,920 44,856,682 21,916,127 27,697,475 WATER REPLACEMENT 15,302,849 43,225,000 I 8,392,668 40,134,181 REDEVELOPMENT BONDS 348,71 a 0 0 348~1 a GAS TAX 5,l 13,452 37,450,000 20,937,100 21,626,352 OTHER 153,472 4,210,000 4,210,000 153,472 TOTAL I I 3,380,402 462,592,919 436,138,831 139,834,490 CITY OF CARLSBAD PERSOBL ALLOCATIONS FOR 1998-99 AND la-00 EAHltrlI G OVER 98/99 99/00 (UNDER) FINAL FINAL 1998-99 MAJOR SERVICE AREA BUDGET BLJDGFT AI I OCATFn "- ". ""_. POLICY AND LEADERSHIP GROUP . . - - - -. . . - - I CITY COUNCIL 1 1 0 CITY MANAGER CITY TREASURER CITY CLERK CITY ATTORNEY 9 6.75 (2.25) 0.75 0.75 0 4 4 0 5 6 1 ADMINISTRATIVE SERVICES I ADMINISTRATION INFORMATION SYSTEMS FINANCE RISK MANAGEMENT PURCHASING HUMAN RESOURCES &WORKERS COMP 0 13 14 2 5 8 2 2 17 4 20 6 2 0 5 0 9 1 PUBLIC SAFETY I I POLICE 128 134 6 FIRE 79 79.75 0.75 COMMUNITY DEVELOPMENT COMM DEVELOPMENT ADMINISTRATION 4.75 4.75 0 BUILDING INSPECTION ECONOMIC DEVELOPMENT GEOGRAPHIC INFORMATION PLANNING HOUSING AND REDEVELOPMENT 13 1 2 24 10 13 0 1 0 2 0 24 0 10 0 COMMUNITY SERVICES I LIBRARY 32.25 40.75 8.5 CULTURAL ARTS 3 4 1 PARK PLANNING AND RECREATION MANAGEMENT 3 3 0 RECREATION 15.5 16 0.5 SENIOR PROGRAM 3 3 0 IPUBLIC WORKS I ADMINISTRATION ENGINEERING SERVICES GENERAL SERVICES MAINTENANCE & OPERATIONS 7.25 4 (3) 37 51 14 47.25 51.75 5 81.25 71 (1 0) GRAND TOTAL LABOR FORCE 553 586.5 33.5 a CITY OF CARLSBAD PERS EL ALLOCATIONS FOR 1998-99 AND moo SUMMARY OF REQUESTED LABOR FORCE BY CATEGORY 98/99 99/00 Difference Full Time Personnel 547 582 35 3/4 Time Personnel in Full Time Equivalents 6 4.5 -1.5 Hourly Full Time Equivalent Personnel 111.41 135.55 24.14 TOTAL LABOR FORCE 664.41 722.05 57.64 I I LIMITED TERM EMPLOYEES INTERNS 98/99 99/00 Difference Management Interns Building Inspector Intern GIS Plannina -front counter 0 2 0.5 1 0.5 2! 0.5 0.5 0 1.5 1.5 0 - TOTAL LIMITED TERM EMPLOYEES 2.5 5 2.5 \ CONTINUING APPROPRIA la 0 EXHIBIT D 1998-99 TO 1999-00 AMOUNT Citv Clerk Office furniture & equipment for redesign & reconfiguration of Clerks Department 21,500 Citv Attorney Legal services for Habitat Management Plan Scanner Purchasing NlGP Commodity Code System 7,078 1,000 4,500 Human Resources Cabinets Pulsetaker Survey Mandated Title VI1 training 1,300 15,000 40,000 Records Manaqement Citywide records management / imaging project 1,319,500 - Fire Citizen alert system Office furniture for remodel project Community Development Administration Systems Furniture Public Works Administration Systems Furniture Park Maintenance Holiday Park tot lot sidewalk / curbing Tennis court lighting upgrades (La Costa Canyon & Laguna Riviera) Poinsettia irrigation filter installation Sports lighting control system Playground equipment replacement Enqineering NPDES program Beach erosion program Traffic impact fee program 28,000 38,035 55,000 12,000 40,000 40,000 10,000 36,000 45,000 15,924 6,423 16,100 Engineering - Developer funded Developer deposits for condemnation projects 464,432 Aquatics Solar heating system renovation 95,000 Recreation Computer equipment Harding systems furniture 1,775 5,325 2 CONTINUING APPROPRIAas a EXHIBIT D 1998-99 TO 1999-00 ~~ ~ ~~ ~ AMOUNT Library - Adult learning Literacy Scholarship Account Library - Historical preservation Historic tree inventory and management program 1,363 2,500 Non - Departmental Baiiquitos Lagoon Foundation 20,000 Subtotal General Fund $ 2,342,755 Police Asset Forfeiture Available year-end balance 68,000 COPS Grant Available year-end balance, Bicycle Patrol 169,000 Law Enforcement Block Grant Available year-end balance Cultural Arts - Sister City Available year-end balance, delegation visits 3,371 1,122 Art Gallery Donations Available year-end balance, for art exhibits Recreation Donations Available year-end balance; for park improvements Available year-end balance; for triathlon and luau festival Available year-end balance; for youth sports uniforms and T-shirts 22,500 3,900 10,900 8,800 Library Literacv Grants Available year-end balance 731 9 Misc. State Grants Available year-end balance 17,200 Misc. Federal Grants Available year-end balance CDBG Available year-end balance 128,736 268,387 Water ODerations Utility Billing System Implementation staffing Automatic meter reading (AMR) equipment Flashing arrow signs (traffic control) 12,500 35,000 6,000 * CONTINUING APPROPRIA la a EXHIBIT D 1998-99 TO 1999-00 C11 vouchers Asphalt repairs Valve box adjustment after overlay AMOUNT 2,000 15,000 20,000 Recvcled Water Operations Trench Safety Equipment trailer 5,000 Sewer Maintenance Utility Billing System Implementation staffing Televising 8, evaluating sewer collection system Asphalt repairs Sewer benefit area study Manhole adjustment after street overlay Asphalt I concrete saw with trailer Fleet Replacement Medium replacement trailer 3 small replacement trailers Information Systems Faraday network integration assistance Outside help desk pilot Microsoft Office 2000 upgrade and UNlX tools MS Office and BiTech /IFAS technical training New GIS computer CMWD server HP K380 UNlX box upgrades Remote access equipment 12,500 75,000 10,000 10,000 15,000 5,000 13,000 30,000 23,000 30,000 77,837 22,000 22,000 12,000 25,000 43,000 Subtotal Other Funds $ 1,230,272 Grand Total $ 3,573,027